Loading...
JWC Agenda 06-05-2024 AGENDA JOINT WATER COMMISSION June 5, 2024 – 1:30 pm Remote Attendance: Members of the public may attend this meeting via Microsoft Teams by calling 1-872-256-4160 and entering access code 119 801 16#. Questions/Comments: Members of the public who have questions about the commission or any items on the agenda should contact the staff commission liaison – Patrick Sele, Utility Superintendent, City of Crystal, patrick.sele@crystalmn.gov, 763-531-1166. 1. Call to Order—Roll Call 2. Approval of Minutes – April 3, 2024 3. Approval of the Purchase of Adapters from Thompson Pipe Group 4. TAC Update 5. Adjournment Joint Water Commission, April 3, 2024 Page 1 of 2 JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of April 3, 2024 The Golden Valley - Crystal - New Hope Joint Water Commission (JWC) meeting was called to order at 1:32 pm. Roll Call Present Tim Kieffer, Public Works Director, Golden Valley Adam Bell, City Manager, Crystal Reece Bertholf, City Manager, New Hope Staff Present RJ Kakach, Assistant City Engineer, Golden Valley Dave Lemke, Operations Manager, New Hope Matt Rowedder, Utilities Maintenance Supervisor, New Hope Patrick Sele, Utilities Supervisor, Crystal Analeigh Moser, Accountant, Golden Valley Bernie Weber, Public Works Director, New Hope Ben Perkey, Crystal Carrie Nelson, Engineering Assistant, City of Golden Valley Approval of Minutes - February 7, 2024 Moved by Bell and seconded by Bertholf to approve the minutes of the February 7, 2024, Joint Water Commission (JWC) Meeting. Upon a roll call vote the following voted in favor: Kieffer, Bell and Bertholf. The following voted against: None. Motion carried. JWC Golden Valley and Crystal Pump House MMC Improvement Project – Bolten & Menk Contract Amendment Moved by Bertholf and seconded by Bell to authorize the proposed amendment to the Bolten & Menk Contract. Upon a roll call vote the following voted in favor: Kieffer, Bell, and Bertholf. The following voted against: None. Motion carried. TAC Update Staff provided an update from the March 28, 2024 TAC meeting. Other Business The next meeting is scheduled for May 1, 2024 Joint Water Commission, April 3, 2024 Page 2 of 2 Adjournment Chair Kieffer adjourned the meeting at 2:00 pm. ATTEST: Carrie Nelson, Recording Secretary Chair Tim Kieffer Patrick Sele City of Crystal, MN Phone: (763) 531-1166 Fax: Email: patrick.sele@crystalmn.gov Date: 5/17/2024 Rep.: Davis Cassell Qty Item # Name Price Total 1 16 L301 Bell x MJS $4,545.71 $4,545.71 1 16 L301 Spigot x MJS $4,545.71 $4,545.71 1 16" X 12" Joint Wrap (Diaper) (Additional)$20.00 $20.00 1 16" LCP Gasket (Additional)$48.00 $48.00 1 18 L301 Bell x MJS $4,854.43 $4,854.43 1 18 L301 Spigot x MJS $4,854.43 $4,854.43 1 18" X 12" Joint Wrap (Diaper) (Additional)$24.00 $24.00 1 18" LCP Gasket (Additional)$52.00 $52.00 1 30 L301 Bell x MJS $6,191.43 $6,191.43 1 30 L301 Spigot x MJS $6,191.43 $6,191.43 1 30" X 12" Joint Wrap (Diaper) (Additional)$32.00 $32.00 1 30" LCP Gasket (Additional)$68.00 $68.00 1 Freight (Estimate) PrePay & Add $2,750.00 $2,750.00 1 Diaper & 1 Gasket included Per Adapter Cement Transition Letter Attached Lead Times: 12-14 Weeks To place order, please return Signed Quote, PO (If Applicable), Completed Job Info Sheet, Sales Tax Exemption Certificate (If Applicable). Sub Total $34,177.14 Shipping & Handling Taxes 0.000%$.00 TOTAL $34,177.14 1003 MacArthur Blvd Grand Prairie, Texas 75050 Phone: 972-262-3600 Quote #: 240517-7828 Adapters Crystal MN ***ALL QUANTITIES ARE ESTIMATED. ACTUAL QUANTITIES WILL BE INVOICED AT QUOTED RATE. STAND-BY TIME WILL BE APPLIED. Thank you for your business. Quote # Today's Date: THOMPSON PIPE GROUP CUSTOMER INFORMATION SHEET Public Work Private Work Name and Location of Job - Address, Zip and County Owner Name and Address: (If Applicable) General Contractor Name and Address: (If Applicable) Subcontractor Name and Address: (If Applicable) Bond Company Name, Address and Bond Number: (Surety name - not insurance co): * When available, please attach a copy of the payment bond. PO #: Tax Exempt: Yes No Certificate Attached: Yes No Sales Representative: Phone: Contact: *Job Site Contact: Cell: Phone: Contact: *Job Site Contact: Cell: Phone: Contact: *Job Site Contact: Cell: Is the Job Bonded? Yes No Phone: Contact: Bond No: NOTE: IF PROJECT IS TAX EXEMPT, PLEASE FORWARD A COPY OF THE TAX EXEMPTION CERTIFICATE. OR YOU WILL BE RESPONSIBLE FOR TAXES Completed By: Date Completed: The following information is required prior to scheduling and ordering material. THOMPSON PIPE GROUP PRESSURE PIPELINE SERVICES TERMS AND CONDITIONS: Scheduling of Welding Services: Standard lead time for welding services is 2- 3 weeks. Expediting these times is possible depending on volume and project. The actual date/time of service is subject to mutual agreement and the final scheduled date must be confirmed by Thompson Pipe Group Pressure. In the event work is scheduled and subsequently cancelled, Thompson Pipe Group Pressure will make every attempt to reschedule as per your request. Scheduling of Tapping Services: Standard lead time for tapping services is 2- 3 weeks. Expediting these times is possible depending on volume and project. The actual date/time of service is subject to mutual agreement and the final scheduled date must be confirmed by Thompson Pipe Group Pressure. In the event work is scheduled and subsequently cancelled, Thompson Pipe Group Pressure will make every attempt to reschedule as per your request. Material Delivery Terms: 1) DIP mechanical accessories are not included with this quote 2) Freight to be FOB Thompson Pipe Group Pressure facility, pre-paid and add. 3) Materials on this quote are based on our standard coating, lining and specs unless otherwise noted. 4) Material Delivery Terms: F.O.B. Origin 5) Prices are Quoted for Class 250 pipe unless otherwise noted. II. SPECIAL NOTES PERTAINING TO PRICES QUOTED The following notes are conditions of the pricing quoted herein: 1) Prices are firm for 30 days from the date of this quote. 2) Pricing includes one laying gasket (polyisoprene, 60 Duro) and one grout wrapper per Thompson Pipe Group Pressure joint. Additional gaskets and diapers will be invoiced accordingly. 3) A cancellation charge applies if the order is cancelled. Materials are not eligible for return or credit unless specifically authorized by Thompson Pipe Group Pressure PRIOR TO RETURNING. 4) Normal business hours are defined as 8:00am to 5:00pm, Monday thru Friday, exclusive of holidays. OVER TIME CHARGES APPLY IF WORK IS PERFORMED AFTER NORMAL BUSINESS HOURS. 5) STANDBY charges may apply and will Invoiced to buyer’s account. 6) ALL QUOTED PRICING is contingent upon the customer furnishing materials and/or services as defined below. 7) Contractor or Owner is responsible for providing and mounting tapping valve unless otherwise specified. 8) If these quoted materials are used to connect to an existing concrete pressure pipeline, it is the responsibility of the purchaser to ensure that the existing pipeline is properly restrained to account for any thrust forces that may result from this modification. Please contact Thompson Pipe Group Pressure staff if there are any concerns or questions regarding the use of this material. Site Preparation 1) Contractor or Owner is responsible for arranging and paying for all necessary permits, licenses, fees and/or inspections 2) Contractor or Owner is responsible for all excavation de-watering, ventilation and/or scaffolding necessary to provide clear and safe workspace per applicable OSHA requirements. 3) Contractor or Owner is responsible for removal of all hazardous and /or explosive chemicals from within pipeline, and surrounding area Safety 1) Contractor or Owner is responsible for site excavations must meet Occupational Safety and Health Administration (OSHA) Safety Standards 2) CONFINED SPACES WILL NOT BE ENTERED UNTIL OSHA PERMIT ENTRY PROCEDURES HAVE BEEN COMPLETED to our personnel’s satisfaction. 3) The work site location must be accessible by a suitable roadway from a public highway. If the jobsite location or site conditions require barricades, traffic control or assistance, you or your representative must furnish barricades and assistance. 4) Site conditions MUST be suitable for safe and efficient welding / tapping. If Wet / Muddy conditions exist, rock, pallets or other acceptable material must be employed to facilitate safe and efficient work conditions. Equipment & Utilities - Personnel to operate required. 1) Contractor or Owner is responsible to furnish electric power and lighting as required by us to perform our work. 2) Contractor or Owner is responsible to furnish an air compressor capable of operating and delivering compressed air at 185 cfm at 90 psi. 3) Contractor or Owner is responsible for furnishing any necessary lifting equipment to lift, move, set, or place our furnished equipment or materials. Labor 1) Contractor or Owner is responsible to furnish at a minimum, one man designated as your representative to provide safety oversight. Your representative must always be available to us when we are performing work on site for you. 2) Contractor or Owner is responsible to furnish labor to assist in rigging or handling materials in and out of work area. 3) Contractor or Owner is responsible for Pipeline Preparation 4) Thompson Pipe Group provides grout material and labor to grout the saddle and the gland. Thompson Pipe Group provides and installs diaper. Thompson Pipe Group DOES NOT provide material or labor to fill diapers with grout / mortar unless otherwise specified. 5) You or your representative will be asked by our personnel to verify and confirm the pipeline operating pressure is reduced to a safe working limit (generally <90 psi) 6) Contractor or Owner is responsible for Post Repair 7) Contractor or Owner is responsible for Clean-up and debris removal. 8) Contractor or Owner is responsible for Inspection of the work and sign off / acceptance of completion. 9) Contractor or Owner is responsible for Restoring the pipeline and site to service after our work is complete 10) TAPPING: Coupon retrieval is not guaranteed and in the event the coupon is not retrieved, or pilot bit is broken, Thompson Pipe Group Pressure is not liable for any costs associated with retrieval. IV. ADDITIONAL ESCALATION Prices are firm for material shipped within 120 days of our acceptance of your order. Prices for material shipped after 120 days will be increased 1.5% per quarter until complete shipment is made on the order. DELIVERY Ready-to-ship/delivery noted elsewhere within this quotation is based on current production schedules and is based on your release for manufacturing or our receipt of approved drawings, and receipt of purchase order. Completed at a rate jointly determined by the purchaser and seller, subject to the terms and conditions herein. Changes in our production schedule prior to acceptance of this quotation may require adjustments in the delivery estimate. NOTE: Jobsite must be accessible to normal truck/trailer operations with no pushing or pulling allowed on truck/trailer. Only items specifically stated are included in the price(s). PAYMENT Invoiced amounts are due 30 days after invoice date, without any right of offset. Thereafter, interest accrues on any unpaid amounts at the rate of 1½ % per month, compounded monthly. Payment shall not be subordinated to any retention, project specifications, or third-party contract terms and conditions specifying when Buyer will be paid for the Products. SERVICE CHARGE 1.5% per month on the unpaid balance will be due on all amounts unpaid 30 days after the due date. ACCEPTANCE This quotation is valid for acceptance for 30 days from date of bid shown on this quotation. If an award is not made within that time, we will accept an order from you contingent upon your receipt of a contract with the owner. SERVICE WARRANTY All service work, including but not limited to tapping, welding, line stop, field representation performed by us is subject to the satisfaction and acceptance of the customer at the time of performance, and no other responsibility or liability is accepted or implied by us. BASIS OF QUOTATION This quotation is made subject to the attached terms and conditions. All quotations are subject to correction of stenographic errors. Shop Drawings: One complete set of shop drawings will be prepared and are included at no additional charge. Unless caused by our error, additional time spent on shop drawing preparation for previously completed drawings will be charged at the rate of $125 per hour. WARRANTIES: Seller warrants that its Products meet its published product specifications in effect at the time of manufacture. This warranty is valid for 12 (twelve) months after manufacture. Seller ’s specifications represent typical values obtained in accordance with ASTM testing methods. This warranty does not cover damage in shipment. Seller makes no other express warranties. Seller, disclaims and the buyer waives all implied warranties, including merchantability and fitness for a particular purpose. Warranty or defect claims must be received by Seller within 30 days after discovery or within one year of shipment, whichever is earlier. ANY CAUSE OF ACTION THAT BUYER MAY HAVE AGAINST SELLER AND WHICH MAY ARISE UNDER THIS CONTRACT MUST BE COMMENCED WITHIN ONE (1) YEAR AFTER THE CAUSE OF ACTION HAS ARISEN. Buyer's sole recourse for breach of this warranty is (a) repair of the defective Products; (b) replacement of defective Products with conforming Products. F.O.B. Shipping Point; or (c) the return of purchase price, at Seller’s sole discretion. Short count claims must be made in writing 7 days of receipt of the Products. Seller may require verification of any such claim. Defective goods should be shipped to Seller, freight prepaid, but only after prior written approval by an authorized Seller Manager. Claims that are not made within the applicable claims period are deemed waived. This limited warranty covers normal use. Seller does not warrant and is not responsible for: (a) damage caused by failure to provide a suitable installation or operating environment for the Products; (b) damage caused by any accidents; (c) damages caused by any disaster such as fire, flood, wind, earthquake, or lightning; (d) damage caused by unauthorized attachments, alterations, modifications or foreign objects; (d) damage caused by the use of the Products for purposes other than those for which they are customarily used; (f) damage from improper installation or maintenance; or (g) damage caused by any other abuse, misuse, mishandling or misapplication. Furthermore, this limited warranty shall not apply to any Products or parts of Products which have been repaired or altered outside of Seller factory, in any manner. All technical advice, recommendations, and services of Seller are intended for use by persons having skill, at their own risk, and Seller assumes no responsibility, and buyer hereby waives all claims against Seller, for results obtained or damages incurred from the use of Seller advice, recommendations, and services. Unless otherwise agreed in writing, Seller makes no further warranty of any kind, express or implied, relating to the product, whether used alone or in combination with other materials. Seller MAKES NO OTHER WARRANTY OF ANY KIND WHATSOEVER, EXPRESSED OR IMPLIED, INCLUDING WITHOUT LIMITATION, ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR END-USE OR PURPOSE. Seller DISCLAIMS ANY WARRANTY EXCEEDING THE EXPRESS WARRANTY STATED HEREIN. STORAGE: In the event the Buyer delays receipt of shipment(s) scheduled beyond 15 days, Seller will invoice customer at a pro-rated monthly rate of 1-1/2% of the value of the delayed shipment(s) to cover storage and carrying costs up to 59 days. In the event Buyer does not accept delivery of Products within 60 days of the Buyer submitted delivery schedule agreed upon between the Seller and Buyer, Buyer agrees to pay a monthly storage fee of three percent (3%) of the price of the stored Products until delivery occurs. Risk of Loss transfers to Buyer at the point Buyer fails to accept or schedule delivery in accordance with the agreed schedule. Any rescheduling shall be by mutual agreement with the same prevailing terms. Title to the Products and risk of loss, passes to Buyer upon the commencement date of such additional charges. Seller will be entitled to invoice material manufactured and stored on Buyer’s behalf after 60 days. Buyer shall be responsible for payment of said invoice whether products have been delivered to job site. PRICE ESCALATION: Any Products not delivered to the jobsite within 182 calendar days of 1st delivery or ordered manufacture date will be subject to an 8% escalation charge of product cost, at whichever date is earlier. Additional escalation charges will be assessed each subsequent 182 calendar day term period, until all remaining Products have been delivered. In the event of escalation of steel prices, additional charges shall be based on American Metal Markets Hot Rolled Coils Index, FOB Midwest Mill. The pipe pricing adjustment shall be for every $1.00/cwt in movement in steel price indices; pipe selling price will be adjusted by 1.5%. RETURNS: Seller is producing an engineered product per customer order. Seller does not accept return to stock material unless mutually agreed upon. Should Buyer wish to return, and Seller agrees to accept any material from original purchase order, Buyer will incur a charge of 30% of the net selling price plus any charges incurred by Seller to inspect, transport and rework material to working condition upon delivery to Seller ’s inventory. FLANGED PRODUCTS ARE SPECIAL ORDER AND MAY ONLY BE RETURNED FOR REPLACEMENT UNDER A WARRANTY CLAIM. FORCE MAJEURE: Seller may suspend or delay its delivery of any Product ordered hereunder upon the occurrence of any event beyond Seller's reasonable control, including, but not limited to, wars, terrorist acts, hostilities, revolutions, riots, civil commotion, national emergency, strikes, lockouts, epidemics, fire, flood, earthquake, force of nature, explosion, embargo, any other act of God, any utilities outage, or any law, proclamation, regulation, ordinance of any court, government or governmental agency. Unavailability of supplies (except if an event of Force Majeure as described before occurs with Seller's supplier(s)), and failure of suppliers, are within Seller's control. Seller may only rely on the above provision if it promptly notifies BUYER in writing—either by fax or by email—of the occurrence of any of the above events. BUYER shall be entitled to cancel a Product Purchase Order if the delay lasts for more than 16 weeks and may place a corresponding order with another supplier. III. THOMPSON PIPE GROUP ATTACHMENTS PROVIDED WITH THIS QUOTATION Attachments: - Quote - Customer Information Sheet (COMPLETE AND RETURN WITH ORDER) IV. Sales Tax: TAXES Sales or Use Tax are not included. Purchaser is responsible for payment of any such assessments. If project is tax exempt, purchaser must furnish a tax exemption certificate at time of signing quotation, or tax will be invoiced. CUSTOMER ACCEPTANCE: Company: ____________________________________ Print Name: ___________________________________ Title: ________________________________________ Thompson Pipe Group Pressure Quote Number: ___________________ Joint Water Commission TAC Meeting Thursday, May 30, 2024 10:00 AM 1. Towers a. MLR tower i. Move construction to 2025. Updated budget to 3 million for construction and engineering. This will include a new altitude valve and hydrant at tower location within the fenced in area. ii. Security improvements 1. Camera’s, door fobs, no climb fence around the perimeter with new gate. NOTE: This will be a separate project after construction has been completed. iii. Parts storage 1. Connex containers will be needed for storage of existing parts during construction. iv. New Hope is working with KLM. b. Tower replacement i. GV tower to get replaced 2028/2029. ii. Golden Valley is working with KLM. 2. Projects a. MCC / motor, pump, VFD replacement at both pump houses i. GV construction 2024/2025 (pump #4) 1. HVAC a. Old AC units out b. New windows are installed in place of the old AC units. c. New AC units are in with the sub-contractor now and will be installed in June. 2. Switch Gear / Transfer Switch a. 30-week lead time is anticipated. Will know more when the submittals are completed. ii. Crystal construction 2025/2026 (pump #3) 1. No updates b. Effluent Meters i. GV 1. Access the condition of the existing structures when time allows. ii. Crystal construction 2026/2027 tentative 1. After the MCC project is complete, the effluent meters along with 3 valves will be replaced. 2. Have meters on site. c. Reservoirs i. Golden Valley 1. No updates ii. Crystal 1. KLM completed the robotic inspection in 2023. Working with KLM. d. Fiber i. Golden Valley 1. Fiber is completed. a. Working with Total Control to implement. b. Security enhancements will include camera’s, door fobs will run through the fiber network when the MCC project is completed at the GV station. e. SCADA i. Met with Total Control 1. Total Control recommended security upgrades at all JWC properties which included cameras, door fobs, etc. Will be done after the MCC project. f. Valve replacement. i. GV 1. 18” @ Olympia and Louisiana Ave ii. New Hope 1. 16” 42nd Ave between R&R bridge and Winnetka iii. Crystal 1. 30” 45th Ave and Douglas Dr 2. Quotes a. PCCP adapters (looking for approval) i. We currently have the PCCP adapters in storage to do projects. With long lead times we need to replace the adapters that will be used in all 3-valve replacement projects. ii. See attachment. 3. Parts a. Waiting on quotes from suppliers 4. Labor a. Waiting on quotes from contractors 3. Miscellaneous a. Finance i. 2025 CIP in review b. Wells i. GV 1. Currently under review with the TAC ii. Crystal 1. Run both wells, and test water in September of 2024 iii. New Hope 1. Run well and test water in 2024. c. Cyber Security i. Each city completed their own assessment with Total Control and submitted. d. Lead Service inventory. i. Due August 15, 2024. 1. Each city is being proactively doing their own inventory and submittal.