Loading...
22-033 (04-05) Accept Feasibility Study Spring Valley Road Streetlight District RESOLUTION NO. 22-033 RESOLUTION ACCEPTING FEASIBILITY STUDY AND ORDERING CONSTRUCTION OF CERTAIN PROPOSED PUBLIC IMPROVEMENTS ON SPRING VALLEY ROAD RESIDENTIAL STREET LIGHT DISTRICT AND OVERHEAD UTILITY LINE BURIAL WHEREAS, pursuant to resolution of the council No. 22-033 adopted April 5, 2022, a report has been prepared by the City Engineer (the “Feasibility Study”) with reference to the proposed Improvements for Residential Street Light District and Overhead Utility Line Burial on Spring Valley Road, the improvement of the following: Residential Street Light District Three ornamental light poles installed on the lot lines of the following p roperties listed below: 1318 and 1320 Spring Valley Road 1334 and 1400 Spring Valley Road 1410 and 1420 Spring Valley Road Overhead Utility Line Burial Overhead utility lines buried in front of the following properties listed below: 1318 Spring Valley Road 1320 Spring Valley Road 1326 Spring Valley Road 1334 Spring Valley Road 1400 Spring Valley Road 1410 Spring Valley Road WHEREAS, the Feasibility Study provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the e stimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels; and W HEREAS, a council hearing was held on this public improvement on this day (April 5, 2022) at 6:30 pm The meeting was held via Webex in accordance with the local emergency declaration made by the City of Golde n Valley under Minnesota Statute, section 12.37, ten days’ mailed notice and two weeks’ published notice of the hearing was given, and all persons desiring to be heard were given an opportunity to be heard thereon . NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF GOLDEN VALLEY, MINNESOTA: 1. The Feasibility Study is hereby approved. DocuSign Envelope ID: E84E1CF1-470A-46C4-B405-38DD69C43AE8 Resolution No. 22-033 -2- April 5, 2022 2. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered. 4. The City Engineer is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. 5. The council will consider the assessment of abutting propertie s for at least 20% of the cost of the streetlight improvements pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement of $2,673. 6. The council will consider the assessment of abutting propertie s for at least 20% of the cost of the overhead utility line burial improvements pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement of $51,500. Adopted by the City Council of Golden Valley, Minnesota this 5th day of April 2022. _____________________________ Shepard M. Harris, Mayor ATTEST: _____________________________ Theresa Schyma, City Clerk DocuSign Envelope ID: E84E1CF1-470A-46C4-B405-38DD69C43AE8