2023 Master Fee ScheduleCouncil Review 10/11/2022
1st Consideration 11/1/2022
2nd Consideration 11/15/2022 Approved
2023 Fee Schedule
CITY OF GOLDEN VALLEY FEE SCHEDULE-2023 FEES
TABLE OF CONTENTS
ADMINISTRATION
LICENSES 3
MISCELLANEOUS FEES 6
ENGINEERING 8
FIRE DEPARTMENT 10
INSPECTIONS DEPARTMENT 12
PLANNING DEPARTMENT 15
POLICE DEPARTMENT 17
PUBLIC UTILITIES 18
PARK & RECREATION
RECREATION 21
BROOKVIEW 24
BROOKVIEW GOLF COURSE / 316 BAR & GRILL 26
DONATIONS 31
2
ADMINISTRATION
LICENSES CITY CODE SECTION
RENEWAL
DATE
2023 ADOPTED
FEE
AMUSEMENT DEVICES no longer licenced after 2022
AUCTIONING
CHICKEN COOP LICENSE
Initial Application Fee $75.00
Annual License Renewal Fee 1-Apr $25.00
CIGARETTES - TOBACCO PRODUCTS
Over the counter 1-Jan $450.00
Investigation Fee each individual/person $200.00
DOG KENNEL
Per Kennel 1-Apr $200.00
FIREWORKS
Retail consumer fireworks that sell other items 1-May $100.00
Retail consumer fireworks, retailers that sell only fireworks 1-May $350.00
GARBAGE HAULERS (See also Recycling Haulers)
Base Fee per Hauler $400.00
Per Vehicle 1-Apr $100.00
GASOLINE STATIONS
Dispensers 1 - 4 (each)Per Location 1-Apr $75.00
Over four dispensers (each)Per Location $50.00
LIQUOR LICENSING Section Code 4-41
Liquor License Processing Fees - On-sale, Off-sale, Beer, Wine, and Sunday sale (Non-refundable)
New License
Investigation Fee - per establishment $1,500.00
Administrative Fee $750.00
Renewal
Investigation Fee - each individual/person $200.00
Administrative Fee $250.00
Miscellaneous Change thru the year
Investigation Fee - each individual/person $200.00
Administrative Fee $100.00
Liquor License State Law 340A.408
Sunday sale 1-Jul $200.00
Off-sale 1-Jul $200.00
Auctioneers do not need to be licensed in the City of Golden Valley. However,
they have to show us a copy of a license or bond from the county or state and
provide us a letter on the date, time and place of the auction.
3
ADMINISTRATION
LICENSES CITY CODE SECTION
RENEWAL
DATE
2023 ADOPTED
FEE
On-sale 1-Jul $8,000.00
Wine & Beer On-sale 1-Jul $2,000.00
Club 1-Jul
up to 200 members $300.00
200-500 members $500.00
501-1,000 members $650.00
1,001-2,000 members $800.00
2001-4000 members $1,000.00
4001-6000 members $2,000.00
Over 6000 members $3,000.00
Liquor - On-sale 1-Jul
Non-Intoxicating Malt $500.00
Brewer Tap Room $600.00
Cocktail Room $600.00
Liquor - Off-sale 1-Jul
Non-Intoxicating Malt $150.00
Brew Pub - Malt Liquor $200.00
Small Brewer $200.00
Distilled Spirits $200.00
Liquor - Temporary Non-Intoxicating/Intoxicatng Malt Liquor License $100.00
MASSAGE THERAPIST - INDIVIDUAL
Certificate each individual/person 1-Jan $100.00
Investigation fee each individual/person $200.00
MASSAGE THERAPIST PREMISE LICENSE 1-Jan
Operating location new applicant and renewal $500.00
Investigation fee each individual/person $200.00
MOBILE VENDING/SERVICES
Annual vendor registration 1-Jan $40.00
Event permits
City parks (up to three days)$50.00
Other non-residential zoning districts (up to three days for targeted events $30.00
or seasonally for regularly occuring events)
R-1 and R-2 zoning districts (up to two one-day permits in a 12 month period)$30.00
R-3 and R-4 zoning districts $30.00
NEW/USED VEHICLE SALES 1-Sep $400.00
PEDDLERS AND SOLICITORS 1-Jan
Each Employee $30.00
PAWNBROKER AND PRECIOUS METAL
Dealer Location 1-Jan $5,000.00
Dealer 1-Jan $400.00
Investigation Fee $1,500.00
Background check / Identification
card
4
ADMINISTRATION
LICENSES CITY CODE SECTION
RENEWAL
DATE
2023 ADOPTED
FEE
Non-refundable administrative fee $500.00
APS Transaction Fee $1.30
RECYCLING HAULERS (MULTI FAMILY APARTMENT)1-Apr
Base Fee per Hauler $400.00
Per Vehicle $100.00
RENTAL DWELLING LICENSE
Single Family Dwellings
One Unit Dwelling License 1-Jul $125.00
Re-inspection $100.00
Twin Homes & Duplexes License per Dwelling Unit
Per Dwelling Unit 1-May $125.00
Re-inspection per unit/per address $100.00
Condominiums & Townhomes License Per Dwelling Unit
Per Dwelling Unit 1-Sep $125.00
Re-inspection per unit/per address $100.00
Group Homes / homes with services
License Per Dwelling Unit 1-Nov $125.00
Re-inspection per unit/per address $100.00
Multiple Unit Dwelling 3 or more units per building 1-Mar
3 - 50 Units $175.00
51 - 150 Units $225.00
151 + Units $300.00
Re-inspection per unit/per address $100.00
Star Program Fees Based on participation level and discount is capped at 151 units for market rate re
Base Rate $35/unit
Level 1 $20/unit
Level 2 $12/unit
Level 3 $8/unit
Level 4 $0/unit
SEXUALLY ORIENTED BUSINESS
License Fee per operating location 1-Jan $5,000.00
Investigation Fee $1,500.00
Non-refundable administrative fee $500.00
Tetrahydrocannabinol (THC) Retail Establishment
Tetrahydrocannabinol (THC) Products (new applicant and renewal)$450.00
Over the counter
Investigation Fee each individual/person $200.00
5
ADMINISTRATION
MISCELLANEOUS FEES
2023
ADOPTED
FEE
ADDRESS CHANGE Residential $50.00
Non-Residential $100.00
ADMINISTRATIVE PERMIT $75.00
Seasonal, Farm Produce, Christmas Tree Sales, etc in Commercial
Zoning District
ADMINISTRATIVE CITATIONS
1st citation per violation $100.00
2nd citation per violation $250.00
3rd citation per violation $500.00
per violation $500.00
CITATION APPEAL filing fee per violation $25.00
CERTIFICATION FEE (SPECIAL ASSESSMENT)$30.00
CITY CEMETERY
Cemetery Plot $500.00
Open/Close Fee:
Crematory (up to 2 per lot)per lot $200.00
Burial $750.00
CONDUIT DEBT ISSUANCE
Issuance of Debt (Amount of Bonds)1.00%
Refinancing Issuance Fees (Amount of Bonds)0.50%
Host City (plus pay for legal publication)$500
DOCUMENTS
City Code
Full book in binder Cost of book, binder +20%
All information is on the Municode website at:
https://library.municode.com/mn/golden_valley/codes/code_of_ordinances
City Maps
10.00
Copies Minnesota Rules, part 1205.0300, subpart 4
Black & White - letter or legal size documents of 100 or fewer pages .25/page
Color - letter or legal size documents .33/page
Plats, Record Drawings, Other Plats (i.e. address maps, building plans,comp plan,
zoning)
4th citation and subsequent
violations in 12 month period
6
ADMINISTRATION
MISCELLANEOUS FEES
2023
ADOPTED
FEE
DOCUMENTS (continued)
Digital Format
Aerial photography time & material
Custom Maps or Map Layers time & material
Topography time & material
Special Assessment Search non-owner $15.00
Video Reproduction per tape, DVD, CD + shipping $20.00
DOMESTIC PARTNER REGISTRATION
Initial Registration $40.00
Amendment/Notice of Termination $25.00
ELECTRIC VEHICLE CHARGING STATION
0 - 3 hours / hour $0.90
3+ hours / hour $1.20
PARADE/SPECIAL EVENT $25.00
PERSONNEL (OVERTIME WOULD BE 1.5 X RATE)
Staff Attorney $108/hr
7
ENGINEERING
2023 ADOPTED
FEE
EASEMENT VACATION (EACH REQUEST) $500.00
EQUIPMENT CHARGE (Per Hour) (Personnel will be added)
Utility Vehicle does not include personnel $55.00
Utility Equipment does not include personnel $250.00
Heavy Equipment does not include personnel costs $175.00
Medium Equipment does not include personnel $100.00
Light Equipment not include personnel $55.00
FLOODPLAIN SEARCH LETTER $50.00
FORCED TREE REMOVAL cost + 20%
MICROMOBILITY SHARING OPERATIONS
Implementation and oversight of License Agreement $500.00
PERSONNEL (OVERTIME WOULD BE 1.5 X RATE)
Public Works Employee $70.00
NATIVE VEGETATION LANDSCAPE PERMIT $100.00
RIGHT OF WAY
Access Permit-Temporary $50.00
Delay Penalty - Right of Way Minn. Rule 7819.1000 subp. 3 $500/day
Driveway Replacement Permit $125.00
In Boulevard Excavation Permit per opening $200.00
In Pavement Excavation Permit per opening (includes curb alterations)$400.00
Obstruction Permit-Permanent, per obstruction (includes courtesy benches,structures, walls, lighting, signage)$150.00
Obstruction Permit-Permanent, (includes fences, landscaping, trees, shrubs, vegetation, irrigation)$50.00
Obstruction permit-Temporary (includes use of parking lane, sidewalk, boulvard, driving lane, alley)$100.00
RIGHT OF WAY (continued)
Overhead Utility Repair per location No Charge
Underground Utility
0 to 100 Feet
Administrative permit fee $250.00
per foot fee $1.50
over 100 Feet
Administrative permit fee $400.00
Sewer jet, vac truck, sewer camera
Front end loader, 360 Backhoe, Pickup sweeper, Tandem axle truck, Aerial truck
Single axle dump truck, Water truck, Tractor backhoe, Utility tractor/ accessory, 15 ft cut lawn mower, brush
chipper, asphalt roller, asphalt paver, skid steer, tool cat, trackless
Truck - one ton and under, Air compressor, Water pump, Generator, Steamer, Asphalt/saw, Concrete, Cable
tracer)
8
ENGINEERING
2023 ADOPTED
FEE
per foot fee $1.00
Service Drop meeting conditions
Not parallel to right-of way at least 10' from any city facility or utility, less
than 1' wide, and depth in accord with law or, if none, industry standard No charge
STREET ASSESSMENTS
Residential/Single Family/Duplex, per dwelling unit on local street
Multi Unit Residential (more than 2 dwelling units) on local street
Residential/Single Family/Duplex, per dwelling unit on state aid street
Multi Unit Residential (more than 2 dwelling units) on state aid street
Other Zonings, Local Streets
Other Zonings, State Aid Streets
Administrative Fee for Driveways and/or Sanitary Sewer repairs $250/maximum
Seven percent of total or maximum fee -whichever lessor)
Low Income Level for Senior/Retired due to Disability Deferral Current HUD Limits
STORMWATER MANAGEMENT
Projects that do not require watershed review - No post construction BMPs $100.00
New Home Construction - no watershed review - No post construction BMPs $400.00
Projects that require watershed review or require Post Construction BMPs $600.00
TREE AND LANDSCAPE PERMIT
Single Family Residential $150.00
All Other Projects $500.00
Tree Mitigation Fee (per tree)500/tree
UTILITY PERMITS
Water Meter Permit $150.00
Water Tapping Permit $150.00
Water Cut-off Permit $150.00
Sewer Permit (connection)$150.00
Sewer Repair Permit $150.00
Sewer Cut-off Permit $150.00
Sewer & Water Permits for Commercial Projects (Fee Based on Plumbing Value and
if there is a Plan the Plan Review Fee would be 65% of the Fee)
State Surcharge - each permit $1.00
Sewer Repair CCTV Inspection $150.00
WETLAND MANAGEMENT (PLUS PROFESSIONAL FEES IF NECESSARY)$200.00
WIRELESS AESTHETICS
Collocation Agreement
Rent to collocate on the City structure Up to $150.00
Maintenance associated with the collocation $25.00
Electrical Service-monthly
Per radio node less than or equal to 100 maximum watts $73.00
Per radio node over 100 maximum watts $182.00
Or actual costs of electricity, if the actual exceed the foregoing
When a project is approved the street assessment will be considered following the special assessment policy.
9
FIRE DEPARTMENT
2023
ADOPTED
FEE
CARSEAT INSTALLATIONS/INSPECTIONS
Non-resident $20.00
Each additional $10.00
EQUIPMENT CHARGE PER HOUR
Fire Engine (includes personnel)$250.00
Fire Rescue Truck (includes personnel)$250.00
Fire Aerial Truck (includes personnel)$350.00
Police and Fire Rescue Truck (includes personnel)$250.00
Fire Boat (includes personnel)$75.00
Fire ATV (includes personnel)$75.00
Fire Life Safety Trailer (includes personnel)$200.00
Gas Lines, construction damage with Fire Department Response $250.00
FIRE COMMERCIAL COOKING VENTILATION SYSTEMS (HOOD AND DUCT CLEANING)
Inspection $75.00
Re-inspection $150.00
FIRE SPRINKLER, FIRE ALARMS & SPECIAL FIRE SUPPRESSION SYSTEMS
New Installation or Alteration of Existing
Ref. MN Rules 1300.0160,subd. 1, subd. 2
Total valuation based on below fee schedule:
FROM TO FEES
0 $500 $50.00
501 $2,000 $50.00 for the first $500 plus $3.05 for each additional $100 or
fraction thereof, up to and including $2000
2,001 $25,000 $95.75 for the first 2,000 plus $14.00 for each additional $1,000 or
fraction thereof, up to and including $25,000
25,001 $50,000 $417.75 for the first $25,000 plus $10.95 for each additional $1,000
or fraction thereof, up to and including $50,000
50,001 $100,000 $691.50 for the first $50,000 plus$ $7.34 for each additional $1,000
or fraction thereof, up to and including $100,000
100,001 $500,000 $1,058.50 for the first $100,000 plus $6.00 for each additional $1,000
or fraction thereof, up to and including $500,000
500,001 $1,000,000 $3,458.50 for the first $500,000 plus $5.00 for each additional $1,000
or fraction thereof, up to and including $1,000,000
1,000,001 and up $5,958.50 for the first $1,000,000 plus $4.00 for each additional
1,000 or fraction thereof
VALUATION
10
FIRE DEPARTMENT
2023
ADOPTED
FEE
FIREWORKS/PYROTECHNIC SPECIAL EFFECTS
Permit fee includes required rental of fire engine and crew for one hour stand-by at display $350.00
FLOOR DRY (ACCIDENTS)per bag $20.00
FUEL TANKS
Permanent above/underground
Use Fire Sprinkler, Fire Alarms & Special Fire Suppression Systems Table Above
Fuel, Compressed Gasses, Hazardous Materials, and Associated Appliances & Piping
Temporary LP Tank/Fuel Tank per tank $50.00
PERSONNEL (OVERTIME WOULD BE 1.5 X RATE)
Full-time Fire Personnel (scheduled time after hours -minimum 2 hours)$75/hr
Paid On-Call Fire Personnel $35/hr
TENT/CANOPY INSPECTIONS - REQUIRED FOR TENT EXCEEDING 400 SQ FT AND $50.00
canopies exceeding 700 sq ft (per site)
each additional tent and/or canopy (per site)$25.00
WEED ERADICATION/LAWN MOWING - PER HOUR (SEE MINIMUMS)
Occupied/unoccupied residential/commercial property - 3 hour minimum $125/hr
SECOND OR MORE VIOLATIONS IN ONE SEASON A 12 - MONTH PERIOD
Occupied/unoccupied residential/commercial property - 3 hour minimum $250/hr
11
INSPECTIONS DEPARTMENT
2023
ADOPTED FEE
WORKING WITHOUT A PERMIT - INVESTIGATION FEE
The greater of $100 or 25% of the permit fee, not to exceed $500. Fee not to exceed permit fee.
www.goldenvalleymn.gov/permits/pdf/building-fees.pdf
WHEN APPLICABLE, A PLAN REVIEW FEE WILL BE ADDED TO PERMIT APPLICATIONS
65% of permit
fee
BUILDING PERMIT FEES BASED ON FEE SCHEDULE BELOW.
Mandatory State Surcharge: per permit is a minimum of .50 and when a permit
fee is over $1,000 in value the state surcharge is .0005 times the permit value.
Surcharge is remitted to MN State Treasurer.
Permit Cancellation Policy: 80% of the permit fee will be returned upon written
notice of cancellation. If job has been started no refund will be made. If an inspection has been done no refund can
HVAC CONTRACTORS LICENSE FEE (April 1-March 31)$75.00
100.00
BUILDING PERMITS BASED ON SCHEDULE BELOW:
Mandatory State Surcharge: per permit is a minimum of .50 and when a permit
fee is over $1,000 in value the state surcharge is .0005 times the permit value.
Surcharge is remitted to MN State Treasurer.
Cancellation and Refund Policy
Permits: 80% of the permit fee will be returned refunded upon written notice of cancellation.
If an inspection has been done no refund can be given. Refunds are subject to administrative policies.
Plan Review: Plan review fees are non-refundable once plan review has been started
Surcharges, Electronic Document Fees and other related fees: Non-refundable
BUILDING PLAN/STORAGE RETRIEVAL $50.00
BUILDING PERMITS (Ref. MN Rules 1300.0160,subd. 1, subd. 2)
Table 1
Total valuation based on below fee schedule:
FROM TO FEES
1 $500 $50.00
501 $2,000 $50.00 for the first $500 plus $3.05 for each additional $100 or fraction
thereof, up to and including $2000
2,001 $25,000 $95.75 for the first 2,000 plus $14.00 for each additional $1,000 or
fraction thereof, up to and including $25,000
REINSPECTION FEE
The fee will be charged by the Building Official or designee where additional time and expense is incurred by the
City to achieve code compliance.
VALUATION
ALL BUILDING PERMIT VALUATION DATA WILL BE BASED ON THE CURRENT INTERNATIONAL CODE
COUNCIL OR CONTRACT
12
INSPECTIONS DEPARTMENT
2023
ADOPTED FEE
25,001 $50,000 $417.75 for the first $25,000 plus $10.95 for each additional $1,000 or
fraction thereof, up to and including $50,000
50,001 $100,000 $691.50 for the first $50,000 plus$ $7.34 for each additional $1,000 or
fraction thereof, up to and including $100,000
100,001 $500,000 $1058.50 for the first $100,000 plus$ $6.00 for each additional $1,000
or fraction thereof, up to and including $500,000
500,001 $1,000,000 $3,458.50 for the first $500,000 plus $5.00 for each additional $1,000
or fraction thereof, up to and including $1,000,000
1,000,001 and up $5,958.50 for the first $1,000,000 plus $4.00 for each additional $1,000
or fraction thereof
ELECTRICAL
State Surcharge - each permit $1.00
Minimum Fee
Minimum permit fee is $50.00 plus $1.00 State surcharge. This is for one inspection only.
Minimum fee for rough-in inspection and final is $100.00 plus $1.00 State surcharge.
Maximum Fee
Maximum fee for single family dwelling or townhouse not over 200 Amps is $200.00
plus $1.00 State surcharge. Maximum of 3 inspections.
0 to 300 Amp 50.00
400 Amp 58.00
Add $14.00 for each additional 100 Amps.
Circuits and Feeders
0 to 30 Amp 8.00
31 to 100 Amp 10.00
Add $5.00 for each additional 100 Amps.
Apartment Buildings per unit $85.00
house wiring
Reinspection fee $100.00
Remote Control and Signal Circuits per device $0.75
Retro Fit Lighting per fixture $0.65
Saver Switch $35.00
Service Replacement $100.00
Sign Transformer per transformer $8.00
Solar PV Installation Per Minnesota Solar PV System most current Fee Chart
Street Lights and parking lot lights per each standard $4.00
SubPanel Replacement $40.00
The inspection fee for the installation, addition, alteration or repair of each circuit, feeder,
Fee per unit of an apartment or condominium complex. This does not cover service and house
13
INSPECTIONS DEPARTMENT
2023
ADOPTED FEE
Swimming Pool includes maximum 2 inspections $100.00
ELECTRICAL (continued)
Traffic Signals per each standard $7.00
Transformers and Generators
up to 10 KVA $10.00
11 - 74 KVA $40.00
75 - 299 KVA $60.00
over 300 KVA $150.00
MECHANICAL: HVAC, GAS PIPING, REFRIGERATION AND FIREPLACE
Includes all types of fireplaces - masonry, gas, gas log, gas insert, etc.
Value Permit charge
0 $1,000 $50.00
1,001 $5,000 $75.00 + 2.60%
5,001 $10,000 $179.00 + 2.15%
10,001 $25,000 $286.50 + 1.85%
25,001 $50,000 $534.00 + 1.65%
50,001 and up $946.50 + 1.30%
PLUMBING AND PIPING FIXTURES
Includes hydraulic sewer valves, rain water leaders, and alteration to existing systems.
Value Permit charge
0 $1,000 $50.00
1,001 $5,000 $75.00 + 2.60%
5,001 $10,000 $179.00 + 2.15%
10,001 $25,000 $286.50 + 1.85%
25,001 $50,000 $534.00 + 1.65%
50,001 and up $946.50 + 1.30%
ELECTRONIC DOCUMENT FEE
Based on Permit Fee permits with fixed fee or charged by item 2.85%
do not have an electronic fee
HOUSE/BUILDING
Moving $500.00
Demolition $500.00
PERMIT CANCELLATION
Request must be made within 180 days of permit issue date and no inspections have been performed
80% of permit
fee
SEWER ACCESS CHARGE (SAC) -CITY per unit $750.00
No surcharge or plan review fees will be returned (includes the fees for stormwater management, right-of-way
ROW) and tree preservation permits). Subject to Department Policies.
14
INSPECTIONS DEPARTMENT
2023
ADOPTED FEE
PARTIAL OCCUPANCY APPROVAL
Partial Occupancy form Administrative fee $300.00
WATER ACCESS CHARGE (WAC) -CITY per unit $2,000.00
WAC Charges shall be based on the Residential Equivalent Connection Units (REC) resulting from the use of the
City Water/Sewer systems. The REC shall equal the number of SAC Units determined under the SAC Determination
by the Metropolitan Council to which the building permit relates.
SAC Charges shall be based on the Residential Equivalent Connection Units (REC) resulting from the use of the
City Water/Sewer systems. The REC shall equal the number of SAC Units determined under the SAC Determination
to which the building permit relates.
15
PLANNING DEPARTMENT
2023
ADOPTED
FEE
RECORD REAL ESTATE ITEMS
Easements, CUP, PUDs, Development Agreements, Simplifile Hennepin County fee
CONDITIONAL USE ITEMS
Conditional Use Permit $400.00
Amendment to Conditional Use Permit $300.00
Extension $125.00
FUTURE LAND USE MAP AMENDMENT $1,000.00
OUTDOOR SERVICE AREAS
Outdoor Service Areas in Targeted Zoning Districts Application $200.00
Renewal Fee $100.00
PARK DEDICATION FEES Minnesota Statute 462.358
6% of Land
Value
PLANNED UNIT DEVELOPMENT
Preliminary PUD Plan $1,000.00
Final PUD Plan $1,000.00
Extension $150.00
PLANNED UNIT DEVELOPMENT - MAJOR AMENDMENT $500.00
PLANNED UNIT DEVELOPMENT - MINOR AMENDMENT $250.00
PLANNED UNIT DEVELOPMENT - ADMINISTRATIVE AMENDMENT $100.00
SIGN PERMIT
Temporary Sign $50.00
Special Temporary Sign Additional $50.00
Permanent Sign $100.00
Building and Electrical permits maybe required.
SUBDIVISION $400.00
Extension to Submit Final Plat $150.00
SUBDIVISION - MINOR $250.00
Extension to Submit Final Plat $150.00
TAX PARCEL DIVISION $100.00
TEMPORARY RETAIL SALES for each sale, up to five days $150.00
VARIANCE FROM ZONING CODE
Single-Family Residential Zoning District $200.00
All other Zoning Districts $300.00
16
PLANNING DEPARTMENT
2023
ADOPTED
FEE
Extension $150.00
Appeal of Determination $100.00
ZONING EXAMINATION LETTER $100.00
ZONING MAP AMENDMENT $500.00
ZONING PERMIT (Fence, Shed, Deck, Patio, Garden Structure)$25.00
17
POLICE DEPARTMENT
2023
ADOPTED
FEE
ALARM SYSTEM - FALSE ALARMS (12 month period beginning March 1 of each year upon given notice)
1-3 false alarms $0.00
4-10 false alarms $100.00
11-15 false alarms $150.00
16 or more false alarms $250.00
ANIMAL CONTROL
Impound Fee for dogs $50.00
Boarding Fee for dogs and cats per day (7 day maximum)$20.00
Dangerous Dog License $250.00
EQUIPMENT CHARGE PER HOUR
Police Rescue Truck (includes personnel)$250.00
Squad Car (includes personnel)$110.00
FINGERPRINTING
Golden Valley Resident $10.00
Anyone employed in Golden Valley $25.00
Additional Card $5.00
FORFEITED DWI VEHICLE ADMINISTRATIVE FEE $1,000.00
NUISANCE SERVICE CALL FEE (AFTER THREE CALLS)$250.00
PERSONNEL (OVERTIME WOULD BE 1.5 X RATE)$109/hour
Off Duty Police Officer (minimum applies as determined by
City Manager/designee)
18
PUBLIC UTILITIES
Rates begin with any billing after April 1
2023
ADOPTED FEE
RESIDENTIAL UTILITY RATES - QUARTERLY BILLING
includes all residential classes except those classified as apartments)
Inspection Fee for Fire lines $6.00
Penalties (for late payment)10%
Sanitary Sewer (in 1000 gallons)
Residential (per dwelling unit) (Flat Rate)- 5 and under units-winter qtr consumption $86.60
Residential (per dwelling unit) (Flat Rate) - 6-15 units-winter qtr consumption $89.84
Residential (per dwelling unit) (Flat Rate) - 16-19 units-winter qtr consumption $98.81
Residential (per dwelling unit) (Flat Rate) - 20-25 units-winter qtr consumption $112.66
Residential (per dwelling unit) (Flat Rate) - 26-39 units-winter qtr consumption $147.61
Residential (per dwelling unit) (Flat Rate) - 40-59 units-winter qtr consumption $169.98
Residential (per dwelling unit) (Flat Rate) - 60-79 units-winter qtr consumption $182.84
Residential (per dwelling unit) (Flat Rate)- 80 to 99 units-winter qtr consumption $206.73
Residential (per dwelling unit) (Flat Rate)- 100 and over units-winter qtr consumption $245.34
Recycling -
Residential curbside (per unit) -Recycling $18.00
Organics (Starting January 2022)
Residential curbside (per unit) -Organics $18.00
Storm Sewer Utility Rate
Charge for a Residential Equivalent Factor of 1.00 $84.00
Each single family residential property is considered to be 1/3 of an acre.
Street Lights
Ornamental (per unit)$13.57
Overhead (per unit)$9.35
Water
Minimum fee, includes up to 1,000 gallons of flow $21.00
Water meters up to and including 1"$21.00
Water meters over 1" and including 2"$112.85
Water meters over 2" and including 4"$155.40
Water meters over 4"$196.77
Above 1,000 gallons of flow per quarter up to 79,000 (per 1,000 gallons)$7.06
80,000 gallons and over of flow per quarter (per 1,000 gallons)$7.09
Emergency Water Supply - per 1000 gallons $0.30
2.43
Irrigation Accounts (All) - Monthly Billing
Minimum fee, includes up to 1,000 gallons of flow $21.00
Water rate per 1000 gallons $7.09
All apartment buildings over 50 units will be billed monthly beginning April 1, 2018
Water Connection Fee (Fee charged by State for each water hookup)
19
PUBLIC UTILITIES
Rates begin with any billing after April 1
COMMERCIAL & INDUSTRIAL UTILITY RATES -MONTHLY BILLING
Inspection Fee for Fire lines
Penalties (for late payment on monthly billings)
Sanitary Sewer
Water meters up to and including 1"
Water meters over 1" and including 2"
Water meters over 2" and including 4"
Water meters over 4"
Based on per 1,000 gallons
Note: Water Meter Flow is used to establish sewer flow unless a
separate sewer flow meter has been established.
Storm Sewer Utility Rate
Charge per acre for property X Residential Equivalency Factor (REF)
Street Lights
Ornamental (per unit)
Overhead (per unit)
Water Connection Fee -State charge for each water hookup -(January 1)
Water Usage:
Minimum fee, includes up to 1,000 gallons of flow
Water meters up to and including 1"
Water meters over 1" and including 2"
Water meters over 2" and including 4"
Water meters over 4"
Water rate per 1000 gallons
Emergency Water Supply -per 1000 gallons
OTHER UTILITY FEES
Driveway Covers -Replace
Hydrant Maintenance (Private)
Materials, parts, labor
Hydrant Meter Rental
Residential (per day+ consumption)
Commercial (per day+ consumption)
Commercial (rate per day after 60 days+ consumption)
Deposit (residential)
Deposit (commercial)
Repair Parts
Meter Read -Manual Read of Water/Sewer Meter/Upgrade-4th Letter
Meter Testing (to be returned if meter is in error of 5% or more of read)
20
2023
ADOPTED FEE
$2.00
5%
$14.64
$37.71
$52.45
$66.83
$6.34
$28.00
$4.52
$3.12
$0.81
$21.00
$21.00
$37.62
$51.80
$65.59
$7.09
$0.30
$150.00
Actual Cost+ 20% ad min
$2.00
$5.00
$10.00
$300.00
$1,750.00
cost +20%
$100.00
$50.00
PUBLIC UTILITIES
Rates begin with any billing after April 1
2023
ADOPTED FEE
Sanitary Sewer Inspections and Compliance Fees
Ordinance No. 352
Noncompliant discharge into sanitary sewer(or refuse inspection)
Single Family Residential $500/month
Non Single Family Residential $1,000/month
Application fee for noncompliant winter discharge into sanitary sewer per month $250.00
Application fee for certificate of sewer regulations compliance
Single Family Residential (R-1 or R-2), per structure $250.00
Non Single Family Residential (all other structures), per structure $750.00
Video Review
Residential video record completed by private licensed plumber $100.00
Non-residential video record completed by private licensed plumber $375.00
Sump Pump Inspection $50.00
Water Meter and Parts (All)At cost +20%
Water on/off per each event
business day)$25.00
after hours)$175.00
21
PARK & RECREATION
2023 ADOPTED FEE
ACTIVITIES
Rates/Fees are printed in Seasonal Activities Catalogs (Spring/Summer, Fall, Winter).
Staff will pro-rate and make program/event/activity fee adjustments as necessary.
Adult (Non-resident fees applicable)
Individual Athletics/Fitness $20.00-$150.00
Programs $1.00-$150.00
Special Events $0-$75
Open Gyms
Drop-in fee $5.00
10-time Punch Pass $40.00
55+ Adult Newsletter Subscription $5.00-$8.00
Presentation/Discussion Groups $1.00-$5.00
Adult Trips & Sports Leagues (Non-resident fees non-applicable)
Trips - 1-6 day Market Rate
Sports Leagues $100.00-$900.00
Sports League Cancelation Fee $40.00
Youth
Athletics $10.00-$200.00
Programs $5.00-$175.00
Trips/Events $0.00-$125.00
BACKYARD INDOOR PLAYGROUND
Daily Rates
Resident $5.00
Non-resident $6.00
Twilight (last hour of daily operation)$2.00
Socks $2.00
10 Punch Pass - Resident $40.00
10 Punch Pass - Non-resident $50.00
Group Rates
Pre-reservation required; Ratio of 10:1 youth/adult; 1 payment only
Groups of 15 kids or more, max 50, includes use of a party room when available $5.00
Party Rates
Includes 2 hrs party room; 10 wristbands; extra wristbands may be
Resident $110.00
Non-resident $130.00
Picnic Packages
Three One SIx Bar + Grill will provide food package options for party groups.
Entire Playground Private Rental
Includes 2 hrs exclusive use of playground and 2 party rooms
Resident $250.00
Non-resident $280.00
Additional hour $100.00
OTHER PARK & RECREATION FEES
Athletic Field
Resident - no attendent per hour/per field (min 2 hrs)$25.00
Resident - with attendent per hour/per field (min 2 hrs)$40.00
purchased for daily rate (max of 20 people total per party room)
22
PARK & RECREATION
2023 ADOPTED FEE
Non-resident - no attendent per hour/per field (min 2 hrs)$35.00
Non-resident - with attendent per hour/per field (min 2 hrs)$50.00
With Lights per hour/per field $10.00
All day tournament
Resident per day/per field $150.00
Non-resident per day/per field $250.00
Field Attendant per hour $15.00
Beer/Wine Permit (only with Picnic Shelter rental)$50.00
Davis Community Center Gym
Resident per hour $30.00
Non-resident per hour $40.00
Brookview Only Entire Park Use (includes all facility rental fees)
Resident up to 12 hrs $850.00
Non-resident up to 12 hrs $1,200.00
Equipment Use Fee Permit
Inflatable, climbing wall, zipline, etc Each $25.00
Gazebo/Sun Shelter
Resident per hour (min 2 hrs)$25.00
Non-resident per hour (min 2 hrs)$35.00
Hockey Rink (outdoor)
Resident per hour $25.00
Non-resident per hour $35.00
Community Garden Container
Resident $35.00
Non-resident $50.00
Dog Bag Station Sponsorship
Initial Sponsorship $375.00
Annual Renewal Sponsorship $160.00
Park Shelter Building
Resident per hour (min 2 hrs)$40.00
Non-resident per hour (min 2 hrs)$50.00
Key Deposit refundable when returned $25.00
Picnic Pavilion Rental at Brookview
Small Pavilion (up to 50 people)
Resident $115.00
Non-resident $150.00
Large Pavilion (up to 100 people)
Resident $150.00
Non-resident $200.00
Picnic Shelter Damage & Use Guideline Compliance Deposit
Charged at time of reservation and refundable $250.00
Professional Photo/Video Use of Specific Park Area (plus facility rental fees)
Resident per hour $100.00
Non-resident per hour $125.00
Sand Volleyball Courts at Brookview (2 courts)
23
PARK & RECREATION
2023 ADOPTED FEE
Resident per hour/per court $15.00
Non-resident per hour/per court $20.00
With Lights per hour/per field $10.00
Tennis or Pickleball Court
Tournament
Resident per day/per court $75.00
Non-resident per day/per court $100.00
Court
Resident per hour $7.00
Non-resident per hour $9.00
Youth Athletic Association
Player Field Maintenance Fee
Resident & Non-resident per person/per season $8.00-$12.00
Organization Field Maintenance Fee per organization/per season $100.00-$2,000.00
24
DEPOSIT Deposit is due at time of booking to hold reservation.
500 refundable damage deposit is due 30 days prior to rental.
All rentals include:Set-up / take-down and AV equipment
RESIDENT (Live or work in GV, book 24 months in advance for 14.5 hr, 12 months in advance for hourly)
CapacityHours122hrmin
North 25 2 hr min
South 25 2 hr min
Both 70 2 hr min
20 2 hr min
20 2 hr min
Capacity Hours Mon-Thur Fri Sat Sun
200 14.5 hr (10 am-12:30 am) $1400 + tx $1800 + tx $1200 + tx
200 Hourly (2 hr min)$100/hr + tax $120/hr + tax $150/hr + tax $100/hr + tax
North 72 Hourly (2 hr min)$65/hr + tax $70/hr + tax $90/hr + tax $65/hr + tax
South 72 Hourly (2 hr min)$65/hr + tax $70/hr + tax $90/hr + tax $65/hr + tax
N/A N/A
40 2 hr min
10 2 hr min
50 2 hr min
200
Event/Ceremony Fee (extra set-up, PA)N/A
Special Set-up/Clean-up
Banquet/Event Attendant
Drapery
Outdoor Heater (each)
Stages
NON-RESIDENT (Book 22 months in advance for 14.5 hr, 10 months in advance for hourly)
CapacityHours122hrmin
North 25 2 hr min
South 25 2 hr min
Both 70 2 hr min
20 2 hr min
20 2 hr min
Capacity Hours Mon-Thur Fri Sat Sun
200 14.5 hr (10 am-12:30 am) $1600 + tx $2000 + tx $1400 + tx
200 Hourly (2 hr min)$130/hr + tax $150/hr + tax $180/hr + tax $130/hr + tax
North 72 Hourly (2 hr min)$80/hr + tax $85/hr + tax $105/hr + tax $80/hr + tax
South 72 Hourly (2 hr min)$80/hr + tax $85/hr + tax $105/hr + tax $80/hr + tax
N/A N/A
40 2 hr min
10 2 hr min
50 2 hr min
200
Event/Ceremony Fee (extra set-up, PA)N/A
Special Set-up/Clean-up
Banquet/Event Attendant
Drapery
Outdoor Heater (each)
Stages
CATERING
per caterer
per event
per event
BROOKVIEW - 2023 ADOPTED FEE
24-month Venue Approval $150
Facility Use 12%
Wirth Lake Rm $100/hr + tax
Rice Lake Conference Rm $40/hr + tax
Evergreen Deck $85/hr + tax
Upper Level
Room
Bassett Creek
Full
Lilac Room
Additional Clean-up $50
Fairway Deck
Included in Bassett Creek South or Bassett Creek Full Room Rental
250
ADD-ON'S
All rooms Varies based on needs
50 min
40/hour
200-$500
50
25 for up to three sections
15/hr + tax
Fossil Creek Rm PLEASE REMOVE THESE ROOMS FROM FEES
Hideout $40/hr
Clubhouse $40/hr
Valley Room
65/hr + tax
65/hr + tax
100/hr + tax
Twin Lake Rm PLEASE REMOVE THESE ROOMS FROM FEES
Lower Level
Room Mon-SunSweeneyLakeConferenceRm $40/hr + tax
Fairway Deck Included in Bassett Creek South or Bassett Creek Full Room Rental
200
ADD-ON'S
All rooms Varies based on needs
50 min
30/hour
200-$500
50
25 for up to three sections
Wirth Lake Rm $85/hr + tax
Rice Lake Conference Rm $30/hr + tax
Evergreen Deck $70/hr + tax
Upper Level
Room
Bassett Creek
Full
Lilac Room $15/hr + tax
Fossil Creek Rm PLEASE REMOVE THESE ROOMS FROM FEES
Hideout $30/hr
Clubhouse $30/hr
Valley Room
55/hr + tax
55/hr + tax
85/hr + tax
Twin Lake Rm PLEASE REMOVE THESE ROOMS FROM FEES
LowerLevelRoom Mon-SunSweeneyLakeConferenceRm $30/hr + tax
25
BROOKVIEW GOLF COURSE / 316 BAR & GRILL
All fees are pre-tax
2023 ADOPTED
FEE
REGULATION COURSE
18 Hole $42.00
18 Hole Club Member $34.00
18 Hole Senior Club Member (Age 60+)$30.00
18 Hole Senior (Age 60+)$35.00
18 Hole League $42.00
18 Tournament $42.00
9 Hole $22.50
9 Hole Club Member $19.00
9 Hole Senior Club Member (Age 60+)$17.50
9 Hole Senior (Age 60+)$19.50
9 Hole League $22.50
9 Hole Tournament $22.50
2nd Nine $19.50
2nd Nine Club Member $15.00
Sunrise/Sunset Rate $19.50
Twilight $23.50
Twilight Club Member $19.00
Junior Rate Club Member 25.50/14.50
Junior Rate 28.00/17.00
PAR 3 COURSE
9 Hole $14.50
9 Hole Club Member $11.00
9 Hole Senior Club Member (Age 60+)$10.00
9 Hole Senior (Age 60+)$11.50
9 Hole League $14.50
9 Hole Tournament $14.50
9 Hole Junior Rate Club Member $10.00
9 Hole Junior $11.50
9 Hole Youth on Course $6.00
2nd 9 Par 3 $9.50
Junior Par 3 Season Pass $90.00
CART RATES
18 Hole Power Cart $34.00
18 Hole Tournament Cart $34.00
18 Hole Club Member Cart $28.00
9 Hole Tournament Cart $22.00
26
BROOKVIEW GOLF COURSE / 316 BAR & GRILL
All fees are pre-tax
2023 ADOPTED
FEE
9 Hole Power Cart $22.00
9 Hole Par 3 Power Cart $18.00
Pull Cart/Regulation Course $5.00
Pull Cart/Par 3 Course $4.00
Trailer fee/Use of personal power cart $15.00/$10.00
CLUB MEMBER CARDS
Resident Adult $85.00
Non-resident Adult $125.00
Resident Senior (Age 60+)$55.00
Non-resident Senior (Age 60+)$90.00
Resident Junior (17 yrs & under)$45.00
Non-resident Junior (17 yrs & under)$50.00
Par 3 $35.00
CLUB RENTALS
18 Hole full rental - Regulation $20.00/$30.00
9 Hole full rental - Regulation $10.00/$15.00
9 hole Par 3 half rental $10.00
CURLING
Curling League $200.00
Curling Rink Rental (1 hour)$20.00
DRIVING RANGE
Small Bucket $4.00
Medium Bucket $6.00
Large Bucket $8.00
LAWN BOWLING
League Fee M-Th evenings (7 week league)$400.00
Single Rink Rental - Resident and Club Member $25.00/hour
Single Rink Rental - Non-resident $30.00/hour
Private Rental of Four Rinks $120.00/hour
Private Rental of Eight Rinks - exclusive use $240.00/hour
Senior Leagues $5.00
Game Official For Private Rentals / Events $30.00/hour
Game Equipment Use For Leagues & Rentals included
27
BROOKVIEW GOLF COURSE / 316 BAR & GRILL
All fees are pre-tax
2023 ADOPTED
FEE
LESSONS
Adult Group $95.00-$200.00
Junior Camp $150.00-$320.00
Junior Group $65.00-$150.00
LOCKER RENTAL
Season $120.00
MISCELLANEOUS FEES
USGA Handicap Service
MGA Non-Club Member $50.00
Club Member Annual $35.00
Comedy Shows $20.00-$50.00
No Show Fee FULL FEE
Tent Rental (per day)$1,000.00
Table and chair rental (per hole)$15.00
Commemorative Bench $1,000.00
THREE ONE SIX BAR + GRILL
Market Rate - All products and services
28
DONATIONS
2023
ADOPTED
FEE
Commemorative Bench with Engraved Plaque- City Park or Open Area $2,600.00
Tree Donation- City Park or Open Area $350.00
Brookview Golf Course:
Commemorative Bench with Engraved Plaque $1,000.00
Tree Donation $350.00
29