Loading...
05-05-09 Special CM Agenda Packet AGENDA Special Council/Manager Meeting Golden Valley City Hall 7800 Golden Valley Road Council Conference Room May 5, 2009 7 pm or immediately following the City Council Meeting 1. 2010 Pavement Management Program Hey emorandum Public Works 763-593-8030 I 763-593-3988 (fax) Executive Summary Golden Valley Special Council/Manager Meeting May 5, 2009 Agenda Item 1. Proposed Pavement Management Capital Improvement Plan Modifications Prepared By Jeannine Clancy, Director of Public Works Jeff Oliver, City Engineer Summary As requested, Public Works staff has prepared an alternative Capital Improvement Plan (CIP) for the Pavement Management Program (PMP). The current CIP includes completion of the reconstruction phase of the PMP in 2014, with the reconstruction of non-standard streets in the lakeview Heights area. The proposed modified PMP extends the reconstruction schedule to 2019, with the lakeview Heights area the last to be completed. This memorandum will outline the construction costs used for the development of the existing and proposed CIPs and describe the proposed modifications to the plan. Construction Cost Calculations The street reconstruction costs utilized for the existing and proposed CIPs have been updated to more accurately reflect the actual costs incurred by the City in recent years. These costs were calculated for the street reconstruction portion of the proiect on/v, using the PMP projects since 2005 to obtain a cost per mile of street reconstruction. Therefore, the costs reflect projects with difficult subgrade conditions that require significant correction costs, and areas where minimum subgrade corrections were required. In addition to the construction costs, the calculated project costs include all indirect costs, including an estimated 24 percent for preliminary and final design, construction observation, surveying and project management. An additional 6 percent of the construction costs were included for administrative costs. Therefore, the total indirect costs are an estimated 30 percent of the construction costs. Based upon the above discussion, the baseline project cost to be used for the 2010 PMP is $1.4 million per mile. These costs were adjusted annually for inflation at a rate of 4 percent. The cost calculations are for local streets only and therefore do not include Municipal State Aid (MSA) roadways. Because MSA streets require a higher axle loading design as required by State Aid Rules, resulting in additional subgrade correction and pavement thicknesses, and MSA streets include minimum street widths that may exceed City practice, a separate project cost calculation is used for these streets. The CIP for Golden Valley's remaining substandard MSA routes is currently in development and is not included at this time. Funding for sanitary sewer, watermain and storm sewer construction associated with these projects is from sources separate from street reconstruction. Therefore, these costs are not included in the estimated project costs used in the CIP development. Existinq Pavement Manaqement Proqram CIP The existing PMP program formally began in the mid-1990s, and was modified by the City Council shortly thereafter. The program included two construction seasons where approximately 15 miles of roadway were reconstructed in 2000 and 2001, followed by reconstruction of approximately 8 miles of streets in the Brookview area in 2003 and 2004. Subsequent projects included approximately 3 to 4 miles of street reconstruction annually through the completion ofthe program in 2014. This CIP has resulted in approximately 80 percent of the City's local streets being rehabilitated to City standards. The current CIP is illustrated on the attached Pavement Management Capital Improvement Plan. While illustrated on the attached exhibit, the cost calculations do not include significant MSA reconstruction projects such as Zane Avenue and Lindsay Street, Harold Avenue or Duluth Street. Based upon the adjusted project costs discussed above and the existing CIP, the estimated street reconstruction costs are as follows: Project Cost Year Miles Cost/Mile (street only) 2010 2.6 $1,400,000 $3,640,000 2011 4.4 $1,456,000 $6,406,000 2012 3.2 $1,514,200 $4,846,000 2013 3.1 $1,574,800 $4,882,000 2014 3.1 $1,637,800 $5,077,000 Proposed Capital Improvement Plan The modified CIP, as shown on the attached Pavement Management Capital Improvement Plan: PROPOSED, extends the reconstruction phase of the PMP to a 2019 completion. This alternate plan was developed with a target budget between $2 million and $3.5 million per year. This target budget has been achieved in all project years except 2010 and 2019. Highlights of this plan include: . Maintains the entire proposed 2010 PMP, which is currently in the preliminary design phase, with resident open houses scheduled for May, and the public hearing scheduled for August 2009. . Divides the current plan for 2011 into two separate projects in 2011 and 2012. . Divides the proposed 2012/2013 PMP, located north and south of 23rd Avenue North and west of Winnetka Avenue, into five separate years. . Maintains the Lakeview Heights area as a single project at the completion of the reconstruction portion of the CIP in 2019. The Lakeview Heights neighborhood is maintained as a single project due to the storm water drainage patterns combined with a layout that makes the neighborhood difficult to split without construction impacts for the entire neighborhood during a two-year construction project. While illustrated on the attached exhibit, the cost calculations do not include significant MSA reconstruction projects such as Zane Avenue and Lindsay Street, Harold Avenue or Duluth Street. The estimated street reconstruction costs of the modified CIP are as follows. Project Cost Year Miles Cost/Mile (street only) 2010 2.6 $1,400,000 $3,640,000 2011 1.6 $1,456,000 $2,330,000 2012 1.2 $1,514,200 $1,817,000 2013 1.5 $1,574,800 $2,362,000 2014 1.8 $1,637,800 $2,948,000 2015 1.2 $1,703,300 $2,044,000 2016 1.3 $1,771,400 $2,303,000 2017 1.1 $1,842,300 $2,027,000 2018 1.0 $1,916,000 $1,916,000 2019 3.1 $1,992,600 $6,177,000 The PMP CIP should be reviewed annually to determine if future economic and debt conditions warrant modifying the program to complete the reconstruction phase as early as possible. Pavement Overlavs The Pavement Management Policy includes maintenance and rehabilitation of the streets in order to maximize their functional lifespan, including sealcoating and pavement overlays. The sealcoating program has a long history in Golden Valley, with this maintenance and preservation activity limited to streets that are constructed to City standards. In accordance with the Pavement Management Policy, staff has begun implementing pavement overlays in recent years. The emphasis of the recent overlay activities has been on high volume roadways such as MSA streets and trunk highway frontage roads, with some overlays performed on local streets that were reconstructed approximately 25 years ago and that exhibited a need for this treatment method. Current funding sources for pavement overlays in Golden Valley include MSA funds and local street improvement funds. In addition, Minnesota Statutes, Chapter 429, allows cities to levy special assessments for public improvements, including pavement overlays. In the past, special assessments have been utilized for street reconstruction, but not for pavement overlays. Public Works staff recently completed a survey of 13 cities to determine the prevalence of special assessments as a funding source for pavement overlays. As expected, the use of assessments, and the methods of assessment varied widely among these communities. One of the cities has a very limited program, with overlays on a block-by-block basis that are performed adjacent to street reconstruction projects and funded by the city. Of the remaining 12 cities, 6 utilize special assessments and 6 fully fund the overlays. The assessment rates ranged from 33 percent of the project costs to 100 percent of the costs. In addition, there was variability in the method of assessments (front foot or per unit charges) and rates assessed to high traffic generating uses such as commercial and industrial land uses. The Golden Valley street system was re-evaluated in the fall of 2008 for pavement condition. Staff is in the process of evaluating options for a long-term pavement overlay plan based upon these pavement ratings, traffic conditions and financing. The results of this analysis will be forwarded to the City Council when completed. Impact on Operatinq Funds The extension of the PMP CIP will have an impact on the City's streets maintenance budget funded by the General Fund. Because many of the streets are beyond their useful life, significant patching will need to be done to maintain a safe driving surface. Staff is in the process of developing cost estimates for additional patching and repair of streets, which may be included in the City's Street Department's 2010 budget request if this CIP revision is adopted. Attachments City of Golden Valley Pavement Management Program maps dated April 30, 2009 (2 pages) I'l .. "~:J l::;~ '>oZ . 1iJ.:tfjj= E: o \~ ~ \ I I- ~. ~ 01_ VoIay --~ 7IGO _ VIIor_ -liliey, loIN 15S427-45BB ~ WWlY.d.goIdm.vaDey.mn,UB ~Wl'i I ~. PAVEMENTMANAGSMENT CAPITAL IMPROVEMENT PLAN NOTE: THE SCHEDULE SHO\IVN ON THIS MAP IS A PLAN ONLY AND IS SUBJECT TO CHANGE. Year Programmed 2009 4.0 mnlllocaJ, 0.0 mII.s USA .2010 2.7 mII.slocaJ, 0.0 mil.. USA 2011 4.4 mile. local, 0.2 milo, USA 2012-2013 6.3.....1ocaJ, 0.5 mIIe,USA 2014 3.1 mIIu local, 0.2 mile. USA After 2014 O.Omleslocal,l.3mllasUSA Streets Built to Standard f\IISA Municipal State Aid Street Private Streets .h'. '_0 -- . 0 Other Agency's Jurisdiction .,." l/pdofoIt No.._2OOIl _ Dolo: 11/24/1/8 - . ~~~r0r7=~~u...(2OO8). N A ... ... ... ..... \.... ..... F;\gIo\userelongln.erlnglproJeds\ClP _SlroeteIClP_lStreeto...,24x3B -'W ~ ..< o!;l )02; t-~ ....'" U'" o \0:: ....~i........'...... .-. .... \ I CIty of Golden Valley Publlo _ OepoItmenl 7800 Golden Valley Road GckIen Valley, MN 55427-4588 ~ >>- .f. 1- ~ ~i (~ .. Hey PAVEMENT MANACEMENT CAPITAL IMPROVEMENT PLAN PROPOSED N01'E: DOES NOr INC&..UDE MAJOR STAlE MJ PROJECI'8 OR OVERLAW, NOTE: THE SCHEDULE SHO\I\IN ON THIS MAP IS A PLAN ONLY AND IS SUBJECT TO CHANGE, Year programmed . 2009 4.4 miles local 2010 2.6 niles local 2011 1.6 Riles local 2012 1.2 Riles local, 0.2 niles MSA 2013 1.5 nileslocal 2014 1.8 miles local 2015 -- - 1.1 miles local, 0.2 miles MSA 2016 1.3 miles local 2017 1.1 miles local 2018 1.0 mle local, 0.2 mI.s MSA 2019 3.1 mII.s local, 0.2 miles USA After 2019 1.4 mII.s MSA MSA Streets Built to Standard Municipal State Aid Street Private Streets Other Agency's Jurisdiction Mop UpdMed: Apff 200P PrItt Dltte: 4122109 Sc<.Rros: Hennepin Cotny Sln'eyllrS omce lor PrDpel1y LbJa (2009). CIty of Golden V_for all_layers. ... .... . 2,400 .... N A ... ',BOO F:~ers\englrl88rlng\projeots\ClP _Streets\CJP _streets..,24x36.mxd