Loading...
2023 Master Fee ScheduleCouncil Review 10/11/2022 1st Consideration 11/1/2022 2nd Consideration 11/15/2022 Approved 2023 Fee Schedule CITY OF GOLDEN VALLEY FEE SCHEDULE-2023 FEES TABLE OF CONTENTS ADMINISTRATION LICENSES 3 MISCELLANEOUS FEES 6 ENGINEERING 8 FIRE DEPARTMENT 10 INSPECTIONS DEPARTMENT 12 PLANNING DEPARTMENT 15 POLICE DEPARTMENT 17 PUBLIC UTILITIES 18 PARK & RECREATION RECREATION 21 BROOKVIEW 24 BROOKVIEW GOLF COURSE / 316 BAR & GRILL 26 DONATIONS 31 2 ADMINISTRATION LICENSES CITY CODE SECTION RENEWAL DATE 2023 ADOPTED FEE AMUSEMENT DEVICES no longer licenced after 2022 AUCTIONING CHICKEN COOP LICENSE Initial Application Fee $75.00 Annual License Renewal Fee 1-Apr $25.00 CIGARETTES - TOBACCO PRODUCTS Over the counter 1-Jan $450.00 Investigation Fee each individual/person $200.00 DOG KENNEL Per Kennel 1-Apr $200.00 FIREWORKS Retail consumer fireworks that sell other items 1-May $100.00 Retail consumer fireworks, retailers that sell only fireworks 1-May $350.00 GARBAGE HAULERS (See also Recycling Haulers) Base Fee per Hauler $400.00 Per Vehicle 1-Apr $100.00 GASOLINE STATIONS Dispensers 1 - 4 (each)Per Location 1-Apr $75.00 Over four dispensers (each)Per Location $50.00 LIQUOR LICENSING Section Code 4-41 Liquor License Processing Fees - On-sale, Off-sale, Beer, Wine, and Sunday sale (Non-refundable) New License Investigation Fee - per establishment $1,500.00 Administrative Fee $750.00 Renewal Investigation Fee - each individual/person $200.00 Administrative Fee $250.00 Miscellaneous Change thru the year Investigation Fee - each individual/person $200.00 Administrative Fee $100.00 Liquor License State Law 340A.408 Sunday sale 1-Jul $200.00 Off-sale 1-Jul $200.00 Auctioneers do not need to be licensed in the City of Golden Valley. However, they have to show us a copy of a license or bond from the county or state and provide us a letter on the date, time and place of the auction. 3 ADMINISTRATION LICENSES CITY CODE SECTION RENEWAL DATE 2023 ADOPTED FEE On-sale 1-Jul $8,000.00 Wine & Beer On-sale 1-Jul $2,000.00 Club 1-Jul up to 200 members $300.00 200-500 members $500.00 501-1,000 members $650.00 1,001-2,000 members $800.00 2001-4000 members $1,000.00 4001-6000 members $2,000.00 Over 6000 members $3,000.00 Liquor - On-sale 1-Jul Non-Intoxicating Malt $500.00 Brewer Tap Room $600.00 Cocktail Room $600.00 Liquor - Off-sale 1-Jul Non-Intoxicating Malt $150.00 Brew Pub - Malt Liquor $200.00 Small Brewer $200.00 Distilled Spirits $200.00 Liquor - Temporary Non-Intoxicating/Intoxicatng Malt Liquor License $100.00 MASSAGE THERAPIST - INDIVIDUAL Certificate each individual/person 1-Jan $100.00 Investigation fee each individual/person $200.00 MASSAGE THERAPIST PREMISE LICENSE 1-Jan Operating location new applicant and renewal $500.00 Investigation fee each individual/person $200.00 MOBILE VENDING/SERVICES Annual vendor registration 1-Jan $40.00 Event permits City parks (up to three days)$50.00 Other non-residential zoning districts (up to three days for targeted events $30.00 or seasonally for regularly occuring events) R-1 and R-2 zoning districts (up to two one-day permits in a 12 month period)$30.00 R-3 and R-4 zoning districts $30.00 NEW/USED VEHICLE SALES 1-Sep $400.00 PEDDLERS AND SOLICITORS 1-Jan Each Employee $30.00 PAWNBROKER AND PRECIOUS METAL Dealer Location 1-Jan $5,000.00 Dealer 1-Jan $400.00 Investigation Fee $1,500.00 Background check / Identification card 4 ADMINISTRATION LICENSES CITY CODE SECTION RENEWAL DATE 2023 ADOPTED FEE Non-refundable administrative fee $500.00 APS Transaction Fee $1.30 RECYCLING HAULERS (MULTI FAMILY APARTMENT)1-Apr Base Fee per Hauler $400.00 Per Vehicle $100.00 RENTAL DWELLING LICENSE Single Family Dwellings One Unit Dwelling License 1-Jul $125.00 Re-inspection $100.00 Twin Homes & Duplexes License per Dwelling Unit Per Dwelling Unit 1-May $125.00 Re-inspection per unit/per address $100.00 Condominiums & Townhomes License Per Dwelling Unit Per Dwelling Unit 1-Sep $125.00 Re-inspection per unit/per address $100.00 Group Homes / homes with services License Per Dwelling Unit 1-Nov $125.00 Re-inspection per unit/per address $100.00 Multiple Unit Dwelling 3 or more units per building 1-Mar 3 - 50 Units $175.00 51 - 150 Units $225.00 151 + Units $300.00 Re-inspection per unit/per address $100.00 Star Program Fees Based on participation level and discount is capped at 151 units for market rate re Base Rate $35/unit Level 1 $20/unit Level 2 $12/unit Level 3 $8/unit Level 4 $0/unit SEXUALLY ORIENTED BUSINESS License Fee per operating location 1-Jan $5,000.00 Investigation Fee $1,500.00 Non-refundable administrative fee $500.00 Tetrahydrocannabinol (THC) Retail Establishment Tetrahydrocannabinol (THC) Products (new applicant and renewal)$450.00 Over the counter Investigation Fee each individual/person $200.00 5 ADMINISTRATION MISCELLANEOUS FEES 2023 ADOPTED FEE ADDRESS CHANGE Residential $50.00 Non-Residential $100.00 ADMINISTRATIVE PERMIT $75.00 Seasonal, Farm Produce, Christmas Tree Sales, etc in Commercial Zoning District ADMINISTRATIVE CITATIONS 1st citation per violation $100.00 2nd citation per violation $250.00 3rd citation per violation $500.00 per violation $500.00 CITATION APPEAL filing fee per violation $25.00 CERTIFICATION FEE (SPECIAL ASSESSMENT)$30.00 CITY CEMETERY Cemetery Plot $500.00 Open/Close Fee: Crematory (up to 2 per lot)per lot $200.00 Burial $750.00 CONDUIT DEBT ISSUANCE Issuance of Debt (Amount of Bonds)1.00% Refinancing Issuance Fees (Amount of Bonds)0.50% Host City (plus pay for legal publication)$500 DOCUMENTS City Code Full book in binder Cost of book, binder +20% All information is on the Municode website at: https://library.municode.com/mn/golden_valley/codes/code_of_ordinances City Maps 10.00 Copies Minnesota Rules, part 1205.0300, subpart 4 Black & White - letter or legal size documents of 100 or fewer pages .25/page Color - letter or legal size documents .33/page Plats, Record Drawings, Other Plats (i.e. address maps, building plans,comp plan, zoning) 4th citation and subsequent violations in 12 month period 6 ADMINISTRATION MISCELLANEOUS FEES 2023 ADOPTED FEE DOCUMENTS (continued) Digital Format Aerial photography time & material Custom Maps or Map Layers time & material Topography time & material Special Assessment Search non-owner $15.00 Video Reproduction per tape, DVD, CD + shipping $20.00 DOMESTIC PARTNER REGISTRATION Initial Registration $40.00 Amendment/Notice of Termination $25.00 ELECTRIC VEHICLE CHARGING STATION 0 - 3 hours / hour $0.90 3+ hours / hour $1.20 PARADE/SPECIAL EVENT $25.00 PERSONNEL (OVERTIME WOULD BE 1.5 X RATE) Staff Attorney $108/hr 7 ENGINEERING 2023 ADOPTED FEE EASEMENT VACATION (EACH REQUEST) $500.00 EQUIPMENT CHARGE (Per Hour) (Personnel will be added) Utility Vehicle does not include personnel $55.00 Utility Equipment does not include personnel $250.00 Heavy Equipment does not include personnel costs $175.00 Medium Equipment does not include personnel $100.00 Light Equipment not include personnel $55.00 FLOODPLAIN SEARCH LETTER $50.00 FORCED TREE REMOVAL cost + 20% MICROMOBILITY SHARING OPERATIONS Implementation and oversight of License Agreement $500.00 PERSONNEL (OVERTIME WOULD BE 1.5 X RATE) Public Works Employee $70.00 NATIVE VEGETATION LANDSCAPE PERMIT $100.00 RIGHT OF WAY Access Permit-Temporary $50.00 Delay Penalty - Right of Way Minn. Rule 7819.1000 subp. 3 $500/day Driveway Replacement Permit $125.00 In Boulevard Excavation Permit per opening $200.00 In Pavement Excavation Permit per opening (includes curb alterations)$400.00 Obstruction Permit-Permanent, per obstruction (includes courtesy benches,structures, walls, lighting, signage)$150.00 Obstruction Permit-Permanent, (includes fences, landscaping, trees, shrubs, vegetation, irrigation)$50.00 Obstruction permit-Temporary (includes use of parking lane, sidewalk, boulvard, driving lane, alley)$100.00 RIGHT OF WAY (continued) Overhead Utility Repair per location No Charge Underground Utility 0 to 100 Feet Administrative permit fee $250.00 per foot fee $1.50 over 100 Feet Administrative permit fee $400.00 Sewer jet, vac truck, sewer camera Front end loader, 360 Backhoe, Pickup sweeper, Tandem axle truck, Aerial truck Single axle dump truck, Water truck, Tractor backhoe, Utility tractor/ accessory, 15 ft cut lawn mower, brush chipper, asphalt roller, asphalt paver, skid steer, tool cat, trackless Truck - one ton and under, Air compressor, Water pump, Generator, Steamer, Asphalt/saw, Concrete, Cable tracer) 8 ENGINEERING 2023 ADOPTED FEE per foot fee $1.00 Service Drop meeting conditions Not parallel to right-of way at least 10' from any city facility or utility, less than 1' wide, and depth in accord with law or, if none, industry standard No charge STREET ASSESSMENTS Residential/Single Family/Duplex, per dwelling unit on local street Multi Unit Residential (more than 2 dwelling units) on local street Residential/Single Family/Duplex, per dwelling unit on state aid street Multi Unit Residential (more than 2 dwelling units) on state aid street Other Zonings, Local Streets Other Zonings, State Aid Streets Administrative Fee for Driveways and/or Sanitary Sewer repairs $250/maximum Seven percent of total or maximum fee -whichever lessor) Low Income Level for Senior/Retired due to Disability Deferral Current HUD Limits STORMWATER MANAGEMENT Projects that do not require watershed review - No post construction BMPs $100.00 New Home Construction - no watershed review - No post construction BMPs $400.00 Projects that require watershed review or require Post Construction BMPs $600.00 TREE AND LANDSCAPE PERMIT Single Family Residential $150.00 All Other Projects $500.00 Tree Mitigation Fee (per tree)500/tree UTILITY PERMITS Water Meter Permit $150.00 Water Tapping Permit $150.00 Water Cut-off Permit $150.00 Sewer Permit (connection)$150.00 Sewer Repair Permit $150.00 Sewer Cut-off Permit $150.00 Sewer & Water Permits for Commercial Projects (Fee Based on Plumbing Value and if there is a Plan the Plan Review Fee would be 65% of the Fee) State Surcharge - each permit $1.00 Sewer Repair CCTV Inspection $150.00 WETLAND MANAGEMENT (PLUS PROFESSIONAL FEES IF NECESSARY)$200.00 WIRELESS AESTHETICS Collocation Agreement Rent to collocate on the City structure Up to $150.00 Maintenance associated with the collocation $25.00 Electrical Service-monthly Per radio node less than or equal to 100 maximum watts $73.00 Per radio node over 100 maximum watts $182.00 Or actual costs of electricity, if the actual exceed the foregoing When a project is approved the street assessment will be considered following the special assessment policy. 9 FIRE DEPARTMENT 2023 ADOPTED FEE CARSEAT INSTALLATIONS/INSPECTIONS Non-resident $20.00 Each additional $10.00 EQUIPMENT CHARGE PER HOUR Fire Engine (includes personnel)$250.00 Fire Rescue Truck (includes personnel)$250.00 Fire Aerial Truck (includes personnel)$350.00 Police and Fire Rescue Truck (includes personnel)$250.00 Fire Boat (includes personnel)$75.00 Fire ATV (includes personnel)$75.00 Fire Life Safety Trailer (includes personnel)$200.00 Gas Lines, construction damage with Fire Department Response $250.00 FIRE COMMERCIAL COOKING VENTILATION SYSTEMS (HOOD AND DUCT CLEANING) Inspection $75.00 Re-inspection $150.00 FIRE SPRINKLER, FIRE ALARMS & SPECIAL FIRE SUPPRESSION SYSTEMS New Installation or Alteration of Existing Ref. MN Rules 1300.0160,subd. 1, subd. 2 Total valuation based on below fee schedule: FROM TO FEES 0 $500 $50.00 501 $2,000 $50.00 for the first $500 plus $3.05 for each additional $100 or fraction thereof, up to and including $2000 2,001 $25,000 $95.75 for the first 2,000 plus $14.00 for each additional $1,000 or fraction thereof, up to and including $25,000 25,001 $50,000 $417.75 for the first $25,000 plus $10.95 for each additional $1,000 or fraction thereof, up to and including $50,000 50,001 $100,000 $691.50 for the first $50,000 plus$ $7.34 for each additional $1,000 or fraction thereof, up to and including $100,000 100,001 $500,000 $1,058.50 for the first $100,000 plus $6.00 for each additional $1,000 or fraction thereof, up to and including $500,000 500,001 $1,000,000 $3,458.50 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof, up to and including $1,000,000 1,000,001 and up $5,958.50 for the first $1,000,000 plus $4.00 for each additional 1,000 or fraction thereof VALUATION 10 FIRE DEPARTMENT 2023 ADOPTED FEE FIREWORKS/PYROTECHNIC SPECIAL EFFECTS Permit fee includes required rental of fire engine and crew for one hour stand-by at display $350.00 FLOOR DRY (ACCIDENTS)per bag $20.00 FUEL TANKS Permanent above/underground Use Fire Sprinkler, Fire Alarms & Special Fire Suppression Systems Table Above Fuel, Compressed Gasses, Hazardous Materials, and Associated Appliances & Piping Temporary LP Tank/Fuel Tank per tank $50.00 PERSONNEL (OVERTIME WOULD BE 1.5 X RATE) Full-time Fire Personnel (scheduled time after hours -minimum 2 hours)$75/hr Paid On-Call Fire Personnel $35/hr TENT/CANOPY INSPECTIONS - REQUIRED FOR TENT EXCEEDING 400 SQ FT AND $50.00 canopies exceeding 700 sq ft (per site) each additional tent and/or canopy (per site)$25.00 WEED ERADICATION/LAWN MOWING - PER HOUR (SEE MINIMUMS) Occupied/unoccupied residential/commercial property - 3 hour minimum $125/hr SECOND OR MORE VIOLATIONS IN ONE SEASON A 12 - MONTH PERIOD Occupied/unoccupied residential/commercial property - 3 hour minimum $250/hr 11 INSPECTIONS DEPARTMENT 2023 ADOPTED FEE WORKING WITHOUT A PERMIT - INVESTIGATION FEE The greater of $100 or 25% of the permit fee, not to exceed $500. Fee not to exceed permit fee. www.goldenvalleymn.gov/permits/pdf/building-fees.pdf WHEN APPLICABLE, A PLAN REVIEW FEE WILL BE ADDED TO PERMIT APPLICATIONS 65% of permit fee BUILDING PERMIT FEES BASED ON FEE SCHEDULE BELOW. Mandatory State Surcharge: per permit is a minimum of .50 and when a permit fee is over $1,000 in value the state surcharge is .0005 times the permit value. Surcharge is remitted to MN State Treasurer. Permit Cancellation Policy: 80% of the permit fee will be returned upon written notice of cancellation. If job has been started no refund will be made. If an inspection has been done no refund can HVAC CONTRACTORS LICENSE FEE (April 1-March 31)$75.00 100.00 BUILDING PERMITS BASED ON SCHEDULE BELOW: Mandatory State Surcharge: per permit is a minimum of .50 and when a permit fee is over $1,000 in value the state surcharge is .0005 times the permit value. Surcharge is remitted to MN State Treasurer. Cancellation and Refund Policy Permits: 80% of the permit fee will be returned refunded upon written notice of cancellation. If an inspection has been done no refund can be given. Refunds are subject to administrative policies. Plan Review: Plan review fees are non-refundable once plan review has been started Surcharges, Electronic Document Fees and other related fees: Non-refundable BUILDING PLAN/STORAGE RETRIEVAL $50.00 BUILDING PERMITS (Ref. MN Rules 1300.0160,subd. 1, subd. 2) Table 1 Total valuation based on below fee schedule: FROM TO FEES 1 $500 $50.00 501 $2,000 $50.00 for the first $500 plus $3.05 for each additional $100 or fraction thereof, up to and including $2000 2,001 $25,000 $95.75 for the first 2,000 plus $14.00 for each additional $1,000 or fraction thereof, up to and including $25,000 REINSPECTION FEE The fee will be charged by the Building Official or designee where additional time and expense is incurred by the City to achieve code compliance. VALUATION ALL BUILDING PERMIT VALUATION DATA WILL BE BASED ON THE CURRENT INTERNATIONAL CODE COUNCIL OR CONTRACT 12 INSPECTIONS DEPARTMENT 2023 ADOPTED FEE 25,001 $50,000 $417.75 for the first $25,000 plus $10.95 for each additional $1,000 or fraction thereof, up to and including $50,000 50,001 $100,000 $691.50 for the first $50,000 plus$ $7.34 for each additional $1,000 or fraction thereof, up to and including $100,000 100,001 $500,000 $1058.50 for the first $100,000 plus$ $6.00 for each additional $1,000 or fraction thereof, up to and including $500,000 500,001 $1,000,000 $3,458.50 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof, up to and including $1,000,000 1,000,001 and up $5,958.50 for the first $1,000,000 plus $4.00 for each additional $1,000 or fraction thereof ELECTRICAL State Surcharge - each permit $1.00 Minimum Fee Minimum permit fee is $50.00 plus $1.00 State surcharge. This is for one inspection only. Minimum fee for rough-in inspection and final is $100.00 plus $1.00 State surcharge. Maximum Fee Maximum fee for single family dwelling or townhouse not over 200 Amps is $200.00 plus $1.00 State surcharge. Maximum of 3 inspections. 0 to 300 Amp 50.00 400 Amp 58.00 Add $14.00 for each additional 100 Amps. Circuits and Feeders 0 to 30 Amp 8.00 31 to 100 Amp 10.00 Add $5.00 for each additional 100 Amps. Apartment Buildings per unit $85.00 house wiring Reinspection fee $100.00 Remote Control and Signal Circuits per device $0.75 Retro Fit Lighting per fixture $0.65 Saver Switch $35.00 Service Replacement $100.00 Sign Transformer per transformer $8.00 Solar PV Installation Per Minnesota Solar PV System most current Fee Chart Street Lights and parking lot lights per each standard $4.00 SubPanel Replacement $40.00 The inspection fee for the installation, addition, alteration or repair of each circuit, feeder, Fee per unit of an apartment or condominium complex. This does not cover service and house 13 INSPECTIONS DEPARTMENT 2023 ADOPTED FEE Swimming Pool includes maximum 2 inspections $100.00 ELECTRICAL (continued) Traffic Signals per each standard $7.00 Transformers and Generators up to 10 KVA $10.00 11 - 74 KVA $40.00 75 - 299 KVA $60.00 over 300 KVA $150.00 MECHANICAL: HVAC, GAS PIPING, REFRIGERATION AND FIREPLACE Includes all types of fireplaces - masonry, gas, gas log, gas insert, etc. Value Permit charge 0 $1,000 $50.00 1,001 $5,000 $75.00 + 2.60% 5,001 $10,000 $179.00 + 2.15% 10,001 $25,000 $286.50 + 1.85% 25,001 $50,000 $534.00 + 1.65% 50,001 and up $946.50 + 1.30% PLUMBING AND PIPING FIXTURES Includes hydraulic sewer valves, rain water leaders, and alteration to existing systems. Value Permit charge 0 $1,000 $50.00 1,001 $5,000 $75.00 + 2.60% 5,001 $10,000 $179.00 + 2.15% 10,001 $25,000 $286.50 + 1.85% 25,001 $50,000 $534.00 + 1.65% 50,001 and up $946.50 + 1.30% ELECTRONIC DOCUMENT FEE Based on Permit Fee permits with fixed fee or charged by item 2.85% do not have an electronic fee HOUSE/BUILDING Moving $500.00 Demolition $500.00 PERMIT CANCELLATION Request must be made within 180 days of permit issue date and no inspections have been performed 80% of permit fee SEWER ACCESS CHARGE (SAC) -CITY per unit $750.00 No surcharge or plan review fees will be returned (includes the fees for stormwater management, right-of-way ROW) and tree preservation permits). Subject to Department Policies. 14 INSPECTIONS DEPARTMENT 2023 ADOPTED FEE PARTIAL OCCUPANCY APPROVAL Partial Occupancy form Administrative fee $300.00 WATER ACCESS CHARGE (WAC) -CITY per unit $2,000.00 WAC Charges shall be based on the Residential Equivalent Connection Units (REC) resulting from the use of the City Water/Sewer systems. The REC shall equal the number of SAC Units determined under the SAC Determination by the Metropolitan Council to which the building permit relates. SAC Charges shall be based on the Residential Equivalent Connection Units (REC) resulting from the use of the City Water/Sewer systems. The REC shall equal the number of SAC Units determined under the SAC Determination to which the building permit relates. 15 PLANNING DEPARTMENT 2023 ADOPTED FEE RECORD REAL ESTATE ITEMS Easements, CUP, PUDs, Development Agreements, Simplifile Hennepin County fee CONDITIONAL USE ITEMS Conditional Use Permit $400.00 Amendment to Conditional Use Permit $300.00 Extension $125.00 FUTURE LAND USE MAP AMENDMENT $1,000.00 OUTDOOR SERVICE AREAS Outdoor Service Areas in Targeted Zoning Districts Application $200.00 Renewal Fee $100.00 PARK DEDICATION FEES Minnesota Statute 462.358 6% of Land Value PLANNED UNIT DEVELOPMENT Preliminary PUD Plan $1,000.00 Final PUD Plan $1,000.00 Extension $150.00 PLANNED UNIT DEVELOPMENT - MAJOR AMENDMENT $500.00 PLANNED UNIT DEVELOPMENT - MINOR AMENDMENT $250.00 PLANNED UNIT DEVELOPMENT - ADMINISTRATIVE AMENDMENT $100.00 SIGN PERMIT Temporary Sign $50.00 Special Temporary Sign Additional $50.00 Permanent Sign $100.00 Building and Electrical permits maybe required. SUBDIVISION $400.00 Extension to Submit Final Plat $150.00 SUBDIVISION - MINOR $250.00 Extension to Submit Final Plat $150.00 TAX PARCEL DIVISION $100.00 TEMPORARY RETAIL SALES for each sale, up to five days $150.00 VARIANCE FROM ZONING CODE Single-Family Residential Zoning District $200.00 All other Zoning Districts $300.00 16 PLANNING DEPARTMENT 2023 ADOPTED FEE Extension $150.00 Appeal of Determination $100.00 ZONING EXAMINATION LETTER $100.00 ZONING MAP AMENDMENT $500.00 ZONING PERMIT (Fence, Shed, Deck, Patio, Garden Structure)$25.00 17 POLICE DEPARTMENT 2023 ADOPTED FEE ALARM SYSTEM - FALSE ALARMS (12 month period beginning March 1 of each year upon given notice) 1-3 false alarms $0.00 4-10 false alarms $100.00 11-15 false alarms $150.00 16 or more false alarms $250.00 ANIMAL CONTROL Impound Fee for dogs $50.00 Boarding Fee for dogs and cats per day (7 day maximum)$20.00 Dangerous Dog License $250.00 EQUIPMENT CHARGE PER HOUR Police Rescue Truck (includes personnel)$250.00 Squad Car (includes personnel)$110.00 FINGERPRINTING Golden Valley Resident $10.00 Anyone employed in Golden Valley $25.00 Additional Card $5.00 FORFEITED DWI VEHICLE ADMINISTRATIVE FEE $1,000.00 NUISANCE SERVICE CALL FEE (AFTER THREE CALLS)$250.00 PERSONNEL (OVERTIME WOULD BE 1.5 X RATE)$109/hour Off Duty Police Officer (minimum applies as determined by City Manager/designee) 18 PUBLIC UTILITIES Rates begin with any billing after April 1 2023 ADOPTED FEE RESIDENTIAL UTILITY RATES - QUARTERLY BILLING includes all residential classes except those classified as apartments) Inspection Fee for Fire lines $6.00 Penalties (for late payment)10% Sanitary Sewer (in 1000 gallons) Residential (per dwelling unit) (Flat Rate)- 5 and under units-winter qtr consumption $86.60 Residential (per dwelling unit) (Flat Rate) - 6-15 units-winter qtr consumption $89.84 Residential (per dwelling unit) (Flat Rate) - 16-19 units-winter qtr consumption $98.81 Residential (per dwelling unit) (Flat Rate) - 20-25 units-winter qtr consumption $112.66 Residential (per dwelling unit) (Flat Rate) - 26-39 units-winter qtr consumption $147.61 Residential (per dwelling unit) (Flat Rate) - 40-59 units-winter qtr consumption $169.98 Residential (per dwelling unit) (Flat Rate) - 60-79 units-winter qtr consumption $182.84 Residential (per dwelling unit) (Flat Rate)- 80 to 99 units-winter qtr consumption $206.73 Residential (per dwelling unit) (Flat Rate)- 100 and over units-winter qtr consumption $245.34 Recycling - Residential curbside (per unit) -Recycling $18.00 Organics (Starting January 2022) Residential curbside (per unit) -Organics $18.00 Storm Sewer Utility Rate Charge for a Residential Equivalent Factor of 1.00 $84.00 Each single family residential property is considered to be 1/3 of an acre. Street Lights Ornamental (per unit)$13.57 Overhead (per unit)$9.35 Water Minimum fee, includes up to 1,000 gallons of flow $21.00 Water meters up to and including 1"$21.00 Water meters over 1" and including 2"$112.85 Water meters over 2" and including 4"$155.40 Water meters over 4"$196.77 Above 1,000 gallons of flow per quarter up to 79,000 (per 1,000 gallons)$7.06 80,000 gallons and over of flow per quarter (per 1,000 gallons)$7.09 Emergency Water Supply - per 1000 gallons $0.30 2.43 Irrigation Accounts (All) - Monthly Billing Minimum fee, includes up to 1,000 gallons of flow $21.00 Water rate per 1000 gallons $7.09 All apartment buildings over 50 units will be billed monthly beginning April 1, 2018 Water Connection Fee (Fee charged by State for each water hookup) 19 PUBLIC UTILITIES Rates begin with any billing after April 1 COMMERCIAL & INDUSTRIAL UTILITY RATES -MONTHLY BILLING Inspection Fee for Fire lines Penalties (for late payment on monthly billings) Sanitary Sewer Water meters up to and including 1" Water meters over 1" and including 2" Water meters over 2" and including 4" Water meters over 4" Based on per 1,000 gallons Note: Water Meter Flow is used to establish sewer flow unless a separate sewer flow meter has been established. Storm Sewer Utility Rate Charge per acre for property X Residential Equivalency Factor (REF) Street Lights Ornamental (per unit) Overhead (per unit) Water Connection Fee -State charge for each water hookup -(January 1) Water Usage: Minimum fee, includes up to 1,000 gallons of flow Water meters up to and including 1" Water meters over 1" and including 2" Water meters over 2" and including 4" Water meters over 4" Water rate per 1000 gallons Emergency Water Supply -per 1000 gallons OTHER UTILITY FEES Driveway Covers -Replace Hydrant Maintenance (Private) Materials, parts, labor Hydrant Meter Rental Residential (per day+ consumption) Commercial (per day+ consumption) Commercial (rate per day after 60 days+ consumption) Deposit (residential) Deposit (commercial) Repair Parts Meter Read -Manual Read of Water/Sewer Meter/Upgrade-4th Letter Meter Testing (to be returned if meter is in error of 5% or more of read) 20 2023 ADOPTED FEE $2.00 5% $14.64 $37.71 $52.45 $66.83 $6.34 $28.00 $4.52 $3.12 $0.81 $21.00 $21.00 $37.62 $51.80 $65.59 $7.09 $0.30 $150.00 Actual Cost+ 20% ad min $2.00 $5.00 $10.00 $300.00 $1,750.00 cost +20% $100.00 $50.00 PUBLIC UTILITIES Rates begin with any billing after April 1 2023 ADOPTED FEE Sanitary Sewer Inspections and Compliance Fees Ordinance No. 352 Noncompliant discharge into sanitary sewer(or refuse inspection) Single Family Residential $500/month Non Single Family Residential $1,000/month Application fee for noncompliant winter discharge into sanitary sewer per month $250.00 Application fee for certificate of sewer regulations compliance Single Family Residential (R-1 or R-2), per structure $250.00 Non Single Family Residential (all other structures), per structure $750.00 Video Review Residential video record completed by private licensed plumber $100.00 Non-residential video record completed by private licensed plumber $375.00 Sump Pump Inspection $50.00 Water Meter and Parts (All)At cost +20% Water on/off per each event business day)$25.00 after hours)$175.00 21 PARK & RECREATION 2023 ADOPTED FEE ACTIVITIES Rates/Fees are printed in Seasonal Activities Catalogs (Spring/Summer, Fall, Winter). Staff will pro-rate and make program/event/activity fee adjustments as necessary. Adult (Non-resident fees applicable) Individual Athletics/Fitness $20.00-$150.00 Programs $1.00-$150.00 Special Events $0-$75 Open Gyms Drop-in fee $5.00 10-time Punch Pass $40.00 55+ Adult Newsletter Subscription $5.00-$8.00 Presentation/Discussion Groups $1.00-$5.00 Adult Trips & Sports Leagues (Non-resident fees non-applicable) Trips - 1-6 day Market Rate Sports Leagues $100.00-$900.00 Sports League Cancelation Fee $40.00 Youth Athletics $10.00-$200.00 Programs $5.00-$175.00 Trips/Events $0.00-$125.00 BACKYARD INDOOR PLAYGROUND Daily Rates Resident $5.00 Non-resident $6.00 Twilight (last hour of daily operation)$2.00 Socks $2.00 10 Punch Pass - Resident $40.00 10 Punch Pass - Non-resident $50.00 Group Rates Pre-reservation required; Ratio of 10:1 youth/adult; 1 payment only Groups of 15 kids or more, max 50, includes use of a party room when available $5.00 Party Rates Includes 2 hrs party room; 10 wristbands; extra wristbands may be Resident $110.00 Non-resident $130.00 Picnic Packages Three One SIx Bar + Grill will provide food package options for party groups. Entire Playground Private Rental Includes 2 hrs exclusive use of playground and 2 party rooms Resident $250.00 Non-resident $280.00 Additional hour $100.00 OTHER PARK & RECREATION FEES Athletic Field Resident - no attendent per hour/per field (min 2 hrs)$25.00 Resident - with attendent per hour/per field (min 2 hrs)$40.00 purchased for daily rate (max of 20 people total per party room) 22 PARK & RECREATION 2023 ADOPTED FEE Non-resident - no attendent per hour/per field (min 2 hrs)$35.00 Non-resident - with attendent per hour/per field (min 2 hrs)$50.00 With Lights per hour/per field $10.00 All day tournament Resident per day/per field $150.00 Non-resident per day/per field $250.00 Field Attendant per hour $15.00 Beer/Wine Permit (only with Picnic Shelter rental)$50.00 Davis Community Center Gym Resident per hour $30.00 Non-resident per hour $40.00 Brookview Only Entire Park Use (includes all facility rental fees) Resident up to 12 hrs $850.00 Non-resident up to 12 hrs $1,200.00 Equipment Use Fee Permit Inflatable, climbing wall, zipline, etc Each $25.00 Gazebo/Sun Shelter Resident per hour (min 2 hrs)$25.00 Non-resident per hour (min 2 hrs)$35.00 Hockey Rink (outdoor) Resident per hour $25.00 Non-resident per hour $35.00 Community Garden Container Resident $35.00 Non-resident $50.00 Dog Bag Station Sponsorship Initial Sponsorship $375.00 Annual Renewal Sponsorship $160.00 Park Shelter Building Resident per hour (min 2 hrs)$40.00 Non-resident per hour (min 2 hrs)$50.00 Key Deposit refundable when returned $25.00 Picnic Pavilion Rental at Brookview Small Pavilion (up to 50 people) Resident $115.00 Non-resident $150.00 Large Pavilion (up to 100 people) Resident $150.00 Non-resident $200.00 Picnic Shelter Damage & Use Guideline Compliance Deposit Charged at time of reservation and refundable $250.00 Professional Photo/Video Use of Specific Park Area (plus facility rental fees) Resident per hour $100.00 Non-resident per hour $125.00 Sand Volleyball Courts at Brookview (2 courts) 23 PARK & RECREATION 2023 ADOPTED FEE Resident per hour/per court $15.00 Non-resident per hour/per court $20.00 With Lights per hour/per field $10.00 Tennis or Pickleball Court Tournament Resident per day/per court $75.00 Non-resident per day/per court $100.00 Court Resident per hour $7.00 Non-resident per hour $9.00 Youth Athletic Association Player Field Maintenance Fee Resident & Non-resident per person/per season $8.00-$12.00 Organization Field Maintenance Fee per organization/per season $100.00-$2,000.00 24 DEPOSIT Deposit is due at time of booking to hold reservation. 500 refundable damage deposit is due 30 days prior to rental. All rentals include:Set-up / take-down and AV equipment RESIDENT (Live or work in GV, book 24 months in advance for 14.5 hr, 12 months in advance for hourly) CapacityHours122hrmin North 25 2 hr min South 25 2 hr min Both 70 2 hr min 20 2 hr min 20 2 hr min Capacity Hours Mon-Thur Fri Sat Sun 200 14.5 hr (10 am-12:30 am) $1400 + tx $1800 + tx $1200 + tx 200 Hourly (2 hr min)$100/hr + tax $120/hr + tax $150/hr + tax $100/hr + tax North 72 Hourly (2 hr min)$65/hr + tax $70/hr + tax $90/hr + tax $65/hr + tax South 72 Hourly (2 hr min)$65/hr + tax $70/hr + tax $90/hr + tax $65/hr + tax N/A N/A 40 2 hr min 10 2 hr min 50 2 hr min 200 Event/Ceremony Fee (extra set-up, PA)N/A Special Set-up/Clean-up Banquet/Event Attendant Drapery Outdoor Heater (each) Stages NON-RESIDENT (Book 22 months in advance for 14.5 hr, 10 months in advance for hourly) CapacityHours122hrmin North 25 2 hr min South 25 2 hr min Both 70 2 hr min 20 2 hr min 20 2 hr min Capacity Hours Mon-Thur Fri Sat Sun 200 14.5 hr (10 am-12:30 am) $1600 + tx $2000 + tx $1400 + tx 200 Hourly (2 hr min)$130/hr + tax $150/hr + tax $180/hr + tax $130/hr + tax North 72 Hourly (2 hr min)$80/hr + tax $85/hr + tax $105/hr + tax $80/hr + tax South 72 Hourly (2 hr min)$80/hr + tax $85/hr + tax $105/hr + tax $80/hr + tax N/A N/A 40 2 hr min 10 2 hr min 50 2 hr min 200 Event/Ceremony Fee (extra set-up, PA)N/A Special Set-up/Clean-up Banquet/Event Attendant Drapery Outdoor Heater (each) Stages CATERING per caterer per event per event BROOKVIEW - 2023 ADOPTED FEE 24-month Venue Approval $150 Facility Use 12% Wirth Lake Rm $100/hr + tax Rice Lake Conference Rm $40/hr + tax Evergreen Deck $85/hr + tax Upper Level Room Bassett Creek Full Lilac Room Additional Clean-up $50 Fairway Deck Included in Bassett Creek South or Bassett Creek Full Room Rental 250 ADD-ON'S All rooms Varies based on needs 50 min 40/hour 200-$500 50 25 for up to three sections 15/hr + tax Fossil Creek Rm PLEASE REMOVE THESE ROOMS FROM FEES Hideout $40/hr Clubhouse $40/hr Valley Room 65/hr + tax 65/hr + tax 100/hr + tax Twin Lake Rm PLEASE REMOVE THESE ROOMS FROM FEES Lower Level Room Mon-SunSweeneyLakeConferenceRm $40/hr + tax Fairway Deck Included in Bassett Creek South or Bassett Creek Full Room Rental 200 ADD-ON'S All rooms Varies based on needs 50 min 30/hour 200-$500 50 25 for up to three sections Wirth Lake Rm $85/hr + tax Rice Lake Conference Rm $30/hr + tax Evergreen Deck $70/hr + tax Upper Level Room Bassett Creek Full Lilac Room $15/hr + tax Fossil Creek Rm PLEASE REMOVE THESE ROOMS FROM FEES Hideout $30/hr Clubhouse $30/hr Valley Room 55/hr + tax 55/hr + tax 85/hr + tax Twin Lake Rm PLEASE REMOVE THESE ROOMS FROM FEES LowerLevelRoom Mon-SunSweeneyLakeConferenceRm $30/hr + tax 25 BROOKVIEW GOLF COURSE / 316 BAR & GRILL All fees are pre-tax 2023 ADOPTED FEE REGULATION COURSE 18 Hole $42.00 18 Hole Club Member $34.00 18 Hole Senior Club Member (Age 60+)$30.00 18 Hole Senior (Age 60+)$35.00 18 Hole League $42.00 18 Tournament $42.00 9 Hole $22.50 9 Hole Club Member $19.00 9 Hole Senior Club Member (Age 60+)$17.50 9 Hole Senior (Age 60+)$19.50 9 Hole League $22.50 9 Hole Tournament $22.50 2nd Nine $19.50 2nd Nine Club Member $15.00 Sunrise/Sunset Rate $19.50 Twilight $23.50 Twilight Club Member $19.00 Junior Rate Club Member 25.50/14.50 Junior Rate 28.00/17.00 PAR 3 COURSE 9 Hole $14.50 9 Hole Club Member $11.00 9 Hole Senior Club Member (Age 60+)$10.00 9 Hole Senior (Age 60+)$11.50 9 Hole League $14.50 9 Hole Tournament $14.50 9 Hole Junior Rate Club Member $10.00 9 Hole Junior $11.50 9 Hole Youth on Course $6.00 2nd 9 Par 3 $9.50 Junior Par 3 Season Pass $90.00 CART RATES 18 Hole Power Cart $34.00 18 Hole Tournament Cart $34.00 18 Hole Club Member Cart $28.00 9 Hole Tournament Cart $22.00 26 BROOKVIEW GOLF COURSE / 316 BAR & GRILL All fees are pre-tax 2023 ADOPTED FEE 9 Hole Power Cart $22.00 9 Hole Par 3 Power Cart $18.00 Pull Cart/Regulation Course $5.00 Pull Cart/Par 3 Course $4.00 Trailer fee/Use of personal power cart $15.00/$10.00 CLUB MEMBER CARDS Resident Adult $85.00 Non-resident Adult $125.00 Resident Senior (Age 60+)$55.00 Non-resident Senior (Age 60+)$90.00 Resident Junior (17 yrs & under)$45.00 Non-resident Junior (17 yrs & under)$50.00 Par 3 $35.00 CLUB RENTALS 18 Hole full rental - Regulation $20.00/$30.00 9 Hole full rental - Regulation $10.00/$15.00 9 hole Par 3 half rental $10.00 CURLING Curling League $200.00 Curling Rink Rental (1 hour)$20.00 DRIVING RANGE Small Bucket $4.00 Medium Bucket $6.00 Large Bucket $8.00 LAWN BOWLING League Fee M-Th evenings (7 week league)$400.00 Single Rink Rental - Resident and Club Member $25.00/hour Single Rink Rental - Non-resident $30.00/hour Private Rental of Four Rinks $120.00/hour Private Rental of Eight Rinks - exclusive use $240.00/hour Senior Leagues $5.00 Game Official For Private Rentals / Events $30.00/hour Game Equipment Use For Leagues & Rentals included 27 BROOKVIEW GOLF COURSE / 316 BAR & GRILL All fees are pre-tax 2023 ADOPTED FEE LESSONS Adult Group $95.00-$200.00 Junior Camp $150.00-$320.00 Junior Group $65.00-$150.00 LOCKER RENTAL Season $120.00 MISCELLANEOUS FEES USGA Handicap Service MGA Non-Club Member $50.00 Club Member Annual $35.00 Comedy Shows $20.00-$50.00 No Show Fee FULL FEE Tent Rental (per day)$1,000.00 Table and chair rental (per hole)$15.00 Commemorative Bench $1,000.00 THREE ONE SIX BAR + GRILL Market Rate - All products and services 28 DONATIONS 2023 ADOPTED FEE Commemorative Bench with Engraved Plaque- City Park or Open Area $2,600.00 Tree Donation- City Park or Open Area $350.00 Brookview Golf Course: Commemorative Bench with Engraved Plaque $1,000.00 Tree Donation $350.00 29