08-11-08 PC Agenda
AGENDA
Planning Commission
Regular Meeting
Golden Valley City Hall, 7800 Golden Valley Road
Council Chambers
Monday,August11,2008
7 pm
1. Approval of Minutes
June 23, 2008 Regular Planning Commission Meeting
2. Informal Public Hearing - Property Rezoning - Z012-16
Applicant: City of Golden Valley
Address: Northeast Corner of Douglas Drive and Golden Valley Road
Purpose: To make the zoning designation consistent with the General
Land Use Plan map designation
3. Informal Public Hearing - Preliminary Plan Review - Planned Unit
Development - Applewood Pointe - PUD 106
Applicant: United Properties
Address: Northeast Corner of Douglas Drive and Golden Valley Road
Purpose: To allow for the construction of a 4-story, 74-unit senior
cooperative building and 4-story, 105-unit assisted living
building.
4. Informal Public Hearing - Conditional Use Permit - Teacher Federal
Credit Union - 601 Boone Avenue North - CU-123
Applicant: Teacher Federal Credit Union
Address: 601 Boone Avenue North
Purpose: To allow for the construction of a 7,700 square foot credit
union building with 4 drive-through lanes in the Commercial
Zoning District. The Conditional Use Permit is required for the
drive-through lanes.
---Short Recess---
5. Reports on Meetings of the Housing and Redevelopment Authority,
City Council, Board of Zoning Appeals and other Meetings
6. Other Business
7. Adjournment
Regular Meeting of the
Golden Valley Planning Commission
June 23, 2008
A regular meeting of the Planning Commission was held at the Golden Valley City Hall,
Council Chambers, 7800 Golden Valley Road, Golden Valley, Minnesota, on Monday, June
23, 2008. Vice Chair Waldhauser called the meeting to order at 7 pm.
Those present were Planning Commissioners Cera, Eck, Kluchka, McCarty, Schmidgall
and Waldhauser. Also present was Director of Planning and Developm k Grimes,
City Planner Joe Hogeboom, Environmental Coordinator AI Lundstro . istrative
Assistant Lisa Wittman. Chair Keysser was absent.
1. Approval of Minutes
June 9, 2008 Regular Planning Commission Meeting
Eck noted several typographical errors.
MOVED by Eck, seconded by Cera and motion
9, 2008 minutes with the corrections noted
2.
Continued Item - Minor Subd
- SU09-13
2, Block 3, Glen Urban Addition
Applicant:
DiGiacomo1
Address:
, Glen Urban Addition
Purpose:
n wou d create three separate lots to allow for the
f three new homes
Waldhauser re
May 28,
prese
area in
ission that this subdivision request was tabled at their
der to obtain further information regarding the City's tree
nd to get an update on a drainage study that was done in the
a e City's Environmental Coordinator, AI Lundstrom is available to talk
ommission about the City's tree preservation requirements. He referred
to the u drainage study done by SEH Consulting and stated that they don't feel that
the proposed development would cause any significant changes to the existing storm
water issues however, they do recommend that best management practices are followed.
He suggested that a condition of approval be added regarding the requirement of a rain
garden, infiltration basin or some sort of water retention system.
Eck stated that he was disappointed that Lundstrom's memo regarding tree preservation
requirements didn't address the interconnected root issue and how oak wilt could spread
from tree to tree. He said he spoke with Mr. Lundstrom about oak wilt and was told that it
could be an issue in April, Mayor June but that the beetle that causes oak wilt is dormant
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 2
after June. He stated that at their previous meeting for this proposal there was concern for
the large, old oak trees in this area. He added that those oak trees were there before the
houses that exist there now were built so it has to be possible to build houses without
wiping out all the oak trees.
Waldhauser said she would like more information regarding the tree inventory. Lundstrom
explained that there is no requirement for the applicant to do a tree inventory for this type
of development. He stated that the applicant has provided a very preliminary, informal
tree inventory, but more detailed information will be required when the t applies
for building permits.
Waldhauser asked
that for hardw
a significant tre
develop
20%.
how
Waldhauser asked Lundstrom if he could comment on the oak
many could possibly be removed or damaged with this develo
explained that the amount of trees removed or damaged de
location of the proposed houses on the lots. He stated that h
the applicant about the potential development and he
current tree preservation requirements. There will
He explained that oak wilt is always a concern i
explained that if a tree is wounded in April, May
dressing to help prevent oak wilt. He ad de
for example red oak to red oak or white
urban forest with a mix of trees. He ex
together or their roots are grafted
to 100 feet in a year or two.
Intand
ssions with
i build under the
hey can be minimized.
edevelopment. He
ould be treated with wound
only spread to like species
that Golden Valley is an
ak trees are close enough
gus could possibly move up to 50
Cera asked how the City e
explained that a building
approved.
e preservation plans are followed. Lundstrom
ed until the tree preservation permit is
determined to be a "significant tree", Lundstrom stated
e is 6 inches in diameter at the base and for softwoods
s In diameter at the base. He added that for this particular
maximum removal of trees before mitigation is required is
KI
strom to discuss his findings regarding the preliminary tree
n. Lundstrom said it is feasible to build on these proposed lots without
tion or no mitigation depending of the type of homes built and the
homes on the lots.
McCarty asked Lundstrom if he could estimate the average age of the trees in this area.
Lundstrom said no and that it varies quite a bit. There is a large variety of trees including
some old oaks and some new due to more recent developments.
Kluchka asked if removing trees would affect the surface water drainage issues.
Lundstrom stated that there is no information available regarding trees effect on surface
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 3
water drainage. He said his inclination is that the removal of 20% of the trees would have
minimal to no affect on storm water issues.
Schmidgall stated that if a developer can remove 20% of the trees and there were 30
trees on these lots the developer could remove 6 trees over the course of developing
these 3 lots. Lundstrom clarified that the threshold for mitigation is 20%. If less than 20%
of the significant trees are removed, the applicant does not have to mitigate. If more than
20% of the significant trees are removed, the applicant would have to mitigate.
Kluchka referred to the pond in the area and as
drainage issues in this neighborhood. Grimes e
issues with the pond the neighbors could
have a pump installed, the cost of whic
owners. He explained that the drainag
make sure that this proposal won't'
added that there are also things
problems.
at
t that
n would
ng that the
Grimes suggested that Waldhauser read aloud the memo from SEH
requested updated drainage study. Waldhauser read the memo a s
SEH concludes that the proposed changes and development w' insl
some sort of storm water reduction practice such rain garde
fit nicely in this proposal. Grimes suggested adding a condit
developer should work with the Public Works Department re
recommendations.
Id help mitigate the
in order to mitigate any
an improvement project to
to the benefiting property
ee one and updated in order to
II~ate the current issues. Waldhauser
do themselves to help reduce water
Mike Schock, 4316 Gle
Stinson, they had a tree s
record. He stated t w
about preservation.
Rainbow Tree r
destructive to t
tree pres
removl
d that in conjunction with his neighbor, Judy
e y inbow Tree Care. He submitted study for the
difficult to replace the old oaks so he is more concerned
there is no immediate danger to his trees but the
that if trees become sick or wounded it can be
st. e said he wants the City to be very aggressive regarding
nts and he wants it to be economically painful for people
Glencrest Road, asked the Planning Commission if they have seen
n these lots. He said based on the topography he doesn't know how
built there without flattening the lots. He said he is concerned about the
preservatl f wildlife. He loves the deer that hang out at the pond and migrate through
these properties and developing these lots will significantly change the deer's migration
paths. He added that he wants to make sure these homes are designed to be
aesthetically pleasing because they will be corner lots and will stick out like a sore thumb
if they are not.
Bobbie Conner, 244 Janalyn Circle, said she's been asked by several neighbors to speak
about a report written by Robert Burke (4223 Glencrest Road). She submitted copies of
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 4
the report to the Planning Commission. She highlighted the five major points from the
report as follows: 1) In the promotional piece done by Mr. DiGiacomo the "front" of the
home on proposed Lot C is on Janalyn Circle, not on Glencrest Road which is the
narrower side of the lot; 2) The issue of steep slopes occurs in this proposal. The street
drops 30 feet over 170 feet in length; 3) The issue of excessive wetness occurs in this
proposal. People have had wet basements and yards and she has had to drive around
water in the streets to get to her house; 4) A government agency such as the Bassett
Creek Watershed Management Commission has not been included in this review and; 5)
There is a question if Mr. DiGiacomo is legally capable of granting eas ecause he
is not, at the present time, the owner of all the lots. She submitted ares that
support Mr. Burkes' report and asked that the Planning Commissi d d deny
this request. She added that she needs to see much more deta' plans
DiGiacomo.
Gene Hollister, 240 Janalyn Circle, submitted photos of the a
it rains there are streams of water two to three feet in
said there are only two drains in the street to servi
new houses will increase the strain on the sewe
new homes are supposed to be in the style of th
of that in this case. He stated that many of
and asked if rain gardens would increas
environmental issues become feasible.
were two also increases the popul
ed how after
e street. He
a and these proposed
that these proposed
od and there is no evidence
environmental concerns
ation and at what point
ating four homes where there
Yvonne Fredericks, 300 Janaly
buys a lot, there has to be
long time and has not s
She stated that the appli
that need to be cle up.
quite understand wh
is not that big 0
in the area bec
care of a
to be ta'
id oesn't understand why, when a person
e involved. She said she has lived in this area a
ter problems people have been talking about.
oug very nice piece of property, full of dead trees
said the developer has been very nice and she doesn't
;'t~ien so much discussion in the neighborhood because it
h't want this developer blamed for any water problems
something the group in the neighborhood should have taken
e reiterated that she thinks a lot of the trees on these lots need
ust wants to see the anxiety in the neighborhood go away.
alyn Circle, said he does not object to the proposed subdivision as
city requirements. He stated that he and his neighbor, Jeff Nordstrom,
t $12,000 worth of water removal equipment at their own expense with
the City eer's approval. He feels he has done his part and now the City needs to do
what it's supposed to do when the water comes.
Rich Baker, 224 Janalyn Circle, said that if the comments received are not applied to this
project they should be considered for future action. He said that there were a lot of trees
removed from these lots by builders that preceded this one. He agreed that there should
be a stronger disincentive to remove trees. He referred to the updated drainage study and
said it was disappointing in its scope because it only looked at impervious surface
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 5
coverage, not compaction, erosion and steep slopes. He said the City is doing a very poor
job in assessing the hydrology report.
Helga Thielen, 400 Janalyn Circle, said she is asking the City to deny this subdivision
request. She said the proposal would increase density and she bought her house
because of the large size of the lots. She said the impact from this development would be
wide reaching because there are several lots in the area that could be subdivided so it
would be wise for the City Council to deny this request.
KI
not
propos
Commissl
been removed from
ow those. trees are included
Judy Stinson, 4308 Glencrest Road, said she has encountered in th
belief that this subdivision is already a done deal because of the Ii's liter
She said she supports Mr. Burke's report and requested that th ms In
addressed because many developers can not be trusted to pr tr
that going forward "more teeth" be put into the City's tree pr nd
requirements because there is not much of a financial cost in
trees.
Brant Pallazza, 4101 Glencrest Road, stated th
these properties prior to this developer's reques
in the total tree count.
Seeing and hearing no one else wishi
hearing.
Kluchka said from what he has
a better way to handle issu
stated that the City does
applicant could have the
there will be a sub . . 'on
tree preservation a
that neighborhood covenants might be
, trees, wildlife and tree mitigation. Grimes
orhoods to have covenants but in this case the
om wners form an association. He reiterated that
ment agreement to address the issues of grade and
9s.
Waldhauser s
have to b
more b
Ie or the neighbors to form an association but there would
. h all of the neighbors and in her experience covenants create
t environmental impact studies. Grimes stated that this proposal does
shold to require an environmental impact study. He added that this
esn't meet the threshold for the Bassett Creek Water Management
o review but the City does follow their best management practices.
Kluchka asked at what point the grading plans are done. Grimes stated that the grading
plans are done during the building permit process. However, in this case the City has
asked the applicant to show preliminary grading. He added that the elevation of the
foundations will also be set in the subdivision development agreement. Cera clarified that
the grade is set in the subdivision development agreement but the grading plan is done
during the building permit process.
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 6
Kluchka asked what excessive wetness means. Grimes stated that there are ways to
mitigate wetness on properties. He said excessive wetness is rare unless a property is in
a wetland area. Kluchka asked if wetness refers more to protecting the foundation of
buildings. Grimes said yes.
Waldhauser suggested the Planning Commission take the concerns they have heard and
see what additional support the City can give people to help them solve their own
drainage problems. She said she agrees with the updated drainage study done by SEH
and with staff reports.
McCarty said subdivision reque
of people against these types 0
requirements they are har
of the proposed new ho
architectural design stan
keep the houses wi . the
diversity of house st
stated that the
e removed but if more
Eck stated that this is a "who do you believe" type of situation bec
think the grade, the drainage and the build-ability of these lots i
problems but there are professional staff and consultants sa .
manageable. He said he has to accept the professional reli
Cera asked if certain trees can be singled out not to b
tree preservation ordinances states that any num
than 20% of the trees are removed then mitigati
DiGiacomo stated that one of the lots has
will be saved. He noted that the other 10
save. He stated that he wants to do w
h have significant value and
them that he also wants to
ake sure the trees survive.
icult because there is a strong turn out
t if the proposals meet the City's
eferred to a comment made about the aesthetics
hat Golden Valley does not have any
weve e thinks that the developer has incentive to
ter of the neighborhood even though there is a large
a. He said he is in support of this proposal.
nclined to support this proposal. He said he wants to make
s remain but feels that the tree preservation requirements will
hat if these properties provide their own storm water
on' add to the existing drainage issues in the area. Grimes reiterated
agement will be a part of the subdivision development agreement.
Kluch
Grimes sa
Council.
at the report written by Mr. Burke be forwarded to the City Council.
e and the City Attorney will review the report and forward it to the City
MOVED by McCarty, seconded by Eck and motion carried unanimously to recommend
approval of the minor subdivision of Lots 11 & 12, Block 3, Glen Urban Addition in order
to create three separate lots to allow for the construction of three new homes subject to
the following conditions:
Minutes of the Golden Valley Planning Commission
June 23, 2008
Page 7
1) The applicant will work with the Public Works Department regarding a run-off retention
system
2) The final plat of this proposed minor subdivision (yet to be named) will be consistent
with the preliminary plan submitted with the minor subdivision application.
3) The recommendations in the memo from City Engineer Jeff Oliver, PE, to Mark
Grimes, Director of Planning and Development and dated May 19, 2008, shall become
a part of this approval.
4) A park dedication fee shall be paid in an amount approved by the City Council at time
of final plat approval.
5) Individual Tree Preservation Plans shall be submitted for the dev
the proposed lots at time of building permit application.
6) A Subdivision Agreement will be drafted for review and appr ncil
that includes issues found in the City Engineer's memo d
4. Other Business
Reports on Meetings of the Ho
Council, Board of Zoning Ap
pment Authority, City
etings
Grimes suggested that the neighborhood also work with the
and/or the Environmental Commission regarding the C'l '
requirements.
3.
No other meetings were discuss
No other business
5.
Hey
Planning
763-593-8095 I 763-593-8109 (fax)
Date:
August 5, 2008
To:
Golden Valley Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject:
Informal Public Hearing to Amend the Zoning Map from the Single Family Zoning
District (R-1) to the High Density Zoning District (R-4) for 1100, 1170, 1200, and
1300 Douglas Dr. N.; and Medium Density Residential Zoning District to High
Density Residential Zoning District for 6200 and 6212 Golden Valley Rd.-City of
Golden Valley, Applicant
The existing General Land Use Plan Map approved by the City Council in 1999 designates all
properties on the east side of Douglas Dr. N. that are north of Golden Valley Rd. and west of
the railroad tracks for High Density Residential uses. This proposed General Land Use Plan
map that will be a part of the City's updated Comprehensive Plan to be approved later this year
by the Planning Commission and City Council also designates this property for High Density
Housing. It is a requirement of the State of Minnesota that the General Land Use Plan map for
a City and the Zoning Map should be consistent. In the case of the area south of Bassett
Creek, the zoning map is not consistent with the General Land Use Plan map. The Zoning Map
has remained Single Family Residential (R-1) for the four single family or two-family homes
along Douglas Dr. and Medium Family Residential (R-3) for the two multi-family buildings at
6212 and 6200 Golden Valley Rd.
The General Land Use Plan map designation for this area as High Density Residential allows
housing with 12 or more units per acre. The existing R-1 zoning for the lots along Douglas Dr.
N. allows five or fewer units per acre and the R-3 zoning for the two lots along Golden Valley
Rd. allows no more than 12 units per acre. This is a conflict that must be corrected by
amending the Zoning Map to be consistent with the General Land Use Plan map. This
discrepancy should have been corrected with the change several years ago to the Zoning
Code that eliminated the Multiple Dwelling (M-1, M-2, M-3, and M-4) zoning district and
created the new R-3 and R-4 zoning district. The two new zoning districts were created in
order to have two multiple residential zoning districts that would better correspond to the
Medium and High Density designation on the General Land Use Plan map. The new Medium
Density Residential zoning district (R-3) corresponds to the Medium Density designation on the
General Land Use Plan map and the High Density Residential zoning district corresponds to
the High Density designation on the General Land Use Plan map.
1
It is necessary to amend the zoning map to High Density Residential (R-4) for these parcels in
order to make their zoning consistent with the General Land Use Plan map. This is a
requirement of state statute. Secondly, United Properties has requested a Planned Unit
Development (PUD) to construct about 175 units of cooperative and assisted living units for
persons 55 years and older on the properties to be rezoned. The property to be rezoned is
about 5.6 acres in area. With the proposed 175 units, the density is over 30 units per acre.
Therefore the United Properties development (Applewood Pointe) greatly exceeds the
permitted density allowed in both the R-1 and R-3 zoning districts.
Recommendation
The staff recommends amending the zoning map to change the zoning of the properties at
1100, 1170, 1200, and 1300 Douglas Dr. N. from Single Family Residential (R-1) to High
Density Residential (R-4); and the zoning of the properties at 6212 and 6200 Golden Valley
Rd. from Medium Density Residential (R-3) to High Density Residential (R-4). The change in
the zoning is consistent with the General Land Use Map dating back to 1999. (The City is in
the process of updating its General Land Use Plan map. The proposed update does not
change the designation for the subject property.) The high density designation on the General
Land Use Plan map has been placed on this property by the City Council due to the need for
multiple family housing in Golden Valley and because this is a good location based on
accessibility to the street system and access to sidewalks and transit.
Attachments
Location Map ( 1 page)
Zoning Map (1 page)
General Land Use Plan Map ( 1 page)
2
, , I I I I 1
l$Oll 6424 64tl8 6400 6326 6316 6_
I I I I I I I
~
1400
1315
1436 6425 6401
1336 I'll
0 ~ 0 0
1320 0 i 0 0
1310 0 i 0
0 0 0
:ill: 0 0
6436 6424
6400 6336
/
~
~
1111
M~ '-:'~ '($'itl.~-~,#iW - C<.lp),~;.-tt {C~ lOOtS GIS 21))5
o
ZO,,\~
tv\~
->t'\\~.- ........
.... -J. . - _\ . lll1. ~\r.'
\,..' -j.l- \.. T
- '
Legend
House Numbers
Street Centerline.
IV' City Umit
o Open Waler
# Streams
Zoning
o
. 01'0
.c
.'
ill ,.,
o .2
0103
O~
. .5
Ou
OR.'
o R.2
IiiII R.3
. R"
OX
o Park.
o Parcels
3m! AVENUE
CITY OF
Prop~s~g
.
.
.J ·
cm OF CRYSTAL
I~r~~' ::':~::----.-----'.'-;~;~1"-" ; ~', :,~ ,~~H I I U2j~ ~ )::\~ttil:Z: T ,1= ~R=I.r: Noble ~ 't:1=l = CI1:; OF ROBBINSD~E AVFNUE
\ ~ ...41 I:lt:t:YHH!l!ili 'i'\WM H '.1[1 r~. B~k: Eleme ~ ' -, W&
I L:',; iMe~I~HI I g'lg;1rw~r. ~ ~j:htl~ '.'IU - Sandburg L:J.,J; ': ~~f~~E School ~:\\ ~ ~ ~
\ ark ~ ~ ~ ~ ' Middle School ill , ~e ~ ,a. ~ 'z
"""-1 l\ 1 - ",' ~ -.. A IHII ' ~
>- I,' I . " ~::t - ',,", ~!"'" II 8 .= >h ~Terrac ~ ~
; 13i3EI;J83ffi~~ ifjfj?jE mnR= ~mR~, ~~~.J~~';"il- ssellcreek,\' ~- 89~ , . ~\, P~r ,~ ~ .
== ~EE3t:Fj~IIrx:' I ~ [[j]JFF i:1=lmR sr~rll~,.. : .-. tur,eArea, ' I "':= ~ , "li 66 -\..Ii~
A D H MnIDOTIJ...{/ ~ ~ '
~'o,r, :::; 68 ,',)/ 7{'., ~ I
~.,' od'::"'lI ::P'..,<""j- 0 . IiT/ 1 ;j). It I
uWO "It I' ~.Qt;.Z h
- Hone~ell t:l, . '\ Ii,
Sigurd , J ~ PondJ~ ' 'MI <~ '$
~ ~~ 156 Elemen ' ~I ~ /, :y:~ PE!J.' ~ jr-f::j _ I _ ?~ ;.
J~I-D V~~ S"'"gffiffi, ~"-..,I Y~:f: ~1.J1. 1~::>':_,~4e.!d"""J.;lC>=l~_:: I.>~ "'i"
mmmw ~L 0 . ~~~(HJ; Sfrrm II. '*"~ ~~ \ I
JB 'lltu I ley I~ < M~ :I~' Subj_ect Pr~pe.~ies ,:~l~; r'_ '~ ~:'I ' ~\\\l ~ ~
UI ~ fjPark ,~, ~m ,~ms, ~~d ,~ :' ~~ ~rrrr-tr P" ~ TheodOrel "LJLJ1
, " I: EN E -'Ml 1-1< ' ~" (Pubhc) .$-~ T,,; ~I
i _ ..... =- .0 ell, ".., 1..1. :::,." r" <(;" 'J ....-', ~ "'
.l::it7,~ .....:::~~ . I ar rn \\ ~ I :\~ _-'-_. __, ",' 10
, i~ CREEK~ ~ \\2E ,-=1 ~<t \1 ~ I ...'" 'Wit 1
,"- '~~Lor,ks ,un;o.~,:','Ir;, R, , '\, F=lEE311 . ....sars a;:n: ~10 t ;..." "- -U. I-i: EEFE ? e.,~ !...it:I.' I \.4~. 16
'\\ E-~ _{,...", , ~ mtflJ .7' 1. A' " Cl I d1. CI.,.~ '''fl, ,I(
J ,~ ,Y,,) -J., ,li,t .Ik'''''r>r ~ ~ ," ~ , 9-O~ r! ,tf -i ~rT :c ~ r'~'-' ~(Y'~ f~''.).~2.I. ~~-TOOI ~
~ ,," . D - ~ ~ ~~!: rr - fY~ -~, 1.\ '-J.'// 0 V~ -..
~ : c-., '0 P, rt ", Llbr :j, I~ .. ~~"" Golden Valley '" ~ ;J, n ~ - rtliVA lJ.'o.p",r~ <::::: '~iJ"\\'
"' ~ :1 '\ ,I, ==t 1 P G '-o\. , Golf Club - dU~~ ~ ~ ~ ~ , J: Theodore 'i;
o r===c ~ Gover' (Private) S. 0.-' 'i -J. 'Scha rr "T 'h ,Wirth I
C:: .". . enter "[ g " '" ztBl' lP ark ,'r Park
tJ ti COUNTRY CLUB DRIVE 8 ~ ,;:j "./L_! r.- t '~.
I ost ,.J: :1 " v ;.-.;: ~ - '
j :<..... flic ::; -J;:;l;:lJ::l1.L11 I ,,;:r;::::::::.... ~ fRCNTAO d~; ifITnll :--\ , 'II it _ ' ,
.-:::::.. :s;; ~, _ 66 0::11 'I":< ' " _' 66 = '
,.. ,:--;. '" 'r I.\., I /' -~inn,esota A:;s;" ,-y ~ -;~ ' "
( ,~" 'C11~~ r--/L" """"~~~cf,l::LL, iE ~ lcwerof I~I Y~~\\R~III~~~~~!'!:r::;::. (1! l~
~"iSO::DJjF1 .~ =1 1 ~ o the Arts YLl.u..1~' '~
1"1 ;<~ \111 \; =n ITRr:! \ ::l p. I- i=UD~-P' , ~~ I I,AU'
./ I _"." (2 ~~~
// '--/ :' ~ Hl'l~ ..rllE.' . -l1" 1. I J-L ~'Breck', lA"'"
'\ ~ 'llm' ' \:::::;J ~ 'J"'~~:" ~r:::; 7)1- ~: 40' \.:;'V_"-J.. R+m ~ _ l School ,~, .~, '/[:" "" ~ - . . T-
V ' ) B k.(j r:J/ ~ ~f.. Natchez, \-1 - J . I
. _ roo VIew, ~'. ,Par ' _v
~' It ~ Golf Course , ~ ".,-e.tern/Avenue-..., e:- LIOns ~ 'f m ' ......" "tIJlf1\ - ~ ~ I "Q", ,,' \.\,U
==tl1"", ' !t ~ = (p.bI.) 0 · ""'"'" Ii'"' 133 tIT!l' -' -' ii; "'-.. "EtlI:l!, . m.'% ---. I
--ql'~~'" ! ' 0 rIll l~ ch ~~ f \'\\"l t fRl.. r-' '," ~' ell
. 0 I H Park V 0 ., l'\' - JIl~ H 1'40'~1 ' hll c iFi1i . ~ I '- L
9 ,r j, ,(J ~" ,8Iffi~~ m Sclm, _ ~ .. iHtt1 ,''''' nmn""lRJl' "","_. ,~
rrn> Q( 11" 1\ Q =. m\:bW re mi. ld ~
~ I ~(}~__~~.. ~ ~ ~v ?~,
~7fU~~;-~r:Qtr, "'\~'-,' .I:tgj ~ Jj~~T '- ~ UJ~',]I~/~HD~I~~~ );-,100~ 'g:f= ~ -~;l;;:~L:1:3,.,F
'. / ," . . m; rd '--1"'1 'F'tH' bj_\ I /l~. -1 ~ ~
'so OE RD . · , , '0/:"; ./11 rL ........
~Jl74 ') ~ '\ ',,-VT ~PED " ,'___ b1l1~iIJL>1){' 'fH " ' ,,-., ~- v' ... 7j~ Jt
Westwood Hi~s Environmental IIf-- CITY OF ST LOUIS PARK --- .
Education Center J'l....,
...INTERSTATE,-'- 394----~ ,
..&7. J,JjTI =e t$~ t1
r~~~
,11111' II '~TL~J:J'a'N~
((lr((})!Ll/J) IEI~
..(111\
l(j]
TV A1ILILlE'Y!
GENERAL LAND USE PLAN
RESIDENTIAL
c=J Low Density (Less than 5 units per acre)
J~{;~':,] Medium Density (5 to 11.9 units per acre)
.. High Density (12 or more units per acre)
COMMERCIAL
CJ Office
.. Commercial
(also includes Office)
INDUSTRIAL
c=J Light Industrial (also includes Office)
[::J Industrial (also includes Office)
[~;:] Open Space - Public and Private Ownership
c=J Schools and Religious Facilities
CJ Public Facilities - Miscellaneous
.. Semi-Public Facilities - Miscellaneous
c::J Open Water
II Wetlands National Wetland Inventory - not field verified
L-J (MInor adjustments made to some wetlands)
~ Railroad
Existing Local Trail
Proposed Local Trail
Regional Trail
Proposed Regional Trail
Pedestrian Bridge
Road Rights-of-Way
_PEO
Municipal Line
1 inch = 1,833 feet
(j)
WgvJ~
1Moo,....,
D..........
.............
I.....
Golden Valley
May 1999
Comprehensive Plan 1999 - 2020
Hey
Planning
763-593-8095 I 763-593-8109 (fax)
Date:
August 5, 2008
To:
Golden Valley Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject
Informal Public Hearing on Preliminary PUD Plan for Applewood Pointe-
PUD No. 106 (Northeast corner of Douglas Dr. N. and Golden Valley Rd.)-
United Properties, Applicant
Background and Description of Request
United Properties, represented by Alex Hall, has entered into agreements with several property
owners at the northeast corner of Golden Valley Rd. and Douglas Dr. N. The 4.74 acre site
now consists of six lots that are each occupied by housing. The largest lot is the 6200 Golden
Valley Rd. property that is occupied by an apartment building constructed in the 1960s. The
remainder of the housing is single family homes, duplexes or a triplex. United Properties plans
to demolish all the buildings and construct two buildings on the site. The north building is
planned for a senior cooperative that would have 74 units. The buildings would be 3 and 4
stories with underground parking. The south building would be for assisted living. The plan for
the south building is to have a total of 105 units with 78 assisted living units and 27 memory
care units. This building would also be 3 and 4 stories in height with underground parking for
staff and residents. The development is best described in the attached "Applewood Pointe
Preliminary PUD Development Plan" prepared by Alex Hall of United Properties.
The attached site plans indicate that the site will have its sole access from Golden Valley Rd.
at the east end of the site. The developer had originally wanted to have a second access on to
Douglas Dr. north just north of Golden Valley Rd. However, Hennepin County controls access
to its County roads and the County staff believed that the access to the development just north
of Golden Valley Rd. would cause conflicts. Therefore, the site plan was modified to have only
one access. After review by the Public Works and Public Safety Departments, the plan was
deemed to be acceptable with only one access. (See attached memos from Deputy Fire
Marshal Ed Anderson and City Engineer Jeff Oliver, PE.)
The property is designated on the General Land Use Plan map for High Density Residential
(over 12 units per acre). However, the zoning map indicates that the property is zoned both
Single Family Residential (R-1) and Medium Density Residential (R-3). There is a proposal by
the City of Golden Valley to change the zoning to High Density Residential (R-4) that would
bring the site into consistency with the General Land Use Plan map. (This rezoning proposal is
also on the August 11,2008 Planning Commission agenda.) City policy has been that in the
1
case of a PUD consideration, the underlying General Land Use Plan map and Zoning Map
designations should be consistent with the proposal made by the PUD. Therefore, staff is
recommending that the zoning map be changed to High Density Residential (R-4) prior to
approving the final PUD plan.
The City is in the process of studying the land use and bike/pedestrian connections along the
Douglas Dr. corridor. It is hoped that the study will be completed in early 2009. The study has
taken into account that the Applewood Pointe property will someday be developed into high
density housing as outlined on the General Land Use Plan map.
Qualification as a PUD
Staff has reviewed the application for the PUD to insure that it qualifies to be considered as a
PUD. It is the staff's determination that this application does qualify to be considered as a
PUD. The development of Applewood Pointe as a PUD is consistent with the intent and
purpose provision of the PUD section. Also, the applicant (United Properties) has shown the
City contracts for the development of each of the parcels proposed to be part of the PUD. The
applicant has also had several pre-application conferences with the City staff and they recently
held a neighborhood meeting to get information and feedback from the surrounding property
owners.
The intent of the use of a PUD is to provide for an optional method of development which
permits design flexibility from other provisions of the zoning and subdivision codes including
flexibility in uses, height, setbacks, parking requirements and other similar regulations.
The staff has reviewed the information submitted for the Preliminary PUD Plan. The staff has
determined that the information is complete and, therefore, can go forward with the
consideration by the Planning Commission and City Council.
Review of Development Proposal
United Properties has proposed two types of senior housing for this site as described in the
attached description provided by United Properties. There will be a 74 unit cooperative building
at the north end of the site and a 105 unit assisted living building along Golden Valley Rd. The
assisted living building will include 27 memory care units.
United Properties believes that there is a market for these two types of housing built on one
campus. It allows seniors to live independently in the cooperative building and provides for
more services in the assisted living building. This allows couples to stay on the same campus if
one needs to move to the assisted living while the other remains in the cooperative housing.
The City's housing plan has always encouraged a variety of housing types and opportunities
Golden Valley residents. As the population ages, the cooperative and assisted living gives
nearby residents the option to stay within their community. This helps to "free up" existing
single family homes for younger families who would like to live in Golden Valley and enjoy its
good schools and amenities.
The proposed cooperative and assisted living buildings will each be three and four stories in
height. The building elevation plans for each building shows that the majority of the building is
four stories with a smaller portion being three stories. The maximum height of the building is 56
ft. with the measurement taken from the mid-point of the highest gable. In comparison, the
condominium building to the north of this site is three stories in height. The south elevation of
the condo building (creek side) is 46 ft. in height where the basement is exposed.
2
The north elevation of the condo building is 38 ft. in height. The height is measured to the mid-
point of the highest gable.
The proposed Applewood Pointe buildings meet the setback standards found in the R-4 zoning
district with the exception of the front setback along Douglas Dr. The setback for buildings
along the public right-of-way is 25 ft. The closest point that the cooperative structure will be to
Douglas Dr. N. is about 18 ft. The rear and side setback in the R-4 zoning district is 20 ft. All
structures meet this setba.ck requirement. (Note that there is a triangular shape parcel south of
Bassett Creek that is owned by the condominium association to the north of the creek.
Applewood Pointe has entered into an agreement to purchase this triangle (about 6000 sq. ft.)
in order to provide adequate setback area for the cooperative building from the north property
line. The final plan of development cannot be approved until Applewood Pointe obtains title to
this property.)
In comparison, the condominium building to the north is setback a total of 35 ft. from Douglas
Dr. N. However, the 35 ft. is measured from the existing right-of-way line for Douglas Dr. in
front of the condominium building. The Applewood Pointe setback from Douglas Dr. N. is
measured from the right-of-way line for Douglas Dr. N. based on a dedication of an additional
17 ft. along the east side of the road. (Douglas Dr. width in front of Applewood Pointe will be
100 ft. vs. 66 ft. in front of the condominium building to the north.) With the additional
dedication, the setback of the Applewood Pointe buildings along Douglas Dr. N. will be in
almost the same as the condominium to the north.
Hennepin County has also asked for an additional 1 0 ft. wide trail easement along the east
side of Douglas Dr. This easement is outside of the right-of-way and may be used by the
County for future bike trails. As you will note on the plans, there are sidewalks planned along
the east side of Douglas Dr. that will connect to the sidewalk along Golden Valley Rd. In the
future, the City hopes to extend sidewalks along the entire length of the east side of Douglas
Dr.
The Applewood Pointe development indicates that there are a total of 192 parking spaces for
both buildings. The cooperative building has 74 underground garage spaces and 40 surface
stalls. The assisted living building has 60 underground garage spaces and 18 surface stalls.
This exceeds the City's parking requirement for these two types of structures by almost 100
stalls. The City's parking code requires that senior housing have .5 to 1 space per unit and that
assisted living have 1 space per every 5 beds. Using the highest requirement for the senior
housing (cooperative housing) of 1 space per unit, the total parking required by the zoning
code is only 95 spaces. Applewood Pointe believes that the 192 spaces will better serve their
residents, visitors and employees.
The R-4 zoning district states that buildings should occupy no more than 45% of the property
and that the total impervious surface should not exceed 60%. Based on the information .
provided on their plans, the buildings cover 30.9% of the site and the total impervious surface
of the site is about 47% of the site. Applewood Pointe indicates that 53% of the site is
landscaped, natural or open (including ponding).
United Properties has submitted a landscape plan as part of the submittal package. This plan
appears to be well designed. However, the plan must be reviewed by the City's Environmental
Coordinator and approved by the Building Board of Review. In addition, the developer must
3
show how the site will meet the City's tree preservation ordinance and come up with a
mitigation plan. This plan must be developed and submitted with the final PUD plan.
Overall, the staff believes that is a good plan. It provides the City will additional senior and
special needs housing. It is located in an area that is designated for high density housing. The
site will have more than adequate parking and it will be well landscaped. Applewood Pointe will
provide additional right-of-way for future street improvements to Douglas Dr. and additional
sidewalks and
trails. The design of the buildings appears to be well thought out. In terms of height, it is four
stories in height (56 ft.) which is substantially less than the 96 ft. (approximately 8 stories) that
is permitted in the R-4 zoning district. Access to the site is limited to Golden Valley Rd. By
eliminating a driveway to the site from Douglas Dr., potential conflicts along that minor arterial
are greatly reduced. Because these buildings are limited to senior citizens, staff believes that
the traffic generation from the site will not be significant during the peak hours when workers
are commuting on the busy streets in the area.
Recommended Action
Staff recommends approval of the preliminary plan for Applewood Pointe, PUD No. 106 with
the following conditions:
1. The "Preliminary Site Development Plans for Applewood Pointe" prepared by MRFA
Associates and dated 7/25/08 shall become a part of this approval. These plans consist of
Sheets C-1.01, 2.01, 3.01, 3.02,4.01,4.02,4.03, 5.01, 5.02, 5.03,6.01, 8.01, 9.01, 9.02,
and 10.01.
2. The preliminary architectural plans for Applewood Pointe of Golden Valley prepared by
JSSH Architects and dated 5/09/08 shall become a part of this approval. These plans
consist of Cooperative Sheets CS, A1.1, A2.0, A2.2, A2.3, A2.4, A2.5, A2.6, A2.7, A3.1,
A3.2, A3.3, A3.4, A4.1, A4.2, A4.3, A4.4, Assisted Living Sheets A2.1 , A2.2, A4.1, and
A4.2.
3. The recommendations and findings made by City Engineer Jeff Oliver, PE, and found in the
memo to Mark Grimes, Director of Planning and Development and dated July 30, 2008
shall become a part of this approval.
4. The recommendations and finding made by Deputy Fire Marshal Ed Anderson and found in
the memo to Mark Grimes, Director of Planning and dated July 21, 2008 shall become a
part of this approval.
5. Prior to approval of the final plan of development by the City Council, title to the triangular
piece of property now owned by the condominium association north of Bassett Creek shall
be in the ownership of Applewood Pointe.
Attachments
Location Map (1 page)
Applicant's Narrative titled "Applewood Pointe Preliminary PUD Development Plan" (3 pages)
Memo to Mark Grimes from City Engineer Jeff Oliver dated July 30, 2008 (6 pages)
Memo to Mark Grimes from Deputy Fire Marshal Ed Anderson dated July 21,2008 (2 pages)
Letter to Mark Grimes from Hennepin County Director of Transportation & County Engineer
James Grube dated July 23, 2008 (1 page)
Site Plans, Survey and Architectural Plans (36 oversized pages)
4
--LLLJ
6600 6S2tl GlOM
6611
~
-I
~
M:I;:l(:,':~lJl.~t';t~"ii!S.. ~~4flIi{C:I.LO~lS~~
un
z
~
(.ll
1 i
II
; I
,
,
;
\
"
APPLEWOOD POINTE PRELIMINARY
PUD DEVELOPMENT PLAN
United Properties is excited about the opportunity to work with the City of Golden Valley in
developing Life-Cycle housing consisting of a senior living campus with the addition of an
Assisted Living Community and an Applewood Pointe Cooperative. Over the past year United
Properties has been working on a plan with staff that would give us the opportunity to assemble
all of the properties in the northeast quadrant of Golden Valley Road and Douglas Drive. The site
consists of approximately 4.74 acres and is bounded by the railroad tracks on the east, Bassett
Creek on the north, Douglas Drive on the west, and Golden Valley Road on the south.
Because the City of Golden Valley is a First Tier Community, it has a larger number of seniors
that have lived in the City for 30 to 50 years. According to the Housing chapter of the City's
Comprehensive Plan, the number of residents age 75 and older nearly doubled between 1990 and
2000. Building housing suitable for these long-time Golden Valley residents will serve both the
needs of these aging citizens as well as the City's need to attract a younger population.
Residents that have raised their families and lived in the community for many decades are
hesitant to leave that community. This is especially true in a City like Golden Valley where the
quality of living is extremely high. Because there are so few new options for seniors, many are
forced to stay in their home beyond the time they would like, and perhaps beyond the time their
housing safely meets their needs.
We believe that this proposed plan is ideal for allowing Golden Valley residents to remain in their
community and for the City of Golden Valley.
COOPERATIVE
The senior cooperative will be a 3 and 4-story, 74-unit building. The Cooperative is a '"for sale"
property for independent seniors age 55 and older. The building will have underground parking
for the owners providing one stall per unit. Surface parking includes 40 additional stalls on the
south side of the building.
The community will include 13 unique floor plans ranging from an 835 square foot one bedroom,
one bath unit to a 1,764 square foot two bedroom with den unit. Cooperative members own a
share of the entire building and grounds, and have a right to occupy a specific unit. Each member
purchases a share in the Limited Equity Corporation, and has equal voting status in electing the
Cooperative Board of Directors from their membership. Cooperative housing combines the
advantages of pride of home ownership with the conveniences of community living.
The exterior of the building will consist of brick, stone, stucco, and maintenance-free lap siding.
The roof will be asphalt shingled. Residents will have no individual exterior building
maintenance obligations. The interior will include a community room with small serving kitchen,
a 2-story entrance lobby with multiple seating areas, a library, a sun room, game and craft rooms,
conference room, media room, barber shop, great room and an office for the on-site manager.
Additional amenities include a guest suite, an exercise room with sauna, and a carwash and
woodworking shop. Residents will enjoy a social, interactive, and healthy lifestyle.
Cooperative housing provides an affordable option for seniors to have an ownership interest in
their housing. We anticipate we will be utilizing a HUD Guaranteed Mortgage which will assist
in the long term affordability ofthe housing for our residents. We also structure our Cooperatives
as limited equity coops which means that there is a limit to the amount of annual appreciation the
owners receive. Typically we have limited the appreciation to 2% to 2-1/2%. This additional
control provides another mechanism for keeping the housing affordable; not only for the initial
coop members, but also for future members.
ASSISTED LIVING
The assisted living facility will be a 3 and 4-story, approximately lOS-unit building with 78
independent! assisted and 27 memory care units. The facility is primarily for assisted living and
memory care, but does contain congregate living for independent seniors looking for limited
services. The building will have underground parking for staff and residents. Surface parking
includes 18 additional stalls on the north side of the building. First floor will contain independent
living and memory care units. The second, third and forth floors will have assisted living and
independent living units.
The exterior of the building will consist of brick, stone, stucco, and maintenance-free lap siding
complementing the design of the adjacent cooperative building. The roof will be asphalt
shingled. The interior will include a serving kitchen, dining area, beauty! barber area, staff
lounge, a 2-story entrance lobby with multiple seating areas, a sun room, private enclosed garden
and spa area for memory care, and an office for the on-site manager and nurses. Additional
amenities include an exercise room, game room, and an outside patio. Residents will enjoy a
social, interactive, and healthy lifestyle.
SITE AND LANDSCAPE
There will be two entry points into the senior living campus, one from Golden Valley Road and
one from Douglas Drive. The area between the two buildings will consist of exterior parking a
central pond with a fountain and an amenity area with a gazebo! shade structure and seating area.
The parking lot will be paved with brick pavers creating the feel of an outdoor plaza between the
buildings. .
The front entrance area of the site is designed to have a more formal landscape and amenities to
welcome the residents and visitors. A loop drive will provide easy access into the site for pick up
and drop off of the residents and parking. One naturalistic pond, adjacent to Basset Creek and two
decorative pond areas consisting of decorative plantings and fountains provide key focal points
on the site. Decorative plantings will extend across the front of the building and along the sides,
where it will transition into the general open space at the back of the building. The back of the
site will capture landscape complementing the adjoining creek and openspace.
Creative storm water design and treatment was also used to minimize impact to the site.
Drivelanes, parking lot and building storm water will be collected into a series of ponds, filtration
and infiltration areas, and permeable brick pavers in the central and eastern parking area to
provide treatment. Filtration systems have been utilized to reduce pond footprint sizes, lowering
the impact of the development. The treated and clean water from the ponds and filtration areas
will be directed to the adjacent existing storm sever and Basset Creek.
United Properties has worked closely with city staff in developing this community under a pun
that conforms to city standards and is environmentally sensitive. Many meetings and discussions
were committed in ensuring that the project will fit with the vision ofthe community. Special
attention was made to develop a plan focusing on protecting the majority of the existing trees
around the perimeter of the property. The addition of a public trail along Douglas drive north to
the Basset Creek bridge were stemmed from our discussions with staff.
In summary, we look forward to developing a senior living campus in Golden Valley. We have
enjoyed a great working relationship with the City, and look forward to breaking ground on this
community as soon as possible.
AHlbls
alley
Memorandum
Public Works
763.593.8030 I 763.593.3988 (fax)
Date:
July 30, 2008
To:
From:
Mark Grimes, Director of Planning and Development
Jeff Oliver, PE, City Engineer .$...
Preliminary Design Plan ReJ:l).)
Applewood Point Assisted Living
PUD 106
Subject:
Public Works staff has reviewed the plans for the proposed Planned Unit Development
(PUD) NO.1 06, Applewood Point. The proposed development, which is located in the
northeast corner of Golden Valley Road and Douglas Drive, consists of two new
buildings of co-op and assisted living facilities. Bassett Creek is immediately adjacent to
the site on the north, and the CP Railroad tracks are adjacent to the eastern boundary
of the site.
Site Plan and Preliminary Plat
Access to this proposed development is provided by a single driveway from Golden
Valley Road. The driveway is located in the southeast corner of the site. Site circulation
consists of a looped driveway, with parking stalls on the outside of the loop. Access to
both buildings and the subsurface parking beneath the buildings is provided from the
driveway.
Previous discussions with the developer included a request to demonstrate the turning
radii of the City's largest fire truck, a 45-foot long single axle vehicle, within the parking
lot and driveway. This exhibit was not submitted with the Preliminary PUD plans, and
must be provided as part of the General Plan submittal.
There are several easements along Douglas Drive and Golden Valley Road that
encumber this site for roadways and utilities. The easements are labeled on Douglas
Drive, but not on Golden Valley Road. The developer must document all existing
easements on the proposed development site. In addition, all easements for roadways
. and easements must be vacated as part of the platting process, with the appropriate
dedication shown on the final plat. The developer will be required to submit an
application for easement vacation as part of the General Plan submittal for this PUD.
G:\Developments - Private\Applewood Point\PreDesignReview 072208.doc
1
,-
The Hennepin County Transportation Department has reviewed this proposed PUD.
This review identified the need for additional right-of-way on Douglas Drive to
accommodate future upgrading of the roadway. The proposed site plan indicates a total
right-of-way dedication on Douglas Drive of 50 feet. In addition, the County is requiring
a 10-foot wide trail easement along Douglas Drive. The right-of-way and easements
shown on the preliminary plat are acceptable as submitted. Because the trail easement
must be recorded as a separate document and cannot be shown on the final plat, the
developer must provide a legal ,description for the easement and the City will prepare
the easement documents for signature and recording.
The preliminary plat submitted for review includes drainage and utility easements to the
Base Flood Elevation (BFE) of Bassett Creek (elevation of 870.0 feet). However, the
City's Floodplain Management Code requires management of the floodplain to the
Regulatory Flood Protection Elevation (RFPE), which is 2 feet above the BFE, or to an
elevation of 872.0 feet. Therefore, the drainage and utility easements over the floodplain
must be extended to an elevation of 872.0 feet.
Previous discussions with the developer indicated that the triangle of land south of
Bassett Creek owned by the condominium association to the north would be
incorporated into the PUD. However, this land is not included in any of the proposed
plans submitted for review. This additional property must be included in all appropriate
plans for the PUD in order to allow staff to fully review the proposed site developments.
Douglas Drive is identified as a Primary Bikeway Route in the Hennepin County Bicycle
System Plan. Therefore, the developer must dedicate the appropriate easement as
discussed earlier in this review, and construct the trail across the property included in
the PUD. Discussions with County staff indicate that the trail must be a minimum of
8 feet wide and be paved with asphalt.
The developer will be required to obtain the appropriate permits from the Hennepin
County Transportation Department and the City of Golden Valley for all work proposed
within the rights-of-way for Douglas Drive and Golden Valley Road. Copies of all County
permits must be submitted to the Public Works Department prior to issuance of City
permits for the work.
This PUD will require a Development Agreement. The developer will be required to
submit detailed construction cost estimates for all sanitary sewer, storm sewer,
watermain, storm water management, trail and street excavation and repairs to the City
as part of the General Plan submittal. These costs will be used for calculation of the
securities required for the Development Agreement.
Sanitary Sewer and Water
There are existing sanitary sewer and water supplies available in Douglas Drive and
Golden Valley Road for this proposed development. There is adequate capacity
available in these facilities to meet the anticipated demands from the development.
G:\Developments - PrivatelApplewood Point\PreDesignReview 072208.doc
2
The developer will be responsible for ownership and maintenance of the sanitary sewer
and watermain systems within the proposed PUD. The utilities must be constructed
according to City standards and the maintenance requirements will be included in the
Development Agreement.
This PUD must comply with Chapter 3 of Golden Valley City Code regarding the
sanitary sewer system and inflow and infiltration (III). In order to comply with Chapter 3,
the sanitary sewer services to the existing buildings within the property being developed
that are not being reused must be removed in their entirety. If removal of any service is
not possible, it must be rehabilitated to eliminate infiltration into the line and may be
abandoned in place. The developer must submit an III compliance plan for the existing
service lines with the PUD general plan. In addition, a security of 125 percent of the
estimated cost of III compliance will be required as part of the securities for the PUD. An
escrow agreement is currently in place for the existing property at 1200 Douglas Drive.
The developer must also determine an approach for the water services to the existing
buildings within the PUD. As with the sewer, removal of these services to the main is
the goal of the City. Public Works staff will review the removals with the developer to
determine the appropriate approach for each service.
Golden Valley Road adjacent to this PUD was reconstructed in 2007. Therefore, open
cutting of the street should be minimized to the extent possible. If open cutting cannot
be avoided, additional street restoration may be necessary. The restoration
requirements will be determined at the time of issuance of utility and right-of-way
permits.
The City reserves the right to require modifications to the utility plan prior to issuance of
permits. The developer will be responsible for any additional costs resulting in
modifications to the utility plan.
Gradina, Drainaae and Erosion Control
This proposed PUD is within the Main Stem sub-district of the Bassett Creek
Watershed. Therefore, the development must comply with the Bassett Creek Water
Management Commission (BCWMC) Requirements for Improvements and
Development Proposals, and must be submitted to the BCWMC for its review and
approval.
As discussed earlier in this review, the Main Stem of Bassett Creek is immediately
adjacent to this site on the north side of the property being developed. Because there is
a floodplain associated with Bassett Creek, the PUD must comply with Section 11.60 of
the Golden Valley City Code. As discussed above, the floodplain for this site is
managed to the RFPE of 872.0 feet, and drainage and utility easements are required to
this elevation.
G:\Developments . Private\Applewood Point\PreDesignReview 072208.doc
3
. ..
The proposed grading plan indicates grading near the northern most portion of the
proposed building that will extend the 872 contour against the building, and apparent
patio elevations at an elevation of 872. The grading plan must be revised to keep the
proposed 872 contour a minimum of 15 feet from the edge of the proposed building.
The drainage and utility easements over the floodplain should be platted accordingly.
The developer has proposed a combination of on-site ponds, infiltration and storm
sewer to provide drainage for the site and bring this PUD in compliance with the
BCWMC rate control and water quality requirements.
As shown on the grading plan, the developer has proposed an infiltration trench around
much of the site. Portions of this infiltration trench will be located beneath an internal
trail system that will be built by the developer. Storm water runoff from the rooftops and
some localized storm water drainage will discharge into the infiltration trenches, which
are constructed of large diameter aggregate and fabric. These trenches are planned to
drain into Ponds 2 and 3 as shown on the grading plan. Storm sewer structures have
been proposed to serve as outlets from these ponds. The overflow from Pond 2 is into
Bassett Creek, and the overflow from Pond 3 is into the storm sewer system on Douglas
Drive.
The proposed pond outlets must be constructed according to City standard details
including skimming and emergency overflow structures.
The developer has proposed a system of porous pavement underlain by a drain-tile
system to provide storm water drainage in the central portion of the site. A piped outlet
draining into the Douglas Drive storm sewer provides the outlet from Pond 1, which is
located in the center of the looped driveway in the middle of the site.
The proposed storm water management system on site appears to comply with the
BCWMC requirements for water quality and rate control. However, long-term
maintenance of the porous pavement will be critical in ensuring the ongoing treatment of
storm water runoff prior to its discharge into Bassett Creek. Therefore, the developer
must submit a maintenance plan for the storm water system on site. This plan will
become part of the PUD agreement for the site.
The developer has also proposed a series of catch basins within the porous pavement
areas to serve as a backup to the porous pavement. These catch basins are located in
low point in the parking lot and will only receive runoff in the event that the porous
pavement becomes plugged with accumulated sediment or ice, or in the event of a large
rain event, that exceeds the infiltration capacity of the pavement. The proposed catch
basins drain into the subgrade beneath the porous pavement, which flows directly into
Pond 1.
The developer will be required to provide a native vegetation landscaped buffer along
Bassett Creek. This buffer area must be located north of the proposed internal trail
system and be entirely within the drainage and utility easements over the Bassett Creek
G:\Developments - PrivatelApplewoocl Point\PreDesignReview 072208.cloc
4
. .
floodplain. The buffer plan and a maintenance plan must be submitted with the General
Plan submittal for the PUD.
A City of Golden Valley Grading, Drainage and Erosion Control Permit must be obtained
prior to starting any work on site. In addition, the developer will be required to obtain an
NPDES General Storm Water Permit from the Minnesota Pollution Control Agency
(MPCA) prior to starting work on site. The City permit will be issued when a copy of the
MPCA permit is provided to the City.
Tree Preservation
This PUD must comply with the City's Tree Preservation Ordinance. The developer has
submitted an inventory and Tree Preservation Plan for the site. The plan does not
include the proposed planting schedule for mitigation. The tree mitigation portion of the
plan must be submitted with the General Plan submittal for the PUD.
Summary and Recommendations
Public Works staff recommends approval of the Preliminary Design Plan for the
proposed Applewood Point, Planned Unit Development NO.1 06, subject to the
comments contained in this review, which are summarized as follows:
1. The plans be modified to address the floodplain management issues discussed
in this review.
2. A truck turning radius plan must be submitted as discussed within this review.
3. A final utility plan, including a plan for compliance with the City's Inflow and
Infiltration Ordinance, must be submitted as part of the General plan submittal.
This plan must limit the extent of open cutting of Golden Valley Road to the
extent possible.
4. The developer must submit a maintenance plan for the porous pavement and
storm water management system on site as part of the General Plan submittal.
5. Detailed construction cost estimates for all sanitary sewer, watermain, storm
sewer, trail and pavement restoration items be submitted with the General Plan
submittal for use in calculation of securities for the PUD.
6. A revised Tree Preservation Plan be submitted to address the issues discussed
in this review.
7. The developer must obtain the appropriate review and permits from Hennepin
County, the Minnesota Pollution Control Agency, the Bassett Creek Water
Management Commission, and other agencies as discussed in this review.
G:\Developments - Private\Applewood Point\PreDesignReview 072208.doc
5
, .
Approval is also subject to the review and comment of other City staff. Please feel free
to call me if you have any questions regarding this matter.
C: Tom Burt, City Manager
Jeanne Andre, Assistant City Manager
Jeannine Clancy, Director of Public Works
Mark Kuhnly, Chief of Fire and Inspections
Gary Johnson, Building Official
Ed Anderson, Deputy Fire Marshal
Ron Nims, Public Works Project Coordinator
AI Lundstrom, Environmental Coordinator
Eric Eckman, Public Works Specialist
G:\Developments . Private\Applewood Point\PreDesignReview 072208.doc
6
alley
M randu
Fire Department
763-593-8079 I 763-593-8098 (fax)
To:
Mark Grimes, Director of Planning & Zoning
From:
Ed Anderson, Deputy Fire Marshal
Subject: Preliminary Site Development Plan #PUD-106, Applewood Point of Golden Valley
(Revised)
Date: July 21,2008
Cc: Mark Kuhnly, Chief of Fire & Inspections
The Golden Valley Fire Department staff has reviewed the revised proposed site plan for the
Applewood Point project located on the NE corner of Douglas Drive and Golden Valley Road. The
revised following comments are focused on the site plan, fire department access, water supply, fire
protection and landscaping of the site.
Site Plan
1. The current site has existing buildings to be demolished. The demolition of all buildings on the
site for this proposed project shall be in accordance with the Minnesota State Fire Code and
other city regulations.
2. The current revised plans indicated that the fire department's apparatus access road cannot
be obtained to due to physical terrain. Fire protection safeguards will need to be installed in all
of the buildings.
Fire Department Access
1. Since the fire department apparatus access driveway from Douglas Drive has been eliminated,
the only fire department access road for the entire complex is the access off of Golden Valley
Road. Therefore, it is imperative that a single access road needs to work with the responding
fire apparatus and other emergency vehicles. The following requirements for the fire
department apparatus access road will be as follows:
a. The fire department apparatus access road will be a minimum of 26' wide. The
apparatus access road will be the starting point from the driveway entrance on Golden
Valley Road to the center point of the circle, around the circle and then out again to the
driveway, exiting on Golden Valley Road. The fire department apparatus access road
will be a one-way circulation around the circle with the necessary directional one-way
signage.
b. "No Parking Fire Lane" signs will be installed in accordance with the Golden Valley City
Ordinance. The location of the posted signs will be determined by the fire marshal.
c. The turning radius for the fire apparatus access road should be in accordance with the
Minnesota State Fire Code and the fire code official. Requirements include all
driveways approach off Golden Valley Road.
d. The fire department apparatus access road should be designed and maintained during
the different phases of the construction of the site to support the imposed loads of all
fire apparatus. The surface of the fire apparatus access road shall be surfaced to
provide all-weather driving capabilities.
Water Supplv
1. The water supply for the proposed site should be capable of supplying the required fire flow for
all fire protection systems, including fire hydrants, fire suppression, sprinkler systems and
Class I standpipe systems for both buildings.
2. A post indicator valve will be required for each building. The location and distance of the post
indicator valve from the building shall be accessible and protected from any physical damage.
Protective barriers shall be installed in accordance with the Minnesota State Fire Code.
3. The location of the fire hydrants on the proposed revised plan shall be relocated to that the fire
department apparatus access road has better traffic circulation within the confines of the inner
circle area. The fire hydrant relocations will be determined by the code official.
Fire Protection
1. The proposed buildings will require additional fire protection safeguards. The following fire
protection safeguards will include, but not be limited to, the following: automatic fire
suppression system in all attic and concealed spaces, balconies, apartments, apartment
restrooms, Class I standpipes, and the installation of a smoke detection fire alarm system in
the common corridors and all storage rooms within each building.
2. The walking path around the proposed site will be used by fire department personnel for
emergency access for both buildings. The design and construction of the approved fire
department access walkway will be a minimum of 6' wide and the surface of the walkway shall
be an approved surface and maintained for all-weather climates.
Landscapinq
1. Fire hydrants, fire department connections and other fire protection system control valves shall
not be obstructed by any landscaping materials including, but not limited to, posts, fences,
vehicles, growth, trash, storage and other materials or objects that would hinder the fire
department gaining immediate access to the fire department equipment and/or fire hydrants.
If you have any questions regarding these items, please contact me at 763-593-8065.
Hennepin County Transportation Department
1600 Prairie Drive
Medina, MN 55340-5421
612-596-0300, Phone
763-478-4000, FAX
763-478-4030, TDD
www.hennepin.us
July 23, 2008
Mr. Mark Grimes, Director of Planning
City of Golden Valley
7800 Golden Valley Road
Golden Valley, Mn 55447
Re: Preliminary Plat - Applewood Pointe
CSAH 102, Northeast Quadrant Golden Valley Road
Section 28/33, Township 118, Range 21
Hennepin County Plat No. 3139A
Review and Recommendations
Dear Mr. Grimes:
Minnesota Statutes 505.02, 505.03, and 462.358, Plats and Surveys, allow up to 30 days for county
review of preliminary plats abutting county roads. We reviewed the above plat revision and offer the
following comments:
· Hennepin County Transportation finds the updated plat and site plan acceptable as
submitted. The City may need to more clearly identify the Golden Valley Road right of way
and address the minor sidewalk encroachment at the plat's southwest comer. We
acknowledge and appreciate the City's and developer's response to our prior comments
eliminating direct access to CSAH 102 and providing adequate right of way for future
roadway improvements.
· Please inform the developer that all proposed construction within county right of way
requires an approved Hennepin County permit prior to beginning construction. This
includes, but is not limited to driveway and street access, drainage and utility construction,
trail development, and landscaping. Appropriate forms can be obtained by contacting our
Permits Section at (612) 596-0336.
Please direct any response to Dave Zetterstrom at (612) 596-0355.
Sincerely,
~/2~
James N. Grube, P.E.
Director of Transportation & County Engineer
DKZ/sew
Cc: Plat Review Committee-Byers 1 Lindgren 1 Holtz 1 Drager 1 Zetterstrom 1 Fackler 1 Lemke
Mark Larsen, Hennepin County Surveyor's Office
An Equal Opportunity Employer
Recycled Paper
Hey
Planning
763-593-8095 I 763-593-8109 (fax)
Date:
August 4,2008
To:
Golden Valley Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject:
Informal Public Hearing to Consider Conditional Use Permit (CUP)
Application to Allow Four Drive-Through Auto Banking Lanes
as Part of a New Teacher Federal Credit Union Building at 601 Boone Ave. N
(existing Malik service station)- Teacher Federal Credit Union, Applicant
Teacher Federal Credit Union (TFCU) has entered into a purchase agreement with the owner
of the service station at the northwest corner of Boone Ave. and TH 55. TFCU plans to tear
down the service station and replace it with a 7700 sq. ft., two-level credit union building with
four drive-through banking lanes.
This property is designated on the General Land Use Plan map for commercial uses. The
Zoning Map indicates that the property is zoned Commercial. Copies of the General Land Use
Plan Map and Zoning Map for this area are attached. The proposed use as a financial
institution is consistent with the General Land Use Plan Map and financial institutions are
considered permitted uses within the Commercial zoning district. However, drive-through lanes
require a Conditional Use Permit (CUP) within the Commercial zoning district.
The approximately 50,000 sq. ft. site (about 1.14 acres) has been a service station for over 30
years. Currently, the zoning code requires that all service stations require a CUP. However,
this service station pre-dates that requirement. Therefore, the existing service station is
considered nonconforming. The existing service station has two driveways on to Boone Ave.
N. These two driveways cannot be used by northbound traffic on Boone Ave. N. due to the
median that was constructed several years ago. There is also a driveway into the service
station from ih Ave. N. that provides access to those vehicles coming from the south, east and
west.
TFCU will keep the 7th Ave. N. driveway although it will be widened. The existing two
driveways on Boone Ave. N. for the service station will be eliminated and replaced by one new
driveway on Boone Ave. N. There are no changes planned to the median in Boone Ave. N.
Access to TFCU by traffic from the south must use the driveway off ih Ave. N. or do a U-turn
at the intersection of ih Ave. N. and Boone Ave. N.
1
Section 11.80 of the Zoning Code outlines the CUP process. It states in Subd. 1 that:
It is the purpose and intent of this Section to provide the City with a reasonable degree
of discretion to determine the suitability of certain uses with characteristics which maybe
appropriate within a given zoning district but which might have an unusual impact upon
surrounding properties or which might otherwise adversely affect the future development
of the City or the general public health, welfare, or safety of the property or residents.
The Planning Commission must make finding on ten factors and send those findings and
recommendations to the City Council when they consider the application. The ten factors and
staff comments follow:
1. Demonstrated Need for the Proposed Use: The City's policy has been to allow the
market to determine the need for each particular use. In this case, the financial institution
is a permitted use but the drive-through lanes are allowed only by CUP. TFCU continues
to operate at their current location in Golden Valley (6500 Olson Memorial Highway) and
they will remain there until the new credit union structure is completed. At the current
location, there are three drive-through lanes that have operated well over the past three
decades. TFCU believes that the drive-through lanes are critical to their operation and that
they will not have a negative impact on the BoonefTH 55 intersection.
2. Consistency with the Comprehensive Plan: A financial institution is consistent with the
Commercial designation of this property on the General Land Use Plan Map.
3. Effect upon property values in the neighboring area: The staff does not anticipate that
the credit union with four drive-through lanes will have a negative impact on property
values in the area. TFCU will construct a new building designed by an architect. It will be
well landscaped. Overall, the value of the area should increase due to the change from a
service station to a financial institution.
4. Effect of any anticipated traffic generation upon the current traffic flow and
congestion in the area: The new credit union building will have access from both Boone
Ave. N. and ih Ave. N. As compared to the existing gas station on the site, the number of
driveways on to Boone Ave. N. will be reduced from two to one. This should help to reduce
conflicts with Boone Ave. N. traffic. Also, traffic on Boone Ave. N. will be only right in and
right out due to the median. No changes to the existing street system are needed due to
the TFCU construction. In terms of traffic generation, the staff does not see this as a
problem for this site. The existing gas station has a significant amount of traffic throughout
the day which will be similar to the traffic from the credit union with drive-through windows.
The City's consulting traffic engineer Mike Kotila, PE, from SEH, Inc. has reviewed the
plans. He believes that the plan will work as submitted and applauds the reduction in
driveway access points to Boone Ave. He is recommending that a sidewalk connection
from the sidewalk along Boone Ave. to the sidewalk along the north (front) side of the
building be made to better serve pedestrians.
5. Effect on any increases in population and density upon the surrounding land uses:
The credit union will not increase the population of Golden Valley. However, the number of
employees at this site will increase from two or three to 10-12 employees.
2
6. Increase in noise levels to be caused by the proposed use: The credit union with
drive-through lanes should not cause any increase in noise levels compared to the current
use of the site for the sale of gas and repair of vehicles.
7. Any odor, dust, smoke, gas, or vibration caused by the proposed use: There will be
some pollution caused by the idling of vehicles waiting to be served in the drive-through
lanes. Due to the surrounding land uses and it proximity to TH 55 with 40,000 vehicles a
day; this increase would not be significant.
8. Any increase in flies, rats, or other animals or vermin in the area to be caused by the
proposed use: None of these animal pests are anticipated with the construction of a new
credit union building with drive-through lanes.
9. Visual appearance of any proposed use or structure: The existing service station will
be removed and replaced with a new two level credit union building. The building will be
architecturally designed. The building and parking Jot will meet all setback requirements.
The property will be landscaped. The landscape plan and building plans will be reviewed
by the Building Board of Review. The landscape plan will be guaranteed by a financial
guaranty that will cover the landscaping for two growing seasons.
10. Any other effect upon the general public health, safety, and welfare of the City and
its residents: The TFCU has operated in Golden Valley for several decades with three
drive-through lanes. It is anticipated that the existing customers of the credit union will now
use the new facility. TFCU hopes there will be some increase in traffic to the facility over
the existing facility due to the improved visibility of the site compared tothe existing TFCU
site. The new location is a commercial area with good access that can handle the
additional traffic.
City Engineer Jeff Oliver, PE, has written a memo to me dated July 31, 2008. He makes
several recommendations that will be included in the Planning staff recommendation. In his
memo, he addresses the history of this site, recent improvements, and information that is
needed to allow this site to develop.
Deputy Fire Marshal Ed Anderson has also written a memo to me dated July 30, 2008. In the
memo he makes several findings that will also be included in the Planning staff
recommendation.
Recommendation
Staff recommends approval of a Conditional Use Permit to allow the construction of four drive-
through lanes in the new TFCU site at 601 Boone Ave. N. Staff believes that this is a good
spot for a financial institution due to its location at the intersection of TH 55 and Boone Ave. N.
Also, this is a relocation of TFCU from its existing location near Douglas Dr. N. and TH 55
where they have successfully operated for several decades with three drive-through lanes.
Staff has reviewed the site plan and believes it will function well. The staff is recommending
the following conditions:
1. The site plan for the TFCU new branch facility at 601 Boone Ave. N. prepared by HTG
Architects and dated 7/14/08 shall become a part of this approval.
3
2. The recommendations and findings of City Engineer Jeff Oliver, PE, found in a memo to
Planning Director Mark Grimes and dated July 31, 2008 shall become a part of this
recommendation.
3. The recommendations and findings of Deputy Fire Marshal Ed Anderson found in a memo
to Planning Director Mark Grimes and dated July 30, 2008 shall become a part of this
recommendation.
4. A sidewalk connection between the sidewalk along Boone Ave. N. to the sidewalk in front
of the proposed credit union building shall be constructed along with other site
improvements.
5. The Building Board of Review shall review and approve the final landscape plan for this
site.
6. Any failure to comply with one or more of the conditions of approval shall be grounds for
revocation of the conditional use permit.
Attachments
Location Map (1 page)
Letter from HTG Architects signed by Ed Muehlberg, AlA dated July 14,2008 (2 pages)
Memo from City Engineer Jeff Oliver, PE, to Mark Grimes dated July 31,2008 (4 pages)
Memo from Deputy Fire Marshal Ed Anderson to Mark Grimes dated July 30, 2008 (2 pages)
Email from Jeff Phillips, KARE-TV dated August 5,2008 (1 page)
Photos of existing service station on site (5 pages)
Zoning Map (1 page)
General Land Use Plan Map ( 1 page)
Site Plans (4 oversized pages)
4
lI::l
~
i
)>
;\'i
:z
145 0
I
~
:z
800
o
o
o
lI35
1SO
o
~J:O::X)
13ll
1:W
8900
000000000 0 0 0 000
ll8Ol)
.~
Subject Property
\L
c9 0 0
106000000
o
o
o
o
:)
7THAVEN
439
8851
9000
lIllOO
600
\
GOLDEN VALLEY RO
9000
_",jl,'1$'5
\\l~' ..
~,..'t5S
\'I); ~......jl,'1 sS
'ji'l.I.>f'--
8815
433
fil
s;
4
c:
;r.l
:0-
~
:z
432
44lJ
8951
8945
424
423
424
8811
416
......
...
ARCHITECTS
14 July 2008
Mr. Mark Grimes
City of Golden Valley
7800 Golden Valley Road
Golden Valley, MN 55427
Re: Teacher Federal Credit Union
Relocated Branch Facility
Golden Valley, Minnesota
Dear Mr. Grimes
As you requested, below is a brief summary of the site usage for the Conditional Use Permit Application for the
Teacher Federal Credit Union proposed new branch location at 601 Boone Avenue North, Golden Valley, MN.
TFCU (Teacher Federal Credit Union) is looking to relocate their existing Golden Valley branch location toa
new site that would better serve their members. Their existing Golden Valley site is at 6500 Olson Memorial
Highway and has 3 drive-thru lanes. They have been a member of the Golden Valley business community for
many years and wish to continue that presence far into the future.
The relocated branch facility would provide its members 3 drive-thru lanes, an ATM lane, and a bypass lane
around the drive up. The new building would have a total of 7700 square feet on two levels. The main level
would have a footprint of 5200 square feet and the upper level would be 2300 square feet. There would be
parking for 31 cars.
The building's main entrance would be on the north side of the site adjacent to the customer parking. The drive-
thru canopy would be located on the southwest comer of the building. Employee parking would be located
along the south side of the site. Site access would be from the existing curb cut locations on the north side of the
site on 7th A venue and the existing Right In/Right Out access on the east side of the site on Boone Avenue.
The proposed use of the site will not affect the health, safety, morals, and general welfare of the occupants of the
surrounding lands. The proposed building type should compliment the other businesses and people of the City
of Golden Valley. The use will not be injurious to the use and enjoyment of the other properties. The
establishment of the conditional use will not impede the normal and orderly development of the surrounding
property. Existing utilities, access roads, drainage, etc. will be utilized for the proposed building. The use is
zoned commercial, which is consistent with the purpose of the zone.
The staffing and hours of operation would be similar to their existing Golden Valley location. The bank will
have between 10-12 employees on site throughout a typical work day. The banking hours of operation will be as
follows:
Auto bank
Bank
M
M-F
7:00 am - 7:00 pm
9:00 am - 5:00 pm
T-F
8:00 am - 6:00 pm
Please contact me if you have any questions or need any clarifications or additional information. The project is
planned for spring construction.
Sincerely,
~-
Ed Muehlberg, AlA
Architect
~3{
(]),
Zo
Z
"'"
- Ub 1q
II -
~ ---11 WDTI [100 ... ...
() m\ .~/LY ^ ~
,- A/T-)(')(')(')II :-< IR I ,-
() ~ -- ... q
-0
r
)> \ ~~ 'ci: ~~~AIN~~~~,~~= 5::f.~ ~ Ol~
z f~ P
~ J t
31 PARKING SPAGES Ol~
MAX BLD6 SF = 1150 -.J
~\ . ~ r (31x25O SF PARKING) ~
\ ~
J 0 ~
. ~ ~ q
c:::
35'-0. trJ
... I SETBACK ;z:
\ ~- ... ...
I Ul ~~
Q "', ~Q~
(j 6"'6 "', ~
Q~ \J m~
1 -l\.J1
I.., o ~ ,-
~ ..~ J t ,.'" Q ('\ q
1 1 7'\
PROPER..rr LINE - 8'-8" - -
120'-0"
BOONE AVENUE N.
A1.1
PROJECT #: 07163
DATE: 7/10/08
TEACHER FEDERAL CREDIT UNION
9300 Hennepin TO\llfn Road
Eden Prairie, MN. 55347
SHEET:
GOLDEN VALLEY, MN
Tel: 952.278.8880 Fax: 952.278.8822
alley
Memorand m
Public Works
763.593.8030 /763.593.3988 (fax)
Date: July 31,2008
To: ,IJV1ark Grimes, Director of Planning and
From: Jeff Oliver, PE, City Engineer
Subject: Review of Conditional Use Permit at 601 Boone Avenue North
Teacher's Federal Credit Union
Public Works staff has reviewed the plans submitted for the proposed Conditional Use
Permit (CUP) for the Teacher's Federal Credit Union (TFCU) to construct a building at
601 Boone Avenue North. This site is currently a gas station located at the northwest
corner of Boone Avenue and Trunk Highway 55.
Site Plan:
The proposed TFCU building will utilize two of three existing driveways to this site. The
existing driveway from 7th Avenue North will be widened and the two existing driveways
onto Boone Avenue will be removed, with one new driveway constructed onto Boone
Avenue. The single driveway onto Boone Avenue is approximately at the mid point of
the block, which will help reduce conflicts at the intersections with TH 55 and ih Avenue
North.
The proposed driveways to this site must incorporate the City standard for commercial
driveway aprons. All of the City's standard details are available from the Public Works
Department.
The developer will be required to comply with the City's Right-of-Way Management
Ordinance for all work within the 7th Avenue and Boone Avenue right-of-ways.
Utilities:
There is existing sanitary sewer and wat#r service to the gas station currently on this
site. There is adequate capacity in the af,ljacent facilities to accommodate the proposed
redevelopment of this site.
!
The proposed utility plan indicates constfuction of a.new sanitary sewer service to this
site between the new building and the sewer main within Boone Avenue. During the
G:\Developments. Private\Teachers 601 Boone\CUP Review 073108.doc
reconstruction of Boone Avenue by the City in 2004, a new sanitary sewer service was
installed within the project limits. This new service line extends from the sewer main into
the property to approximately the right-of-way line, and must be reused during
redevelopment. The remaining portion of the sanitary sewer service must be removed
and replaced in order to bring this site into compliance with the City's Inflow and
Infiltration Ordinance. Following construction of the new sanitary sewer service, the
developer must have the service inspected by the Public Works Department in order to
obtain the certificate of compliance.
The existing water service to this site is a 2-inch diameter line from the watermain
located within the TH 55 right-of-way. The proposed utility plan indicates installation of a
new 6-inch diameter water service from the main in the ih Avenue right-of-way. The
developer should consider installing the new water service, which is a combined fire line
and domestic service, from TH 55 to eliminate the potential of open cutting ih Avenue
North, and to avoid an additional trench to remove the existing 2-inch service.
The developer will be required to obtain the appropriate sewer and water permits, and
right-of-way permits for installation of the sanitary sewer and water services to the new
building.
Storm Water Manaaement:
The property being redeveloped is located within the Bassett Creek watershed, and is
therefore subject to the Bassett Creek Water Management Commission's (BCWMC)
Requirements for Improvements and Development Proposals. The BCWMC will review
the plans for compliance with its water quality standards and floodplain impacts.
This redevelopment is also subject to the City's Grading, Drainage and Erosion Control
Ordinance. In order to obtain the permit required under this ordinance, the developer
must modify the grading plan to meet City standards and resubmit the plan for further
review. After City staff has approved the grading plan, the developer must submit the
plans to the BCWMC for its review and comment.
Portions of the property being redeveloped are within the Federal Emergency
Management Agency (FEMA) designated floodplain for Bassett Creek. However, the
frequent flooding of the intersection of Boone Avenue and Golden Valley Road was
addressed as part of the City's reconstruction of Boone Avenue in 2004. The
reconstruction project included the construction of a flood control levee along the west
bank of Bassett Creek, and construction of a storm water pond and lift station in the
northeast corner of Golden Valley Road and Boone Avenue.
In order to prevent increased flooding in other portions of the Bassett Creek watershed,
the City was required to provide mitigating flood storage as part of the Boone Avenue
project. This flood volume was provided by the construction of the General Mills Nature
Area, located east of Trunk Highway 169 and south of Trunk Highway 55. The total
floodplain mitigation provided by the project was 36.73 acre-feet (one acre covered with
G:\Developments. Private\Teachers 601 Boone\CUP Review 073108.doc
one foot of water). The construction of the Boone Avenue project did not address the
water quality requirements of any property protected by the flood control levee.
In order to ensure that adequate flood storage continues to remain available in the
General Mills Nature Area, the developer was required to quantify the volume of fill
placed below the Base Flood Elevation (BFE) of Bassett Creek. The developer has
calculated a total of 0.25 acre-feet of fill has been placed below the BFE of 888.0 feet.
Therefore, adequate compensating flood storage is still available in the General Mills
Nature Area.
Because the developer will be placing fill below the BFE and constructing the new
building at or above the Regulatory Flood Protection Elevation (RFPE) of 890.0 feet, it is
likely that the property can be removed from the FEMA designated flood hazard area. In
order to accomplish this, the developer must apply for a Conditional Letter of Map
Revision (CLOMR) from FEMA. The proposed work on site cannot begin until after
FEMA has issued the CLOMR.
Following construction, the developer will need to submit construction record plans and
complete a Letter of Map Revision (LOMR) application to officially remove the flood
hazard designation.
The developer is proposing the construction of rain gardens on site to provide the water
quality treatment required by the City and the BCWMC. These rain gardens will need to
be designed according to the standards of the BCWMC.
The following storm water related items must be completed prior to issuance of any
permits for this site, assuming the developer wishes to have the property removed from
the flood hazard area.
1. A grading plan prepared to City standards, and an application form, must be
submitted to the Public Works Department for review. This submittal must include
all pertinent design information for the proposed storm sewer and rain gardens
on site.
2. Following approval of the grading plan by City staff, the plans and an application
must be submitted to the BCWMC.
3. Following BCWMC approval, the developer must apply for a CLOMR with FEMA.
4. The City will issue the Grading Permit, and other required permits, when
documentation of the CLOMR is received.
5. Following construction, a record drawing must be submitted to FEMA for the
LOMR.
G:\Developments. Private\Teachers 601 Boone\CUP Review 073108.doc
.
Summary and Recommendation:
Public Works staff recommends approval of this proposed Conditional Use Permit
subject to the comments contained in this review, and the comments of other City staff.
Please feel free to call me if you have any questions regarding this matter.
C: Tom Burt, City Manager
Jeannine Clancy, Director of Public Works
Mark Kuhnly, Chief of Fire and Inspections
AI Lundstrom, Environmental Coordinator
Ron Nims, Public Works Project Coordinator
Eric Eckman, Public Works Specialist
Gary Johnson, Building Official
Ed Anderson, Deputy Fire Marshall
G:\Developments - Private\Teachers 601 Boone\CUP Review 073108.doc
Hey
M n u
Fire Department
763-593-8079 I 763-593-8098 (fax)
To: Mark Grimes, Director of Planning & Zoning
From: Ed Anderson, Deputy Fire Marshal
Subject: Conditional Use Permit for Proposed Teacher Federal Credit Union
Date: July 30, 2008
The Golden Valley Fire Department staff has reviewed the Conditional Use Permit Application
proposed for the Teacher Federal Credit Union located at 601 Boone Avenue North. The Conditional
Use Permit Application coincides with the proposed construction of the new office building located on
the same site. The following comments will be focusing on fire department requirement s for the
building site, fire department access road, water supply and landscaping.
BUILDING SITE
The current site has existing buildings to be demolished. The demolition of all buildings on this site
and the removal of all underground and above ground tanks should be removed and disposed of in
accordance with the Minnesota State Fire Code.
FIRE DEPARTMENT ACCESS
Fire Department apparatus access road shall have an unobstructed, with not less than 20 feet, and an
unobstructed vertical clearance not less than 13 feet 6 inches. The fire department apparatus access
road should be designed and maintained during the different phases of construction of the site to
support the imposed load of all fire apparatus. The surface of the fire apparatus access road should
be surfaced to provide all weather driving capabilities. The turning radius for the fire apparatus
access road should be in accordance with the Minnesota State Fire Code and the fire code official.
Requirements for the fire department turning radius will include all driveway approaches off of 7'h
Avenue and Boone Avenue. "No Parking- Fire Lane" signs shall be installed in the fire department
apparatus access road in accordance with the City of Golden Valley City Ordinance.
WATER SUPPLY
The required fire flow for the commercial buildings shall be based on the type of construction,
occupancy type, and the type of fire protection that's being proposed within the building. A post
indicator valve for the fire suppression system will be required in the location and the installation shall
be in accordance with the National Fire Code Standards.
LANDSCAPING
Fire hydrants, fire department connections, and other fire protection system control valves shall notbe
obstructed by any landscaping materials including, but not limited to posts, fences, vehicles, growth,
trash, storage and other materials, or objects that would hinder the fire department gaining immediate
access to the fire department equipment and/or fire hydrants.
If you have any questions regarding these items please contact me at 763-593-8065.
Wittman. Lisa
From:
Sent:
To:
Subject:
Phillips, Jeff (KARE) [jpphillips@kare.gannett.com]
Tuesday, August 05, 2008 3:54 PM
Wittman, Lisa
8/11/08 Public Hearing
Lisa:
I<.ARE-TV is unable to send a representative to the Public Hearing on August 11, 2008.
Specifically, in regards to the request by Teacher Federal Credit Union to construct a 7,700 sq. foot building with 4
drive-through lanes, I<.ARE- TV has no objection to the request, and in fact, supports their request.
Please have our opinion heard.
Best regards,
Jeff Phillips
V.P. Technology & Operations
KARE-TV
8811 Olson Memorial Hwy.
Minneapolis, MN 55427
763.797.7363
612.708.1111
763.546.8772
jphi11 ips@karel1.com
1
1\.
- .
"' "
'.t: .,
,::\
"
~. ~,
l' \
);\;~
,.1\
\
"'
1::
\
l.
'~
..
~..
,~
Jl. ".
.
~
f
d
"
-'1
., !r
;1,'" ;'1
, .
f
~:\,
. l
, ~l
\
,.
.,. ft ' :
,,,..
~'
...,Y
,
;if
} ~ l
~
City of Golden Valley
830
~
8511
8]25
\
Brookvlew Comm.Ctr., G.C~,_ &. Park
n
601 BOONE AVE N
GOLDEN VALLEY, MN 55427
PID:3111821310016
Zmi~ ~
013111
"f;,.~ t~1
'(J{!IDj)1 ':llk:;'
Logond
~ Highlighted Feature
House Numbers
St",et Centerline"
p City Urnit
o Open Water
IV' Stre.ma
o
. BPO
.c
.'
I!I!!!I ~,
Ou
Ou
0'"
. '5
Ou
o R.t
o R.2
~ R.)
. A-4
OX
o Parka
o Parcels
Zoning