10-11-11 CM Agenda Packet AGENDA Council/Manager Meeting Golden Vailey City Hall 7800 Golden Valley Road Council Conference Room October 11, 2011 6:30 pm or immediately following the HRA meeting 1. Tobacco Compliance Check Failure Penalties 2-3 2. Accessibility, Design, Policy and Implementation Manual for Public Rights-of-Way 4-30 3. Proposed Amendments to Snow Plowing and Ice Control Policy for City Streets, 31-40 Alleys, Parking Lots, Trails and Sidewalks , 4. Douglas Drive Project Update 41-42 5. 2012-2013 Proposed Budget- Other Funds 43-139 6. 2012-2016 Capital Improvement Program 140-258 Council/Manager meetings have an informal, discussion-style format and are designed for the Council to obtain background information, consider policy alternatives, and provide general directions to staff. No formal actions are taken at these meetings. The public is invited to attend Council/Manager meetings and listen to the discussion; public participation is allowed by invitation of the City Council. This document is available in alternate formats upon a 72-hour request. Please call �' ` ' 763-593-8006(T1Y: 763-593-3968)to make a request. Examples of alternate formats ' may include larg�print,electronic,Braille,audiocassette,etc. �i' ''��T`� 1',�3�. r ..- --� :� '; :, xs , j � r1 '�������- � Police De artment p ^� � P u b I i c S a f e t y 763-593-8079/763 593-8098(fax) � � Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 1. Tobacco Compliance Check Failure Penalties Prepared By Nathan Gove, Commander Summary On September 23, 2011 the Police Department conducted compliance checks at all establishments within the City that hold a current tobacco license. Three establishments failed the compliance checks by selling cigarettes to the seventeen year-old checker. City Code Section 6.34, Subdivision 13(B) was revised in July 2011, to state the Council shall impose a civil fine "not to exceed" a certain dollar amount, and the license shall be suspended for"not less than" a certain number of days for licensed establishments that fail compliance checks. Police Department staff is seeking clarification as to the fee and suspension term to ascribe to these establishments. Attachments City Code Section 6.34, Subdivision 13(B) (1 page) B. Administrative Civil Penalties: Licensee. If a licensee or an employee of a licensee is found to have violated this Section the licensee shall be charged an administrative penalty as follows: 1. First violation. The Council shall impose a civil fine not to exceed five hundred dollars ($500). In addition, after the first violation, the license shall be suspended for not less than five (5) consecutive days. 2. Second violation within twenty-four (24) months. The Council shall impose a civil fine not to exceed seven hundred fifty dollars ($750). In addition, after the second violation, the license shall be suspended for not less than fifteen (15) consecutive days. 3. Third violation within twenty-four (24) months. The Council shall impose a civil fine not to exceed one thousand-dollars ($1,000). In addition, after the third violation, the license shall be suspended for not less than thirty (30) consecutive days. 4. Fourth violation within twenty-four (24) months. After the fourth violation the license shall be revoked for at least one (1) year. C. Administrative Penalty Procedures. No suspension or penalty may take efFect until the licensee or person has received notice (served personally or by mail) of the alleged violation and of the opportunity for a hearing before the Council or a person authorized by the City to conduct the hearing. A notice that a violation has occurred must be in writing and must provide that a rlght to a hearing must be requested within ten (10) business days of receipt of the notice or it shall terminate. D. Misdemeanor Prosecution. Nothing in this Subdivision shall prohibit the City from seeking prosecution as a misdemeanor for any alleged violation of this ordinance. E. Defense. It is a defense to the charge of selling tobacco or tobacco-related devices to a person under the age of eighteen (18) years, that the licensee or individual, in making the sale, reasonably and in good faith relied upon representation of proof of age described in Minnesota Statutes section 340A.503. F. Exceptions. An Indian may furnish tobacco to an Indian under the age of eighteen (18) years if the tobacco is furnished as part of a traditional Indian spiritual or cultural ceremony. For purposes of this paragraph an Indian is a person who is a member of an Indian tribe as defined in Minnesota Statutes section 260.755, subd. 12. Subdivision 14. Violation a Misdemeanor Every person who violates a section, subdivision, paragraph or provision of this Section, when such person performs an act thereby prohibited or declared unlawful, t t,j� `TM � T, �J '',. ., 0\ � � � � � �, e, Public Works � 763-593-8030/763-593-3988(fax) Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 2. Accessibility, Design, Policy and Implementation Manual for Public Rights-of-Way Prepared By Jeannine Clancy, Director of Public Works Jeff Oliver, PE, City Engineer Mark Ray, PE, Engineering Technician Summary The United States Access Board, U.S. Department of Transportation, and U.S. Department of Justice have released new regulations and design standards relating to the accessibility of public facilities for pedestrian traffic. As part of these new regulations and design standards, local municipalities are required to develop and implement transition plans meet the new requirements. Staff has prepared a Draft Accessibility, Design, Policy and Implementation Manual specific to public rights-of-way to satisfy the new requirements and provide a basis for all of pedestrian system improvements. The policy is not a stand-alone initiative, but a guide for what pedestrian provisions need to be included when projects take place. Similar to how the Minnesota Manual on Uniform Traffic Control Devices dictates what, where, and when signs need to be installed, this new accessibility and design policy will dictate what, where, and when specific pedestrian provisions are required. In addition, the plan identifies priority areas for accessibility improvements of the existing City pedestrian system. Attachments Draft Accessibility, Design, Policy and Implementation Manual for Public Rights-of-Way (26 pages) • � P City of Golden Valley Accessibility, Design, Policy and Implementation Manual For Public Rights-Of-Way Table of Contents Introduction ..............................................................................................................................1 Accessibility Policy Development and Implementation Process...........................................2 Public Rights-of-Way Accessibility Policy Goals...................................................................2 Definitions ................................................................................................................................3 When Are Accessibility Upgrades Required?...........................................................................3 Accessibility Project Request Process .....................................................................................5 Accessibility Grievance Process ..............................................................................................5 DesignGuidelines....................................................................................................................5 PedestrianAccess Routes ...................................................................................................5 Curb Ramps / Blended Transitions.......................................................................................6 Detectable Warning Surfaces...............................................................................................7 Pedestrian Overpasses / Underpasses (Public Right-of-Way Accessibility Guide) ..............8 Accessible Pedestrian Signals (Public Right-of-Way Accessibility Guide)............................9 Street Furniture (Public Right-of-Way Accessibility Guide).................................................10 Trails (Outdoor Developed Areas 1017).............................................................................11 PublicParking.....................................................................................................................12 FrequentlyAsked Questions..................................................................................................13 Sidewalks ...........................................................................................................................13 Curb Ramps / Blended Transitions.....................................................................................13 Signals................................................................................................................................15 Accessibility during construction.........................................................................................16 References.............................................................................................................................17 Notice of Availability of Draft Public Rights-of-Way Accessibility Guidelines......................17 Special Report: Accessible Public Rights-of-Way Planning and Design for Alterations......19 Resources..............................................................................................................................24 Appendix................................................................................................................................25 G:\PROJECTS�ADA Study(05-8)\GV Accessibility Manual v.2 FINAL.docx Introduction Based upon new and emerging regulations, federal design guidelines, and research, the City of Golden Valley has prepared this Design, Policy and Implementation Manual specific to public rights-of-way as it relates to accessibility for individuals with disabilities within the community. Elements covered in this manual include: . Pedestrian Access Routes '� • Curb Ramps / Blended Transitions • Detectable Warning Surfaces `r • Pedestrian Crossings � • Accessible Pedestrian Signals �� • Street Furnishings ����� • Trails � � A review of published design guidelines and technical papers, and case law was conducted by JQP, Inc. in the spring of 2010. References that were identified and used as part of the development process included: • United States Access Board o Public Rights-of-Way Accessibility Guidelines (PROWAG) o Outdoor Developed Areas • Department of Transportation • Department Justice • Minnesota Department of Transportation (MnDOT) Documents • Minnesota Building Code - Chapter 1341 (July 2007) In addition to the literature review, the City of Golden Valley conducted a review and site inspection of the condition of curb cuts and sidewalks and has documented the findings on a series of City maps. These maps will be used during the planning and implementation phases. Additionally, JQP, Inc. met with City staff and reviewed the City's documentation of conditions. Site visits were also conducted at locations with typical conditions to the transportation network in Golden Valley. Fundamentally, any sidewalk, trail, street, development or redevelopment project within the City of Golden Valley should begin with the intent of fully compliant accessibility and then be modified while evaluating a balance between access and feasibility. The City may develop a specific process through which exemptions for a project may be obtained. This manual is based upon available resources and information as of June 2011. It will be necessary to update and monitor Federal and State enforcement and case law related to accessibility of public right-of-way as time passes, and accessibility case law interpretations. G:\PROJECTS�ADA Study(05-8)\GV Accessibility Manual v.2 FINAL.docx 1 Accessibility Policy Development and Implementation Process • Finalize Accessibility, Design, Policy and Implementation Manual: o Determine applicable laws, codes and design standards for pedestrian facilities, including curb cuts, sidewalks, crosswalks, etc. o Conduct an assessment of the City's facilities to determine which locations do not fully comply (noting specific features of non-compliance) - This has been completed 2007-2008. o Include clear language in contracting for services with architects, engineers, contractors, landscape architects, stating that the City of Golden Valley requires full compliance with American's with Disabilities Act (ADA) and other provisions for public rights-of-way. • Prioritize locations of needed improvements and sort them into two categories: o Those that could be included with other projects (example: overlays, reconstruction). o Stand-alone improvements. Identify work items for different improvements. ���� . Long-range identification and budgeting for needed improvements. • Monitor other construction by federal, state, county and private developers to coordinate projects; i.e., state bike path project with the City of Golden Valley curb cuts project. � ,,:. Public Riqhts-of-Wav Accessibilitv Policv Goals Based upon extensive review of accessibility materials available, meetings with City staff, and review of walkway data/maps provided by the City, JQP, Inc. recommends the following: 1. Partnership between Public Works and Inspections Departments to inform developers and contractors of their responsibility to incorporate accessibility into their projects. 2. Prepare an informational packet and distribute to developers related to accessible curb cuts, parking, and sidewalks. 3. Monitor private projects to facilitate accessibility improvements to the extent feasible. 4. Coordinate with developments, remodeling, and construction projects, including state, and federal projects, to facilitate accessibility improvements to the extent feasible. 5. Proactively implement an access improvement plan using guidelines from the published materials to improve overall network accessibility with an emphasis on points of interest such as government facilities, transit stops, special population residences, healthcare facilities, and public spaces. 2 Definitions Detectable Warning Surfaces "A surface feature of truncated dome material built in or applied to the walking surFace to advise of an upcoming change from pedestrian to vehicular way." Pc;destrian Access Routes A pedestrian access route (PAR) is a continuous and unobstructed walkway within a pedestrian circulation route specifically designed for ADA accessible travel. Pedestrian access routes consist of the following components: • Walkways �. • Ramps • Curb Ramps (excluding flared sides) and landings �� ; • Blended transitions �' • Crosswalks • Pedestrian overpasses and underpasses • Elevators �; • Platform lifts ;� . Program Access ' As required by the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990, public entities are obligated to not discriminate in the programs or services offered to the "general public." Parking, sidewalks, pedestrian crossings are a feature or amenity offered by the City of Golden Valley. It may be appropriate for Golden Valley to create a plan or special projects to improve or provide accessibility where no work is currently scheduled. Consideration in planning is to include location of government services, libraries, schools, specialized housing, health care providers, or other origins or destinations of significant volumes of pedestrian trips. Inclusion of inembers of the community to establish priorities is encouraged. When Are Accessibility Upgrades Required? The following is a list of typical construction and maintenance activities conducted on sidewalks, trails, and roads and the degree to which accessibility projects are required for each activity. Crack sealing — Not required Crosswalk installation — Required Example: Any new midblock or corner (intersection) crossing needs to be compliant. Concrete and pavement repair— Dependent on scope of work Example: Isolated, partial or full panel replacement does not trigger larger scale accessibility work. However, the repair should be consistent with accessibility guidelines such as slope and no lips over 0.5 inches when feasible. Larger concrete repair projects may trigger additional accessibility provisions. 3 Concrete joint sealing — Not required Concrete surface planning/grinding - Not required Curb replacement— Dependent on scope of work Example: If the curb replacement is at an existing or proposed pedestrian ramp location, then it should meet ADA requirements. If the curb is not at a pedestrian crossing then standard curb (B6-18, etc.) can be used. Mill and Overlay — Required Examples: For mid/partial block overlays upgrades are only required in impacted street areas. Curb ramp must be installed where they are required, but do not exist and any existing curb ramps must be brought into compliance (see Design Guideline section on curb ramps). New construction — Required Examples: Curb cuts, sidewalks/trails, pedestrian crosswalks, traffic signal installation, pedestrian tunnels/overpasses, and new development. Pavement marking — Dependent on scope of work Examples: Any pedestrian-related pavement markings should be consistent with accessibility provisions, but do not trigger any additional accessibility projects. Pavement markings for vehicle traffic do not trigger any additional accessibility provisions. Pothole patching - Not required �� Reconstruction — Required Examples: Roadway widening, additional vehicle/bike lanes, horizontal/vertical alignment changes, bridge replacement, total road rehabilitation, installation of concrete curb and gutter, traffic signal replacement, sidewalk/trail replacement. Sealcoating - Not required Sidewalk panel replacement — Dependent on scope of work Example: Accessibility upgrades should be done to the extent feasible. If only one or two panels are being replaced, then there may be no opportunity to make changes. The higher the number of replacement sections, the better the opportunity to obtain consistency in corridor accessibility. Sidewalk joint grinding - Not required Sidewalk panel bituminous patch — Dependent on scope of work Example: The larger the patch section, the better the opportunity to accommodate some provisions such as slope, cross-slope, and path consistency. Skin patching - Not required Utility patch - Dependent on scope of work Example: A utility patch in the street or boulevard would not trigger an accessibility project as the intended user is vehicle traffic, or no traffic. A utility patch along a trail, sidewalk, or other pedestrian route may require accessibility provisions. Generally 4 speaking, the larger the patch area, the better the opportunity to obtain achieve accessibility provisions. Accessibility Project Request Process The City of Golden Valley has established a Public Sidewalk and Trail Policy that outlines the process for requesting new access routes. The Public Sidewalk and Trail Policy is included in Appendix A of this manual. Accessibility Grievance Process The City of Golden Valley has established a grievance process for responding to concerns about accessibility. The grievance procedure is included in Appendix B of this manual. Design Guidelines Pedestrian Access Routes (Public Right-of-Way Accessibility Guide) Minimum Design Standards ���� • Width - 4-foot minimum exclusive of curb width. • Passing Spaces - If the walkway is less than 5 feet wide, passing spaces 5 feet x 5 feet minimum must be provided at intervals of 200 feet. • Cross Slope - 2% maximum. • If the walkway is contained within street or highway border its grade shall not exceed the general grade established for the adjacent street or highway. The walkway must be on the roadway and marked or signed as a separate space for non-motorized travel. • Surfaces - Firm, stable, slip resistant. • Vertical Lips - '/4-inch to '/z-inch beveled 1:2 up to '/2-inch maximum. • Horizontal Gaps - '/2-inch sphere cannot pass through opening. o Advisory R301.3.1- If horizontal, must be perpendicular to path of travel. • Horizontal Gaps at railroad tracks — 3-inch maximum. � � ,:e. � � __ r' . f, ..� ,' ,` f t F �, f 60"wide concrete walk from the grass to the curb/gutter 5 Curb Ramps / Blended Transitions (Public Right-of-Way Accessibility Guide) Curb Rarr►ps • Cross Slope - 2% maximum. • Width — 4-foot minimum. • Surfaces - Firm, stable, slip resistant. • Maximum Vertical Lips— '/4- to '/z-inch beveled 1:2 up to '/z-inch maximum. • Maximum Horizontal Gaps — '/2-inch sphere cannot pass through opening. • Grade Breaks - Must be perpendicular to the direction of the ramp surface. • Street/Gutter Pan - Maximum 5°/a slope of the gutter pan/street at the foot of the ramp. • Clear Space - At the bottom curb face, 4 feet x 4 feet minimum within the width of the crosswalk and wholly outside the parallel vehicle travel lane. • Detectable Warnings - Provided where curb ramps, landings, or blended transitions connect to a street. Perperidicular Curb Ramps • Must be at a right angle to the gutter. • Running Slope - 5% minimum - 8.33% maximum, 15-foot maximum length. • Flared Sides - 10% maximum measured parallel to the curb line. • Cross Slope - 2% maximum, may be warped to meet the street or highway. • Landing - minimum of 4 feet x 4 feet at the top, 2% slope (maximum) in all directions. Parallel Curt� R�mps ` • Have running slopes in line with the direction of sidewalk travel. • Running Slope - 5% minimum - 8.33% maximum, 15-foot maximum length. • Cross Slope - 2% maximum. • Landing — 4 feet x 4 feet at the bottom, may be warped to match the street. ;� ..� , - :� . . , . . �:: , r �.b � ��;� , _ �"� ��� - - _ - ���*��� �' �,",. d., .� z + yw`. �i ^:.+}� ,. ra ��'lil'I# �r+��j� °� - �._,. 'I � � �ti �r I f;e,��,.. . F �` - . ���:,;a+. . - .. - .. f.���.��.«.�-�' �.���:c. .��,�r.v., .. ,.a�.x.::�:, b.a,�.,.M., �.w��+�e�.a `�`� Location near Courage Center-asphalt Golden Valley road near the Fire Station connectivity to new curb has proper cut. - measurement is noting a 48" level Crossing needs truncated dome. landing at the top of the curb cut. s Detectable Warning Surfaces (Public Right-of-Way Accessibility Guide) l�dvrsory R221 "Advisory R221 Detectable Warning Surfaces. Detectable warning surfaces are required where curb ramps, blended transitions, or landings provide a flush pedestrian connection to the street. Sidewalk crossings of residential driveways should not generally be provided with detectable warnings, since the pedestrian right-of-way continues across most driveway aprons and overuse of detectable warning surfaces should be avoided in the interest of inessage clarity. However, where commercial driveways are provided with traffic control devices or otherwise are permitted to operate like public streets, detectable warnings should be provided at the junction between the pedestrian route and the street." DomE; Sizc • Base: 0.9-inch minimum - 1.4-inch maximum. • Top diameter: 50°/a of the base minimum - 65% of the base maximum. • Height: 0.2-inch maximum. Dome Spacing • 1.6-inch minimum - 2.4-inch maximum, center-to-center. Gor�trast • The surface shall contrast visually within the adjacent gutter, street or walk light on dark or dark on light. Size • Direction of travel — 24-inch minimum. • Full width of the curb ramp, excluding flared sides and landings, and matching the width of the approaching sidewalk. For example a 5-foot wide sidewalk needs a 5-foot wide ramp, with a 5-foot wide detectable warning surface. Nate� MnDOT has standard details for detectable warning surFaces. Visit the MnDOT website for more information: http://standardplates.dot.state.mn.us/ �� � � �, . ,. ; ., � � . .. � . - a F=.�"", _` ���-���, � ���� ��.�� - ��. � ���.. ,�. ._- � . _ —-_ _.-- �_.�- �""`' �'` �� , ``� City Hall Golden Valley Road near Fire Station - Good placement of truncated domes Good placement of truncated domes, measuring 24"deep, and stretching the curb cuts and pedestrian walkway area. full width of curb cut "It is in alignment with the pedestrian path of travel and puts pedestrians out of the intersection when crossing." � Pedestrian Overpasses / Underpasses (Public Right-of-Way Accessibility Guide) !I pproach Where the approach slope exceeds 5%, the approach shall be one of the following: � Ramp with 4-foot minimum width. • Elevator. • Limited use/limited application elevator (LULA). • Platform lift. Stairs If stairs are provided in addition to ramp, elevator, LULA or platform lift, they must comply with R407, including: � Uniform treads and risers. • Risers — 4-inch minimum to 7-inch maximum. % • Treads — 11-inch minimum. � �,, :� • Open risers are not permitted. • Tread Surface — 2-inch minimum width of contrasting color on the front edge of each tread. • Nosing - curved, '/z-inch maximum or angled. • Handrails - required on both sides. • Handrail height — 34 inches to 38 inches above surface. • Handrail clearance — 38-inch minimum between handrails. s Accessible Pedestrian Signals (Public Right-of-Way Accessibility Guide) Where accessible pedestrian signals (APS) are provided at pedestrian street crossings, they shall comply with R306. Each accessible crosswalk with pedestrian signal indication shall include audible and vibrotactile indication of the "walk" interval. The push button must be accessible (height / approach). Signal Location • 10-foot minimum from other pedestrian signals at a crossing. • Button within reach (48-inch maximum above the ground surface). • Provide a clear ground spaces 30 inches x 48 inches with a 2% cross slope. l�udible Walk Indic��tor • Signal shall be tone or speech message. • Tone frequency, timing and volume are addressed in R306. Push Button Locatar Tone • 2-5 dbs above ambient noise from 3 feet away. � �.. �,� 0 ■ �;. � ■ . ,,i� ; `�;. �, ; A Y/ City Hall —example of APS unit and signage ;�., s Street Furniture (Public Right-of-Way Accessibility Guide) General • Maintain a 36-inch continuous pedestrian access route around street furniture. Drinking Fountains • Drinking Fountains - dual height. o Spout 1 — 36-inch maximum spout height with knee clearance. o Spout 2 - 38 inches to 43 inches spout height. ,;� � Tables • Tables - minimum 5% (minimum of one) must be accessible at each location. Benches • Benches - 50% minimum (minimum of one) at each location must provide a wheelchair positioned at the end providing shoulder to shoulder seating. • Bench design - Seat height 17 inches to 19 inches at front edge. ��, .,, ,,� io Trails (Outdoor Developed Areas 1017) The accessibility guidelines for Outdoor Developed Areas apply only to Federal land management agencies. However, Golden Valley will make reasonable efforts to meet these guidelines to the extent feasible. The guidelines for the trails are published and considered a best practice. If full compliance with 1017 is not possible, document why it is not possible. General • Passing Spaces - If the trail is less than 5 feet wide, passing spaces 5 feet x 5 feet minimum must be provided at intervals of 1,000 feet. • Concrete, asphalt or boards - '/2-inch maximum lips/gaps. • Horizontal Openings - 3/-inch sphere cannot pass through opening. • Resting Intervals at least 60 inches long x 36 inches side (provided according to Table 1017.7.1). • Slope of resting intervals. o Concrete, asphalt or boards -1:48 maximum. ``'�'� o Other surfaces - 1:20 maximum. Surfaces � Firm/stable. • Slip resistant. Wid th • Width — 36-inch minimum, may be reduced to 32 inches for a maximum distance of 24 inches. Slope • Maximum 30% of the total trail length can have a slope exceeding 1:12. • No segment of trail may be steeper than 1:8. • Where a trail is steeper than 1:20 rest areas must be provided. The maximum �:,,` length of a segment and spacing of the rest intervals are in Table 1017.7.1 in the Outdoor Development Areas document. Cross Slc�>c • Concrete, asphalt or boards - 1:48 maximum. • Other surfaces - 1:20 maximum. Trail Signage • Must be located at the trail heads. • Length of trail or segment. • Surface type. • Typical and minimum width. • Typical and maximum running slope. 11 • Typical and maximum cross slope. Public Parking Street Parkir�g (Draft Public Right-of-Way document) Requirements for street parking apply only to marked or metered street parking. When on-street parking is marked or metered, accessible parking spaces complying with R308 shall be provided on the block perimeter in accordance with Table R216 in the Draft Public Right-of-Way document. Parkinq Lots (MN1341 1106.1, 502) �y� � Parking Space Width — 8-foot minimum. ""`�'� ��� • Access Aisle Width — 8-foot minimum. • Access Aisle Markings - striped the full length of the parking space, indicate "no parking" (sign or painted on surFace). • Slope- 1:48 maximum in all directions for entire space and access aisle. • Vertical Clearance — 96-inch minimum. • Signage o Centered at head end of the parking space 0 96-inch maximum from head end of the space 0 60 to 66 inches above the parking surface to the bottom of the sign Note - In Minnesota, all access aisles are 8 feet wide (no 5-foot wide aisles). ,,,���t�. �„a, 12 Frequently Asked Questions Sidewalks Question: A project will be undertaken to connect a series of sidewalk segments near a schoo/. Must the existing segments of sidewalk be modified if they do not meet width or cross slope provisions? Answer: Yes, to the maximum extent feasible within the scope of the project. Agencies are not required to expand a planned scope of work to include other items of accessibility. Question: A new sidewalk is being built along an existing road that contains driveway access points. Must those driveways be modified if their cross slope exceeds 2%? Answer: Yes, to the maximum extent feasible within the scope of the project. Quesfion: A city is rebuilding a sidewalk along Main Street. The distance between the edge of the right-of-way and the existing road does not provide sufficient room for a 4-foot-wide pedestrian access route. Does the municipality have to acquire more right- of-way on private property or narrow the roadway to provide the necessary space? Answer: No, these guidelines do not require the municipality to obtain right-of-way or to narrow roadways. A municipality may decide to do either for other reasons (for instance, the roadway may be narrowed as a larger traffic calming effort or as part of a larger project in the roadway). Curb Ramps / Blended Transitions Question: A multi-block length of roadway is being resurfaced. The corners have curb ramps that meet some, but not all, of the current specifications; for example, the cross slope may be too steep or the curb ramps do not have detectable warnings. Must the curb ramps be reconstructed as part of the resurfacing project? Answer: Yes, if it is technically feasible to provide complying features. The work should be done at the same time the resurfacing is being done. Question: New curb ramps are being installed at an existing developed corner. New construction standards require the curb ramp to be within the crosswalk, but an existing underground utility vault is located where the ramp should be. Must the utility vault be moved? Answer: The scope of this project will determine the answer. If utilities are being moved for other reasons within the project limits, it may be possible to alter or relocate the vault. If project construction will not involve the vault, it may be technically infeasible to locate the curb ramp optimally. It may be possible to widen the crosswalk markings to include the curb ramp. 13 Question: What if the curb ramp can be placed over the vault, but the access cover would be located on the curb ramp? Answer: If the access cover must be located on the curb ramp, it should meet the surface requirements of the pedestrian access route. Question: One corner of an intersection is being altered by curb and gutter reconstruction and paired curb ramps are being installed as part of this project. The other three corners of the intersection are not being altered. Must curb ramps be provided at the unaltered corners as part of this work? Answer: No. The scope of the project requires curb ramps only at the altered corner. Question: Are concrete paver blocks for sidewalks acceptable for pedestrian access routes? Answer: Yes, but considerations should be made to ensure that the route is comfortably and safety traversable by wheelchairs and individuals with canes or other walk assisting devices. Question: Are expansion joints in sidewalks compliant with accessibility guidelines? Answer: It depends, as long as there is not a gap (where an expansion joint has worn away) that is wider than 0.5 inches the expansion joints are okay. Question: Where should a detectable warning device be used? Answer: Truncated domes are required at all street crossings and discouraged at all alley and driveway crossings. However, if the driveway access looks and operates like a street approach, truncated domes should be considered. Question: What is the minimum Mn/DOT width required for median refuge? Answer: Mn/DOT is using a minimum width of 6 feet (back of curb to back of curb) for pedestrian refuges. Question: When is edge protection required for sidewalk runs? Answer: Edge protection is required whenever a handrail is required. A detectable edge is also required for sidewalks adjacent to roundabouts. Question: When ramps are being reconstructed, does the curb need to be removed or the ramp retrofitted to the curb? Answer: The curb should be removed so that the new ramp meets as many accessibility guidelines as feasible. 14 Question: If the slope exceeds 5%, how far can the walk be built before requiring a landing? Answer: A landing is required for every 30 inches in rise for a sidewalk that is separated from a roadway. Question: What does features does a compliant ramp need? Answer: Generally speaking, a rap needs: a running slope less than or equal to 8.3%, meets MnDOT Spec. 2521.3, cross slope less than or equal to 2%, landing slope /ess than 2% in every direction, landing area at least 4 feet by 4 feet, landing location at the top of the ramp or at a change in the access route direction, truncated domes covering the entire curb opening, proper drainage, no vertical discontinuities greater than 0.25 inches. Siqnals Quesfion: Curb ramps are being installed at a signalized intersection as part of a roadway improvement project. Existing pedestrian signals are pedestrian actuated but the pushbuttons are not accessible or placed in accessible locations. Must accessib/e pedestrian signals be installed at the existing pedestrian signals? Answer: If work on pedestrian pushbuttons is not planned as part of this project, there is no need to expand its scope to include APS. Question: The pedestrian signals in a corridor are being replaced with new combined count-down signals. Must APS be included in the new system? Answer: Yes. The installation of a new system is an alteration that requires compliance with the new construction guidelines to the maximum extent feasible. However, the addition of a new feature, such as a countdown face or larger display, to an existing installed system does not require that the scope of work be expanded to include other features. Question: Count-down signal displays are being added to the existing pedestrian signal heads at an intersection, but the software and signal controller are not being altered. Must APS be installed? Answer: No, simply adding a display to the existing WALK/DON'T WALK signal would not involve the system changes needed to implement APS. Question: An intersection is being signalized and will include APS. The installation of stub poles on the existing sidewalks to mount the new pedbuttons will not involve disturbing the roadway or sidewalk. Must curb ramps be installed if none existed? Answer: No. This is a project to install ped buttons; it is not an alteration to the sidewalk or street that would require the installation of curb ramps, as required by 28 CFR 35.151(e). 15 Question: The pushbutton on an existing pedestrian signal is being replaced with a sturdier model. Must APS be installed? Answer: No, but the new pushbutton must meet applicable requirements (i.e., location, height, operable parts). Quesfion: An intersection with sidewalks and pedestrian signals is being widened to include a right turn lane. Must APS be installed as a consequence of the widening project? Answer: No, installing APS is not within scope of the project. Any new pedestrian pushbuttons installed in the course of the work must meet applicable requirements. Note that this project is an alteration to the street and sidewalk and thus must provide compliant curb ramps. � Accessibilitv durinq construction Quesfion: What provisions for accessibility must be made during construction activities? Answer: When a pedestrian access route is disrupted, closed, or relocated during construction, maintenance work, or other temporary conditions, the alternative pedestrian access route shall include pedestrian ramps to maintain accessibility. See the Minnesota Manual on Uniform Traffic Control Devices (MN MUTCD) for further guidance on the requirements for establishing an alternative pedestrian access route for temporary traffic control. See also the "Pedestrian Accessibility Considerations in Temporary Traffic Control Zones Check List"in the MN MUTCD. � �� � �.s:;:� � � ��;:: 16 References Notice of Availability of Draft Public Rights-of-Way Accessibility Guidelines (Highlighted Notes from Original - Summary) (Page 7) Draft Guidelines for Public Rights-of-Way R202 Alterations and Additions to Existing Facilities. Text and advisory notes have been added to this draft to clarify the application of new construction guidelines to an alteration project. New work put in place within an existing developed right-of-way must comply with these guidelines to the maximum extent feasible; see Advisory R202.3. Transitional segments that connect undisturbed improvements with new work can facilitate compliance (R202.1.1). Where items are places within an existing developed streetscape and the circulation route is not altered, items required to be accessible shall be located for optimal usability and access (R202.1.2). (Page 13) Technical Assistance Q & A for Alterations Projects Alterations are projects planned for implementation by a jurisdiction. Program access obligations for existing facilities are not a part of the Board's accessibility guidelines, and the Board's responses to the following questions do not address program access issues (see title ll of the ADA at 28 CFR 35.149 and 35.151). (Page 22) R202.1 General Advisory R202.1 General. Alterations include, but are not limited to, renovation, rehabilitation, reconstruction, historic restoration, resurfacing of circulation paths or vehicular ways, or changes or rearrangement of structural parts or elements of a facility. The U.S. Department of Justice Title II regulation at 28 CFR 35.151(e) requires that curb ramps be installed whenever pedestrian walkways on sidewalks and across streets are newly constructed or altered. A 1993 case, Kinney v. Yerusalim, 9 F.3d 1067 (3d Cir. 1993), cert. denied, 511 U.S. 1033 (1994), held that resurfacing of a street constitutes an alteration that requires the installation of curb ramps (for text see http://www.ada.gov/deldot.htm). Pavement patching and liquid-applied sealing, lane restriping, and short-term maintenance activities are not alterations. (Page 30) R221 Detectable Warning Surfaces Advisory R221 Detectable Warning Surfaces. Detectable warning surfaces are required where curb ramps, blended transitions, or landings provide a flush pedestrian connection to the street. Sidewalk crossings of residential driveways should not generally be provided with detectable warnings, since the pedestrian right-of-way continues across most driveway aprons and overuse of detectable warning surfaces should be avoided in the interests of message clarity. However, where commercial driveways are provided with traffic control devices or otherwise are permitted to operate like public streets, detectable warnings should be provided at the junction between the pedestrian route and the street. 17 (Page 3) June 17, 2002 Release of Draft Guidelines In fact, only future new projects would be subject to these guidelines (Accessible Pedestrian Signals). With respect to APS in particular, only pedestrian crossings that provide pedestrian signals would be required to include APS. � , i1�I�po, � 4�i,�;, ��: � 18 Special Report: Accessible Public Rights-of-Way Planning and Design for Alterations (Highlighted Notes from Original - Summary) Introduction (Page 10) Alterations: Terminology Federal highway agency nomenclature relies on new construction, reconstruction, and `3R (resurfacing, rehabilitation, and restoration of pavements)'. Whatever term is used, the removal of some existing improvements and installation of replacement improvements constitutes an alteration under the ADA. Transportation agencies may consider resurfacing a roadway a maintenance item, for ADA purposes it has been considered an alteration with respect to the special Title ll obligation at 35.151(e) to install curb ramps. (Page 10) Alterations: Curb Ramps 35.150(d)(2) Transition plan. If a public entity has responsibility or authority over streets, roads, or walkways, its transition plan shall include a schedule for providing curb ramps or other sloped areas where pedestrian walks cross curbs, giving priority to walkways serving entities covered by the Act, including State and local government offices and facilities, transportation, places of public accommodation, and employers, followed by walkways serving other areas. (Page 27) Design Process: Examples Examples LeYs use the classic 4Rs of highway design to illustrate how establishing the scope of work relates to access planning (see Appendix for TxDOT's definitions). Most 4R projects involve roadway pavement, although many other elements of construction can a/so be included: 1. Reconstruction Reconstruction of roadway facilities is an ambitious undertaking of comprehensive scope under which most objectives can be fully realized for both roadway and sidewalk design. Projects of this complexity should be able to meet or exceed minimum accessibility criteria. Example: A 1.5-mile length of residential street was reconstructed and re-aligned and water, fire hydrant, and sanitary and storm sewers rehabilitated as part of the project. New curbs and gutters were provided throughout. Accessibility features included new aligned curb ramps with detectable warnings at all crossings. Sidewalks were replaced and driveway aprons reconstructed where needed to meet cross slope limits. (Page 27 cont.) 2. Rehabilitation Rehabilitation projects typically raise subgrade issues. Feasibility is a factor here and `work- arounds' will require case-by-case design solutions. 19 Example: Storm drainage improvements (new inlets) are planned for one side of an existing developed streetscape. Sidewalk and roadway surfaces and subgrade facilities are removed at each corner, but the sidewalks they connect to will remain. When sidewalk segments are replaced or repaired, the new work must provide accessibility/usability. But it must also meet the grades of existing sidewalks at the project boundary. Providing intermediate transition segments between the new and existing work (rather than matching the old) will serve users best. Future work then need only improve the transition segment and the existing sidewalk. In addition, the scope of work for this alteration must include new curb ramps (and the improvement of existing ones, as feasible). The agency should consider adding opposite-side curb ramps to the scope of work, as well. 3. Restoration Restoration projects return pavement structure, riding quality, or other roadway characteristic in an existing cross-section to near-new condition. Because the work affects the usability of the surface, it is considered an alteration and must include curb ramps at pedestrian crossings. Example:An existing rutted roadway surface will be restored. Subgrade structure will be improved and a new surface added without disturbing adjacent existing sidewalks. Curb ramps added in an alteration of this limited scope will be usable by many, but may not be optimal in location, wayfinding, s/ope, width, or other feature until a later alteration to the sidewalk is undertaken. 4. Resurfacing Most resurfacing will be viewed as an alteration—a change that affects surface usability. However, spot patching and liquid-applied seals are described as maintenance not requiring curb ramps in DOJ technical assistance publications. FHWA guidance distinguishes between structural and non-structural resurfacing. ,, .� .,;,. � �� � Funding �H�;, Resources: Planning and Funding Accessible Pedestrian Facilities Funding Availability and Design Philosophy(Page 100-103) The combined funding of Federal, state and local government on surface transportation is one of this country's largest domestic spending programs. The funding for pedestrian issues has increased dramatically since 1991. This increase was spurred by transportation legislation, grassroots support, and accessibility policies. Pedestrian projects and programs are eligible for funding in almost every major federal-aid surface transportation category. Transportation legislation, including the Safe, Accountable, Flexible, Efficient Transportation Equity Act:A Legacy for Users (SAFETEA-LU) calls for mainstreaming pedestrian (and bicycle) projects into planning, design, and operation of our nation's transportation system. Transportation facilities must include features that will allow people of all abilities to use them. The federal-aid highway program can work hand-in-hand with the ADA of 1990, which requires all pedestrian facilities be accessible for people with disabilities. Accessibility is not an exclusive or separate issue. 20 Rather, accessibility design is fundamental to the walking environment because all pedestrians with or without disabilities benefit from accessibility design. Accessibility is an intrinsic part of planning, retrofitting, and constructing pedestrian facilities, along with safe accommodation and good design. Accessibility is a safety issue because if a facility is not accessible, then it is not safe for more than 54 million people in this country who have some form of disability. The USDOT's policy on accessibility states, "Accessibility is a civil right. The key function of transportation, at its most fundamental level, is to provide basic mobility to society. It is our responsibility to strive to ensure that transportation systems are not only safe and efficient, but also usable by all-including persons with disabilities." The USDOT's Accessibility Policy Statement can be reviewed at www.dot.gov/accessibility/polfin.htm. Accessibility requirements are not new and these obligations have been around long before the ADA in 1990. States and localities were first required to place curb ramps at street crossings in 1973 by Section 504 of the Rehabilitation Act. Also, the DOJ has ruled that resurfacing a roadway (beyond filling pot holes) is an alteration, thus triggering the requirement to place curb ramps at roadway intersections. Funding Sources for Pedestrian Projects Pedestrian projects are broadly eligible for funding from almost all the major federal- aid highway, transit, safety and other programs. The matrix at the end of this section denotes the FHWA and FTA funding programs that can be used to fund pedestrian projects and activities. Federal-Aid Highway Programs National Highway System funds may be used to construct pedestrian walkways and facilities on land adjacent to any highway on the National Highway System, including Interstate highways. Surface Transportation Program (STP) funds may be used for either the construction of pedestrian walkways, or non-construction projects (such as maps, brochures, and public service announcements) related to safety. TEA 21 adds "the modification of public sidewalks to comply with the Amerrcans with Disabilities AcY'as an activity that is specifically eligible for the use of these funds. Ten percent of each state's annual STP funds is set-aside for Transportation Enhancement Activities (TEAs). The law provides a specific list of activities that are eligible TEAs and this includes "provision of facilities for pedestrians and bicycles, provision of safety and educational activities for pedestrians and bicyclists,"and the "preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian and bicycle trails)." Another 10% of each state's STP funds is set aside for the Hazard Elimination and Railway— Highway Crossing programs, which address pedestrian safety issues. Each state is required to imp/ement a Hazard Elimination Program to identify and correct locations that may constitute a danger to motorists, bicyclists, and pedestrians. Funds may be used for activities including a survey of hazardous locations and for projects on any publicly owned, shared-use path, pedestrian pathway or trail, or any safety-related traffic ca/ming measure. Congestion Mitigation and Air Quality Improvement Program funds may be used for either the construction of pedestrian walkways or non-construction projects (such as maps, brochures and public service announcements). 21 Recreational Trails Program funds may be used for all kinds of trail projects. Of the funds apportioned to a state, 30% must be used for motorized trail uses, 30% for non-motorized trail uses and 40% for diverse trail uses (any combination). Provisions for pedestrians are eligible under the various categories of the Federal Lands Highway Program in conjunction with roads, highways, and parkways. Priority for funding projects is determined by the appropriate Federal Land Agency or Tribal government. National Scenic Byways Program funds may be used for "construction along a scenic byway of a facility for pedestrians." High-Priority Projects and Designated Transportation Enhancement Activities identified by SAFETEA-LU include numerous pedestrian, trail, and traffic calming projects in communities throughout the country. Safe Routes to School funds are provided to the states to substantially improve the ability of primary and middle school students to walk and bicycle to school safely. The purposes of the program are: 1. to enable and encourage children, including those with disabilities, to walk and bicycle to school; 2. to make bicycling and walking to school a safer and more appealing transportation alternative, thereby encouraging a healthy and active lifestyle from an early age; and 3. to facilitate the planning, development, and implementation of projects and activities that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity (approximately 2 miles) of primary and middle schools (Grades K-8). Each state administers its own program and develops its own procedures to solicit and select projects for funding. The program establishes two distinct types of funding opportunities: infrastructure projects (engineering improvements) and non-infrastructure related activities (such as education, enforcement, and encouragement programs Federal Transit Program Title 49 U.S.C. (as amended by SAFETEA-LU) allows the Urbanized-Area Formula Grants, Capital Investment Grants and Loans, and Formula Program for Other Than Urbanized Area transit funds to be used for improving pedestrian access to transit facilities and vehicles. Eligible activities include investments in "pedestrian and bicycle access to a mass transportation facility"that establishes or enhances coordination between mass transportation and other transportation. SAFETEA-LU also created a Transit Enhancement Activity program with a one percent set-aside of Urbanized-Area Formula Grant funds designated for, among other things, pedestrian access and walkways. Highway Safety Programs Pedestrian and bicyclist safety remain priority areas for State and Community Highway Safety Grants funded by the Section 402 formula grant program. A state is eligible for these grants by submitting a performance plan (establishing goals and performance measures for improving highway safety) and a highway safety plan (describing activities to achieve those goals). Research, development, demonstrations, and training to improve highway safety 22 (including pedestrian safety) is carried out under the Highway Safety Research and Development (Section 403) program. Matrix of FHWA and FTA Funding Opportunities for Pedestrian Facilities SAFETEA-lU & de/Pedesvi�n fur►din 0 rtunioes IHA STP NEP RN[ TEA (MAQ ATP FTA TE B�I 402 PU TCSP OBS FlH Bl'W �ryde and pedesvian pbn = _ - _ � �IC ��KS lnl ��{j�f� i 11[ i[ Y i it Y i[ f[ ][ i gved shoukltn � � x Y li Y iL f[ X ned bikt route = x � = Y - �1iRd-U3t �Vdl� " " '� ' " x " ' Sn k mck hike/bict trzil = t im ovement o r�m = _ _ - � . . ,� 8ke ncks on buses x - _ - - 8 d! �cin (acikoiES • _ _ - _ � hiUhi hw intersetonn = x = _ _ � - - g tk stan e/strrict ctnur Y = _ _ _ _ _ Sdewtlks,new or rettofit Y Y x ,� � � ,� . � . . GosswaNu,roew or rtvo6t = = Y = = Y Y Y .� . SAFETEA-lU & ck/Pedesuitn Fundin 0 nioes IHA STP HEP AH( TEA (MAQ RTP FTA TE BAI 402 PU TCSP OBS FlH BYW S nil im ovemenu " ' ' " : ' (Lrb tuts and rim ' ' � % � � Trlffit plmin = '� '� - ' {oordinator sition '� � � Sa(e /e�aaan sio�n x � Y Pol�ia ornl = � Y Helmet omation � � x S�h brochurelbook � x - Y Tr�inin Y = �r NNS Nitioal N�Srstem (fWQ (aa�estioa MMitintioa/Air Q,u�itr Projnm T(SP inasporutioa iad tormw�j ind STstem STP Surita� 3rinspaution Projnm flN kbertl luds Ni�hrr�ri Pro�run Prestnitioo P�ot Projrun NEP Huud Elimi�ttion Pro�nm 84W Sa�ac B�a�s p81 Acuu to)osslAerene tanaext Pro�rim RN( I�i«a7•MqArny trossrq Prognm Btl Brx4�e �TP Aeanuio�al Tnis Projnm TEA &�sponitt;on f�oaeaxn�Acivities 102 Suce s�i tam+uary kt�c S�4ry Pro�rim FU kdenl Tnmic(apipl.U�sn i I�fued► PU SutdMetropoYtia PhiriK Fuads TE Tr�sit Ednacemeats 23 Resources 28 CFR 35 http://www2.ed.gov/po I icy/rig hts/reg/ocr/28cfr35.pdf Accessible Rights-of-Way: A Design Guide http://www.access-board.gov/prowac/guide/PROWGuide.htm Americans with Disabilities Act Accessibility Guidelines (ADAAG) http://www.access-board.gov/adaag/html/adaag.htm Architectural Barriers Act of 1968 (ABA) http://www.gpo.gov/fdsys/pkg/FR-2007-06-20/pdf/07-2979.pdf Hennepin County Program Access and Transition Plan http://www.hennepin.us/ Minnesota Department of Transportation � http.//www.dot.state.mn.us/ada/ Public Rights of Way Access Advisory Committee (PROWAAC) http://www.access-board.gov/prowac/alterations/guide.htm Public Rights of Way Accessibility Guidelines (PROWAG) http:Uwww.access-board.gov/prowac/ / Section 504 of the Rehabilitation Act of 1973 http://www.access-board.gov/enforcement/rehab-act-text/intro.htm The Access Board http://www.access-board.gov/ ;����' The Americans with Disabilities Act (ADA) http://www.ada.gov/ US Department of Transportation Department http://www.dot.gov/citizen_services/disability/disability.html 24 Appendix � , ;, , , &,. � s� ;, 25 `�� � � � � � , s��, ;�. < � �' �K a, : � � �� Public Works � c :� ��_�:-� 763-593-8030 I 763-593-3988(fax) Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 3. Snow Plowing and Ice Control Policy for City Streets, Alleys, Parking Lots, Trails and Sidewalks Prepared By Jeannine Clancy, Director of Public Works Bert Tracy, Public Works Maintenance Manager Charles Perkins, Street Maintenance Supervisor Summary In January 2009, the City adopted its Snow and Ice Control Policy for streets and a separate policy for trails and sidewalks. This proposed revision to these documents includes the following: 1. Combines the two documents; 2. Reflects the City's current practices and procedures; and 3. Addresses the issue of mailboxes when damaged. The policy is based on recommendations from the League of Minnesota Cities. If Council finds the policy acceptable, it will be placed on the November 15, 2011 Council agenda. Attachments Draft City of Golden Valley Snow Plowing and Ice Control Policy for City Streets, Alleys, Parking Lots, Trails and Sidewalks (redline/strikeout version, 5 pages) Adopted City of Golden Valley Snow Plowing and Ice Control Policy, dated January 20, 2009 (4 pages) � �jl ��r�en � , Snow Plowing and Ice Control Policy for City Streets, Alleys, Parkinq Lots, Trails and Sidewalks January 20, 2009 Amended November 15, 2011 1. Introduction The City of Golden Valley, Minnesota, finds that it is in the best interest of the residents of the City to assume basic responsibility for control of snow and ice on City streets. Reasonable ice and snow control is necessary for routine travel and � emergency services. The City will attempt to provide snow and ice� control in a safe and cost-effective manner, keeping in mind safety, budget, personnel, and environmental concerns. The City will use City employees and City-owned equipment, and private equipment when necessary. This policy does not relieve the operator of private vehicles, pedestrians, property owners, residents and all others � that may be using public streets, alleys, parkinq lots, sidewalks and trails, of their responsibility to act in a reasonable, prudent and cautious manner, given the � prevailing st�ee�-conditions. 2. Initiation of Snow and Ice Control Operations The Public Works Maintenance Manager, or his designee, will decide when to begin snow or ice control operations. The criteria for that decision are: a. New accumulation of two (2) inches or more; b. Drifting of snow that causes problems for travel; c. Icy conditions which seriously affect travel; and d. Time of snowfall in relationship to heavy use of streets. I Snow and ice control operations are expensive and involve dedication of a siqnificant amount of +"o ,��^ ^f ��m�+�,� personnel and equipment. Consequently, snow plowing operations will not generally be conducted for snowfall of less than two (2) inches. However, an accumulation of consecutive snowfall events of less than two (2) inches may constitute initiation of snow plowing operations. 3. Plowing Method Snow will be plowed in a manner so as to minimize traffic obstructions. The center of the roadway will be plowed first. The snow shall then be pushed from left to right. When a plow goes on a bridge, the driver shall slow down so snow does not go over the bridge, if possible. In times of extreme snowfall, streets mav not be �e� ��immediately -cleared of snow. Plowinq �#�eSe procedures will be adapted to address field conditions. , , , ���p����o �n���i ���r�ne �rc�.+ �uill ho I�n.+�orl c�� r+� �� minimi�o y 4. Maintenance Priorities and Schedule of Streets, Alleys, Municipal Parkinq Lots, Sidewalks and Trails 5.A. Streets, Alleys and Municipal Parkinq Lots The City has classified city streets based on the street function, traffic volume and importance to the welfare of the community. Those streets classified as minor arterials and collectors will be plowed first. These are high volume routes, which connect major sections of the City and provide access for emergency, fire, police and medical services. The second priority streets are those streets providing access to schools and commercial businesses. The third priority streets are low volume residential streets. The fourth priority areas are alleys and City parking lots, except for those parkinq lots needed for Public Safetv and Public Works functions. Each year the Public Works Department prepares a map of the City showing the City's streets svstem. m�;^+�;,,o,� �+ro�+ �.,�+o�.,. The City is divided into routes, in which ice control and snow removal will be performed. The routes are periodically revised to correspond to budgetary, equipment and personnel resources. Within each route, the major streets are designated as well as areas of steep grades (hazardous areas) that require extra care. Equipment is assigned for the control of snow and ice. � The start of snow and ice control operations for any storm is dependent upon immediate and forecasted weather conditions. The most critical time periods I are weekday mornings and evening rush hours. Collector and arterial streets under the Citv's jurisdictional authority are the first priority. When feasible, the City will attempt to remove snow and ice from the City's collector and arteriat streets prior to the rush hour periods. . Once the collector and arterial �+er+t�-streets a�ea�are plowed and opened, the remaining streets and cul-de-sacs in the residential, commercial and industrial areas will be I plowed and de-iced. The qoal is to complete this work within 8 hours of the end of the snow event. � During significant and severe storms, the City must be prepared to move personnel and equipment to maintain priority routes first. In fulfilling the need to have all collector and arterial p�+e�i#�streets safe and passable, when resources are limited, plowing of all other streets may be suspendedste�e� at any time so resources can be shifted to the priority routes. � Unforeseeable circumstances may cause delays in completing assigned plow routes. Such circumstances may include weather conditions that endanger the safety of snowplow operators and/or safe and effective operation of equipment, commuter traffic, disabled vehicles, poor visibility conditions, parked cars along streets, assistance to emergency response vehicles, equipment breakdown, and personnel shortages. B. Sidewalks and Trails The Citv will maintain some of the sidewalks and trails in the Citv. A map of the trails and sidewalks is prepared annually and the sidewalks and trails have been prioritized based on function and use. As there are a limited number of personnel available, the City will only maintain these sidewalks and trails in accordance with qersonnel and equipment availability. a. Priority 1 and 2 trails and sidewalks are typically plowed within 24 hours after a 2-inch snow event occurs, if resources allow. b. The Citv mav plow onlv Priority 1 trails if a snow event occurs with excessive accumulation (qreater than 2 inches), in the event of an ice storm, or if equipment or manpower issues require an adjustment in the City's schedule. c. Prioritv 3 trails are plowed only after the maintenance effort for Priority 1 and 2 trails has been completed. This mav tvpically be 48 to 72 hours after a 2-inch snow event. The trails mav not be completed if consecutive snow events occur, or if manpower or equipment issues do not allow for plowinq. 5. Haulinq Snow from Riahts-of-Wav The Public Works Maintenance Manaqer, or desiqnee, will determine if and when snow will be removed from Citv-owned parkinq lots and riqhts-of-way. Such snow removal will occur in areas where there is room on the boulevard for snow storaqe and in areas where accumulated piles of snow create a hazardous condition. Snow removal operations will not commence until other snow plowinq operations have been completed. Snow removal operations mav also be delayed dependinq on weather conditions, personnel and budqet availability. The snow will be removed and hauled to a snow storaqe area. The snow storaqe area will be located so as to minimize environmental impacts. 6. Work Schedule for Snowplow Operators In severe snow emergencies, operators may have to work in excess of 12-hour shifts. Operators are allowed a 10-minute break every 2 hours with a 20-minute meal break after 4 hours. Except for special emergency situations, the operators will be replaced after a 12-hour shift if additional qualified personnel are available. Ideally, snow removal operations should be conducted during early morning hours to avoid interfering with traffic, and allow property owners the time to clear their driveway � approaches before travelinq �ea�+r�gto work. 7. Traffic Regulations The City recognizes that snowplow operators are exempt from traffic regulations set forth in Minnesota Statutes, Chapter 169, while actually engaged in work on streets, except for regulations related to driving while impaired and the safety of school children. Pursuant to this authority, snowplow operators engaged in snow removal or ice control on City streets have discretion to disregard traffic laws set forth in Chapter 169, except for laws relating to impaired driving and school children safety, when in their judgment, it is safe to disregard such laws. The privileges granted herein to operators of snow removal and ice control vehicles shall apply only if the vehicle is equipped with one lighted lamp displaying a flashing, oscillating, or rotating amber light placed in such a position on the vehicle as to be visible throughout an arc of 360 degrees. 8. Weather Conditions Snow and ice control operations will be conducted only when weather conditions do not endanger the safety of snowplow operators and equipment. Factors that may delay snow and ice control operations include: severe cold, significant winds, and limited visibility. 9. Use of Sand, Salt, and Other Chemicals The City will use sand, salt, and other chemicals when there are hazardous ice or slippery conditions. The City is concerned about the effect of such chemicals on the environment and will limit its use for that reason. With the exception of Winnetka Avenue, south of TH 55, the City of Golden Valley does not strive to achieve bare pavement. Sand, salt, and other chemicals are not placed on City trails and sidewalks, except for those which immediately service a City building that is programmed for use during the winter. . c-s , �� 1�!.10. Mailboxes jMailboxes, which are enerall an obstruction in City's riqht-of-way, are sometimes impacted bv snow removal operations. +s�-a . The City will conduct a review of each mailbox incident to determine whether a snowplow came into direct contact with the mailbox or support structure. The City will only repair mailboxes actuallv hit bv a snowplow and installed to United States Postal Service Residential Mailbox Standards (see detail below). The City will not be responsible for damage to mailboxes or support posts caused bv snow or ice cominq into contact with the mailbox. Based on the Citv's review, the City will repair the mailbox to an operational state, or if the mailbox is unable to be adequately repaired, the City will replace e�e�e roimh��rc�omor�} {�r the mailbox with a standard size, non-decorative metal mailbox. The City may also replace the support post as necessary with a 4" x 4", decav resistance wood support post, if necessarv. Dents, scratches, or other superficial damaqe that does not prohibit normal use of the mailbox will be considered normal wear and tear and will not be repaired or replaced bv the City. ces , . , , „ „ , , NOTE: BOTTOM OF MAIIBOX SHOULD BE 47-45 INCHES � ABOVE ROAD 3URFACE.FACE OF MAILBOX 3HOULD BE BETWEEN 8 AND B INCHES FROM FACE , I'� 8'TO FROM OF CURB. � FACE CURB ROAD SURFACE � � 12.1.1. Complaint Procedure Complaints will be recorded on telephone logs. Calls requiring service will be transferred to a work request and forwarded to the appropriate supervisor for scheduling. Emergency complaints will be handled in an expeditious manner as resources are available. . , � ?^.12._Suspension of Snow Removal OperationsNVeather Conditions The Public Works Director, or designee, may suspend plowing operations. Generally, suspension of plowing operations will be considered only when weather conditions endanger the safety of City staff and equipment. Factors that may suspend snow and ice control operations include: severe cold, significant winds and limited visibility, or the weather forecast calls for temperatures of 40 degrees within 12 hours. �,v� /� 4 - \ �� . ��.... �\ . Snow Plowing and Ice Control Policy January 20, 2009 1. Introduction The City of Golden Valley, Minnesota, finds that it is in the best interest of the residents of the City to assume basic responsibility for control of snow and ice on City streets. Reasonable ice and snow control is necessary for routine travel and emergency services. The City will attempt to provide such control in a safe and cost- effective manner, keeping in mind safety, budget, personnel, and environmental concerns. The City will use City employees and equipment. This policy does not relieve the operator of private vehicles, pedestrians, property owners, residents and all others that may be using public streets, of their responsibility to act in a reasonable, prudent and cautious manner, given the prevailing street conditions. 2. Initiation of Snow and Ice Control Operations The Public Works Maintenance Manager, or his designee, will decide when to begin snow or ice control operations. The criteria for that decision are: a. New accumulation of finro (2) inches or more; b. Drifting of snow that causes problems for travel; c. Icy conditions which seriously affect travel; and d. Time of snowfall in relationship to heavy use of streets. Snow and ice control operations are expensive and involve the use of limited personnel and equipment. Consequently, snow plowing operations will not generally be conducted for snowfall of less than two (2) inches. However, an accumulation of consecutive snowfall events of less than two (2) inches may constitute initiation of snow plowing operations. 3. Plowing Method Snow will be plowed in a manner so as to minimize traffic obstructions. The center of the roadway will be plowed first. The snow shall then be pushed from left to right. When a plow goes on a bridge, the driver shall slow down so snow does not go over the bridge, if possible. In times of extreme snowfall, streets will not always immediately be able to be completely cleared of snow. These procedures will be adapted to address field conditions. 1 4. Snow Removal The Public Works Maintenance Manager, or designee, will determine if and when snow will be removed from the area by truck. Such snow removal will occur in areas where there is no room on the boulevard for snow storage and in areas where accumulated piles of snow create a hazardous condition. Snow removal operations will not commence until other snow plowing operations have been completed. Snow removal operations may also be delayed depending on weather conditions, personnel and budget availability. The snow will be removed and hauled to a snow storage area. The snow storage area will be located so as to minimize environmental impact. 5. Priorities and Schedule of Streets to be Plowed The City has classified city streets based on the street function, traffic volume and importance to the welfare of the community. Those streets classified as minor arterials and collectors will be plowed first. These are high volume routes, which connect major sections of the City and provide access for emergency, fire, police and medical services. The second priority streets are those streets providing access to schools and commercial businesses. The third priority streets are low volume residential streets. The fourth priority areas are alleys and City parking lots. Each year the Public Works Department prepares a map of the City showing the City maintained street system. The City is divided into routes, in which ice control and snow removal will be performed. The routes are periodically revised to correspond to budgetary, equipment and personnel resources. Within each route, the major streets are designated as well as areas of steep grades (hazardous areas)that require extra care. Equipment is assigned for the control of snow and ice. The start of snow and ice control operations for any storm is dependent upon immediate and forecasted weather conditions. The most critical time periods are weekday mornings and evening rush hours. When feasible, the City will attempt to remove snow and ice from the City's collector and arterial streets prior to the rush hour periods. Collector and arterial streets under the City's jurisdictional authority are the first priority. �nce the priority areas are plowed and opened, the remaining streets and cul-de-sacs in the residential, commercial and industrial areas will be plowed and de-iced. During significant and severe storms, the City must be prepared to move personnel and equipment to maintain priority routes first. In fulfilling the need to have all priority streets safe and passable, when resources are limited, plowing of all other streets may be stopped at any time so resources can be shifted to priority routes. 2 Unforeseeable circumstances may cause delays in completing assigned plow routes. Such circumstances may include weather conditions that endanger the safety of snowplow operators and/or safe and effective operation of equipment, commuter traffic, disabled vehicles, poor visibility conditions, parked cars along streets, assistance to emergency response vehicles, equipment breakdown, and personnel shortages. 6. Work Schedule for Snowplow Operators In severe snow emergencies, operators may have to work in excess of 12-hour shifts. Operators are allowed a 10-minute break every 2 hours with a 20-minute meal break after 4 hours. Except for special emergency situations, the operators will be replaced after a 12-hour shift if additional qualified personnel are available. Ideally, snow removal operations should be conducted during early morning hours to avoid interFering with trafFic, and allow property owners the time to clear their driveway approaches before heading to work. 7. Traffic Regulations The City recognizes that snowplow operators are exempt from traffic regulations set forth in Minnesota Statutes, Chapter 169, while actually engaged in work on streets, except for regulations related to driving while impaired and the safety of school children. Pursuant to this authority, snowplow operators engaged in snow removal or ice control on City streets have discretion to disregard traffic laws set forth in Chapter 169, except for laws relating to impaired driving and school children safety, when in their judgment, it is safe to disregard such laws. The privileges granted herein to operators of snow removal and ice control vehicles shall apply only if the vehicle is equipped with one lighted lamp displaying a flashing, oscillating, or rotating amber light placed in such a position on the vehicle as to be visible throughout an arc of 360 degrees. 8. Weather Conditions Snow and ice control operations will be conducted only_when weather conditions do not endanger the safety of snowplow operators and equipment. Factors that may delay snow and ice control operations include: severe cold, significant winds, and limited visibility. 9. Use of Sand, Salt, and Other Chemicals The City will use sand, salt, and other chemicals when there are hazardous ice or slippery conditions. The City is concerned about the effect of such chemicals on the environment and will limit its use for that reason. With the exception of Winnetka Avenue, south of TH 55, the City of Golden Valley does not strive to achieve bare pavement. Sand, salt, and other chemicals are not placed on City trails and sidewalks, except for those which immediately service a City building that is programmed for use during the winter. 3 10.Sidewalks The City will maintain some of the sidewalks and trails in the City. A map of the trails and sidewalks is prepared annually. As there are a limited number of personnel available, the City will only maintain these sidewalks after the streets have been p�owed. 11.Mailboxes Coming into contact with a mailbox is a common obstacle snowplow operators face during storm activities. The City will conduct a review of each mailbox incident to determine whether the City will replace or provide reimbursement for the mailbox. Only mailboxes actually hit by a snowplow will be the responsibility of the City. The City will not be responsible for damage to mailboxes or support posts caused by snow or ice coming into contact with the mailbox. At the mailbox owner's request, the City will replace the mailbox with a standard size, non-decorative metal mailbox and replace the support post as necessary with a 4" x 4", decay resistance wood support post, both installed by the City. 12.Complaint Procedure Complaints will be recorded on telephone logs. Calls requiring service will be transferred to a work request and forwarded to the appropriate supervisor for scheduling. Emergency complaints will be handled in an expeditious manner as resources are available. 13.Completion Goals It is the Public Works Department goal to have all streets and cul-de-sacs plowed within eight hours of the end of the snow event. Trails and sidewalks are cleared in priority order: priority ones the first day, priority twos the second day and priority threes by the third day. City-owned parking lots should be cleared prior to regular business hours. �14.Suspension of Snow Removal OperationsNVeather Conditions The Public Works Director, or designee, may suspend plowing operations. Generally, suspension of plowing operations will be considered only when weather conditions endanger the safety of City staff and equipment. Factors that may suspend snow and ice control operations include: severe cold, significant winds and limited visibility, or the weather forecast calls for temperatures of 40 degrees within 12 hours. 4 ����� � ^'��i ii��i �5�. F4� �� �� ` ����� �°��� � �� � Public Works o �, � � e ���_����� 763-593-8030 l 763-593-3988(fax) Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 4. Douglas Drive Project Update Prepared By Jeannine Clancy, Director of Public Works Ron Nims, Public Works Project Coordinator Summary At the January 5, 2010 City Council meeting, the Council formally authorized the Mayor to request that the Douglas Drive Project (TH 55 to Medicine Lake Road) be placed in the Hennepin County Capital Improvement Plan for right-of-way acquisition in 2015 and construction in 2016. The estimated concept level cost of the project is approximately $20 million, and the City's portion will be about one-half of the project costs. A new cost estimate will be prepared at the completion of the preliminary design phase. Background Since January 2010, the following activities have occurred: 1. The City received notice from Transit for Livable Communities (TLC) of an award in the amount $1,050,000. The City is utilizing these funds for the preparation of preliminary design and early right-of-way acquisition. 2. In November 2010, the City Council authorized a contract with WSB &Associates, Inc. to prepare the preliminary design and develop the necessary environmental documents. In order to complete the environmental documents, a Cultural Resources/Architectural History Investigation will be perFormed by Summit Envirosolutions, MnDOT's authorized vendor. The cost to perform the investigation is up to $31,137.57 for both Phase I and II portions of the investigation. The City's share will be approximately 20% of the actual total cost or$6,228. The final cost will depend on results of the Phase I portion with the remainder paid by MnDOT. 3. In early 2011, Xcel Energy began collection of the franchise fee ordered by the City Council which will assist in paying for the City's portion of the project. 4. At the Council/Manager meeting on July 12, 2011, the design consultant presented the project layout to the Council for a preliminary review. Based upon the City Council consensus, the design was forwarded on to the TLC and Hennepin County, both of whom have approved the project in concept. 5. On September 22, 2011, City staff met with property owners whose property will be impacted by the project to the extent that the property needs to be taken in total. 6. In late September 2011, the City purchased one home that was available and had been identified as a total take. 7. On October 5, 2011, an open house was held to review the project with the corridor property owners. Next Steps 1. At the October 11, 2011 Council/Manager meeting, staff will update the Council on the status of the Douglas Drive project prior to officially presenting the preferred layout to the Council at its November 15, 2011 regular meeting for authorization of Municipal Consent. Once Municipal Consent is attained, the environmental documents can be submitted to MnDOT and the Federal Highway Administration (FHWA) for their approval and release of the remaining funding available from the TLC grant. That funding is expected to be utilized to acquire necessary right-of-way along the corridor that is critical for the advancement of the project. The remainder of the acquisitions will be made as funding is available through the Xcel franchise agreement funds and other sources. 2. Xcel is in the process of preparing a preliminary design for the relocation of overhead utilities underground. 3. The City will be entering into an agreement with Hennepin County regarding right-of- way acquisition and other project management issues. :G' - � '.O� \`\ r`"'�a... 4 :1 l� �1 - �/ P Finance 0 '�f ;�� W V 763-593-8013/763-593-8109(fau) � Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 5. 2012-2013 Proposed Budget- Other Funds Prepared By Sue Virnig, Finance Director Summary At the Council/Manager meeting, the Council will be reviewing the following funds: • Water and Sewer Utility Fund (Enterprise) • Storm Sewer Utilifiy Fund (Enterprise) • Vehicle Maintenance Fund (Internal Service Fund) Appropriate staff will be in attendance to discuss the proposed budgets for these divisions and answer questions from the Council. Attachments 2012-2013 Water and Sewer Utility Proposed Budget (39 pages) 2012-2013 Storm Sewer Utility Fund Proposed Budget (42 pages) 2012-2013 Vehicle Maintenance Proposed Budget (15 pages) CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Utility Malntenance(082) 2012% 2013% 2009 2010 2011 2011 2012 2012 2013 OVER 2011 OVER 2012 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT ADOPTED PROPOSED Personal Services 6110 Salaries-Regular Employees $537,774 $548,742 $581,160 $603,220 $581,160 $623,600 $623,600 6111 Overtime-Regular Employees 18,226 19,377 18,000 21,500 18,000 23,000 23,000 6130 Salaries-Temporary Employees 27,171 33,074 36,250 36,250 36,250 36,250 36,250 6150 Employee Insurance 98,831 129,924 130,500 150,810 130,500 157,940 157,940 6160 Retirement 73,283 77,452 99,305 86,450 99,305 90,450 90,450 TOTAL Personal Services 755,285 808,569 865,215 898,230 865,215 931,240 931,240 7.63% 0.00% Supplies and Services 6320 Operating Supplies 143,583 212,234 175,950 192,950 175,950 176,250 158,800 0.17% -9.90% 6324 Clothing 6,355 6,266 6,500 6,500 6,500 7,100 7,100 9.23% 0.00% 6331 EquipmentParts 3,586 3,943 15,250 16,750 14,250 16,750 14,750 9.84% -11.94% 6340 Professional Services 190,292 106,504 147,200 148,150 147,200 143,695 144,180 -2.38% 0.34% 6343 Telephone 6,467 5,845 9,680 9,680 9,680 9,750 9,750 0.72% 0.00% 6371 EledricService-NSP 2,151 2,123 2,600 2,600 2,600 2,600 2,600 0.00% 0.00% 6411 Conferences and Schools 13,752 7,164 13,550 13,550 13,550 15,245 13,245 12.51% -13.12% 6413 DuesandSubscriptions 1,423 1,148 1,530 1,525 1,530 1,580 1,580 3.27% 0.00% 6440 OtherContractualService 1,872,323 2,006,921 2,279,190 2,281,640 2,490,890 2,605,420 2,605,420 14.31% 0.00% 6840 MerchandiseforResale 2,754,535 2,130,612 2,731,000 2,890,465 2,841,000 2,764,180 2,889,190 1.21% 4.52% TOTAL Supplies and Services 4,994,467 4,482,760 5,382,450 5,563,810 5,703,150 5,742,570 5,846,615 6.69% 1.81% Vehicle Maintenance Charaes 7401 MaintenanceCharges-Labor 47,637 40,108 40,000 40,000 41,000 41,000 41,000 2.50% 0.00% 7402 MaintenanceCharges-Parts 39,535 31,270 40,000 40,000 40,000 40,000 40,000 0.00% 0.00% 7403 Motor Fuels 27,143 34,346 32,000 32,000 33,000 33,000 33,000 3.13% 0.00% TOTAL Vehicle Maintenance Chgs 114,315 105,724 112,000 112,000 114,000 114,000 114,000 1.79% 0.00% Capital Outlav 6960 CapitalOutlay 1,421,549 663,704 2,242,000 2,264,320 732,000 1,391,000 1,485,000 -37.96% 6.76% TOTALCapitalOutlay 1,421,549 663,704 2,242,000 2,264,320 732,000 1,391,000 1,485,000 -37.96°/ 6.76°/ Transfers 7110 Permanent Transfer-Reserve Fund - - - - - - - 7220 Overhead Transfer-General Fund 275,000 275,000 290,000 275,000 305,000 275,000 275,000 -5.17% 0.00% TOTALTransfers 275,000 275,000 290,000 275,000 305,000 275,000 275,000 -5.17°/ 0.00% TOTALS $7,560,616 $6,335,757 $8,891,665 $9,113,360 $7,719,365 $8,453,810 $8,651,855 -4.92°/ 2.34% CITY OF GOLDEN VALLEY 2072-2013 OPERATING BUDGET DIVISION: Utility Maintenance(082) PROGRAM: Administration(7121) 2012% 2013% 2009 2010 2011 2011 2012 2012 2013 OVER 2011 OVER 2012 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT ADOPTED PROPOSED Supplies and Services 6320 Operaling Supplies $21,385 $30,103 $25,700 $25,700 $25,700 $27,300 $29,300 6.23% 7.33% 6324 Clothing 6,355 6,266 6,500 6,500 6,500 7,100 7,100 9.23% 0.00% 6331 EquipmentParts 3,586 3,943 15,250 16,750 14,250 16,750 14,750 9.84% -11.94% 6340 ProfessionalServices 89,067 26,812 29,200 30,150 29,200 25,195 25,680 -13.72% 1.92% 6343 Telephone 4,637 4,280 7,680 7,680 7,680 9,250 9,250 20.44% 0.00% 6411 Conferences and Schools 13,752 7,164 13,550 13,550 13,550 15,245 13,245 12.51% -13.12% 6413 DuesandSubscriptions 1,423 1,148 1,530 1,525 1,530 1,580 1,580 3.27% 0.00% 6440 OtherConlractualServices 1,222 620 1,200 1,200 1,200 6,200 6,200 416.67% 0.00% 6840 MerchandiseforResale 4,304 18,766 25,000 25,000 25,000 25,000 25,000 0.00% 0.00% TOTAL Supplies and Services 145,731 99,102 125,610 128,055 124,610 133,620 132,105 6.38% -1.13% Vehicle Mainlenance Charaes 7401 MaintenanceCharges-Labor 47,637 40,108 40,000 40,000 41,000 41,000 41,000 2.50% 0.00% 7402 MaintenanceCharges-Parts 39,535 31,270 40,000 40,000 40,000 40,000 40,000 0.00% 0.00% 7403 Motor Fuels 27,143 34,346 32,000 32,000 33,000 33,000 33,000 3.13% 0.00% TOTAL Vehicle Maintenance Chgs 114,315 105,724 112,000 112,000 114,000 114,000 114,000 1.79% 0.00% Caaital Outlav 6960 CapitalOutlay 1,421,549 663,704 2,242,000 2,264,320 732,000 1,391,000 1,485,000 -37.96% 6.76% TOTALCapitalOutlay 1,421,549 663,704 2,242,000 2,264,320 732,000 1,391,000 1,485,000 -37.96% 6.76% Transfers 7220 Overhead Transfer-General Fund 275,000 275,000 290,000 275,000 305,000 275,000 275,000 -5.17% 0.00% TOTAL Transfers 275,000 275,000 290,000 275,000 305,000 275,000 275,000 -5.17% 0.00% TOTALS $1,956,595 $1,143,530 $2,769,610 $2,779,375 $1,275,610 $1,913,620 $2,006,105 30.91% 4.83% Administration- Utilities Program 7121 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Sho Su lies&E ui ment 1,638 6,201 3,500 3,500 3,500 3,500 4,000 Tools 2,263 2,080 1,000 1,000 1,000 1,000 2,000 Paint&Su lies 690 100 800 800 800 800 800 Safet E ui ment 3,094 1,242 2,500 1,700 2,500 2,500 3,000 Re lacement Parts 5,711 3,350 4,000 4,000 4,000 4,000 4,000 Re air Materials 4,355 4,496 4,100 4,100 4,100 4,100 4,100 Markin PainUlocate 1,770 900 1,000 1,000 Office Furniture 200 1,000 1,000 1,000 1,000 1,000 Metal Locator 1,006 2,254 1,500 1,600 1,500 1,500 1,500 Office Su lies 730 1,680 1,500 1,500 1,500 1,500 1,500 Cement Mixer 3,000 Generator 3,130 Printer 1,131 Meters for City Buildings 2009 Moved to 6340 Water Qualit Re ort 767 800 800 800 800 Re lacement of Com uters 5,000 5,000 5,000 5,000 5,000 S ecial Assessment Char es(Henn Ct 600 600 600 600 $21,385 $30,103 $25,700 $25,700 $25,700 $27,300 $29,300 Administration- Utilities Program 7121 6324-Clothing 2009 2010 2011 2071 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Conce t Uniforms for Crew 3,200 3,290 3,700 3,700 3,700 3,900 3,900 Safet Shoe Reimbursement 10 em lo ees$150/calendar ear/ erson 1,437 1,457 1,500 1,500 1,500 1,500 1,500 Safet Clothin Rain Suits,Vests, Hard Hats Rubber Glove 1,718 1,519 1,300 1,300 1,300 1,700 1,700 $6,355 $6,266 $6,500 $6,500 $6,500 $7,100 $7,100 Administration- Utilities Program 7121 6331-Equipment Parts 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t Hose for Sewer Jet 3,586 4,000 3,800 4,000 4,000 4,000 Nozzle for Sewer Jet 2,000 4,500 2,000 3,000 3,000 Grease Release 1,400 2,900 1,400 2,900 2,900 2 Broom Heads sidewalk machines 1,350 1,350 1,350 1,350 1,350 Misc Su lies 1,000 1,000 1,000 1,000 1,000 Manhole Blowers 2 1,000 1,000 Confined S ace Ent Tri od 3,000 3,000 Confined S ace Ent Monitors/Software 1,500 1,500 1,500 3"Trash Pum 4,500 3,200 Mixer 2,340 Generator 1,603 $3,586 $3,943 $15,250 $16,750 $14,250 $16,750 $14,750 Administration-Utilities Program 7121 6340-Professional Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Go her One Call 4,864 6,029 6,000 7,000 6,000 7,000 7,000 Water Qualit Re ort 800 555 800 600 700 Hi hwa Technolo ies 500 500 500 500 500 AGT International electronic o her locates 1,224 1,224 1,400 1,400 1,400 1,400 1,400 Plumbin at Cit facilities Meter U rades Moved from 6320) 7,000 7,000 7,000 7,000 7,000 Misc. Printin 620 620 620 620 620 800 Mhz. Radio Maint. 16 Radios 2,880 2,352 2,880 3,075 2,880 3,075 3,460 Tree Trust Reservoir Wall 9,109 MCES Foundation Grant Pro ram 70,990 15,658 revenue to offset ex ense) Carte ra h Technical Su ort 1,549 10,000 10,000 10,000 5,000 5,000 $89,067 $26,812 $29,200 $30,150 $29,200 $25,195 $25,680 Administration- Utilities Program 7121 6343-Telephone 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Concept Cell Phone Usa e for De artment 2,762 2,505 2,800 2,800 2,800 2,800 2,800 Ceil Phone Re lacement/Parts 100 100 100 100 100 Com uter Wireless Modem 1,875 1,775 3,060 3,060 3,060 4,650 4,650 6 X$42.5/month X 12 months Net Motion for 2 La To s 2 X$200 1,000 1,000 1,000 600 600 Two more in 2010 GPS Cell Phone $90/month X 12 months 720 720 720 1,100 1,100 $4,637 $4,280 $7,680 $7,680 $7,680 $9,250 $9,250 Administration -Utilities Program 7121 6411-Conferences&Schools 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Concept Proposed Conce t AWWA National Conference 2,000 Suburban Utilit All Utilities Sta 90 180 200 200 200 200 200 MN De t of Health water school 3 da 1,120 1,162 1,200 1,200 1,200 1,200 1,200 Five Utilities Staff MN Pollution Control sewer school 3 da 568 560 1,200 1,200 1,200 1,200 1,200 Six Utilities Staff MN Rural Water Association One Da &Annual Conference 1,275 1,325 1,200 1,200 1,200 1,200 1,200 MN Wastewater O erators Conference Lemke 517 140 800 800 800 800 800 MN AWWA Section Conference 1,500 1,149 1,600 1,600 1,600 1,600 1,600 Trac , Lemke Public Works Leadershi Academ Lemke 1,300 Misc Trainin O ortunities(All Utilities Sta 5,494 4,900 4,305 4,900 4,000 4,000 Safet Trainin All Utilities Sta 1,387 1,485 1,700 1,700 1,700 1,700 1,700 Trainin Materials All Utilities Sta 42 500 500 500 500 500 Audio Metric Onsite Testin 162 168 250 250 250 250 250 CPR Trainin 297 Defensive Snow Plaw Trainin 400 Utilit Mana ement Institute 595 595 595 595 $13,752 $7,164 $13,550 $13,550 $13,550 $15,245 $13,245 Administration-Utilities Program 7121 6413-Dues,Subscriptions and Certifications 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept MN Wastewater O erator Dues (Trac , Lemke 140 200 50 55 50 50 50 AWWA Membershi Trac , Lemke 557 310 600 590 600 600 600 APWA Membershi Trac , Lemke 283 205 290 290 290 290 290 Certification Costs All Utilities Sta 20 100 100 100 100 100 SUSA Membershi Trac , Lemke 200 200 250 200 250 250 250 MN Rural Water Membershi (Cit , Lemke 200 188 200 200 200 200 200 Boiler License Renewal McCall) 23 45 40 90 40 90 90 $1,423 $1,148 $1,530 $1,525 $1,530 $1,580 $1,580 Administration-Utilities Program 7121 6440-Other Contractual Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Miscellaneous Contractual Fees 1,222 620 1,200 1,200 1,200 1,200 1,200 Clean Fill Dis osal 5,000 5,000 $1,222 $620 $1,200 $1,200 $1,200 $6,200 $6,200 Administration -Utilities Program 7121 6840-Merchandise for Resale 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Radio Read Meters and Parts 4,304 18,766 25,000 25,000 25,000 25,000 25,000 $4,304 $18,766 $25,000 $25,000 $25,000 $25,000 $25,000 Administration-Utilities Program 7121 6960 Capital Outlay 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Conce t Utilit Buildin Re airs Air Com ressor 185CFM Unit 637 W&SS-01 15,011 Utilit Truck, Unit 669 W&SS-020 30,684 Portable Generator W&SS-041 23,409 GPS Unit 8,712 Utilities Tractor W&SS-031 Moved From 2010 108,402 San Swr&Wtr Line Re air/Reconst 987,184 275,718 1,000,000 1,000,000 400,000 400,000 1,100,000 I&I Surchar e Pro ram 216,304 185,316 200,000 200,000 200,000 200,000 200,000 Sewer Debris Collector 5,419 Door Re lacement 8,800 H dralic Breaker 5,268 Utilit Buildin Roof Re lace-Wold Priorit #1 21,068 Portable Generator SCADA Connection on All Lift Stations 26,858 Dum Truck W&SS-017 64,677 Picku Truck W&SS-019 25,970 Water Main Re lacement-Boone Ave 88,089 Sidewalk Swee er W&SS-034 10,056 Mill and Overla Outdoor Stora e Area W&SS-046 50,000 50,000 Utilit Buildin Re airs W&SS-045 Vactor Truck W&SS-033 390,000 390,000 Trailer Mounted Welder W&SS-049 20,000 7,337 H dralic Dewaterin Pum W&SS-055 20,000 30,940 Water Main Rehabilitaion-Le end Dr 540,000 470,000 -Bru nswick 70,000 Structure and Pi e Ins ection Pole Camera 22,000 19,185 Trailer 12,000 12,000 Air Com ressor Mounted on Trailer 35,000 25,000 Picku Truck 35,000 45,000 Utilit Buildin Floorin U rade 50,000 50,000 Guide Rail S stem 5,166 Er onomic Work Stations 20,000 Meter Readin S stem U rade 100,000 100,000 Sidewalk Swee er W&SS-044 15,000 Picku Truck 85,000 Harold Ave Reconstruction 500,000 Sewer Televisin E ui ment 24,000 1,421,549 663,704 2,242,000 2,264,320 732,000 1,391,000 1,485,000 City of Golden Valley, Minnesota Capital Improvement Plan Data in Year 2012 and 2013 PROJECTS BY YEAR Project Name Department Project# Priority Project Cost , 20� Sanitary Sewer&Water Line RepaidRecon. Water&Sewer Systems W&SS-001 nla 400,000 inflow/Infiltration Study and Improvements Water&Sewer Systems W&SS-002 n/a 200,000 Utility Building Flooring UpgradelReplacement Water&Sewer Systems W&SS-032 nla 50,000 Pickup/Utility Truck Water&Sewer Systems W&SS-035 nla 45,000 Sidewalk Sweeper Water&Sewer Systems W&SS-044 nla 15,000 Air Compressor Mounted on Trailer Water&Sewer Systems W&SS-047 nla 25,000 Televising Equipment Water&Sewer Systems W&SS-053 nla 24,000 Trailer Water&Sewer Systems W&SS-054 nla 12,000 Harold and Rhode Island Reconstruction Water&Sewer Systems W&SS-057 nla 500,000 Work Stations Water&Sewer Systems W&SS-059 n/a 20,000 Radio Meter Reading System Water&Sewer Systems W&SS-063 n/a 100,000 Totai for 2012 1,391,000 2013 Sanitary Sewer&Water Line RepaidRecon. Water&Sewer Systems W&SS-001 n/a 1,100,000 Inflowllnfiltration Study and Improvements Water&Sewer Systems W&SS-002 n/a 200,000 Pickup Truck Water&Sewer Systems W&SS-062 n/a 85,000 Radio Meter Reading System Water 8 Sewer Systems W&SS-063 n/a 100,000 Total for 2013 1,485,000 GRAND TOTAL 2,876,000 Page 1 Project# WcXLSS-OO1 Department Water&Sewer Systems Contact Project Name Sanitary Sewer& Water Line Repair/Recon. Type Unassigned Useful Life Category Water and Sewer Priority i Description Major repairs and reconstruction on the Ciry's sanitary sewer and water systems as needed. Repairs will be done in conjunction with the City's Pavement I Management Program(See S#1). i Justification To maintain City's water mains and sanitary sewer mains. � Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 400,000 1,100,000 1,100,000 1,100,000 1,100,000 4,800,000 Total 400,000 1,100,000 1,100,000 1,100,000 1,100,000 4,800,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 400,000 1,100,000 1,100,000 1,100,000 1,100,000 4,800,000 Total 400,000 1,100,000 1,100,000 1,100,000 1,100,000 4,800,000 I Project# w&SS-��2 ' Department Water&Sewer Systems Contact Project Name Inflow/Infiltration Study and Improvements Type Unassigned Useful Life Category Water and Sewer Priority Description ! IResults of an enginnering study in 2005 and 2006 identified the sources of clear water inflow and infiltration(1&1)into the cities and the Metropolitan Council I 'Environmental Services(MCES)sanitary sewer systems.Beginning in 2006,the sources identified in the study will be addressed. J Justification ' Consistent with the MCES requirements that the City's 1&I problems must be addressed to avoid the surcharge and pending demand charge from the MCES.In 2013,unaddressed flows were to built into the rates from MCES but will now be used for rehabilia[ion of the system. I Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 200,000 200,000 200,000 200,000 200,000 1,000,000 Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000 Total 200,000 200,000 200,000 200,000 200,000 7,000,000 Page 1 I Project# w&SS-032 i Department Water&Sewer Systems Contact I Project Name Utility Building Flooring Upgrade/Reptacement I TyPe Unassigned Llseful Life Category Water and Sewer Priority � Description � ___ _ Utility Building tile flooring in the main roll call room,restroom,offices,kitchen,steps and entry. J I Justification 'Utility Building flooring withstands heavy abuse from employee tracking and has exceeded its life cycle. 1 Expenditures 2012 2013 2014 2015 2016 Total Other 50,000 50,000 Total 50,000 50,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 50,000 50,000 Total 50,000 50,000 Department Water&Sewer Systems Project# w&LSS-�35 Contact Project Name p�cku /Utili Truck j� �' Type Unassigned Useful Life Category Water and Sewer Priority Description IPickup/Utility truck for the Utility DepaRment to replace Unit#673,a 2002 Ford F-150 pickup. � --- ____---- -- � Justification Increased repair and maintenance on Unit#673,which will be ten years old. � Expenditures 2012 2013 2014 2015 2016 Total Other 45,000 45,000 Total 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 45,000 45,000 Total 45,000 45,000 Page 2 i Project# WBiSS-O44 Department Water&Sewer Systems i� Contact , rro�ecc Name Sidewalk Sweeper I Type Unassigned Useful Life Category Water and Sewer Priority Description _- - _ __ �Gravely side�valk sweeper for complex snow removal and various sweeping duties. _ _� � Justification ' - ----__ --- ----_ ---------- � Ilncreased repair and maintenance expenditures on Unit 663,a 1998 Gravely sidewalk machine. Expenditures 2012 2013 2014 2015 2016 Total Other 15,000 15,000 TOt81 15,000 15,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 15,000 15,000 Total 15,000 15,000 � Project# w&SS-04'] '�� Department Water&Sewer Systems Contact Project Name Air Compressor Mounted on Trailer Type Unassigned Useful Life Category Water and Sewer Priority � Description IAir compressor on trailer to replace Unit 662, 1997 Ingersol Rand. � Justification ', ilncrease repair and maintenance expenditures on Uni[662,which will be 15 years old. � Expenditures 2012 2013 2014 2015 2016 Total Equip/Vehicles/Furnishings 25,000 25,000 TOtal 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 25,000 25,000 TOt81 25,000 25,000 Page 3 �, Project# w&SS-�53 Department Water&Sewer Systems ' Contact 'I Project Name Televising Equipment Type Equipment Useful Life Category Water and Sewer Priority IDescription Sewer televising camera and transporter for televising sewer mainlines.Main Line Televising equipment to replace equipment purchased with truck#680.The equipment will be four years old and the computer software will be not compatible. � Justification ' IiThe equipment will be four years old and the computer software will be outdated.In 2016,all equipment will need to be replaced.. I Expenditures 2012 2013 2014 2015 2016 Total Equip/Vehicles/Furnishings 24,000 50,000 74,000 Total 24,000 50,000 74,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 24,000 50,000 74,000 Total 2a,o0o 50,000 7a,000 Department Water&Sewer Systems � Project# w&SS-054 � Contact Project Name Trailer Type Equipment llseful Life Category Water and Sewer Priority IDescription ' _ __- _� Trailer to haul trench box for water main breaks.This is one of two trailers. __ _ Justification 'This would replace Unit#652 that will be 21 years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 12,000 12,000 Total 12,000 12,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 12,000 12,000 Total 12,000 72,000 Page 4 Project# wa�ss-�57 I Department Water&Sewer Systems ' Contact ' Project Name Harold and Rhode Island Reconstruction T ype Unassigned Useful Life Category Unassigned Priority I, Description 'Major repairs and reconstruction on the City's sanitary sewer and water systems as needed.Repair will be done in conjunction with the City's Pavement I �'Management Program on Harold Avenue.This project is in addition to the 2012 PMP project area. ' Justification __ __- � To maintain City's water mains and sanitary sewer mains. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 500,000 500,000 Total 500,000 500,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 500,000 500,000 Total 500,000 500,000 � Project# wc�ss-0$9 ��� Department Water&Sewer Systems Contact Project Name `7�701'k Stat1011S Type Unassigned Useful Life Category Unassigned Priority Description , - �Ergonomically correct work stations to replace olde style desks that were purchased prior to computers. Justification 'Utility work station replacements due to age and ergonomics.This would include four workstations. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 20,000 20,000 Total 20,000 20,000 Page 5 Project# w8iss-0O2 �� Department Water&Sewer Systems Contact Project Name PjCkU Truck '�' � ype Equipment lJseful Life Category Water and Sewer Priority Description Pickup"I'ruck for the Utility Department to replace Unit#683,a 2008 F-350 4X4 with utility box,lazge crane hoist and plow.Unit#683 will be transferred to , 'Vehicle Maintenance. i Justification Ilncreased repair and maintenance expenditures on Unit#683. I Expenditures 2012 2013 2014 2015 2016 Total Equip/Vehicles/Furnishings 85,000 85,000 Total 85,000 85,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 85,000 85,000 Total 85,000 85,000 Project# wc�iLss-0O3 I, Department Water&Sewer Systems Contact Project Name Radio Meter Reading System Type Equipment Useful Life Category Water and Sewer Priority ' Description IFixed base radio metering reading system. � Justification IExisting FCC radio frequency utilized for reading city water meters has been banned by the FCC and city is forced to comply with the rule changes. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 100,000 100,000 100,000 100,000 400,000 TOtal 100,000 100,000 100,000 100,000 400,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 100,000 100,000 100,000 100,000 400,000 Total 100,000 100,000 100,000 100,000 400,000 Page 6 Administration- Utilities Program 7121 7220-Overhead Transfer-General Fund 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept Transfer to General Fund 275,000 275,000 275,000 275,000 275,000 275,000 275,000 15,000 30,000 $275,000 $275,000 $290,000 $275,000 $305,000 $275,000 $275,000 CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Utility Maintenance(082) PROGRAM: Sewer Maintenance(7722) 2012% 2013% 2009 2010 2011 2011 2012 2012 2013 OVER 2011 OVER 2012 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT ADOPTED PROPOSED Personal Services 6110 Salaries-RegularEmployees $245,768 $247,181 $290,575 $301,610 $290,575 $311,800 $311,800 6111 Overlime-Regular Employees 3,452 5,083 3,000 5,500 3,000 6,000 6,000 6130 Salaries-Temporary Emptoyees 12,403 16,509 18,125 18,125 18,125 18,125 18,125 6150 Employee Insurance 44,742 61,915 62,250 75,405 62,250 78,970 78,970 6160 Retirement 32,969 34,674 47,950 43,225 47,950 45,225 45,225 TOTAL Personal Services 339,334 365,362 421,900 443,865 421,900 460,120 460,120 9.06% 0.00% Supplies and Services 6320 Operating Supplies 81,125 84,158 87,250 89,250 87,250 70,950 51,500 -18.68% -27.41% 6340 Professional Services 48,538 18,552 65,000 65,000 65,000 65,000 65,000 0.00% 0.00% 6343 Telephone 1,830 1,565 2,000 2,000 2,000 500 500 -75.00% 0.00% 6371 ElectricService 2,151 2,123 2,600 2,600 2,600 2,600 2,600 0.00% 0.00% 6440 OtherContractualService 1,613,203 1,592,657 1,669,390 1,669,840 1,736,090 1,842,220 1,842,220 10.35% 0.00% TOTAL Supplies and Services 1,746,847 1,699,055 1,826,240 1,828,690 1,892,940 1,981,270 1,961,820 8.49% -0.98% TOTALS $2,066,181 $2,064,417 $2,248,140 $2,272,555 $2,314,840 $2,441,390 $2,421,940 8.60% -0.80% ++ O (h N N O N M d � � � M 0�0 N V � O (O N � N Q N a N M E V v3 m � N M p � M d � N (n O � � S °- y O M N N o �`1 y N t� � M 0�0 O p m o f0 U7 � N O N V N a N M � G7 M � M � � N y o � a S +• co v v u� N N � � O� m N N C N V � � � V N N M N N R' y � 2 G7 O M N O � O � N (O 00 ul (O � E � n a co co p ,_ W O (O N N N N N � M W fA d � r � R R� N 0 � � _ � � aD � N I� � � � m � � p 0 OD O (O V O N � N � N Q fA N N � � � 2 W OD (O V M U o � � � � Z � m ch rn o � Z N Q � � � � N W tfl H Z y � � � W W � f� _ N � V � 00 � � W � � I� � � � V O N V U� N Q OD Q N V3 N l0 � N � _ W � N \ N � N � O � C c6 � W � � � U U L � N - f0 (6 3 C N � d U C M C � '@ H N N N N 0 Vl u� � I� y C � � C "N � �y O � � @ O � O � N "O y � � � Q � � R y N � � � p j E O N @ m >� � >� c £ � d U � > N > � � 0 �n O N V � � V �' C E � � 1] - 1] U � � _ = 7 � � ao a � a � Q o ° NI " o M N O � � NC � f0 O £ U �a rn °7 o � a � � x � o 0 0 N y 0 O O � � � N p � a d A � N �.' 2 o ° " o N d � O O C � � N p U a> io � N � S a o ° 0 � o ,� � E u' u' o ._ � N y W N N � � � S .o 0 0 � d a o Q O M M N � Q d i0 R' y � 2 W � �N U o � o 0 Z � � u'i 0 Z N Q W F Z y � � � W W � !� _ N N O �0 � V 7 � M O V N Q N l0 � y � S rn N N d � N � O � a � a W W O V � c � « � � �v � rn � y C � (0 N � E �, � Y GI j > ] O � a � co a NI N � � N � � � M y � C � � N m U rn o � a` @ � � � 2 � u' N N� N � O � � N p a` d R � � � x N N N y � � O C � � N p U a� « R � N � 2 ai in `� N N � F � o E ao N y W N N � � Q' 2 � � � d � � 0 � ao m N � Q d N R' N � 2 o � v°� v°, o � '° co N Q N l0 � N � 2 � � o 0 o � � � p V N N N Q d N � h � _ y1 O N - N - A y N N r � o � — o � a w m '6 � o O N M � � � SEWER MAINTENANCE Program 7122 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Conce t Sewer S stem Re air Parts 18,565 19,949 20,000 20,000 20,000 20,000 20,000 includin : manhole covers/castin s cement rin cement sections sealants lift station re airs ie Landsca e Materials 2,929 6,458 3,000 5,000 3,000 3,000 3,000 includin : beddin rock it run ravel black dirt/sod as halt/concrete cement Televisin Camera Parts 2,170 3,353 3,500 3,500 3,500 4,000 4,000 adlocks Grease Release 2,625 2,746 3,000 3,000 3,000 4,200 4,500 Solid Manhole Covers, I/I 15% 47,348 48,482 50,000 50,000 50,000 30,000 10,000 a rox 2900 manhole covers throu hout cit ) Drivewa Clean Out Covers, 50 1,341 0 1,750 1,750 1,750 1,750 2,000 New Sewer Pumps-H 55 lift station emer enc ) Lift Station Su plies 3,173 2,000 2,000 Jetter Hose 2,974 3,170 3,500 3,500 3,500 3,500 3,500 Sewer Flow Meter Re air Parts 2,500 2,500 2,500 2,500 2,500 $81,125 $84,158 $87,250 $89,250 $87,250 $70,950 $51,500 SEWER MAINTENANCE Program 7122 6340-Professional Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t Sewer Line Groutin /Sealin and Linin 35,000 35,000 35,000 32,000 32,000 Manhole Re airs/Flex Seal Chimne s 9,212 13,412 25,000 25,000 25,000 25,000 25,000 40 X$390 each Carte ra h WSB 493 970 2,000 2,000 2,000 2,000 2,000 Sewer Service Re airs 12,038 Le al Fees 2,760 3,000 3,000 3,000 1,000 1,000 To Hat 17,800 Install Transformer 6,235 Lift Station Re airs 3,991 2,000 2,000 Emer enc Service Call 179 3,000 3,000 SCADA Maintnenance $48,538 $18,552 $65,000 $65,000 $65,000 $65,000 $65,000 SEWER MAINTENANCE Program 7122 6343-Telephone 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Concept Proposed Conce t Lift Stations Phone Line 1,830 1,565 2,000 2,000 2,000 Lift Station SCADA Cell Phones 500 500 $1,830 $1,565 $2,000 $2,000 $2,000 $500 $500 SEWER MAINTENANCE Program 7122 6371-Electric Service 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Concept Proposed Concept Electricit at Pum Stations 2,151 2,123 2,600 2,600 2,600 2,600 2,600 $2,151 $2,123 $2,600 $2,600 $2,600 $2,600 $2,600 SEWER MAINTENANCE Program 7122 6440-Other Contractual Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept MCES wastewater 1,585,847 2010 Flow Total 84,519,050 GV-801.14 or.947881% 2011 FlowTota185,293,980 1,586,844 1,650,545 1,650,545 1,716,570 1,824,000 1,824,000 GV-814.78 or.955261% Surroundin Cit Sewer char es Trans Alarm 1,424 1,248 1,600 1,600 1,700 0 0 New Ho e 3 service addresses 1,227 1,475 1,325 1,475 1,400 1,500 1,500 C stal 1 service address) 180 135 220 220 220 220 220 Manhole Re airs Claim 5,879 Bank/cc Char es-I&I 2,170 2,212 2,200 2,500 2,200 2,500 2,500 Lea ue of Minnesota Cities 12,830 13,500 13,500 14,000 14,000 14,000 sewer backu covera e Life Safet S stems 185 Miscellaneous Concrete Re air 3,056 Cit of Bloomin ton Sam le Anal sis 405 Ra id Gra hics 391 Under round Piercin 382 $1,613,203 $1,592,687 $1,669,390 $1,669,840 $1,736,090 $1,842,220 $1,842,220 M "' O M N � O NI M V � � � M a0 � O C � O CO tn N p N V N � £ V N c� A � p� d M a � N O Q' O _ G7 O M N � O N Vl (O e0 � O O � O �n 1� M o0 O m O (O � N 0 N V N � a N M d M � M � � N (n O � � = O O � � � � N N � � 6� � � � U N C N � � � m � N N U d � � � � 2 d O M N O ln O � /0 � a0 � V [O (O O £ 6� O c0 N N N y N V O W N M � M M i0 � N � N Q�' � _ 'O O ln ln ln � � � � � � � � O p O� O � V O N -p N V � Q N N d N � � � S LL1 aD (O V M Z � j N th � O U Q O V O O In In Z N Q V V O w N M H Z � � � Q' W N Q � � _ � � u) (D � �p CO a0 N O 0 3 � m m O O V O O � V N N Q M � � N N N 10 � � � _ m � N N N � N � I� p @ O c w W � � L c � � U U L L c c 3 c o G7 � C N N C C y6 � y N N N O rn v� y f0 � C � �' G .N � '(n L lO � '� � '@ � N � � �°n � Q 3 m Y � Z Y a�o > a� � o o a� o � � m.E rn N 3 N � � 0 N .C y N Q' U � U "' � O 'C � � 1] - 1] U � 7 - 7 N 'p �o a � a � Q CITY OF GOLOEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Utility Maintenance(082) PROGRAM: Water Maintenance(7123) 2012% 2013% 2009 2010 2011 2011 2012 2012 2013 OVER 2011 OVER 2012 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT ADOPTED PROPOSED Personal Services 6110 Salaries-RegularEmployees $292,006 $301,561 $290,585 $301,610 $290,565 $311,800 $311,800 6111 Overtime-Regular Employees 14,774 14,294 15,000 16,000 15,000 17,000 17,000 6130 Salaries-TemporaryEmployees 14,768 16,565 18,125 18,125 18,125 18,125 18,125 6150 Employee Insurance 54,089 68,009 68,250 75,405 68,250 78,970 78,970 6160 Relirement 40,314 42,778 51,355 43,225 51,355 45,225 45,225 TOTALPersonalServices 415,951 443,207 443,315 454,365 443,315 471,120 471,120 6.27% 0.00% Supplies and Services 6320 Operating Supplies 41,073 97,973 63,000 78,000 63,000 78,000 78,000 23.81% 0.00% 6340 ProfessionalServices 52,687 61,140 53,000 53,000 53,000 53,500 53,500 0.94% 0.00% 6440 Other Contrac[ual Service 257,898 413,644 608,600 610,600 753,600 757,000 757,000 24.38% 0.00% 6840 MerchandiseforResale(Water) 2,750,231 2,111,846 2,706,000 2,865,465 2,816,000 2,739,180 2,864,190 1.23% 4.56% TOTAL Supplies and Services 3,101,889 2,684,603 3,430,600 3,607,065 3,685,600 3,627,680 3,752,690 5.74% 3.45% TOTALS $3,517,840 $3,127,810 $3,873,915 $4,061,430 $4,128,915 $4,098,800 $4,223,810 5.81% 3.05% �"1I ~ O O N M V O O n NC I� I� O £ U ta rn °: o A a` � � a x d o 0 N O O O O 0 1� I� N ` a a� m � y � _ 0 0 N d O O � V NC � � O U a� ia � � � _ � o 0 � � o 0 0 0 o E � � N N W N A � N Q' 2 r, a�i °o °o 0 0 o p ui ui N � Q N i0 0.' � � _ W Z � j N N Q O V '7 R Z N Q W H Z � � � � W y Q � � _ � � r r O � O V V V N Q N A 0.' N Q' 2 rn a`�i N � � O T E a W E c � W O U � c .. @ � '� c � � � � y c d � � � � � O > � O � a � ic d � � M d N � � V O C � W N p U r>I N y r q � E m rn � o = a N � N � O 0 QO o0 N a d A � N � x y � � N y � � � V N � � � O U m m � � � 2 d � � � m � � o £ oo ao N N W N R � N Q' 2 � N N N O p eD op N � Q N N � � Q.' _ Z � � � � Q N V (O (O Z Q W H Z � � � � W N Q � � _ O � � � N V V V a d � � � � x N O N — N — j0 U N � y N d � �' � O N — O E a W E m F c 0 M � t0 � Water Maintenance Program 7123 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Water S stem Re air Parts 23,316 7,584 23,000 23,000 23,000 23,000 23,000 H drant Re air Su lies 4,267 9,819 5,000 5,000 5,000 5,000 5,000 Landsca e Materials/As halt 13,490 79,469 25,000 40,000 25,000 40,000 40,000 Water Meter/Parts and Su lies 1,101 10,000 10,000 10,000 10,000 10,000 re lacement batteries ortable interro ator-reads meters $41,073 $97,973 $63,000 $78,000 $63,000 $78,000 $78,000 Water Maintenance Program 7123 6340-Professional Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept Water Connection Fee State of MN 45,267 45,238 46,000 46,000 46,000 46,000 46,000 Bad er Service Maintenance 989 1,057 1,000 1,200 1,000 1,200 1,200 Water Re air/Leak Detection 3,513 5,211 3,500 3,500 3,500 4,000 4,000 Utilit Permits 215 215 500 300 500 300 300 Miscellaneous Concrete 1,663 536 Misc.Traffice Control, Hi hwa Technolo ies 200 2,398 2,000 2,000 2,000 2,000 2,000 Plumbin 1,022 Bacteria Anal sis moved to 7123.6440 840 1,178 Pum Rental Dewaterin 4,285 $52,687 $61,140 $53,000 $53,000 $53,000 $53,500 $53,500 Water Maintenance Program 7123 6440-Other Contractual Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Concept Proposed Conce t Joint Water Contractuat Services 252,007 410,764 605,000 605,000 750,000 750,000 750,000 re air um s electricit hone misc contractual services facilitate Cit of Minne olis Governance Task Force re air to Reservoir Contractual Re airs Misc. Concrete and Street 4,091 2,100 1,500 1,500 1,500 Bacteria Anal sis Twin Cit Water Clinic 1,800 3,600 3,600 3,600 4,000 4,000 WSB Carte ra h Mana ement 780 1,500 1,500 $257,898 $413,644 $608,600 $610,100 $753,600 $757,000 $757,000 Water Maintenance Program 7123 6840-Merchandise for Resale(Water) 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept Water Purchases from JWC 2,750,231 2,111,846 2,706,000 2,865,465 2,816,000 2,739,180 2,864,190 Minnea olis Rates 2013-2.67 2012-2.56 2011 2.46 2010 2.37 2009 2.27 2008 2.12 2007 2.06 $2,750,231 $2,111,846 $2,706,000 $2,865,465 $2,816,000 $2,739,180 $2,864,190 CITY OF GOLDEN VALLEY,MINNESOTA WATER AND SEWER UTILITY FUND REVENUE DETAIL Aetua12009 Actua12010 Adopted 2071 Estimated 2011 Concept2072 Proposed 2012 Concept2013 Percent Percent Parcent Percent Percent Percent Percent Revenue Amount o(Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total WaterCharges (1) $4,130,996 52.6% $3,809,608 51.1% $4,304,300 53.9% $3,932,585 50.8% $4,450,000 53.9% $4A22,955 51.8% $4,103,415 51.8% SewerCharges (2) 3,168,607 40.5% 3,149,569 42.3% 3,210,000 402% 3,145,620 40.6% 3,325,000 40.3% 3,236,245 41.6% 3,300,970 41J% Meter Sales 5,336 0.1% 3,793 0.1% 5,000 0.1% 5,800 0.1% 5,000 0.1% 5,000 0.1% 5,000 0.1% MCES Grant Program 70,643 0.9% 13,286 02% - 110,790 1.4% - 0.0% - 0.0% - 0.0% LatePaymentPenalties 119,687 1.5% 149,544 2.0% 100,000 1.3% 123,450 1.6% 100,000 1.2% 120,000 1.5% 120,000 1.5% ChargesFOrOtherServices 74,892 1.0% 52,866 0.7% 150,000 1.9% 236,000 3.0% 150,000 1.8% 210,000 27% 210,000 27% StateWaterTestingFeePassThrough 45,234 0.6% 45,657 0.6% 43,000 0.5% 43,000 0.6% 43,000 0.5% 43,000 0.6% 43,000 0.5% Miscellaneous Revenue 49,717 0.6% 104,140 1.4% 40,000 0.5% 7,655 0.1% 40,000 0.5% 70,000 0.1% 10,000 0.1% CertificateofCompliance 63,850 0.8% 80,325 1.1% 45,000 0.6% 70,000 0.9% 45,000 0.5% 60,000 0.8% 60,000 0.8% InterestEamings 91,096 12% 41,210 0.6% 85,000 1.1% 65,000 0.8% 100,000 1.2% 65,000 O.Bk 65,000 0.8% TOTALS 57,820,058 700.0% 57.449,998 100.0°/a 57,982,300 700.0% 57,739,900 100.0% f8,258,000 t00.ONa 57,772,200 700.0% 57.977,385 100.0% Water Rates(1): 4.05/M Gallons RES up to 79,000 gallons up to 79,000 4.18/M Gallons 4.34/M Gallons 4.45IM Gallons RES 80,000 gallons and over 4.21/M Gallons 4.37/M Gallons 4.45/M Gallons IRR all consumption $6 meter+4.21/gallon $6 meter+q.37/gallon $6 meter+4.45/gallon Sewer Rates(2): 56.10 over 20,000 62.00 Winter Quarter Water Consumption: 0-5000 52.00 52.00 52.00 52.00 6000-15,000 56.10 56.10 56.10 56.10 16,000-19,000 62.00 62.00 62.00 62.00 20,000-25,000 65.00 65.00 67.40 69.00 26,000-39,000 72.00 80.00 80.00 40,000-79,000 78.00 40,000-59,000 86.00 98.00 60,000-79,000 92.00 104.00 80,000 and over 84.00 100.00 80,000-99,000 115.00 100,000 and over 127.00 26,000-99,000 68.00 100,000 and over 72.00 Commercial Sewer 3.25 3.37 3.47 3.57 per thousand gallons CITY OF GOLDEN VALLEY WATER AND SEWER UTILITY FUND NET ASSETS ANALYSIS Net Assets-01/01/11 $7,482,899 Estimated Revenue-2011 $7,739,900 Estimated Expenses-2011 9,113,360 Change in Net Assets Over(Under) Expenses (1,373,460) Net Assets- 12/31/11 6,109,439 Proposed Revenue-2012 7,772,200 Proposed Expenses-2012 8,453,810 Change in Net Assets Over(Under) Expenses (681,610) Net Assets- 12/31/11 $5,427,829 Concept Revenue-2013 7,917,385 Concept Expenses-2013 8,651,855 Change in Net Assets Over(Under) Expenses (734,470) Net Assets- 12/31/13 $4,693,359 Inventory and Accounts Receivabie is $1,959,010. CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET Division: Storm Sewer Utility Maintenance(093) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 6110 Salaries-Regular Employees $183,157 $154,555 $180,485 $135,980 $180,485 $154,615 $154,615 6111 Overtime-Regular Employees 8,049 12,224 10,000 10,000 10,000 10,000 10,000 6130 Salaries-Temporary Employees 3,677 4,636 3,300 4,600 3,300 4,600 4,600 6150 Employee Insurance 30,721 34,839 34,850 32,460 34,850 37,230 37,230 6160 Retirement 25,075 22,371 27,995 20,615 27,995 23,690 23,690 TOTAL Personal Services 250,679 228,625 256,630 203,655 256,630 230,135 230,135 Supplies and Services 6320 Operating Supplies 8,395 14,371 16,600 18,600 16,600 19,600 19,600 6324 Clothing 150 176 150 50 150 - - 6334 Street Maintenance Materials 7,781 8,656 9,500 9,500 9,500 9,500 9,500 6340 Professional Services 129,550 75,314 246,500 190,000 171,500 171,700 171,700 6342 Postage - - 2,250 2,250 2,250 2,250 2,250 6343 Telephone 218 209 1,100 125 1,100 - - 6344 Use of Personal Auto - 40 200 - 200 - - 6352 General Notices and Publications - - 5,500 5,500 5,500 5,500 5,500 6371 Electric Service 175 294 500 400 500 500 500 6372 Gas Service 244 146 670 400 670 500 500 6375 Waste Disposal - - 500 500 500 500 500 6382 Contractual Maintenance - 4,450 195 - 195 - - 6390 Rentals - 254 1,000 1,000 1,000 1,000 1,000 6411 Conferences and Schools 951 1,220 2,145 220 2,145 400 400 6413 Dues&Subscriptions 181 - 325 150 325 - - 6440 Other Contractual Services 112,052 103,256 109,230 109,230 113,000 140,915 140,915 TOTAL Supplies and Services 259,697 208,386 396,365 337,925 325,135 352,365 352,365 Vehicle Maintenance Charqes 7401 Maintenance Charges-Labor 6,046 9,684 13,250 13,250 13,250 13,250 13,250 7402 Maintenance Charges-Parts 6,817 9,626 8,750 9,750 8,750 8,750 8,750 7403 Motor Fuels 4,480 4,550 8,760 8,760 8,760 8,760 8,760 TOTAL Vehicle Maintenance Chgs 17,343 23,860 30,760 31,760 30,760 30,760 30,760 Caoital Outlav 6960 CapitalOutlay 675,673 818,916 1,623,500 1,521,660 2,776,000 2,376,200 1,525,000 TOTAL Capital Outlay 675,673 818,916 1,623,500 1,521,660 2,776,000 2,376,200 1,525,000 Transfers 7220 Overhead Transfer-General Fund 100,000 100,000 106,000 100,000 112,000 150,000 150,000 TOTAL Transfers 100,000 100,000 106,000 100,000 112,000 150,000 150,000 Debt Services 7310 Debt Service-Principal 270,000 280,000 295,000 295,000 305,000 305,000 320,000 7315 Debt Service-Interest 164,250 147,134 140,300 140,300 128,125 128,125 115,140 7320 Fiscal Charges 976 7,263 2,000 2,000 2,000 2,000 2,000 TOTAL Debt Services 435,226 434,397 437,300 437,300 435,125 435,125 437,140 TOTALS $1,738,618 $1,814,184 $2,850,555 $2,632,300 $3,935,650 $3,574,585 $2,725,400 CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Storm Sewer Maintenance(093) PROGRAM: Storm Utility(7307) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 6110 Salaries-Regular Employees $50,684 $42,003 $52,615 $52,615 $52,615 $52,615 $52,615 6111 Overtime-Regular Employees 711 4,412 2,000 2,000 2,000 2,000 2,000 6130 Salaries-Temporary Employees 3,677 4,636 3,300 4,600 3,300 4,600 4,600 6150 Employee Insurance 10,127 12,029 12,100 12,100 12,100 12,600 12,600 6160 Retirement 6,767 6,345 7,895 7,895 7,895 8,500 8,500 TOTAL Personal Services 71,966 69,425 77,910 79,210 77,910 80,315 80,315 Supqlies and Services 6320 Operating Supplies 7,384 14,371 11,000 13,000 11,000 14,000 14,000 6340 Professional Services 7,475 14,368 88,500 86,500 13,500 13,700 13,700 6371 Electric Service 175 294 500 400 500 500 500 6372 Gas Service 244 146 670 400 670 500 500 6375 Waste Disposal - - 500 500 500 500 500 6390 Rentals - 254 1,000 1,000 1,000 1,000 1,000 6440 Other Contractual Service 112,052 103,256 109,230 109,230 113,000 140,915 140,915 TOTAL Supplies and Services 127,330 132,689 211,400 211,030 140,170 171,115 171,115 Caqital Outlav 6960 CapitalOutlay 675,673 818,916 1,623,500 1,521,660 2,776,000 2,376,200 1,525,000 TOTAL Capital Outlay 675,673 818,916 1,623,500 1,521,660 2,776,000 2,376,200 1,525,000 Transfers 7220 Overhead Transfer-General Fund 100,000 100,000 106,000 100,000 112,000 150,000 150,000 TOTAL Transfers 100,000 100,000 106,000 100,000 112,000 150,000 150,000 TOTALS $974,969 $1,121,030 $2,018,810 $1,911,900 $3,106,080 $2,777,630 $1,926,430 Y � � MI M V (O f0 r O C N N N p u� � E U � �a rn °' o � a � � x N � � N O c0 cp N Q � � a � d A � � � x « u, u, � � � � O C CV N N p �n in U � d ., R � N � 2 d � � � io � � O E N N N y � � W � N N � W Z W F � � � Z � � c0 c0 Q � r � N � � � � Q Uf W � d W ip (� a' � � o � v�i = M (h � j O O N Q V V Uj N N � � � _ � �p � W O 3 � � O V O O N Q � � � d A � � d' 2 N N O � C W O v c N c0 N C ' V N .� N C @ N N � � lC N Y � O T > Q' � U O � 7 �o a O O M N � � � V O C � V N O EA V MI N l0 E � m � y o � a` _ N O c0 tp N 0 � � a m A � N � x 0 0 N d M M � V N C M M O � U d m � N � 2 d o 0 •- m c�o � o E v v N y fA W d ie � y � 2 v o 0 � a� o � N � � � � Q N A G.' W U y Q 2 Z W ~ M M Z O � (O c0 � N V � � Q � W � d W jp � � � Q' � � !� _ r r r n O � � � O V M M N Q EA N N � N a' x N O N - N ' � V N N y N r o 0 � — o � a W E � F c 0 M � t0 (n STORM SEWER MAINTENANCE Program 7301 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Sewer S stem Re air Parts 1,436 7,307 10,000 9,000 10,000 9,000 9,000 re airs from revious PMP ro rams includin : catch basin castin s cement rin s i e/culverts Landsca e Materials 5,948 7,064 1,000 4,000 1,000 5,000 5,000 includin : ri ra black dirt as halt/concrete cement sod/ lantin s $7,384 $14,371 $11,000 $13,000 $11,000 $14,000 $14,000 STORM SEWER MAINTENANCE Program 7301 6340-Professional Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Conce t Professional Services 500 500 500 500 500 Tra Beaver Contractual Re airs, Liners/Re lacement 10,140 10,500 10,500 10,500 10,500 10,500 Golden Valle Count Club Sum 4,012 Professional Services 2,140 2,000 2,000 2,000 2,000 Boone Storm Lift Electrical Re airs 1,323 500 500 500 500 500 NPDES Phase II Pond Anal sis NURP Ponds 75,000 75,000 New Shaft-Wisconsin Control Gate 2,860 Commitment and Search Packa e 748 Henne in Count Recordin Fees 269 200 200 Towin Stuck Loader 351 $7,475 $14,368 $86,500 $88,500 $13,500 $13,700 $13,700 STORM SEWER MAINTENANCE Program 7301 6371-Electric Service 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Concept Proposed Concept Electric Service on Pum s 175 294 500 400 500 500 500 $175 $294 $500 $400 $500 $500 $500 STORM SEWER MAINTENANCE Program 7301 6372-Gas Service 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Boone Avenue Lift Station 244 146 670 400 670 500 500 $244 $146 $670 $400 $670 $500 $500 STORM SEWER MAINTENANCE Program 7301 6375-Waste Disposal 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Concept Ti in Fees 0 0 500 500 500 500 500 $0 $0 $500 $500 $500 $500 $500 STORM SEWER MAINTENANCE Program 7301 6390-Rentals 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Conce t Small E ui ment for back ard work 0 254 1,000 1,000 1,000 1,000 1,000 $0 $254 $1,000 $1,000 $1,000 $1,000 $1,000 STORM SEWER MAINTENANCE Program 7301 6440-Other Contractual Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Bassett Creek Watershed Mana ement 112,052 103,256 109,230 109,230 113,000 140,915 140,915 Commission $112,052 $103,256 $109,230 $109,230 $113,000 $140,915 $140,915 STORM SEWER MAINTENANCE Program 7301 6960 Capital Outlay 2009 2010 2071 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Conce t Pavement Mana ement Pro'ects and various other ro'ects included in CIP. 2009: Residential Storm Sewer Im PMP 639,546 Storm Water Ponds PMP 30,753 Storm Water Dred in 5,464 2010: Residential Storm Sewer Im PMP 718,914 Storm Water Ponds PMP Streambank Stabilization 57,749 Storm Water Dred in 42,253 2011: Residential Storm Sewer Im PMP 600,000 600,000 Streambank Stabilization 786,500 786,500 Storm Water Dred in wait until 2012 105,000 Groundswee er 35,000 32,700 Tandem Axle V-Box Sander(combined 39,360 Tandem Axle V-Box Sander 23,000 0 Sin le Axle V-Box Sander 20,000 0 DeCola Ponds Storm Water Stud 54,000 54,000 Little Lea ue Fields 9,100 2012: Residential Storm Sewer Im PMP 650,000 800,000 Picku Truck 26,000 26,000 Bassett Creek Streambank Stabilization 1,650,000 730,200 Sin le Axle V-Box Sander 40,000 Sweene Lake Outlet Structure 250,000 Decola Ponds Storm Water Stud 100,000 Wirth Lake Outlet Structure 250,000 Anti Icin Production E ui ment 65,000 Heav E ui ment Mounted Winch 20,000 Fla Avenue Draina e Stud 35,000 Sum Manhole Retrofits 60,000 60,000 2013: Lakeview Park Water Qualit Im rovements 150,000 Brookview Golf Course Buffer Stud 30,000 Residential Storm Sewer Im PMP) 1,100,000 10th Avenue Culvert Re airs 185,000 675,763 818,916 1,623,500 1,521,660 2,326,000 2,376,200 1,525,000 City of Golden Valley, Minnesota Capital Improvement Plan Data in Year 2012 and 2013 PROJECTS BY YEAR Project Name Department Project# Priority Project Cost j 2012 Residential Storm Sewer Improvements Storm Sewers SS-Ol nla 800,000 Bassett Creek Stream Bank Stabilization Storm Sewers SS-20 n/a 730,200 Pickup Truck(Storm Water Utility) Storm Sewers SS-22 nla 26,000 V-Box Sander(single) Storm Sewers SS-26 n/a 40,000 DeCola Ponds Storm Water Study Storm Sewers SS-28 n/a 100,000 Sweeney Lake Outlet Structure Storm Sewers SS-29 n/a 250,000 Wirth Lake Outlet Structure Storm Sewers SS-30 n/a 250,000 Winch Mounted on Heavy Equipment Storm Sewers SS-31 n/a 20,000 Anti-Icing Brine Production Room and Equipment Storm Sewers SS-32 n/a 65,000 Sump Manhole Retrofits Storm Sewers SS-33 n/a 60,000 Flag Avenue Drainage Study Storm Sewers SS-35 nla 35,000 Total for 2012 2,376,200 20� Residential Storm Sewer Improvements Storm Sewers SS-Ol nla 1,100,000 Lakeview Park Water Quality Improvements Storm Sewers SS-10 nla 150,000 Brookview Golf Course-Buffer Zone Study Storm Sewers SS-12 nla 30,000 10th Avenue North Culvert Repairs Storm Sewers SS-24 n/a 185,000 Sump Manhole Retrofits Storm Sewers SS-33 nla 60,000 Total for 2013 1,525,000 GRAND TOTAL 3,901,200 IProject# SS-�1 Department Storm Sewers Contact �I Project Name Residential Storm Sewer Improvements Type Improvement Useful Life Category Storm Sewer Priority ' Description Construction and repair of storm sewer system in conjunction with the Pavement Management Program(see S#1).. I Justification Provide an improved storm water runoff drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff;minimize local drainage and flooding issues and protect pavement. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 800,000 1,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Total 800,000 1,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 800,000 1,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Total 800,000 1,100,000 1,700,000 1,100,000 1,100,000 5,200,000 Project# SS-lO Department Storm Sewers ' Contact Project Name Lakeview Park Water Quality Improvements I Type Improvement Useful Life Category Storm Sewer Priority ' Description Water quality improvements in Lakeview Park to improve water quality in Medicine Lake.The scope of this project is to be determined during preliminary project I design. I Justification ' �To reduce nutrients and sediment from storm water runoff in the Lakeview Heights area that drains to Medicine Lake.This project will be consistent with the Medicine Lake Total Maximin Daily Load(TMDL)Implementation Plan. I Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 150,000 150,000 Total �so,000 �so,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 150,000 150,000 Total 150,000 150,000 IProject# SS-12 I Department Storm Sewers � � Contact i, Project Name grookview Golf Course-Buffer Zone Study , TyPe Improvement Useful Life Category Storm Sewer Priority Description Perform a study in 2013 to identify locations for the development of native vegetation buffer areas in Brookview Golf Course.Construction of the buffer areas in I 2014. I Justification Removal of nutrients and sediment from stormwater runoff entering golf course ponds and Bassett Creek. I Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 30,000 250,000 280,000 Total 30,000 250,000 280,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 30,000 250,000 280,000 Total 30,000 250,000 280,000 Project# SS-20 ' Department Storm Sewers Contact � Pro�ect Name Bassett Creek Stream Bank Stabilization T ype Improvement Useful Life Category Storm Sewer Priority Description IStabilize banks along sub reaches of Bassett Creek Main Stem.Need is based on the Bassett Creek Inventory which was completed in 2001 and is updated on an annual basis. I 2012: Main Stem(Between Duluth Street and 26th Avenue)-Subreach 2 I Justification The Bassett Creek Watershed Management Commission has additional funding for stabilization of the stream banks thorughout the watershed.Based upon the availability of funding the Commission has added the portion of Bassett Creek in Golden Valley between TH 169 and the north City Limits just north of Westbrook Road.The project funding is available beginning in 2011 and 2012. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 730,200 730,200 Total 730,200 730,200 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 580,200 580,200 Storm Sewer Utility Fund(730 150,000 150,000 Total 730,200 730,200 , Project# SS-22 Department Storm Sewers Contact Project Name p�ckup Truck(Storm Water Utility) ' TyPe Equipment Useful Life Category Vehicles Priority Description �� 'One half ton pickup truck 1br the Storm Water Management and other environmental activities to replace Unit#501 (2000 Ford F-150). I Justification IIncreased repair and maintenance expenditures on Unit 1�501,which will be twelve years old. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 26,000 26,000 Total 26,000 26,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 26,000 26,000 Total zs,000 26,000 Project# SS-24 Department Storm Sewers Contact '�, Project Name lOth Avenue North Culvert Repairs i TyPe Improvement Useful Life Category Storm Sewer Priority '�Description I�Repair Culverts that convey Bassett Creek under l Oth Avenue North and the Union Pacific Railroad. ' Justification These culverts are technically classified as a bridge by the Minnesota Department of Transportation and are inspected regularly.The last inspection identified high 'level corrosion of the culverts at the base flow level.Although not a high risk for collapse,the corrosion needs to be addressed soon.These culverts are owned by the lirailroad. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 185,000 185,000 Total 185,000 185,000 Funding Sources 2012 2013 2014 2015 2016 Total Union Pacific Railroad 185,000 185,000 Total 185,000 785,000 I Project# SS-26 ' Department Storm Sewers � Contact Project Name V-Box Sander(single) Type Equipment Useful LiTe Category Storm Sewer Priority , Description ' __ - V-Box sander with hook frame for the single axle dump truck#778. i� Justification V-Box sanders are the most efficient and cost effective way to apply the de-icing chemicals for winter operations.V-Box sanders will reduce the impacts of de-icing ', chemicals on local lakes and streams. ' Expenditures 2012 2013 2014 2015 2016 Total Equip/Vehicles/Furnishings 40,000 40,000 TOtal 40,000 40,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 40,000 40,000 Total ao,000 40,000 Project# SS-2$ I Department Storm Sewers �� Contact Project Name DCCOIa POII(IS St01'Ill Watel'StU(�)' Type Improvement l�seful Life Category Storm Sewer Priority Description ' Perform a Hydrologic,Hydraulic,and Flood Mitigation Study of the DeCola Ponds subwatershed,located in the north central porlion of the City.This study will ' develop the storm water runofTmodels for this area,including inflows from New Hope and Crystal,and will investigate storm water management strategies for the Winnetka Ave and Medicine Lake Road intersection and residential areas around the DeCola Ponds. Additional study is needed in 2012 to further identify measures to mitigate flood damage at Decola Ponds and the Medicine Lake Road and Winnetka Avenue areas. This study will examine future land uses,retrofitting existing land uses,structural floodproofing and other measures to reduce and mitigate flooding impacts. Justification This study will give information to proceed to make appropriate improvements. Expenditures 2012 2013 2014 2015 2016 Total Planning/Design 100,000 100,000 Total 100,000 100,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 100,000 100,000 Total 100,000 100,000 Project# SS-29 Department Storm Sewers Contact Project Name Sweeney Lake Outlet Structure I Type Improvement Useful Life Cate or Storm Sewer g Y Priority Description Reconstruction of the outlet structure from Sweeney Lake to a permanent weir. � Justification Based upon a request by the City of Golden Valley,the Bassett Creek Watershed Management Commission has included the reconstruction of the Sweeney Lake outlet in its CIP.The current strucwre is hand placed concrete that is subject to modification and erosion around each end of the structure.The new structure will include engineering cut off walls to prevent flow around the ends of and under the structure,greatly reducing the threat of erosion. I Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 250,000 250,000 Total 250,000 250,000 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 250,000 250,000 Total 2�0,000 250,000 Project# SS-3O Department Storm Sewers Contact Project Name w��h Lake Outlet Strueture Type Unassigned Useful Life Category Unassigned Priority Description 'Reconstruction of the outlet structure from Wirth Lake to prevent high water backtlow from Bassett Creek from entering the lake. I � Justification The Total Maximum Daily Load Study for Wirth Lahe iden[ified the backflow of flood waters from the Bassett Creek into Wirth Lake as the primary phosphorus � load to the lake,resulting in failure to achieve water quality goals.A backflow prevention device was identified as part of the study and has been included in the Bassett Geek Water Management Commission CIP.The City of Golden Valley will be the lead agency in implementing this project. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 250,000 250,000 Total 250,000 250,000 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 250,000 250,000 Total 250,000 250,000 Project# SS-31 Department Storm Sewers Contact Project Name w�nch Mounted on Heavy Equipment Type Unassigned Useful Life Category Unassigned Priority IDescription '� �A winch that mounts on heavy equipment for storm tree damage removal from Bassett Creek � , Justification _---- � IDowned trees obstruct the flow in Bassett Creek creating flooding situations and require removal from the creek to establish flows. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 20,000 20,000 Total 20,000 20,000 �� Project# SS-32 Department Storm Sewers Contact I� Project Name Anti-Icing Brine Production Room and Equipment TyPe Unassigned Useful Life Category Unassigned Priority , Description IConstruct a room at the I Oth Ave storage to house brine production equipment and storage tanks. I I, Justification ' 'Anti-icing brine production for reducing anti-icing/de-icing chemical application on city streets to reduce the impacts of de-icing chemicals in our creeks,lakes and wetlands. The brine production equipment was obtained at no cost from another city.This community replaced and upgraded their equipment to increase de-icing capacity. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 65,000 65,000 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 65,000 65,000 Total 65,000 65,000 Project# SS-33 ii Department Storm Sewers I Contact � Pr°�e�rNa'"e Sump Manhole Retrofits ��� Typ� [mpro�emen� vger���ire Category Storm Sewer Priority Description � Installation of baffles to increase the removal efficiency of existing sump manholes in the storm sewer system. ' Justification Manhole and ca[ch basin baffles will improve the removal efficiencies for suspended solids and phosphorus.Installation priorities will be in the Sweeney Lake and Medicine Lake sub-watersheds,where TMDL studies have been completed and approved. Expenditures 2012 2013 2014 2015 2016 Total Other 60,000 60,000 60,000 60,000 60,000 300,000 Total 60,000 60,000 60,000 60,000 60,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 60,000 60,000 60,000 60,000 60,000 300,000 Total so,000 60,000 60,00o so,000 so,000 300,000 , Project# SS-35 � Department Storm Sewers Contact P�o�e�t Na'"e Flag Avenue Drainage Study TyPe Unassigned LJseful Life Category Unassigned Priority Description _ __ -- Preparation of a drainage study in the vacinity of Flag Avenue between Earl Street and Duluth Street. � Justification �IThis study will address surface water runoff and ground water issues prior to the scheduled 2015 Pavement Management Program. Expenditures 2012 2013 2014 2015 2016 Total Other 35,000 35,000 Total 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 35,000 35,000 Total 35,000 35,000 STORM SEWER MAINTENANCE Program 7301 7220-Overhead Transfer-General Fund 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Transfer to General Fund 100,000 100,000 100,000 100,000 100,000 150,000 150,000 Transfers to Storm Utilit Fund 6,000 12,000 $100,000 $100,000 $106,000 $100,000 $112,000 $150,000 $150,000 CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Storm Sewer Utility(093) PROGRAM: Street Cleaning(7302) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 6110 Salaries-Regular Employees $57,463 $37,203 $52,000 $52,000 $52,000 $52,000 $52,000 6111 Overtime-Regular Employees 7,338 7,812 8,000 8,000 8,000 8,000 8,000 6150 Employee Insurance 11,287 11,711 11,800 16,120 11,800 16,120 16,120 6160 Retirement 8,150 5,731 8,150 8,150 8,150 8,150 8,150 TOTAL Personal Services 84,238 62,457 79,950 84,270 79,950 84,270 84,270 Suaplies and Services 6334 Street Maintenance Materials 7,781 8,656 9,500 9,500 9,500 9,500 9,500 TOTAL Supplies and Services 7,781 8,656 9,500 9,500 9,500 9,500 9,500 Vehicle Maintenance Charqes 7401 Maintenance Charges-Labor 5,488 9,222 12,500 12,500 12,500 12,500 12,500 7402 Maintenance Charges-Parts 6,631 8,893 8,000 9,000 8,000 8,000 8,000 7403 Motor Fuels 4,136 3,955 7,510 7,510 7,510 7,510 7,510 TOTAL Vehicle Maintenance Chgs 16,255 22,070 28,010 29,010 28,010 28,010 28,010 TOTALS $108,274 $93,183 $117,460 $122,780 $117,460 $121,780 $121,780 0 0 �I M V O O �` N C ln lN O � E V �o rn d o �o a` � � � x N O O O N � � � a � a, io � N � S 0 0 N d O O � t1 O C N N N p �n �n U � N 10 � N � S N p O � � O O O E N N N y � � W � N ie � N � _ � � o 0 N � � � Q � N N � � � _ � � N N � O I� 1� Z N Q M M ZQ � J d U � F W W y � � H = � o � � � N Q �i �i � m m � N � 2 a`�i a� 0 E rn c W y � V N C N C � U N � C � ip � �W y N � Y� 7 � � N U(n O � 7 �o a STREET CLEANING Program 7302 6334-Street Maintenance Materials 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Concept Pro osed Concept Brooms for all Swee ers 7,781 8,655 9,500 9,500 9,500 9,500 9,500 $7,781 $8,655 $9,500 $9,500 $9,500 $9,500 $9,500 CITY OF GOLDEN VAIIEY 2012-2013 OPERATING BUDGET DIViSiON: Storm Sewer Utility(093) PROGRAM: Environmental Control(7303) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 6110 Salaries-Regular Employees $75,010 $75,349 $75,870 $31,365 $75,870 $50,000 $50,000 6150 Employee Insurance 9,307 11,099 10,950 4,240 10,950 8,510 8,510 6160 Retirement 10,158 10,295 11,950 4,570 11,950 7,040 7,040 TOTAL Personal Services 94,475 96,743 98,770 40,175 98,770 65,550 65,550 Suaplies and Services 6320 Operating Supplies 1,011 - 5,600 5,600 5,600 5,600 5,600 6324 Clothing 150 176 150 50 150 - - 6340 Professional Services 122,075 60,946 158,000 103,500 158,000 158,000 158,000 6342 Postage - - 2,250 2,250 2,250 2,250 2,250 6343 Telephone 218 209 1,100 125 1,100 - - 6344 Use of Personal Auto - 40 200 - 200 - - 6352 General Notices 8 Public Information - - 5,500 5,500 5,500 5,500 5,500 6382 Contractual Maintenance - 4,450 195 - 195 - - 6411 Conferences and Schools 951 1,220 2,145 220 2,145 400 400 6413 Dues&Subscriptions 181 - 325 150 325 - - TOTAL Supplies and Services 124,586 67,041 175,465 117,395 175,465 171,750 171,750 Vehicle Maintenance Charqes 7401 Maintenance Charges-Labor 558 462 750 750 750 750 750 7402 Maintenance Charges-Parts 186 733 750 750 750 750 750 7403 Motor Fuels 344 595 1,250 1,250 1,250 1,250 1,250 TOTAL Vehicle Maintenance Chgs 1,088 1,790 2,750 2,750 2,750 2,750 2,750 TOTALS $220,149 $165,574 $276,985 $160,320 $276,985 $240,050 $240,050 .J o 0 M M N O O O V � N 0 � � U � E m rn d o m a` � � � x y o 0 N N O O � O � O � � N � a a A � � � x +-' o 0 � � � � N C r r O � U a> « R � � � _ N u� in � N (h M o E - - N y M M W � �7 !0 � y Q' _ � � O O � W O p � � N �p I� I� Q � d N � J � � � � H Z O� rn O o � � � v C7 M J O V � � Q N a n EA H Z W Ci � m Z � O � � > � z = w 0 0 °' 10 0 0 o � O V � � N Q I� f� � N N � y Q' 2 c 0 0 � @ � •` C � t� � A � � � Q 0 y U �o �0 � c � N C � C � O C O � _ C C t0 Ll.� 11.� ENVIRONMENTAL CONTROL Program 7303 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept Office Su lies 25 0 200 200 200 200 200 Presentation Su lies 100 100 100 100 100 Storm Draina e Stencilin Pro'ects 300 300 300 300 300 Buckthorn Pro ram 222 5,000 5,000 5,000 5,000 5,000 Com uter 764 $1,011 $0 $5,600 $5,600 $5,600 $5,600 $5,600 ENVIRONMENTAL CONTROL Program 7303 6324-Clothing 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Safet Shoes/Safet Wear Env Coordinator 150 176 150 50 150 - - $150 $176 $150 $50 $150 $0 $0 ENVIRONMENTAL CONTROL Program 7303 6340-Professional Services 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept Professional Services for addressin NPDES 3,387 5,869 44,500 44,500 54,500 54,500 Phase II Water Qualit and Water Quantit Concerns. case contested in 2011) Native Buffer Zone Maintenance for Ponds 20,981 20,278 27,000 27,000 27,000 27,000 27,000 Wetland Bankin Monitorin Re ortin 5 Years 2,238 2,700 4,500 4,500 4,500 4,500 4,500 General Mills and Minna ua Natural Area $4,000 First ear-2007. 2,000 for each of the remainin four ears S ecial Assessment for Ponds 71,061 32,099 72,000 72,000 72,000 72,000 72,000 U date SurFace Water Mana ement Plan for 23,126 Com letion of Cit Com rehensive Plan Develo Storm Water Ordinance 1,282 10,000 10,000 $122,075 $60,946 $158,000 $103,500 $158,000 $158,000 $158,000 ENVIRONMENTAL CONTROL Program 7303 6342-Postage 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept Water Resource Education 0 0 2,250 2,250 2,250 2,250 2,250 Fertilizer Brochure Newsletter Articles NPDES Phase II Education $0 $0 $2,250 $2,250 $2,250 $2,250 $2,250 ENVIRONMENTAL CONTROL Program 7303 6343-Telephone 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Conce t Environmental Coordinator 218 209 1,100 125 1,100 - - $218 $209 $1,100 $125 $1,100 $0 $0 ENVIRONMENTAL CONTROL Program 7303 6344-Use of Personal Auto 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t Milea e Reimbursement 0 40 200 0 200 - - $0 $40 $200 $0 $200 $0 $0 ENVIRONMENTAL CONTROL Program 7303 6352-General Notices and Public Information 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Concept Water Resource Education: 0 0 5,500 5,500 5,500 5,500 5,500 Gradin Permit cover Fertilizer Brochure Sum Pum s Phase II $0 $0 $5,500 $5,500 $5,500 $5,500 $5,500 ENVIRONMENTAL CONTROL Program 7303 6382-Contractual Maintenance 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Concept 800 MHz Radio Environmental Coordinator) 0 195 0 195 - - K le Avenue Storm Sewer Pro'ect 4,450 $0 $4,450 $195 $0 $195 $0 $0 ENVIRONMENTAL CONTROL Program 7303 6411-Conferences and Schools 2009 2010 2011 2071 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t MPWA S rin Conference 500 500 U of M Tree Ins ector Certification 165 165 125 165 125 Mana ement Workshops 311 200 200 Environmental Trainin 250 680 1,100 1,100 MPWA Fall Conference 225 220 220 MN Societ of Arboriculture 40 Erosion Control Trainin Ins ections De t 375 400 400 LMC Safet Trainin 15 $951 $1,220 $2,145 $220 $2,145 $400 $400 ENVIRONMENTAL CONTROL Program 7303 6413-Dues and Subscriptions 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t APWA Lundstrom 141 0 145 150 145 0 0 Water Resource Periodicals Lundstrom) 50 50 Erosion Control Periodicals Lundstrom 45 45 MECA Membershi Lundstrom 35 35 International Societ of Arboculture 40 50 50 $181 $0 $325 $150 $325 $0 $0 CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET DIVISION: Storm Sewer Utility(093) PROGRAM: Debt Service(7304) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 7310 Debt Service-Principal $270,000 $280,000 $295,000 $295,000 $305,000 $305,000 $320,000 7315 Debt Service-Interest 164,250 147,134 140,300 140,300 128,125 128,125 115,140 7320 Fiscal Charges 976 7,263 2,000 2,000 2,000 2,000 2,000 TOTAL Debt Services $435,226 $434,397 $437,300 $437,300 $435,125 $435,125 $437,140 Program 7304 7310-Bond Principal Payments 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Pro osed Concept 2004 C Storm Sewer Utilit Bonds 170,000 175,000 185,000 185,000 190,000 190,000 200,000 matures 02/01/2019 2006 C Storm Sewer Utilit Bonds 100,000 105,000 110,000 110,000 115,000 115,000 120,000 matures 02/01/2021 $270,000 $280,000 $295,000 $295,000 $305,000 $305,000 $320,000 Program 7304 7315-Bond Interest Payments 2009 2010 2011 2010 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t 2004 C Storm Sewer Utilit Bonds 94,343 87,656 80,456 80,456 72,837 72,837 64,670 matures 02/01/2019 2006 C Storm Sewer Utilit Bonds 69,907 59,478 59,844 59,844 55,288 55,288 50,470 matures 02/01/2021 $164,250 $147,134 $140,300 $140,300 $128,125 $128,125 $115,140 Program 7304 7320-Fiscal Agency Costs 2009 2010 2011 2010 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept 2004 C Storm Sewer Utilit Bonds 531 845 1,000 1,000 1,000 1,000 1,000 matures 02/01/2019 2006 C Storm Sewer Utilit Bonds 445 431 1,000 1,000 1,000 1,000 1,000 matures 02/01/2021 Arbitra e Re ortin 5,987 $976 $7,263 $2,000 $2,000 $2,000 $2,000 $2,000 CITY OF GOLDEN VALLEY STORM SEWER UTILITY FUND REVENUE DETAIL Actua12009 Aetua12010 Adopted 2011 Estimated 2011 Concept2012 Proposed 2072 Concept2013 Percent Percent Percent Percent Percent Percent Percent Revenue Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total StormSewerCharges (1) $2.265,937 93.9% $2,279.838 982q $2,212,150 74.3% $2,228.920 747% $2,212,150 56.0% $2.228,920 66.6% $2,228,920 982% State of Minnesota 56,081 2.3% - 0.0% Bassett Creek Watershed Commission 0 0.0% - 0.0% 715,000 24.0% 715,000 24.0% 1,500,000 38.0% 1,080,200 32.3% 0.0% Other - 568 - - 185,000 4.7% 0.0% 0.0% Trensfer From Conservation/ Recyling Fund 7,000 0.3% - O.Oq - 0.0% 0 0.0% 0 0.0% - 0.0% - O.Oq InterestEamings 85,045 3.5% 41,575 �.8% 50,000 1.7% 40,000 1.3% 50,000 1.3% 40,000 �2% 40,000 1.8% TOTALS 52,414,063 100.0� 52321,981 100.0% E2,977,150 100.0% 52,983,920 700.0% j3,947,150 700.0% 53,349,120 100.0% E2,268,920 100.0% (1)Storm SewerRates 2009 2010 2011 2012 2013 Residential Property per Quarter $22 $22 $22 $22 $22 Commercial Property per Acre per Month $110 $1�0 $110 $110 $110 � CITY OF GOLDEN VALLEY STORM SEWER UTILITY FUND NET ASSETS ANALYSIS Net Assets @ 01/01/11 $4,217,997 Estimated Revenue -2011 $2,983,920 Estimated Expenses -2011 2,632,300 Excess of Revenue Over(Under) Expenses 351,620 Estimated Net Assets @ 12/31/11 4,569,617 Proposed Revenue-2012 3,349,120 Proposed Expenses -2012 3,574,585 Excess of Revenue Over(Under) Expenses (225,465) Projected Net Assets @ 12/31/12 $4,344,152 Concept Revenue-2013 2,268,920 Conceptd Expenses-2013 2,725,400 Excess of Revenue Over(Under) Expenses (456,480) Projected Net Assets @ 12/31/13 $3,887,672 CITY OF GOLDEN VALLEY 2012-2013 OPERATING BUDGET Division: Vehicle Maintenance(070) Program: Vehicle Maintenance(8200) 2009 2010 2011 2011 2012 2012 2013 OBJECT DESCRIPTION ACTUAL ACTUAL ADOPTED ESTIMATED CONCEPT PROPOSED CONCEPT Personal Services 6110 Salaries-Regular Employees $189,437 $172,650 $198,740 $173,810 $202,715 $186,110 $186,110 6111 Overtime-Regular Employees 1,527 3,511 3,000 3,000 3,000 3,000 3,000 6130 Salaries-Temporary Employees 7,279 2,429 5,860 16,455 5,860 5,860 5,680 6150 Employee Insurance 32,169 29,567 38,900 35,600 39,370 39,370 39,370 6160 Retirement 25,343 23,384 30,845 30,845 31,845 31,845 31,845 TOTAL Personal Services 255,755 231,541 277,345 259,710 282,790 266,185 266,005 Supalies and Services 6320 Operating Supplies 8,106 5,148 7,700 7,700 7,700 7,700 7,700 6324 Clothing 1,935 2,284 2,650 3,200 2,650 3,200 3,200 6331 Equipment Parts (1,682) 238 5,000 4,000 5,000 4,000 4,000 6343 Telephone 320 209 400 400 400 300 300 6382 Contractual Maintenance (306) 3,728 10,700 10,275 10,700 11,300 11,350 6390 Rentals 23,213 23,300 23,200 23,300 23,200 23,300 23,300 6411 Conferences and Schools 462 283 870 620 870 870 870 6413 Dues and Subscriptions - 135 310 310 310 310 310 6414 Licenses and Taxes 123 123 240 450 240 225 225 TOTAL Supplies and Services 32,171 35,448 51,070 50,255 51,070 51,205 51,255 Caoital Outlav 6960 CapitalOutlay - - - - - 8,000 - TOTAL Capital Outlay - - - - - 8,000 - Vehicle Maintenance 7401 Maintenance Charges-Labor 1,701 2,595 2,500 2,500 2,500 2,500 2,500 7402 Maintenance Charges-Parts 1,682 1,431 2,500 2,500 2,500 2,500 2,500 7403 Motor Fuels 706 921 1,000 1,000 1,000 1,000 1,000 TOTAL Vehicle Maintenance Chgs 4,089 4,947 6,000 6,000 6,000 6,000 6,000 TOTALS 292,015 271,936 334,415 315,965 339,860 331,390 323,260 0 Y O M � � � N M V M O I� � � � N C � O O � a�O E V v� m � d � � o io a � N N (A O � � V S v N W N O � O N O M f� N O M O I� � O �(7 O O (p N � I� 0 a0 a �, m �n �n m °° °° � N N Q' � V 2 � � N a0 � N d � O V f� � U O C V' O a0 N N O � O U � N N � � � _ d a0 � 1� p O r, � O M [O M I� I� p 00 O £ � f� O M N N I� m 0 � W fp N � � � W aD � N N R' = M � 'C � N M O G7 m M � +• o �n n o p V o R o0 N -p f� � Q � N � � � V V � � � N N y c°o v _ � �n � 7 � M I� tl') O In (p O V V O N N Q I� I� � G7 � N � Q' (O N N � � � S � � N O I� � a � O N � O � � O V V O � � N Q 1� N � N �7 � � V V � (D (O N N (n O (O � � � _ � N U � @ � C O � L C N � � E C N p � @ N — C E N � @ � N � W N C � _ � � V N '[ U N � C i m p m a� a�i O N � � � � m c � � � � m a� � m � � � � � � d c o L � a� =o r — m > a O m' a o 0 N � V W a�0 pp O C � � N p (A � U ta rn °i o � a � � x N Q � � � O a � � N � EA a d a a N G.' _ M a 0 � � � � NC � � O U d .+ eo � N � 2 d o � � � m � � � � N y � O CO W � y r M � N N N K � S � « � � � a °°• °°- o p �n v� N y fA Q W A � N � 2 rn rn o � � � � � N V N � Q N 16 � N 0.' _ rn rn � � � r � � N N o � r � N Q EA d l0 � N � _ N O C � � � W •� 3 � N N Z N y � � � � o � 1� — <p a � N � W y N �9 ~ O � M � � t0 (n H Program 8201 6320-Operating Supplies 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t Weldin , Grindin , Machinin 259 476 600 600 600 600 600 Medical Su lies 85 200 200 200 200 200 Tools/Parts 1,682 2,080 2,400 2,400 2,400 2,400 2,400 Sho E ui ment 2,000 4,000 2,000 4,000 4,000 Su lies 1,283 1,200 2,500 2,500 Used Filters 621 512 Plasma Machine Air D er Com uter 1,382 Carte ra h S stem 2,794 880 500 500 500 $8,106 $5,148 $7,700 $7,700 $7,700 $7,700 $7,700 Program 8201 6324-Clothing 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Concept 3 Mechanic Rental Uniforms 1,791 2,114 1,800 2,200 1,800 2,200 2,200 Additional Clothin Items: 200 200 200 200 200 Safet Boots 3 em loyees X$150/em l0 144 144 450 450 450 450 450 Gloves 26 100 250 100 250 250 Weldin A arel 100 100 100 100 100 $1,935 $2,284 $2,650 $3,200 $2,650 $3,200 $3,200 Program 8201 6331-Equipment Parts 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Conce t Parts that are needed to re air 1,682 238 5,000 4,000 5,000 4,000 4,000 vehicles that are not billed directl to the vehicle. $1,682 $238 $5,000 $4,000 $5,000 $4,000 $4,000 Program 8201 6343-Telephone 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Cell Phone for Steve Loomis 320 209 400 300 400 300 300 Vehicle Maintenance Foreman $320 $209 $400 $300 $400 $300 $300 Program 8201 6382-Contractual Maintenance 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Proposed Conce t Contractual Work to Sho Area 1,266 3,146 10,000 9,000 10,000 10,000 10,000 hoist re air, cranes, etc. 800 Mhz Radio Maint. Henn Co$175/Radio X 960 582 700 575 700 600 650 Used Oil Filters/Floor D lTire Rec clin 700 700 700 moved from 6320 $306 $3,728 $10,700 $10,275 $10,700 $11,300 $11,350 Program 8201 6390-Rentals 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Conce t Pro osed Concept Rentai Char e for Sho Buildin 22,000 22,000 22,000 22,000 22,000 22,000 22,000 Miscellaneous E ui ment Rental 1,213 1,300 1,200 1,300 1,200 1,300 1,300 $23,213 $23,300 $23,200 $23,300 $23,200 $23,300 $23,300 Program 8201 6411-Conferences and Schools 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Conce t Proposed Concept Su ervisor Trainin Loomis 100 91 100 100 100 100 100 Safet Trainin All Vehicles Sta 36 185 185 185 185 185 Mechanic Trainin Fadden, Goddard 95 100 100 100 100 100 APWA National Conference MPWA S rin Conference Loomis 250 250 250 250 APWA Snow Conference Fall Maintenance Ex o 75 75 100 100 100 100 100 Audiometric Examinations 56 60 60 60 60 60 Minnesota Truckin Assoc 75 75 75 75 75 75 CPR Trainin 81 MSSA 61 $462 $283 $870 $620 $870 $870 $870 Program 8201 6413-Dues and Subscriptions 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Adopted Estimate Concept Proposed Concept APWA Membershi Loomis 0 135 135 135 135 135 135 Sho Manuals All Vehicles Sta 100 100 100 100 100 MSSA MN Street Su erv Assoc Loomis 75 75 75 75 75 $0 $135 $310 $310 $310 $310 $310 Program 8201 6414-Licenses and Taxes 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Concept Proposed Conce t Hazardous Waste License Henn Co 53 53 100 60 100 60 60 Hazardous Waste Tax 70 70 70 70 70 Boiler License 20 45 20 45 20 45 45 Fuel License 25 25 250 25 25 25 Fuel Tax License 25 25 25 25 25 25 25 $123 $123 $240 $450 $240 $225 $225 Program 8201 6960-Capital Outlay 2009 2010 2011 2011 2012 2012 2013 Descri tion Actual Actual Ado ted Estimate Concept Pro osed Conce t Picku Truck - - 0 0 0 0 0 S ecialt Tor ue Wrench 8,000 $0 $0 $0 $0 $0 $8,000 $0 CITY OF GOLDEN VALLEY VEHICLE MAINTENANCE FUND REVENUE DETAIL Actua12009 Actua12010 Adopted 2011 Estimated 2011 Coneept2072 Proposed 2012 Concept2013 Percent Percent Percent Percent Percent Percent Percent Revenue Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Amount of Total Charges To Other Funds (1) 292 015 100.0% 27�783 100.0% 334 415 100.0% 315 965 100.0% 339 860 100.0% 331 390 100.0% 339 860 100_0% TOTALS 5292.015 100.0% E273.783 100.0% f334.415 100.Oh 5375.965 100.0% f339.860 700•0% 5331.390 100.0% 5339.860 100.0°/, (1)Per hour labor rates charged to departments: 2009 2010 2011 2012 2013 $72 $76 $BO $82 $85 CITY OF GOLDEN VALLEY VEHICLE MAINTENANCE FUND NET ASSETS ANALYSIS Net Assets @ 01/01/11 $184,757 Estimated Revenue - 2011 $315,965 Estimated Expenditures - 2011 315,965 Excess of Revenue Over (Under) Expenditures 0 Estimated Net Assets @ 12/31/11 184,757 Proposed Revenue - 2012 331,390 Proposed Expenditures - 2012 331,390 Excess of Revenue Over (Under) Expenditures 0 Projected Net Assets @ 12/31/12 $184,757 Concept Revenue - 2013 339,860 Concept Expenditures - 2013 323,260 Excess of Revenue Over (Under) Expenditures 16,600 Projected Net Assets @ 12/31/13 $201,357 Inventory at 01/01/11 was at $150,348 ��t ;' ��' . ,, .a �fler�orandum 31..A° / , � �`� �/ Finance � ``�. ��� N+ � 763-593-8013/763-593-8109(fa�t) Executive Summary Golden Valley Council/Manager Meeting October 11, 2011 Agenda Item 6. 2012-2016 Capital Improvement Program Prepared By Sue Virnig, Finance Director Summary Staff will be present at the October 11 Council/Manager meeting to answer questions on the 2012-2016 Capital Improvement Program (CIP). The Planning Commission will review the document at their October 24 meeting. Those minutes will be shared with Council before the Council/Manager meeting on November 9. The document will be presented at the December 6 Council Meeting for approval. After approval, the document will be bound and distributed. Attachments 2012-2016 CIP (118 pages) � � �� �� .� olden $ va e .. :��_ � �„��_ .�,� .� : _ _ , , _ : _ .� . ._ � � � � � __ � � _ �:�..-�_ .� , �. ; � .. , �� 1 ` ' ��, �s ; . _ _ . : �. ,_� �I , �� ,' , „ C� � � ��. � �,.� � ��� . .. � ��f�f����yJ"...1 4 v� � �� ��� 7 .� `��� / { '�. �. o �, t � � e � t + '} `� ^ � (� ,{ � �, ,ye � �r_� -� � J,� �L�� 1 � � � Y �.,�.-^��"" �'� ' x '� �� ��� �� 4�/ 5� �°; ,,,, .l�� � � , � ('i'�,. � �. . � < �,.:_ � ;�� A � � �a� , �. n � e N4 � ' �� V ki � ��� X� � . ,� ' x' � .��M. �� � �.�f � .�' = � ;f�'� ""f p_' !tt` � �� --� � � ����;K /� � �'� " �� �i �� 'i � �� — — �— �� ' � r�, —�'� �,� ..,, �,'�° � ,,,,,,,..�•• f � � ,��� ' � '� .ii'{`li� �r . � '.� ¥�' �i�� ....: � ..,. � I4 0 � �^"�_ �fi3ft Y ,�i r f . � ^$� �., ���e �� �S .__.�--....�.- ___"«� � '.� f� �. t � ,�,�,.,..�,.�. .� .. " x. - "� � Y,� „°.�,"""".'.. . E , ,��....:�� � , � �k � , I I �,h ..,�...�.-� � ,.�, .�. M, :�. � ..�.�--..�..--.•�. �. : �. Il� . �I � ..".�.��„'-' "" " "� , � �.—°- ' _ '� . : F 4 �� � , , '� =--_"`" ,s _ . . ----,.-.� - �„� . �----_--^ � ; . _..,_.—.,._. �� � .� .. � � : r � i�, " __. � _ , ,� . ._ --- . _ � , � � .... ._ �....�a -_ •.�� � ,: �' - �,� ����.��_� . ..... � � ',, �"„---- '' �- � � , a�� �. � �'�, `-- `-- : . __ —.,._�, : .e_ �,, _�_�e_. __=.� . _. .. �__ ..� -�,��_.�:.,..,�---�----�-� , � . .., . , . . �__ , , . -�-�.—+.., a�: � s •'+� p� , y � �^...� �w��'��� Iltl t � ���r � 4.:�il�i � � � £r�.'�:..'°" . ■3 t 5� � � 2012-2016 Ca ital Im rovement Pro ram p p g �� �; CITY OF GOLDEN VALLEY, MINNESOTA 2012-2016 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Page Number Introduction 1 Financing 3 Exhibit I - General Fund Projects 7 Exhibit II -Water& Sewer Utility Fund Projects 8 Exhibit III - Brookview Golf Course Fund Projects and Working Capital Projection 9 Exhibit IV - Equipment Replacement Fund Projects and Cash Balance Projection 10 Exhibit V - Building Fund Projects and Cash Balance Projection 11 Exhibit VI - Park Improvement Fund Projects and Cash Balance Projection 12 Exhibit VII - City Municipal State Aid Street Fund Projects and Cash Balance Projection 13 Exhibit VIII - Capital Improvement Fund Projects and Cash Balance Projection 14 Exhibit IX - Storm Sewer Utility Fund Projects and Cash Balance Projection 15 Exhibit X - Douglas Drive Corridor Fund Project and Cash Balance Projection 16 Exhibit XI - General Obligation Bonded Debt Tax Levy Projections 17 Exhibit XII - Summary of Capital Improvement Expenditures by Category by Year 18 Exhibit XIII - Financing Summary by Source by Year 19 Vehicles & Equipment (V&E) 20 Buildings (B) 50 Parks (P) 56 Golf (GC) 63 Storm Sewers (SS) 71 Water & Sanitary Sewer Utility (W&SS) 82 Streets (S) 93 Douglas Drive Corridor(DD) 102 Appendix 105 Special Assessment Policy Fleet Operation, Maintenance, and Replacement Policy £. �,y. � ''��, -':��, �"��',�.n�.., . � c ✓'`� f,, � � .�:��� ; '. ��, . ��� �,_;._. .-. . � �,. � Proposed 2012-2016 Capital Improvement Program December 6, 2011 Reviewed by Council October 11, 2011 November 9, 2011 � Reviewed by Planning Commission October 24, 2011 Mayor Linda R Loomis Council Mike Freiberg, Paula Pentel, DeDe Scanlon, Bob Shaffer Management Team Tom Burt City Manager Stacy Carlson Police Chief Jeannine Clancy Director of Public Works Mark Grimes Director of Planning and Development Rick Jacobson Dire�tor of Parks and Recreation Chantell Knauss Assistant City Manager Mark Kuhnly Chief of Fire and Inspection Services Sue Virnig Director of Finance Cheryl Weiler Communications Manager October 11, 2011 The Honorable Linda L Loomis, Mayor Members of the City Council Dear Mayor Loomis and City Council Members: The Proposed Capital Improvement Program (CIP) for years FY 2012-2016 is presented with this transmittal. The Capital Improvement Program is a five-year fiscal planning instrument that is used to identify needed capital projects and to delineate the financing and timing of the associated projects. Generally these projects exceed $10,000 in cost and require long-term financing. An annual capital improvement budget, encompassing the projects outlined for the first year of the CIP, is presented to the Council with the City budget. The capital improvement also identifies bond issues necessary to fund the year's improvements. Each project is brought forth in the upcoming year for final approval by Council. The adoption of a CIP is a requirement for each city in the metropolitan area. As part of the Metropolitan Land Planning Act passed by the State legislature in 1976, each city is required to adopt a Comprehensive Plan. In 2009, the City's Comprehensive Plan was approved and accomplished: • Updated zoning and subdivision codes; • Housing implementation programs; • Capital Improvement Program related to transportation, sewers, parks and open space facilities Because of its relationship to the Comprehensive Plan, the CIP is reviewed by the Planning Commission. The CIP should be viewed as a vehicle to accomplish the goals outlined in the City's Comprehensive Plan. The goals in the plan cover housing, sanitary and storm sewers, public facilities, transportation and parks and open spaces. An orderly expenditure of funds on capital items is a means of accomplishing the Plan. A complete CIP is an indispensable tool for the City Council and the City staff as they manage and control the timing and financing of capital improvements needed to maintain the current high level of City services. A CIP is also used by the bond rating agencies to not only evaluate the current and future financial condition of a city, but also to evaluate the quality of a city's management. Adoption of this comprehensive CIP for 2012-2016 will enhance the City's ability to maintain its current Aa1 bond rating. Finally, a CIP is a valuable document for commission members and individual citizens to use to gain an understanding of how their City works and the means to accomplish its overall plan. The process for completing the 2012-2016 CIP was much the same as the process for the 2012-2013 Budget. Project requests were submitted by all the divisions and reviewed by the Page 1 Management Team and appropriate supervisors to establish the feasibility and priority of the projects, and match with available financing. The CIP is a planning document or guide for the future capital improvements in the City which in no way constitutes formal approval of the various projects. All of the projects will be formally approved through the City's purchasing or public improvement process. Each section lists the upcoming projects, project overview, and an estimated cost of the project. The Financing section includes a narrative analysis of financing sources involved in the program along with exhibits analyzing some of these sources, with special emphasis on the City's Capital Project Funds. Also included is an exhibit which provides an analysis of the estimated future tax levies needed to finance the City's current general obligation debt and the future general obligation debt identified in the program. There are also two exhibits which summarize projects by year, source of financing by year and the category for each project. The sections are: Financing Vehicles and Equipment Buildings Parks Golf Course Storm Sewers Water& Sanitary Sewer Utility Streets Douglas Drive Corridor Study I look forward to completing these important projects in the coming fiscal year. As we move forward with this FY 2012-2016, I hope that this CIP meets your approval and provides a useful tool for the Council as it makes decisions regarding these projects. Thomas D. Burt City Manager Page 2 CITY OF GOLDEN VALLEY, MINNESOTA 2012 -2016 CAPITAL IMPROVEMENT PROGRAM FINANCING The 2012-2016 Capital Improvement Program (CIP), which is detailed on the following pages, is financed from a variety of sources. The purpose of this section is to describe and analyze these sources, in as much detail as possible, so that the users of this CIP can be certain that the program as outlined can be financed from available�nancing sources. General Fund The General Fund is the main operating fund of the City, and as such contains most of the City's operating divisions. The main revenue source for this fund is real estate taxes. Large, non-recurring capital outlay expenditures are usually made from one of the City's capital project funds. Level annual transfers from the General Fund to these funds help to even out the annual budgeting process. The General Fund fund balance as of December 31, 2010 was $9,003,423. Exhibit I lists the General Fund transfers to Funds for projects in the CIP. Water�Sewer Utilitv Fund The Water 8� Sewer Utility Fund is an enterprise fund, which is involved in the operation and renewal 8� replacement of the City's water and sanitary sewer systems. The main sources of revenue for this fund are the user charges to those residential and commercial/industrial customers connected to the systems. Per City policy, new lateral water and sewer system projects are assessed at 100% of cost unless there are unusual circumstances involved, in which case the City would pay for the difference from the reserve account. Since the City is essentially fully developed, there should be fewer and fewer of these projects in future years. These lateral water and sewer system projects are usually requested by property ow►ners, so it is very hard to project when they might occur and the total cost. The trunk water system is owned and operated under a joint powers agreement with the cities of Golden Valley, New Hope and Crystal. This organization is known as the Joint Water Commission. The operating and capital improvement expenditures of the trunk water system are shared by the three cities. The trunk sanitary sewer system is owned by Metropolitan Council Environmental Services to which the City makes monthly payments for the operation of and the capital improvements to the trunk system. Exhibit II is a list of projects in the program financed by the Water& Sewer Utility Fund. The retained earnings or net assets of the fund at 12/31/10 was $7,482,899. This amount is down significantly from prior years primarily because of the improvements to the system with the pavement management program and inflow/infiltration (I/I) improvements to reduce the flow into the sanitary sewer system. The financial position of this fund is extremely important because the City is facing large expenditures in future years for the renewal and replacement of aging water and sewer lines. �rookview Golf Course Fund The Brookview Golf Course Fund is an enterprise fund, which is involved in the operation and improvement of the City's golf course. The main revenue source is green fees paid by the golfers. The golf course consists of an 18 hole regulation course, a 9 hole par 3 course and a driving range. Many of the improvements to the course are part of regular course maintenance, but where specific projects can be defined and costs estimated, they are included in the program. Major pieces of equipment used by the golf course are also included in the program. The working capital in this fund as of December 31, 2010 was $1,007,118. Exhibit III is a list of the major course improvements and equipment included in the program and the projected working capital balances of this fund. Page 3 Storm Sewer Utilitv Fund The Storm Sewer Utility Fund is an enterprise fund, which is involved in the maintenance and improvement of the City's storm water system including storm sewers and holding ponds. The fund is financed from charges to all the property in the City based on the level of estimated storm water runoff from a given class of property. Projects funded are those related to the Pavement Management Program, the City's adopted Storm Water Management Plan and projects constructed in conjunction with the other cities that are members of the Bassett Creek Water Management Commission. Exhibit IX is an analysis of the projected revenue, expenditures and cash balances in this fund. Projected expenditures include the annual debt service payments on the storm water revenue bonds that were sold in 2004 and in 2006. The proceeds of this issue were used to finance the storm water costs of the T.H. 55 & Boone Ave. project. Eauipment Replacement Fund This capital project fund is used to finance major vehicle and equipment purchases for General Fund divisions. One of the revenue sources of this fund is the proceeds of the sale of Certificates of Indebtedness. These are short-term general obligation debt instruments issued for a term of four years and repaid from annual tax levies. Exhibit IV is an analysis of the projected revenue, expenditures and cash balances in this fund. The estimated future annual tax levies that will be needed to repay the debt service on current and future certificates of indebtedness issues are detailed in Exhibit XI. Current legislation has allowed cities to extend the term of these certificates up to ten years if the life of the asset is that in length. We may extend the term for those certificates that will finance fire pumper replacements. Buildina Fund This capital project fund is used to finance major improvements to buildings used by the General Fund divisions. Wotd Architects completed a city facility analysis in 2006. This plan has been incorporated into the Building Fund and the 2012 General Fund Buildings Budget as funding permits. A major source of financing in this fund is transfers from the General Fund. Exhibit V is an analysis of the projected revenue, expenditures and cash balances of this fund. Park Improvement Fund This capital project fund is used to finance major park and open space improvements. One of the revenue sources in this fund is an annual transfer from the General Fund. Exhibit VI is an analysis of the projected revenue, expenditures and cash balances of this fund. Municipal State Aid IMSA) Fund This fund is used to account for moneys held in account both by the City and the State of Minnesota for use in the maintenance and improvement of municipal state aid streets located in the City. Streets are designated as municipal state aid based on criteria established by the State. Each city is allowed a maximum number of miles of these designated streets. Every improvement project involving these streets must first be approved by the State. If approved, a certain portion of the projected cost is advanced to the City from its MSA account at the State, with the balance being paid upon completion. The monies that finance the City's MSA account at the State come from the State gasoline tax. The City's MSA account at the State is essentially the City's money, and the amount in the account at any one time is included as an asset of this fund. The State also participates directly in various street and storm sewer improvement projects with the City, when the particular project benefits or involves State highways and rights of way. On the worksheets for street and storm sewer projects, the designation under the financing analysis of MSA refers to the City's MSA account at the State, and State of Minnesota refers to Page 4 direct State participation. Exhibit VII is an analysis of the projected revenue, expenditures and cash balances of the Municipal State Aid Fund. Doualas Drive Proiect In October 2010, the City passed an ordinance requiring a franchise fee with Xcel Energy. The franchise fee will provide one funding source for improvements related to the Douglas Drive project. The City shall use the franchise fees collected by the Company only for infrastructure costs of the Douglas Drive Project which include City expenditures for the project, including those financed by bonds. Franchise fee revenue will start being received in 2011 and will be accounted for separately in this capital projects fund. Capital Improvement Fund This fund is the old Debt Redemption Fund that was previously used to finance the special assessment debt of the City that was sold to finance the initial infrastructure improvements. Now that the debt has been entirely paid off, the assets of this fund can be used for any purposes designated by the City Council. Monies in this fund finance infrastructure improvements. Exhibit VIII is an analysis of the projected revenue, expenditures and cash balances of this fund. The scheduled transfers from the General Fund to the various capital project funds, as detailed in the program, are outlined in Exhibit I. General Obliaation Bonds To finance certain projects the City must borrow funds extemally by issuing general obligation municipal bonds. The method(s) of financing the repayment of these bonds differentiates the various types of bonds used in the program. Tax Increment Bonds The proceeds of these bond issues are used to pay for public improvements in specially designated tax increment districts. The debt service on the bonds is repaid from property taxes on the increased value in the district over a base year's value. The property taxes on the increased value (increment) are not distributed to the various taxing jurisdictions, but are retained by the City to pay off the debt service on the bonds. The increased value in the district comes from the increased commercial/industrial development made possible by the public improvements financed by the bonds. The City currently has one tax increment district with the following bonded indebtedness as of December 31, 2011. District Bonds/Interest Pavable as Of 12/31/11 Golden Hills 14,572,731 The CIP does not include the land acquisition, building demolition and relocation expenditures projected for these districts. It includes just the basic municipal improvements such as streets, utilities, etc. A pay-go note was used to finance the North Wirth District No. 3. Special Assessment�onds Per State Statute, if at least 20% of the bond principal for a public improvement is financed by special assessments against benefited properties, the balance can be financed from tax levies against all the property in the City without the need of a bond referendum. On the project worksheets, if special assessment bond financing is involved, we have indicated the amount of bonds to be repaid from special assessments and tax levies. Page 5 The pavement management program uses special assessment bonds for financing along with assessments from benefiting properties. These street projects will extend over a longer period than is included in the 2012-2016 CIP and will be financed by annual special assessment bond issues. On the project worksheet for the pavement management program, the method of financing is indicated as just Special Assessment Bonds. Municipal State Aid (MSA) Revenue Bonds MSA bonds were sold in 2007 for the first time for the City of Golden Valley. The project was Golden Valley Road and Bridge replacement. The debt service payments will be repaid over twenty years with State Aid Allotments used to improve and maintain Municipal State Aid roads. Tax Abatement Bonds These bonds will be repaid from the abated City taxes on the General Mills' headquarters expansion, which has been completed. The abatement agreement was signed between the City and General Mills in 2001 and the bonds were sold in 2004. The City taxes generated by the expansion will not be used to �nance general City operations, but will be used to pay the debt service on the bonds. The term of the abatement agreement is fifteen (15) years. On the project worksheets, if tax abatement bond financing is involved, we have indicated the amount of bonds to be repaid from the annual tax abatement. Exhibit XI is an analysis of the projected tax levies needed to finance the current and projected general obligation bonded debt of the City of Golden Valley. Page 6 CITY OF GOLDEN VALLEY 2011 -2015 CIP GENERAL FUND (FUND 1000) EXHIBIT I EXPENDITURES PROJECT (1) 2012 2013 2014 2015 2016 Transfer to Building Fund $189,970 $189,970 $250,000 $275,000 $300,000 Transfer to Park Improvement Fund 104,740 104,740 250,000 250,000 250,000 Totals $294,710 $294,710 $500,000 $525,000 $550,000 Notes• (1) The individual building and park projects funded by these transfers are included in the Building and Parks Sections of the CIP. Page 7 CITY OF GOLDEN VALLEY 2012-2016 CIP WATER AND SEWER UTILITY FUND (FUND 7120) EXHIBIT II 2072 2013 2014 2015 2076 Unreserved Cash Balance @ 1/1 $6,109,439 $5,427,829 $4,693,359 $3,984,918 $2,991,465 Revenue� Water Charges 4,022,955 4,103,415 4,144,449 4,185,894 4,227,753 Sanitary Sewer Charges 3,236,245 3,300,970 3,425,970 3,550,970 3,675,970 State Water Testing Pass Through 43,000 43,000 43,000 43,000 43,000 Late Penalties 120,000 120,000 120,000 120,000 120,000 Other 285,000 285,000 285,000 285,000 285,000 Interest Eamings 65,000 65,000 100,000 100,000 900,000 Total Current Revenue for Operations 7,772,200 7,917,385 8,118,419 8,284,864 8,451,723 Total Available 13,881,639 13,345,214 12,811,778 12,269,781 11,443,187 Exoenditures: Operating Expenditures: Administration (3%increase) (522,620) (521,105) (536,738) (552,840) (569,426) Sewer Maintenance (3%increase) (2,441,390) (2,421,940) (2,494,598) (2,569,436) (2,646,519) Water Maintenance (3%increase) (4,098,800) (4,223,810) (4,350,524) (4,481,040) (4,615,471) Sub-TotalOperations (7,082,810) (7,166,855) (7,381,861) (7,603,316) (7,831,416) Capital Outlay: 2012 (1,391,000) 2013 (1,485,000) 2014 (1,445,000) 2015 (1,675,000) 2016 (1,470,000) Sub-Total Capital Expenses (1,391,000) (1,485,000) (1,445,000) (1,675,000) (1,470,000) Total F�cpenses _ (8,453,810) (8,651,855) (8,826,861) (9,278,316) (9,301,416) Retained Eamings(Net Assets) @ 12/31 $5,427,829 $4,693,359 $3,984,918 $2,991,465 $2,141,771 Page 8 CITY OF GOLDEN VALLEY 2012-2016 CIP BROOKVIEW GOLF COURSE FUND (FUND 7150) EXHIBIT III 2012 2013 2014 2015 2016 Working Capital @ 1/1 $1,003,768 $1,034,093 $1,069,758 $902,978 $827,198 Revenue: Total Course Revenue 1,763,350 1,763,350 1,763,350 1,763,350 1,763,350 Total Available 2,767,118 2,797,443 2,833,108 2,666,328 2,590,548 Exaenses: Operating Expenses: (1,668,835) (1,650,555) (1,742,130) (1,754,130) (1,770,000) Capital Outlay 2012 (64,190) 2013 (77,130) 2014 (188,000) 2015 (85,000) 2016 (136,000) Total Expenses (1,733,025) (1,727,685) (1,930,130) (1,839,130) (1,906,000) Working Capital @ 'i2/31 $1,034,093 $1,069,758 $902,978 $827,198 $684,548 Page 9 CITY OF GOLDEN VALLEY 2012-2016 CIP EQUIPMENT REPLACEMENT FUND(FUND 5700) EXHIBIT IV 2012 2013 2014 2015 2016 Cash Balance� 1/1 1,802,088 1,275,893 1,205,652 820,708 749,915 Revenue: Proceeds-Certificates of Indebtedness 750,000 750,000 750,000 750,000 750,000 Proceeds-Certificates of Indebtedness 500,000 Sale of Assets(Auetion proceeds): 35,000 35,000 35,000 35,000 35,000 Interest Eamings(Beginning Balance) 26,805 12,759 12,057 8,207 7,499 Total Available 2,613,893 2,073,652 2,002,708 2,113,915 1,542,415 Expenditures: Bond Costs (8,000) (8,000) (8,000) (8,000) (8,000) 2012 (1,330,000) 2013 (860,000) 2014 (1,174,000) 2015 (1,356,000) 2016 (667,000) (1,338,000) (868,000) (1,182,000) (1,364,000) (675,000) NetAssets 1,275,893 1,205,652 820,708 749,915 867,415 Page 10 CITY OF GOLDEN VALLEY 2012-2016 CIP BUILDING FUND(FUND 5200) EXHIBIT V 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $876,866 $728,220 $608,652 $428,217 $376,428 Revenue• Transfer From General Fund 189,970 189,970 250,000 275,000 300,000 Cable Capital Grant 22,000 22,000 22,000 22,000 22,000 Insurance Reimbursement Interest Eamings 4,384 5,462 4,565 3,212 2,823 Total Available 1,093,220 945,652 885,217 728,428 701,252 EXqenditures: Cable Equipment (22,000) (22,000) (22,000) (22,000) (22,000) 2012 (343,000) 2013 (315,000) 2014 (435,000) 2015 (330,000) 2016 (330,000) Total Expenditures (365,000) (337,000) (457,000) (352,000) (352,000) Estimated Net Assets @ 12/31 $728,220 $608,652 $428,217 $376,428 $349,252 Page 11 CITY OF GOLDEN VALLEY 2012-2016 CIP PARK IMPROVEMENT FUND(FUND 5600) EXHIBIT VI 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $702,581 $406,190 $225,777 $201,325 $166,625 Revenue• Transfer From General Fund 104,740 104,740 250,000 250,000 250,000 Park Dedication Fee Pertormance Area Donation Interest Earnings 5,269 3,046 1,693 1,510 1,250 Total Available 812,590 513,977 477,470 452,835 417,875 Exuenditures• 2012 (406,400) 2013 (288,200) 2014 (276,145) 2015 (286,210) 2016 (288,450) Total Expenditures (406,400) (288,200) (276,145) (286,210) (288,450) Estimated NetAssets @ 12/31 $406,190 $225,777 $201,325 $166,625 $129,425 Page 12 CITY OF GOLDEN VALLEY 2012-2016 CIP CITY STATE AID CAPITAL PROJECT FUND(FUND 5100) EXHIBIT VII 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $2,942,163 $2,060,831 $2,171,687 $2,311,651 2,451,014 Revenue: State Aid Bond Payments 100,000 100,000 100,000 100,000 100,000 Annual Construction Allotment From State 1,500,000 Annual Maintenance Allotment From State 274,727 274,727 274,727 274,727 274,727 MMAP Agreement(Mn/DO�-Winnekta/55 702,000 Special Assessments-State-Aid Bonds(Harold) 20,000 20,000 20,000 20,000 Special Assessments-State-Aid Bonds; Golden Valley Rd.-Douglas Dr.to T.H. 100 12,520 12,520 12,520 12,520 12,520 Interest Eamings (%of Beg. Bal.) 29,422 20,608 21,717 23,117 24,611 Total Available 5,560,831 2,488,687 2,600,651 2,742,014 2,882,872 Expenditures: Maintenance 100,000 100,000 100,000 100,000 100,000 Overlay Program 366,000 MSA Debt Service(ends 2027) 189,000 189,000 189,000 191,000 192,000 Harold Avenue Reconstruction 1,500,000 Count Down Pedestrian Signals 25,000 Reconstruct Railroad Crossings 20,000 28,000 Winnetka Ave and Trunk Highway 55 1,300,000 Total Expenditures 3,500,000 317,000 289,000 291,000 292,000 Estimated Net Assets @ 12/31 $2,060,831 $2,171,687 $2,311,651 $2,451,014 $2,590,872 Page 13 CITY OF GOLDEN VALLEY 2012-2016 CIP CAPITAL IMPROVEMENT FUND (FUND 6100) EXHIBIT VIII 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $1,275,840 $1,122,398 $967,422 $810,897 $652,806 Revenue• Charge to Street Reconstruction Projects to , Finance CAD&Pavement Management Systems 20,000 20,000 20,000 20,000 20,000 Interest Eamings (1%of Beg. Bal.) 12,758 11,224 9,674 8,109 6,528 TotalAvailable 1,308,598 1,153,622 997,097 839,006 679,334 Expenditures• CAD Application (11,200) (11,200) (11,200) (11,200) (11,200) Street Signs (50,000) (50,000) (50,000) (50,000) (50,000) City Hall Campus Sidewalk Renovation (75,000) (75,000) (75,000) (75,000) Sidewalk and Trail System Upgrades (50,000) (50,000) (50,000) (50,000) (50,000) Total Expenditures (186,200) (186,200) (186,200) (186,200) (111,200) Estimated NetAssets @ 12/31 $1,122,398 $967,422 $890,897 $652,806 $568,934 Page 14 CITY OF GOLDEN VALLEY 2012-2016 CIP STORM SEWER UTILITY FUND (FUND 7300) EXHIBIT IX 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $4,522,167 $4,289,932 $4,080,838 $3,371,383 $3,050,548 Revenue• Storm Sewer Charges 2,212,150 2,279,000 2,279,000 2,279,000 2,279,000 Bassett Creek Watershed Management Commission 1,080,200 285,000 1,300,000 Union Pacific Railroad 185,000 Interest Eamings 50,000 64,349 81,617 67,428 61,011 Total Available 7,864,517 6,818,281 6,726,455 7,017,811 5,390,559 Exuenditures• Operating Expenditures: Storm Sewer Maintenance (401,430) (413,473) (425,877) (493,708) (508,520) Street Cleaning (121,780) (121,780) (125,433) (145,412) (149,774) Environmental Services (240,050) (240,050) (247,252) (286,632) (295,231) Debt Service-Revenue Bonds(2019;2021) (435,125) (437,140) (431,510) (431,510) (431,5'i 0) Sub-Total of Operations (1,198,385) (1,212,443) (1,230,072) (1,357,262) (1,385,035) Capital Outlay: 2012 (2,376,200) 2013 (1,525,000) 2014 (2,125,000) 2015 (2,610,000) 2016 (1,335,000) Sub-Total of Capital Expenditures (2,376,200) (1,525,000) (2,125,000) (2,610,000) (1,335,000) Total Expenditures (3,574,585) (2,737,443) (3,355,072) (3,967,262) (2,720,035) Estimated Net Assets @ 12/31 $4,289,932 $4,080,838 $3,371,383 $3,050,548 $2,670,524 Page 15 CITY OF GOLDEN VALLEY 2012-2016 CIP DOUGLAS DRIVE CORRIDOR (FUND 6200) EXHIBIT X 2012 2013 2014 2015 2016 Cash Balance @ 1/1 $0 $57,650 $462,127 $201,748 $3,304,915 Revenue• Transit for Livable Communities 375,000 675,000 Hennepin County 1,357,000 9,254,500 MnDOT Cooperative Agreement 1,000,000 Franchise Fees 610,000 610,000 610,000 610,000 610,000 Street Reconstruction Bond 7,608,250 Interest Eamings (1%of Beg. Bal.) 0 577 4,621 2,097 33,049 Total Available 985,000 2,343,227 1,076,748 9,779,095 13,202,464 Expenditures: Douglas Drive Improvements (675,000) (1,881,100) (875,000) (6,474,100) (13,169,550) Internal Loan (252,350) Total Expenditures (927,350) (1,881,100) (875,000) (6,474,100) (13,169,550) Estimated NetAssets @ 12/31 $57,650 $462,127 $201,748 $3,304,915 $32,914 Page 16 CITY OF GOLDEN VALLEY 2072-2016 CIP GENERAL OBLIGATION DEBT TAX LEVY PROJECTIONS EXHIBIT XI Principai Balance 1?J31/17 Maturitv 2012 2013 2014 2015 2018 2017 2018 2019 2020 Current Pavement Management General Obliaation Special Assessment Debt 2000A(2009C)Street Improvement Bonda 3,810,000 2016 $831,925 $838,800 $820,050 $832,550 $824,000 2002A(2009D)Street Improvement Bonda 5,465,000 2018 845,250 831,750 901,500 908,550 914,700 914,950 915,200 2003C SVeet Improvement Bonds 4,870,000 2019 1,019,740 1,002,540 968,360 842,855 715,875 721,475 730,875 728,875 2005C Street Improvement Bonds 5,945,000 2025 302,662 305,537 308,200 310,650 402,887 401,087 399,075 396,850 394,412 2006B Street Improvement Bonds 7,320,000 2028 371,165 373,500 375,630 377,555 379,275 500,790 497,180 493,365 574,290 2007C Street Improvement Bonds 4,105,000 2027 185,255 220,255 218,855 227,455 230,655 233,655 281,455 287,150 292,320 2008A Street Improvement Bonds 6,680,000 2028 279,250 279,250 334,250 342,325 345,050 342,600 344,975 457,162 454,562 2009A Street Improvement Bonds 6,990,000 2029 548,569 548,169 545,669 547,419 198,919 543,919 548,569 547,769 547,594 2010A Street Improvemant Bonds 3,845,000 2030 342,490 169,790 119,290 119,290 946,690 567,590 768,590 107,340 105,840 2011A Street Improvemerrt Bonds 1.840,000 2031 40,160 141,475 129,775 168,275 125,975 174,475 146,975 158,975 165 525 Total 50,870,000 $4,766,466 $4,711,066 $4,721,599 $4,676,924 $5,084,026 $4,420,541 $4,632,894 $3,177,486 $2 534.543 Current Certificates oF Indebtedness General Obliaation Debt Certificates of Indebtedness�20088 255,000 2012 262,650 Certificates of Indebtedness-20098 505,000 2013 257,965 259,462 Certificates of Indebtedness-20108 685,000 2014 233,115 235,865 233,335 Certificates of Indebtedness-2011B 655,000 2015 4,668 221,565 225,060 222,860 Total 2,100,000 CurteM Tax Abatement Bonds 2004B Tax Abatemerrt Bonds 2,750,OD0 2019 448,675 440,062 430,825 416,375 406,925 397,262 386,950 370,975 General Obliaation Revenue Bonds 2004C Utility Revenue Bonds 1,775,000 2019 266,756 268,918 265,418 266,706 267,568 268,006 267,725 279,700 2006C Utility Revenue Bonds 1,400,000 2021 172,642 172,928 173,007 172,882 172,552 172,018 176,227 175,127 173,695 3,175,000 Currern State Aid Street Bonds 2007A State Aid Bonds 2,190,000 2027 188,831 189,831 190,631 191,231 161,631 186,631 187,032 187,031 186,832 General Obliqation Tax Increment Bonds 2005A Golden Htlls TI Bonds 1,200,000 2015 126,571 128,915 546,877 533,282 20058 Golden H81s TI Bonds 3,690,OD0 2095 407,991 402,710 1,756,910 1,686,475 2006A Golden Hills TI Taxable Bonds 7,845,000 2015 1,242,250 2,294,750 2,492,500 2,950,500 12,735,000 Total Govemment Wide Principal 73,820,000 8 378 580 9 326 072 11 036 162 11 117 235 6 092 702 5 444 458 5 650 828 4 182 319 2 895 070 Page 17 CITY OF GOLDEN VALLEY 2012-2016 CIP CAPITAL IMPROVEMENT EXPENDITURES BY CATEGORY BY YEAR EXHIBIT XII Category 2012 2013 2014 2015 2016 Total % Vehicles&Equipment $1,330,000 $860,000 $1,174,000 $1,356,000 $667,000 $5,387,000 7.0% Buildings 365,000 337,000 457,000 352,000 352,000 1,863,000 2.4% Parks 406,400 288,200 276,145 286,210 288,450 1,545,405 2.0% Golf Course 64,190 77,130 188,000 85,000 136,000 550,320 0.7% Streets 5,420,200 4,839,200 5,146,200 6,069,200 5,403,200 26,878,000 34.9% Douglas Drive Corridor 920,000 1,881,100 875,000 6,474,100 13,169,550 23,319,750 30.3% Storm Sewers 2,376,200 1,525,000 2,125,000 2,610,000 1,335,000 9,971,200 13.0% Water&Sewer Systems 1,391,000 1,485,000 1,445,000 1,675,000 1,470,000 7,466,000 9.7% Totals $12,272,990 $11,292,630 $11,686,345 $18,907,590 $22,821,200 $76,980,675 100.0% Page 18 CITY OF GOLDEN VALLEY 2012-2016 CIP FINANCING SUMMARY BY SOURCE BY YEAR � EXHIBIT XIII Source 2012 2013 2014 201� 2016 Total % External Sources: Bassett Creek Water Mgmt Comm 1,080,200 0 285,000 1,300,000 0 2,665,200 3.5% Union Pacific Railroad 0 185,000 0 0 0 185,000 0.2% Franchise Fees 610,000 610,000 610,000 610,000 610,000 3,050,000 4.0% MN DOT 702,000 1,000,000 0 0 0 1,702,000 2.2% Transit Livable Communities(TLC) 375,000 675,000 0 0 0 1,050,000 1.4% Hennepin County 0 0 0 1,357,000 9,254,500 10,611,500 13.8% Total Extemal Sources 2,767,200 2,470,000 895,000 3,267,000 9,864,500 19,263,700 25.0% Internal Sources: Equipment Replacement Fund 1,321,000 860,000 1,174,000 1,356,000 667,000 5,378,000 7.0% Brookview Golf Course Fund 64,190 77,130 188,000 85,000 136,000 550,320 0.7% Water&Sewer Utility Fund 1,399,000 1,485,000 1,445,000 1,675,000 1,470,000 7,466,000 9.7% Building Fund 365,000 337,000 457,000 352,000 352,000 1,863,000 2.4% Park Improvement Fund 406,400 288,200 276,145 286,210 288,450 1,545,405 2.0% Capital Improvement Fund 186,200 186,200 186,200 186,200 111,200 856,000 9.1% Municipal State-Aid(MSA)Fund 2,798,000 317,000 289,000 291,000 292,000 3,987,000 5.2% Storm Sewer Utility Fund 1,305,000 1,340,000 1,840,000 1,310,000 1,335,000 7,130,000 9.3% Street Improvement Fund 934,000 500,000 500,000 500,000 500,000 2,134,000 2.8% Street Reconstruction Bonds 0 0 0 7,608,250 0 7,608,250 9.9% Special Assessment Bonds 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 24.9% Total Intemal Sources 9,570,790 9,226,530 10,526,345 18,741,660 9,651,650 57,716,975 75.0% Totals All Sources $12,337,990 $11,696,530 $11,421,345 $22,008,660 $19,596,150 $76,980,675 100.0% Page 19 city of o�den g va e Capital Improvement Program 2012-2016 Vehicles and Equipment Replacement Section This section includes all capital equipment and vehicles that help employees have the tools to fulfill their job requirements. The Vehicle Maintenance department maintains all equipment and vehicles except for the Golf Course Fund. The City's Information Technology Coordinator maintains the computers, printers and phone system. Each year each piece of equipment is reviewed before replacement. This schedule allows the City to finance upcoming purchases for the next five years. Financing for this fund comes from selling Equipment Certificates. Most certificates are paid back in four years by a debt levy. 20 City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 tt►ru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Vehicles and Equipment - -` Marked Squad Cars(Police) V8E-001 Na 60,000 60,000 90,000 100,000 110,000 420;000 Computers and Printers(Finance) V8E-002 n/a 55,000 60,000 60,000 65,000 65,000 305,000 Imaging System(Finance) VB�E-003 nla 15,000 15,000 26,000 15,000 15,000 86,000 Chipper(Street) VB�E-0O6 n/a 35,000 35,000 Passenger Vehicle(Fire) V&E-011 nla 35,000 35,000 Computer Servers(Finance) V&E-019 Na 35,000 35,000 Portable Computers(Police) VB�E-020 n/a 50,000 50,000 100,000 Unmarked Police Vehicle(Police) V�E-024 Na 30,000 30,000 Rotary Mower(Park) V&E-027 nla 90,000 90,000 Rotary Mower(Park) V8E-030 n/a 90,000 90,000 Streetscape Banners(Street) VB�E-038 Na 50,000 50,000 Unmarked Police Vehicle(Police) VB�E-041 Na 30,000 30,000 Van(Park and Recreation) V8E-042 Na 25,000 25,000 Pickup Truck(Engineering) VB�E-044 n/a 25,000 25,000 Fire Pumper(Fire) VS�E-U46 n/a 500,000 500,000 Pickup Truck(Park) V8E-047 n/a 25,000 25,000 RotaryMawer(Park) VB�E-04S nla 90,000 90,000 Asphalt Cold Planer(Street) VB�E-052 n/a 15,000 15,000 Pickup Truck(Park) VS�E-056 nla 43,000 43,000 Pickup Truck(Park) V8E-057 Na 40,000 40,000 Fire Hose(Fire) V&E-058 nla 13,000 13,000 Rescue Vehicle(Fire) VB�E-060 Na 100,000 100,000 SidewalklMaintenance Tractor(Stre.et) VB�E-064 n/a 154,000 154,000 Tandem Axle Dump Truck(Street) V&E-066 n/a 260,000 260,000 Utility T�actor Mower V8�E-069 n/a 20,000 20,000 Single Axle Dump TNCk V&E-070 n/a 205,000 205,000 Pickup Truck(Park) V8E-071 Na 45,000 45,000 Pickup Truck(Engineering) V&E-072 nla 25,000 25,000 SidewalkfMaintenance Tractor V8E-073 n/a 158,000 158,000 Uti►ity Tractor V&E-079 Na 72,000 72,000 CSO Vehicle(Police) V8E-081 nla 35,000 35,000 Fire Pumper(Fire) V&E-082 n/a 575,000 575,000 Self-Contained Breathing Apparatus(Fire) VB�E-084 Na 300,000 300,000 Utility Vehicle(Fire) V8E-085 Na 45,000 45,000 Pickup Truck(Fire) V8E-087 nla 40,000 40,000 Single Axle Dump Truck(Street) V8�E-088 n/a 235,000 235,000 Page 21 Department Project# Priority 2012 2013 2014 2015 2016 Total SidewalklMaintenance Tractor V8E-089 Na 158,000 158,000 Single Axie Dump Truck(Street) V8E-09d nla 205,000 205,000 Pickup Trudc(Park) V&E-091 n/a 43,Q00 43,000 Marked Squad Digiitaal Recording System(Police) V8E-092 Na 80,000 80,000 Unmarked Police Vehicle(Police) V&E-095 Na 30,000 30,000 Unmarked Police Vehicle(Police) VB�E-101 n/a 30,000 30,000 Pickup Truck(Fire) VB�E-102 n/a 40,000 40,000 Speed Trailer(Police) V&E-104 n/a 18,000 18,000 Polaris 6 X 6(Fire) V8�E-106 n/a 15,000 15,000 Bobcat Utility Truckster(Park) VB�E-107 n/a 45,000 45,000 Unmarked Police Vehicle(Police) VS�E-108 nla 30,000 30,000 Dump Truck(Street) V�E-111 n/a 80,000 80,000 Portable Traf�c Programmable Message Sign V&E-115 Na 25,000 25,000 Bobcat Toolcat(Park) VB,E-117 nla 45,000 45,000 Snow Blower(Street) V&E-118 nla 145,000 145,000 Tasers V8E-121 Na 17,000 17,000 Police Vehicle(Police) V&E-122 nla 30,000 30,000 Vehicles and Equipment Total 7,330,000 860,000 1,174,000 1,356,000 667,000 5,387,000 Equfpmettt Replacement Fund 1,321,000 860,000 1,174,000 9,356,Q00 667,000 5,378,000 Sto�n Sewer Utiltty Fund(7300) 9.� 9.0� Yehicles and Equipment Total 1,330,OOD 860,000 1,174,000 1,356,000 667,000 5,387,000 Grand Total 1,330,000 860,000 1,774,000 7,356,000 667,000 5,387,000 Page 22 Project# V&E-001 Department Vehicles and Equipment Cont�ct rro�ect Name Marked Squad Cars(Police) Type Equipment Useful Life Category Vehicles Priority Description Marked squad cars for the Police Deparhnent per replacement schedule for the City's nine squads. Justification IEach year a11 nine squads are looked at based on the number of miles,accidents and overall safety.l'he number replaced may vary based on these factors. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 60,000 60,000 90,000 100,000 110,000 420,000 Total 60,000 60,000 90,000 100,000 110,000 420,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 60,000 60,000 90,000 100,000 110,000 420,000 TOt81 60,000 60,000 9D,000 100,000 110,000 420,000 Project# V&E-002 Department Vehicles and Equipment Contact ProjectName Computers and Printers(Finance) Type Equipment Useful Life Category Equipment:Computers Priority Description � Replacement of computers and printers in the City. Most computers are scheduled to be replaced every four years and printers every eight. The City has a total of 130 computers and printers. Also includes upgrades to the City's computer network system,which includes switches,hubs and fiber connection hazdware. Justification � Technology chauges make personal computers obsolete after five years for business purposes. The computers will be replaced on the basis of need. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 55,000 60,000 60,000 65,000 65,000 305,000 TotSl 55,000 60,000 60,000 65,000 65,000 305,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 55,000 60,000 60,000 65,000 65,000 305,000 Tot31 55,000 60,000 60,000 65,000 65,000 305,000 Page 23 Project# V$tiE-0�3 Department Vehicles and Equipment Contact rro�ecc rtame Imaging System(Finance) Type Equipment -- --- -- ------ —----------- - Useful Life Category Equipment:Computers Priority Description � The purpose is to scan records digitaily to reduce paper copies and reduce the need for additional storage space for records. 711St1�1Ca1'lOII Permanent records take up space in City Hall. There is no additional space for filing cabinets,etc.in the City Offices. By imaging documents,all information can be gathered on the computer instead of digging through cabinets,etc and will be stored in one location.This server is scheduled to be replaced every three years. Every thrid year a server is purchased. Eapenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 15,000 15,000 26,000 15,000 15,000 86,000 Total 15,000 15,000 26,000 15,000 75,000 86,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 15,000 15,000 26,000 95,000 15,000 86,000 Total 15,000 15,000 26,000 75,000 95,000 86,000 Project# V&E-006 Department Vehicles and Equipment Contact Project Name Chipper(Street) Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description New brush chipper for Street Department to be used in disposal of tree branches removed from the rights of way and parks. The mulch can then be used on the trails,planters,etc. -- ---— --- Justification Increased costs for hauling and disposing of brush at sites outside the City. —� Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 35,000 35,000 Total �,000 �,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 35,000 35,000 TOtal 35,000 35,000 Page 24 Project# V&E-Ol l Department Vehicles and Equipment Contact Project Name Pa338IIgCt VB�IIC18�F1C8� Type Equipment Useful Life Category Vehicles Priority Description New passenger vehicle for the Fire Departrnent to replace Unit 346(2007 Ford Crown Victoria). �1l3hfiC3110II � — -- --- Increased repair and maintenance expenditures on Unit#346. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 35,000 35,000 Tota1 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 35,000 35,000 Total 35,000 �,aoo Project# V&E-019 Department Vehicles and Equipment Contact Project Name Computer Servers(Finance) Type Equipment Uaeful Life Category Equipment:Computers Priority Description Replacement of the City's four servers for the city-wide network computer system. The servers run all City applicaYions and need to he replaced every three years. Justification IAdditional disk space will be needed and current technology will be needed for speed and operating systems will need to be updated. L� - ---- __-- - -- Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 35,000 35,000 Total 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 35,000 35,000 Total 35,000 35,000 Page 25 Project# V&E-020 Department Vehicles and Equipment Contact Project Name portable Computers(Police) Type Equipment Useful Life Category Equipment:Computers Priority �Description — —I Replacement of portable computers in syuad cars. There are currently ten Toughbook PCs with docking stations. 7ustifiCatiOn I1'he current machines were acquired in 2008. Increased repair and maintenance occurs as machines age. In addition,new technology requires current hazdware. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 50,000 50,000 100,000 Total so,000 �o,000 700,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 50,000 50,000 100,000 Total so,000 so,000 700,000 Project# V&E-024 Department Vehicles and Equipment Contact Project Name Unmarked Police Vehicle(Police) Type Equipment Useful Life Category Vehicles Priority Description One new unmacked police vehicle to replace Unit#800(2007 Dodge Charger). 1 Justification Increased repair and maintenance e�cpenditures on Unit#800,which will be eight years old. Expendituees 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Z'ptgj 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 Total 30,000 30,000 Page 26 Project# V&E-027 Department Vehicles and Equipment Contact r�o�ect Name Rotary Mower(Park) Type Ec{uipment Useful Life Catcgory Equipment:Heavy Equip. Priority Description —� 16'hydrostatic tractor rotary mower for the Park Departrnent to replace Unit#471(2007 Toro Groundsmaster 580D). Justification Increased repair and maintenance expenditures on Unit#471,which will be eight years old. Large mowers of this type are the most cost-effective approach to 1 mowing large open azeas such as pazk land. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 90,000 90,000 Tota1 so,000 90,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replac�ment Fund 90,000 90,OU0 Total so,000 so,000 Project# V&E-030 Department Vehicles and Equipment Coutact pro�ect Name Rotary Mower(Park) Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description - --- -- -- — - 16'hydrostatic tractor mower for the Patk Department to replace Unit#472(2008 Toro Groundsmaster 580D). _� Justification Increased repair and maintenance expenditures on Unit#472,which will be eight years old. Large mowers of this type are the most cost-effective approach to� mowing large open areas such as park land. __ _ Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 90,000 90,000 Total so,o0o so,000 Funding Sources 2012 2013 2014 Z015 2016 Total Equipment Replacement Fund 90,000 90,000 Tota1 so,000 so,aoo Page 27 Project# V&E-038 Department Vehicles and Equipment Contact Project Name Streetscape Banners(Street) Type Equipment Useful Life Categoty Equipment:Miscellaneous Priority Description � Replacement of banners for streetscape along Winnetka Avenue and Golden Valley Road. There are two different sets of banners with 216 banners in each set. The two sets(summer and winter)were purchased in 2007. Justification Fabric deteriorates and wlors fade after weathered conditions.. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 50,000 50,000 Tota1 50,000 50,000 Funding Sources ZO12 2013 2014 2015 2016 Total Equipment Replacement Fund 50,000 50,000 . Tota1 so,000 �o,000 Project# V&E-041 Department Vehicles and Equipment Contact Project Name Unmarked Police Vehicle(Police) Type Equipment Useful Life Category Vehicles Priority Description New unmazked police vehicle to replace Unit#881(2005 Ford Crown Victoria). � Justification �Increased repair and maintenance eacpenditures on Unit#881,which will be 7 years old. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Total 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 Total 30,000 30,000 Page 28 Pro,ject# V$tiE-042 Department Vehicles and Equipment Contact Project Name Van(Park and Recreation) Type Equipment Usefal Life Category Vehicles Priority Description New van to replace Unit#152(1999 Ford Windstar). This van is used to haul supplies and staffto playgrounds for various pazk and recreation programs. Justification Increased repair and maintenance expenditures on Unit#152,which will be thirteen years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 TOta1 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 25,000 25,000 Total 25,000 25,000 Pro,ject# V&E-044 Department Vehicles and Equipment Contact r�o;ect Name pickup Truck(Engineering) Type Equipment Useful Life Category Velucles Priority Descriptioa 1 New pickup truck for the Engineering Department to replace Unit#229(a 1999 Ford F-150 pickup). Justification Ilncreased repair and maintenance eacpenditures on Unit#229,which will be 13 years old. Egpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 25,000 25,000 Total 25,000 25,000 Page 29 Project# V&E-046 Department Vehicles and Equipment Coatact Pro,ject Name Fire Pumper(Fire) Type Equipment ----- —_— _-- ------- Useful Life Category Vehicles Priority Description � Replace Fire Pumper#338(1999 IntemationaUToyne). Justification Fire pumper truck is not dependable enough for an emergency response piece of equipment.Repair and maintenance on Unit#338 exceeds all other Fire pumper trucks in the fleet.Unit#338 will be 13 years old and would have been due for a refurbishment if it was dependable. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 500,000 500,000 Total so0,0o0 500,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 500,000 500,000 Tota1 soo,000 500,000 Pro,ject# V&E-047 Department Vehicles and Equipment Contact rro;ect rtame pickup Truck(Park) Type Equipment Usefal Life Category Vehicles Priority Description � 3/4 Ton Pickup iruck for the Pazk Departrnent to replace Unit#452(2000 Ford F-150). Justification Increased repa'v and maintenance�penditures on Unit#452,which will be thirteen years old. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Soueces 201Z 2013 2014 ZO15 2016 Total Equipment Replacement Fund 25,000 25,000 Total 25,000 25,000 Page 30 Project# V&E-048 Department Vehicles and Equipment Contact rro�ecc Name Rotary Mower(Park) Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description � 16'hydrostatic tractor rotary mower for the Park Department to replace Unit#460(2002 Toro Groundsmaster 580D). Justification Increased repair and maintenance expenditures on Unit#460,which will be eleven years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 90,000 90,000 Total 90,000 90,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 90,000 90,000 TOt81 90,000 90,000 Project# V&E-�$2 Department Vehicles and Equipment Contact Project Name A,ypbalt Cold Planer(Street) Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description Cold planer attachment for Bobcat T-190 skid streer loader for Street Departrnent to replace Unit#784(MT trackless implement). Justification Increased repair and maintenance expenditures on Unit#784,which will be seven years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 15,000 15,000 Total 75,000 15,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 15,000 15,000 TOtal 15,000 15,000 Page 31 Project# V&E-056 Department Vehicles and Equipment Contact Pro,ject Name plCkup TruCk(Park) Type Equipment --— ---- --- Useful Life Category Vehicles Priority Description One half ton pickup truck for the Pazk Department to replace Unit#455,a 2001 Ford F-150. JUSL'1�Cat10II Increased repair and maintenance expenditures on Unit#455,which will be ten years old Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 43,000 43,000 Tota1 43.U0o 43,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 43,000 43,000 Total a�,000 a�,aoo Project# V&E-057 Department Vehicles and Equipment Contact Pro,ject Name piCkup Tl'uCk(PaTk) Type Equipment Useful Life Category Vehicles Priority Description 3/4 ton pickup truck for the Park Department to replace Unit#456(2001 Ford F-150). Justification Increased repair and maintenance expenditures on Unit#456,which will be eleven years old. Egpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 40,000 40,000 Total 40,000 40,OOo Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 40,000 40,000 Total 40,000 40,000 Page 32 Project# V$tiE-�58 Department Vehicles and Equipment Contact Project Name Fil'e HOSB�F1Y8� Type Equipment Useful Life Category Ec{uipment:Miscellaneous Priority �escription -� 1-3/4",3",and 5"hose. ------- -- -- --- Justification -� Replace hose that failed during annual testing. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 13,000 13,000 Tot31 13,000 13,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 13,000 13,000 TOtal 13,000 73,000 Project# V$tiE-060 Department Vehicles and Equipment Contact r�o�e�t Name Rescue Vehicle(Fire) Type Equipment Useful Life Category Vehicles Priority Description New Rescue Vehicle to replace Unit 339,a 2001 Ford Excursion. __ Justification Increased repair and maintenance eupenditures on Unit 339,which will be ten years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 100,000 100,000 Total 100,000 100,000 Page 33 Project# V&E-064 Department Vehicles and Equipment Contact Project Name Sidewalk/Maintenance Tractor(Street) Type Equipment Useful Life Category Equipment:Heary Equip. Priority �Description —� Sidewalk maintenance tractor for the Street Depariment to replace Unit#753,a 2000 Trackless MT. Justification —� Increased repair and maintenance expenditures which will be twelve years old. -� Eapenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 154,000 154,000 Total 154,000 154,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 154,000 154,000 TOt31 154,000 154,000 Pro,ject# V&E-066 Department Vehicles and Equipment Contact r�o�ect Name Tandem Axle Dump Truck(Street) Type Equipment Useful Life Category Vehicles Priority �escription � Tandem aacle dump truck for the Street Deparpnent to replace unit#762(2000 Sterling L-750 dump truck). � Justification -- __ -— Increased repair and maintenance expenditures which will be twelve years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 260,000 260,000 Tota1 2so,000 2so,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 260,000 260,000 Total 2so,000 2so,aoo Page 34 Project# V$tiE-069 Department Vehicles and Equipment Contact Project Name Utility Tractor Mower Type Equipment ----------—- -------- Useful Life Category Equipment:Heavy Equip. Priority Description Utility Tractor Mower for the Pazk Department to replace Unit#463(2003 John Deere Tractor Mower). —� Justification Increased repair and maintenance expenditures on which will be eleven years old. —� Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 20,000 20,000 Tota1 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 20,000 20,000 Total 20,000 20,000 --- ----- - - Pro,ject# V&E-�7� Department Vehicles and Equipment Contact Project Name Single Axle Dump Truck Type Ec�uipment Useful Life Category Vehicles Priority Description � Single Axle dump truck for the Street Department to replace unit#761,a 2003 Sterling dump truck. Justification � Increased repair and maintenance expenditures on which will be twelve years old. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 205,000 205,000 Total 205,000 205,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Equipment Replacement Fund 205,000 205,000 TOtal 205,000 205,000 Page 35 Project# V&E-071 Department Vehicles and Equipment Contact Project Name piCkuP Ti'uCk(Pal'k� Type Equipment Useful Life Category Vehicles Priority Description 1 Three quarter ton pickup truck for the Pazk Department to replace Unit#466(2004 Ford F-250 pickup). Justification Ilncreased repair and maintenance expenditures on Unit 466,which will be ten years old. __ Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 45,000 45,000 TOta1 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 45,000 45,000 Tota1 a5,000 a�,000 Project# V$tiE-072 Department Vehicles and Equipment Contact rro�ecr Name pickup Truck(Engineering) Type Equipment ---- ----------------- Useful Life Category Vehicles Priority Description 1 One half ton pickup truck for tt►e Engineering Departrnent to replace Unit#231,a 2004 Ford F-150 pickup. —� Justification � �Increased repair and maintenance expenditures on Unit 231,which will be ten years old. ---- — — - — --- Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 TOt31 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 25,000 25,000 Tot31 25,000 25,000 Page 36 Project# V&�+-073 Department Vehicles and Equipment Contact Project Name Sidewalk/Maintenance Tractor Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description Sidewalk maintenance tractor for the Street Department to replace Unit#767,a 2003 Trackless MT. Justification Increased repair and maintenance expenditures on unit 767 which will be twelve years old. � Ezpenditures ZO12 2013 2014 2015 2016 Total EquipNehicles/Fumishings 158,000 158,000 TOtal 156,000 158,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 158,000 158,000 TOtal 158,000 158,000 Pro,ject# V&E-079 Department Vehicles and Equipment Contact Project Name Utility Tractor Type Eqnipment Useful Life Category Equipment:Heavy Equip. Priority Description � Utility tractor with broom and flail mower for the Park Department to replace Unit#459 (2001 John Deere Utility Tractor). �Justification Increased repair and maintenance expenditures on which will be 15 years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 72,000 72,000 Tota1 �z,aoo �2,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 72,000 72,000 Total 72,000 72,000 Page 37 Project# V&E-Ogl Department Vehicles and Equipment Coatact Pro,ject Name CSO Vehicle(Police) Type Equipment Uaeful Life Category Vehicles Priority Description Vehicle for the Police Department Commiu►ity Service Officers,to replace Unit 896,a 2006 Ford Expedition. Justification Increased repair and maintenance expenditures on Unit 896,which will be seven years old. 1'his vehicle is used to pick up stray and dead animals � Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 35,000 35,OU0 TOtal 35A00 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 35,000 35,000 Total 35,000 35,000 Pro,ject# V&E-082 Department Vehicles and Equipment Contact rro�ect Name Fire Pumper(Fire) Type Equipment Useful Life Category Equipment:Heavy Equip. Priority Description New fire pumper to replace Unit 331,a 1990 Peterbilt. Justification Increased repair and maintenance on Unit 331,which will be twenty two years old. Comply with NFPA standazds. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 575,000 575,000 Total 575,000 575,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 575,000 575,000 TOt41 575,000 575,000 Page 38 Pro,ject# VBtE-084 Department Vehicles and Equipment Contact Project Name Self-Contained Breathing Apparatus(Fire) Type Equipment Usefal Life Category Equipment:Miscellaneous Priority Description 1 Replace(40)self-contained breathing apparatus(S.C.B.A) Justification Cuaent Self-Contained Breathing Apparatus was purchased in 2003. New S.C.B.A will meet NFPA standard. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 300,000 300,000 TOtal 300,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 300,000 300,000 Total 300,000 300,000 Pro,ject# VBLF.-�8$ Department Vehicles and Equipment Contact Project Name Utility Vehicle(Fire) Type Equipment Useful Life Category Vehicles Priority Description l New vehicle to replace Unit 343,a 2004 Ford Expedition. _ Justification � �creased repair and maintenance. — - --- — - - � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 45,000 45,000 Total 45,000 45,oU0 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 45,000 45,000 TOtal 45,000 45,000 Page 39 Project# VBiE-�87 Department Vehicles and Equipment Contact Project Name piCkup Tl'uCk(Fi1'e) Type Equipment ----____ Useful Life Category Vehicles Priority Description New pickup truck to replace Unit 348(2005 Ford F-150). � Justification � Ilncreased repair and maintenance on Unit#348,which will be 10 years old. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 40,000 40,000 Tota1 40,000 40,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 40,000 40,000 Z'p� 40,000 40,000 Project# VBLE-�8g Department Vehicles and Equipment Contact Project Name Single Aale Dump Truck(Street) Type Equipment — --- - -- Useful Life Category Equipment:Heavy Equip. Priority Description 1 Single axle dump truck for street depaztment to replace unit#755(2001 Steding L-750 Dump Truck). Justification Increased repair and maintenance expenditures on Unit 755,which will be twelve years old. This expenditure was$205,000 in the 2011-2015 CII'. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 235,000 235,000 Total 235,000 235,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 235,000 235,000 Total 235,000 235,000 Page 40 Project# V$ti�+-089 Department Vehicles and Equipment Contact Project Name Sidewalk/Maintenance Tractor Type Equipment Useful Life Category Equipment:Miscellaneous Priority Descriptioa —� Sidewalk/maintenance tractor for the street department to replace unit#763(2002 Trackless MT). 1 Justification IIncreased repa�r and maintenance expenditures on Unit 763,which will be twelve years old. I�__ _ Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 158,000 158,000 Tot31 758,000 158,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 158,000 158,000 TOta1 158,000 158,000 Project# V&�+-09� Department Vehicles and Equipment Contact Pro,ject Name Single Axle Dump Truck(Street) Type Equipment — - -- Usefal Life Category Equipment:Heavy Equip. Priority Description Single aacle dump truck for street department to replace unit#755(2003 Sterling L-750 Dump Truck). �Justification � Increased repair and maintenance expenditures on Unit 755,which will be eleven years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 205,000 205,000 Totfl1 205,000 205,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 205,000 205,000 Tot21 205,000 205,000 Page 41 Project# V&E-091 Department Vehicles and Equipment Contact Project Name plCkup Ti'uCk(Park) Type Equipment Useful Life Category Equipment:Misceltaneous Priority �Description � One 3/4 ton pickup for the Pazk Department to replace unit#470(2005 Ford F-250 4X2 pickup). 711St1fiC811011 � IIncreased repair and maintenance expenditures on unit 470 which that will be ten years old. � Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 43,000 43,000 Tota1 43,000 43,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 43,000 43,000 'rp�j 43,000 43,Q00 Project# VBiE-092 Department Vehicles and Equipment Contact r�o�ecc Name Marked Squad Digital Recording System(Police) Type Equipment Useful Life Category Equipment:Miscellaneous Priority Description -I Install digital video recording equipment in ten mazked police patrol vehicles and associated communications and computer infrastructure to support storage and maintenance of recordings. _ ___ Justification �--_ Video recording in a police car is invaluable for any officer-citizen contact,citizen transport in police car,and probable cause related questions. Typical benefits are increased conviction rates,less time in court proceedings and reduced litigation,increased officer awareness of the'v conduct,training situations and reinforcemen� and overall easier understanding of any(recorded)situation. Many officer-citizen contacts are one-on-one situations,resulting in factual disputes when citizens challenge officer conduct. In car video would have proven invaluable in evaluating the facts in several recent citizen encounters. In car video recording capability is fastly becoming standard equipment in most squad cars. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 80,000 80,000 Total so,000 80,000 Page 42 Project# V&E-095 Deparlment Vehicles and Equipment Coatact Project Name Unmarked Police Vehicle(Police) Type Equipment ----------- ----- -- Usefal Life Category Vehicles Priority Description New unmarked potice vehicle to replace Unit 888(2004 Ford Crown Victoria). Justification Increased repair and maintenance expenditures on Unit 888,which will be eight years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Tot81 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 Tot31 30,000 30,000 Project# V&E-1�1 Department Vehicles and Equipment Contact Project Name Unmarked Police Vehicle(Police) Type Equipment Usefal Life Category Vehicles Priority Description New unmarked police vehicle to replace Unit 893(2005 Ford Crown Victoria) � Justification Increased repair and maintenance expenditures on Unit 893,which will be eight yeats old. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Total 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 Total 30,000 30,000 Page 43 Project# V&E-102 Department Vehicles and Equipment Contact Project Name plCkup TTUCk(Fire) Type Equipment ---—-- --- ------ -- Useful Life Category Vehicles Priority Description —� Four door pickup truck with storage box for equipment. Justification Vehicle to transport fir�ghters to emergency calls and training.Current(y they are taking a fire engine out of service to these calls. Eapenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 40,000 40,000 Totsl ao,aoo ao,aoo Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 40,000 40,000 Total 40,000 40,000 Pro,ject# V&E-104 Department Vehicles and Equipment Contact Pro,ject Name Speed Trailer(Police) Type Equipment Useful Life Category Unassigned Priority �escription � The speed trailer was purchased sometime in the eady 1990's and is unit#872. _ _ _ Justification —- -- ---- -- -� 1'he trailer has aged and needs to be replaced. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 18,000 18,000 Total 18,000 18,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 9,000 9,000 Storm Sewer Utility Fund(730 9,000 9,000 Total 18,000 18,000 Page 44 Project# V&E-106 Department Vehicles and Equipment Contact rro�e�t rtame polaris 6 X 6(Fire) Type Equipment Useful Life Category Equipment:Miscellaneous Priority Description One new 6X6 off road rescue vehicle to replace unit#341. Justification This unit is utilized for off road rescue operations and fire fighting.This unit was donated in 2004 from Poloris. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 15,000 15,000 Total 15,000 15,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Equipment Replacement Fund 15,000 15,040 Total 15,000 15,000 Project# V&E-107 Department Vehicles and Equipment Contact Project Name Bobcat Utility Truckster(Park) Type Equipment -- ----- ---_ --- Useful Life Category Vehicles Priority Description 1 New utility truckster to replace unit#469(2005 Bobcat). Justification Increased repair and maintenance expenditures on Unit#469,which will be nine years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 45,000 45,000 Total 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 45,000 45,000 Total 45,000 45,000 Page 45 � Department Vehicles and Equipment Project# V&E-108 Contact Project Name Unmarked Police Vehicle(Police) Type Equipment Useful Life Categary Vehicles Priority Description New unmarked police vehicle to replace Unit 899(2007 Ford Crown Victoria) Justificarion � Increased repair and maintenance expenditures on Unit 899,which will be seven years old. Eapenditures ZO12 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Tot31 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 TOtal 30,000 30,000 Project# V&E-111 Department Vehicles and Equipment Contact Project Name Dump Truck(Street) Type Equipment --------- - - - - — - Useful Life Category Vehicles Priority Description New Ford 550 dump truck with swaploadet hook system for the Street Departrnent to replace Unit#769(2004 Ford F550). Justification -- —-- ----- - --� Increased repair and maintenance expenditures on Unit#769,which will be twelve years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Equipment Replacement Fund 80,000 80,000 Tota1 ao,000 so,000 Page 46 Pro,ject# V&E-115 Department Vehicles and Equipment Contact rro�ect rtame portable Traffic Programmable Message Sign Type Unassigned Useful Life Category Unassigned Priority Description Programmable message sign for traffic control,maintenance work and events for the Street Division. Justification � In house programmable message sign for street maintenance activities and city events. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 25,000 25,000 Total 25,000 25,000 -- ---- — --— Pro,ject# V&E-117 Department Vehicles and Equipment Contact Pro,ject Name Bobcat Toolcat(Park) TyPe Ec{uipment Useful Life Category Equipment:Miscellaneous Priority Description � Replace Sand Pro Field Drag for the Pazk Division Unit#467(2004 Toro Sand Pro).with a Bobcat Toolcat for versitility of various projects for the depamnent.� 7ustification Increased repair and maintenance on Unit#467 which will be nine years old. This exendihue was$15,000 in the 2011-2015 CIP. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicleslFumishings 45,000 45,000 Tota1 a�,000 a�,0oo Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 45,000 45,000 Total 45,000 45,000 Page 47 Pro,ject# V&E-118 Departmeot Vehicles and Equipment Contact Project Name Snow Blower(Street) Type Unassigned Useful Life Category Unassigned Priority Description � Snow Blower for the Street Division to replace Unit#712(1989 Root Snow Blower)which hooks up to the large Cat loaders for clearing snow from the right-of-way. Ju.stification Increased repair,maintenance and parts availability on Unit#712,which will be 24 years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 145,000 145,000 Total 145,000 145,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 145,000 145,000 TOta1 145,000 145,000 Pro,ject# V&E-121 Department Vehicles and Equipment Contact Project Name Ta3e1'3 Type Equipment Useful Life Category Equipment:Miscellaneous Priority Description —� 30 Tasers were purchased in 2005.These tasers have no warranty peiod left on them for repairs.This amount would allow the Police Depariment to purchase 19 new units. �ustification ---- -- —-- Maintenance on each taa�er mns azound$800 per time after the wairat►ty exp'ves.This will allow new units to be purchased and less maintenance costs due to the warranty period.The police department believes that the use of the Taser both through deployment and threatened deployment continues to rednce the incidence of injuries to both officers and suspects. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 17,000 17,000 Total 17,000 17,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 17,000 17,OD0 Total 17,000 17,000 Page 48 Project# V$tiE-122 Department Vehicles and Equipment Contact rro;ect Name police Vehicle(Police) Type Fquipment Useful Life Category Vehicles Priority �escription -� New police vehicle to replace Unit 804(2010 Dodge Caravan). 7i13t1f1C1110II Increased repair and maintenance expenditures on Unit 804,which will be eight years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 TOtal 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Replacement Fund 30,000 30,000 Total 30,000 3D,000 Page 49 city of olden g va e Capital Improvement Program 2012-2016 Building Improvement Section The City owns and or/maintains the following facilities for the purpose of carrying out its mission of providing needed services to the community and bringing people together by fostering inviting public spaces where people work and play, encounter their fellow citizens and discover common interests. This has incorporated the Wold Architects and Engineers city-wide comprehensive facility assessment building analysis that was completed late 2006. Golden Valley Buildings Total S uare Feet Ci Hall 26,350 Public Safe Police and Fire Station #1 28,000 Streets and Park Maintenance 29,100 Utilities Maintenance 12,950 Vehicles Maintenance 12,500 Warehouse &Animal Im ound 11,490 Golf Maintenance 12,050 Fire Station No. 2 5,785 Fire Station No. 3 6,030 Communi Center/Golf O erations 17,900 A transfer from the General Fund is the main source of revenue. 50 City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total �uildings CableEquipmentReplacement 8-009 Na 22,000 22,000 22,000 22,000 22,000 110,000 Carpet Replacement City Buildings 8-011 n/a 80,000 50,000 160,000 Generators B-012 nla 85,000 85,000 General Buildir�g Repairs and Maintenance 8-025 n/a 210,000 250,000 250,000 250,000 960,000 Replace City Hall Campus Parking Lot B-026 nla 395,000 315,000 Communit�r Cer�er Facility Needs Assessment B-031 nla 100,000 100,000 Vehicle Maintenance Hoist Installation 8-035 Na 120,000 120,000 Fire Departrnent Washer 8 Dryer &037 Na 13,000 13,000 Buildings Total 365,000 337,000 457,000 352,000 352,000 1,863,000 Budldin�Fund(5200) 365,000 337,000 457,000 352,000 352,000 1,863,Q00 Buiddtngs Total as�,000 �i,000 a�i,000 �Z,000 ��,aoo �,sa,000 Giand TOta1 365,000 337,000 457,000 352,000 352,000 1,863,000 Page 51 Project# B-U�9 Department Buildings Contact Project Name Cable Equipment Replacement Type Improvement - _ -._- ----- Useful Life Category Buildings Priority Description _ Replace aging equipment in cable TV control room with updated equipment employing digital technology. Purchases for the cable equipment is funded from franchise fees on cable usage.If not needed,the remaining monies will be designated for future equipment when needed. Justification � As equipment ages,the use for compatible software and hardwaze changes over time which requires new equipment. Ezpenditures 2012 2013 2014 2015 2016 Total Equip/Vehicles/Fumishings 22,000 22,000 22,000 22,000 22,000 110,000 Total 22,000 22,000 22,000 ?2,000 22,000 110,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Building Fund(5200) 22,000 22,000 22,000 22,000 22,000 110,000 Total 72,OD0 22,000 22,000 22,000 22,000 110,000 Pro,ject# B-Ol l Department Buildings Contact Pro,ject Name Carpet Replacement: City Buildings Type Improvement Useful Life Category Buildings Priority Descriprion � On-going progam to replace worn out carpet in City buildings. Decision as to which carpet to replace in a given year will be based on an annual inspection of the condition of the carpets in the various buildings. -2015 General Services/Finance/Motor Vehiclel Manager's Office-Individual offices only(has been delayed since 2006);City Hall Lunch Room/Council Conference/Council Chambers/Hallway -2016 City Hall Lower Level Plan Review Room/Lower Level East Wing Office,Golf Maintenance Offices,Public Safety Detective Offices/Public Safety Lower Level will include chairs,drapes and carpet in the City Ha11 Conference Raom 1 Justification -� -- --- - Carpet wears out over time,and an on-going program to replace it is a better altemative than a lazge expenditure in a given yeaz when a number of carpets have to be replaced. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 80,000 80,000 160,000 Total 80,000 80,000 160,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 80,000 80,000 160,000 Total 80,000 80,000 160,000 Page 52 Project# 8-012 Department Buildings Contact Project Name GeneratOps Type Improvement Usefnl Life Category Buildings Priority Description Install generated power to the Brookview Community Center,Park&Recreation and Golf Operations Building. Ji1Sh�CRt1oII Brookview Community Center,Park&Recreation and the Golf Operations Building currently do not have back-up power.The Community Center is identified as a location for emergency housing if necessary. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 85,000 85,000 Total 85,000 85,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 85,000 85,000 Total 85,000 85,000 Pro,ject# 8-025 Department Buildings Contact rro�ecc Name General Building Repairs and Maintenance Type Improvement -----_- -- - ---- Useful Life Category Buildings Priority Descnphon As exterior work is completed,this funding source will address life safety and functionality issues in the interior of city buildings. _� JUSt1f1CS11011 Repairs will primarilty include roof and siding replacements and other building envelope projects to maintain the integrity of the buildings.Interior improvements include construction of an office for the Assistant City Forester in the Pazks Maintenance building and providing computer work stations that aze ergonomically acceptable for staff in the Public Works maintenance departments.In addition,staff will continue to implement the security system projects as identified in the analysis completed in 2011. Building and Pazk Shelter Roof&Siding Repairs $125,000 Secuity System Implementation $65,000 Five work stations $20,000 Expenditures 2012 2013 2014 2015 2016 Total Other 210,000 250,000 250,000 250,000 960,000 Total 210,000 250,000 250,000 250,000 960,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 210,000 250,000 250,000 250,000 960,000 Tot81 210,000 250,000 250,000 250,000 9fi0,000 Page 53 Pro,�ect# 8-026 Department Buildings Contact rro�ect Name Replace City Hall Campus Parking Lot Type Lnprovement Useful Life Category Buildings Priority Description —� A mill and overlay is needed at the City Hall Campus Parking Lot. Justification —� This will maintain and preserve the existing parking lot pavements. Ezpenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 315,000 315,000 TOtal 315,000 315,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 315,000 315,000 TOt81 315,000 315,000 Project# B-O31 Department Buildings Contact Project Name Communi Center Facili Needs Assessment T �' ty ype Improvement Useful Life Category Buildings Priority Description _] Currently Brookview houses the City's Park&Recreation Deparlment offices and its Senior Center,conference and community/banquet rooms,a catering kitchen, and a deck and patio for outd�r events.It also houses tt►e Brookview Golf Course operations offices,grill,locker rooms,and pro shop.In 2014,the original portion will be 95 yeazs old. Justification —� 7'he current needs of the building need to be evaluated before plans are drawn for possible construction of a new building.l'his amount involves hiring a consultant to work with possible groups on the space needs of the building. Expenditures 2012 2013 2014 2015 2016 Total Planning/Design 100,000 100,000 TOtal 100,000 100,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 100,000 100,000 Total 900,000 100,000 Page 54 Project# 8-�35 Department Buildings Contact Project Name Vehicle Maintenance Hoist Installation Type Improvement -- ------- ---- ----- — Useful Life Category Buildings Priority Description 1 Staff completed the wall removal project in order to install a new vehicle hoist for larger equipment to be serviced in-house. fU3t1f1C8110II The new hoist system is needed to efficienUy and safely maintain all of Golden Valley's fleet vehicles.The exisitng aged hoist system dces not properly accommodate the larger eyuipment such as fue trvcks and larger Public Works vehicles that the City operates. Installation of the hoist will take place in 2012 ($120,000). Egpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 120,000 120,000 TOt81 120,000 120,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund(5200) 120,000 120,OU0 Total 120,000 120,000 Project# 8-037 Department Buildings Contact Project Name Fire Department Washer&Dryer Type uaassignea Useful Life Category Unassigned Priority Description Washer and dryer for cleaning protective clothing. Justification Current equipment is appro�cimately 20 years old and is requiring increased maintenance.OSHA standazds requ've cleaning protective equipment a minimum of twice a yeaz. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 13,000 13,000 Tot81 13,000 13,000 Funding Sources 2012 2013 2014 2015 2016 Total Bpilding Fund(5200) 13,000 13,000 'rp� 13,000 13,000 Page SS city of olden va e Capital Improvement Program 2012-2016 Park Improvement Section The City Council reviews the submissions from the Open Space and Recreation Commission, Park & Recreation, and Public Works staff for the development and improvement of the City's park system. The commission consists of nine members that are appointed by the City Council and serve as an advisory board to the City Council. In 2006, as part of the City's parks planning initiative on park facilities, the City Council focused this year on developing a vision for Golden Valley parks and recreation facilities. The City solicited citizen input via information meetings in parks, a survey of youth athletic association leaders and a citizen survey was created with the help of the Open Space and Recreation Commission. All information will be gathered to help plan the future of the park improvements for the next five years. The City will also use the results from the building survey and ADA consultant. 56 Golden Valley Parks Activity Areas rn c fp C N ; p� 'O � .L' � � 'O O � V 7 � �o �- E d U �O v r w Y c m :; � O' O d Nl � � � O 'Y C � C d +. _ r � y a, � R .� LL LL V � � 2 J '+�7 � N f0 M N N N LLJ 3 d 07 � � y N Y C O Hl L V � d � � � Parks/FaCil' � � t0 ° �0 f0 � � �o o m a�i o �°— � '� a�i � � o c� x a � m m m �n F- c� x v� c� c� � a m Brookview Park 33 L 1 2/4L 2 Brookview Golf Course 944 Gea Park 4.7 L 1 1 L L L Glenview Terrace Park 5 2L Golden Oaks Park 2 L 1 Ham shire Park 14 L L 2 L L Hone ell Little Lea ue Fieid 11 1 L/2 Lakeview Park 5 L L 1 L Lions Park 19 L L 4 1/1F 2 L L Medle Park 13 L L 2 3L L L Pe ich Center for Arts Field 1.5 7 Natchez Park 6 L L 1 North T rol Park 9.4 1 Sandbur Ballfields 20 2 3 St Croix Park 1.4 Scha er Park 11 2L Scheid Park 9.8 L 1 1 1F 2L L L Seeman Park 4.6 L 1 2 South T rol Park 3.6 L 1 L Stockman Park 1.5 L 1 Sweene Lake Park 0.5 Wesle Park 20 L L 3 1l1F 3L L L Wildwood Park 4.2 2 2 Wirth Park M Is Park Board 517 2 Yosemite Park 1.4 L 1 L Nature Areas Adeline Nature Area 1.2 Bassett Creek Nature Area 7.6 Briarwood Bird Sanctua 99 General Mills Nature Preserve 27 General Mills Research Nature 57 Golden Rid e Nature Area 1.6 Laurel Avenue Greenbelt 33 Ma Hills Nature Area 14 Penns Ivania Woods 23 Rice Lake Nature Area 9 Tree Farm 1.5 Westem Avenue Marsh 22 F=Fall Use L=Lighted *Recreation building restrooms are open seasonally during program hours 57 � o w 0 0 N � i �1 r .. � � '- ' . � 7 r'3XU� � � u3/� J>�fdC '�_�J ��...:,i,"N?: "' :C �,\ �1 _ � ...i�, ��� } j �� , �4 J[�I711AVfN t b. /r j 1 , � .. O � ,. �� + �i�%/ ��...+�/�) ' \ N� °1 ;Gf � V � O � �'\,?� � i''' ,I, , � � � I � , ae I � "°"'� � O •.,�P`o � �i Y v` �w \ ' .. �Q�� 4�' .. � � � `�\� ..,.. . � �• O +�.. . 4 ',. .. , , _ . O .� � ri. `�!` ._',., , ... �.. _. ... .. :.t*.pf �_.........� �. ,.... ` f+Q-�,7/NAMI�� ,�,f `J��Ib P'.��Ow � 1 � AV3�� d �� 1� 31 M31�NW 1tl��/.V3 11�'1 N �� a � Hl `3 : NNYRIOGE W i� p(� f � h I ) d ,�0\'S � ,s.. , �"�J, 5 � f \ ^'` I 11 Jl MO V31^F�8 }i ¢( 1�Nl �Op4.ry l" / yy . J"'�} IJ3AYtl `O �\ � � 0.�UIi 1 [d� " f f � r y_• . ,��':.SSVd3..../ ' `....,t .. . ...� ,�. � UIJ3�31 ,� ��� I p��{LBB �I� [ t ? � n ;ra � �iio��t v waiv . . � ity"v�iinr ,,.�_ �{�`� � ! . aa3yow v� `� � ��• �3/V3Nf1. i "''�i t N 3AV uN f `�y }I�av,� ", �� � � j�7`' �ruivrrvr� � ` t " � �3AV33� ii wi� ., / dAa"�e°Ni ,'� � ' ��r�,�. ` �c � ` �- � lSaa'�oo���I�, � ' � I ��� � � .. -� (f 'rl' � a N3AtltlolVlY��� W� �� ,�t_ ? t'' �.--! t , �;•:,w \�,� aa`ao�siiu�iiie� Ej` �,. " m .:�. W�'� • � S i �h13�tl3190N � �1 ; Q� �a� � B� ��:' �...^ L�.. f \' ���"X 1 �f 53AV23Fq1YN a I ORG iARQ:WE N ' 1� , 1 ; :�. Z� j �� �'��� � � k� ,i.�T� �°�{�aa�j;�o,�a r � , y�'HA��i'�jyuo � ��r J ��.�„�,r � .�.`� �� f Z ._ �� s}�nvvMVUO g� i.: ` � `o;.--^S• z�..�t �w � n3nvnaaadW ! �{��anvaaaa.� (N�rvv ` �F ``� � � a f�� .�e4�h� P � ""`''�,�r,�n � _� °- �,•. � . -� o..��i�anri��na`���l .;3' �� Nanviivrw i\^'aosorod� � �5 � . ' _ � � � � : �� °� � ..�.� !- z �o[" '�_ ;� vtna:,�u J.,.'.,. � � naioi3oHd� ..r.. �C' v , # „n � �O � � i...` �� ' �''�`J i �x' �- "� � � ; . ;�. �� � � '�._. j 1 ' � h' of °t� f��7l � � �a Q �� �/ � ✓� ��N3AV003�01 -I�� � �[5! � ' ..� f 3 P ��,UNITYAVEN� �'1' � . � . � �- Q I y""�l.—�F,' u ��`. N �Vll OS yy��,�yp G� 1 1 '� � � ��� D \ �W N 3AVA1Mf1 � �'�b�tn 1 f II�Y�I�' - �c� , (t � J � ]I""<< .. ..F . _ . . . .._ ((' � � K �. � . i�,iq:�v7�. . . � .� w`i . : c°;nOl7vM1IM�il7* d �-0G�j4Jlotli,� G� Nu :wut � ~�1Jdxs�N •.?1�'r ' sa �stf3 � a i�tl W�N3/�Y0731jNIM p1 � � �� . { � '� � �� N � � �' �'� �r.en �vei1 pj �il z i �� ,., .an!,u.�n� . �� �� = b; "'�� �� � �' >( ° r�G3 � � '' ,�'• �i 1. � , �,r �� �. = � ri anJ a�oiaHOOa • �y�' �.. � �` 'V �s` Q ;ri3i�� i 2_.l��aov cw ��' anr�vz = pp.� , �� ' l� � � � (... . N3Atl IFOVI .'� Z ��y �-.,�. � �- �� � � `_ �' r ' . " N � ,�� � _,�� ,� � V !N 3AY N�IMSN B � � p�StE�W p ? ��rq,� 3 � � �.tdoa�irvi � ` �� J �) !: �( �:;�: � � a Q�j � �;;....7 .. � -dt,�. . ` .I ',-,�" uu' -1� ,�i 4 if �. q $'� � O m -� $ ' I r I � I , Cl i Nanvaowaa�i; �i �II,. .� ��°m p (:h"� i s i+�n'v�aiaq}� M � , � � � Z cQ ., >r_�j � �i Q�\, �i,. z r�fandrroev�� � ' � � �,� N�¢ V( �y'f J� � . �f N3Atl3kXH5��; 5 .v3tlC18� p� . � �� � � IL_ I �� d} N3nvotro � ��' •�aiaoinuk '�"� t � a�%` � � � � ( � ��n.��v��ee : ,�y,t�.��y-�� � � �, I � � C� N� �� � p��:. y'�� + ._-�--/ f � 3� d� I •� .IN3AtlA3Stf31'(S3AVA3 '7�� lu., . ( � ¢ � I � �� N AtlVNVISI��iI �. 1...�:� �. ' � O . 8�tlAN�fllN 1 �� 1�-r�l t / � I. ����� f(Ap � ICrI___N ii'. � xIt ��gnvnmswwi 1J � 'ri3r rowrl:iiini� � � �If � � � � � � �"N�`YaNtlUWW i \ , �ElE�9� �I .. �._ �� �' �� � . ��� � I N 3nvVOVnSH � !�. p � f.. --1. � tlO:ATL7N z) C � �I�� 1 Sr9/�Vtl0VA3t� ' . � �iOAll3:1 � ' � � � � y 3 0���` }�� ,�t.-�.°� �,T'*. . .���f �� � 3 • 3 �� � ���, `�; � L V' m `m N rND'O �a bNV 3 i � � gm� a� � C Hanrri m,� rr�e;� 'S ' � o g �� /4� � ��a �� ��� f� ;[ � �IJ3�X�3B�o� Ht �� �,. ' � (.id' p f . fy� Fyy $m� a;�� � 3ndoririsi 3o0�� �1 �� N 3nvdtid�si 3�QHa I r r s v"'° I��1. ° �^aNn' [, � ' ' o S SI3ar�1 .. � m � .. ,z �' la YH311'HI6f �� ''�'I� .�_.^�t. � �' �'r,, , dmcicuJu:c�=_-i !..� a . a . . �. �_. , ti , _ ,.. rI �: �3`nv�airvne` /�C . �3 W3AYtlA13FINIHi.. � .� '. .. I . . T "-� ! i�./ � ( �'.�I s3 H �/��. ! C . �Y�i�wM ,� � !�) j � `�e'3qrsuaoivn t � 1. "'b �� 11� s`a � �I{W631B �$ � �i � JVK�DR � � $f `� � 1 /�� �nl" � � AYHy� %��/ ,�a' � $ zraaviHao i �f �', �� .z��/'i � vI � . // � � I �I 1�,. i � l', ' D • �.naAaiNrH 'i V/ g .�6 i�ao Hao �. �� { ` <� / . i .. J 1�1 J i3 �1 � ��' . . . IYr{ � �ro ay Nan`vr�UX'� g ; ���'��;� —f�"�� ` ��n�vi�s��siM� r'� �> ,y d�i i .noye `%' i.�' S � ' ' r '� :- �, .f ` �� �f `. 6 � � , 1 � �,� �� ��� �• �'a"r°n}nv�• i ��� � I� ��a`wE�� � �� � �S �� � `� �:,� 1 , . �� � ��� � � : .� .._.�_. .� �—": : � , � t � � �.� �� _ _ I . NN�NN3�i?�mm �t 1 Z N3ANY1f10V N3hY3N009 j` NN3AY3NOOB.. . _._.. . A ; . t���b aD��a� N t� N3Atlpl3AWJ I t� /ti . � � �� �it0A18511q �� �. �. /u[ �c� ��N � � o i!, � �, h�l (� �. n3nr�nir�a� �! L� � � r7�nvUniGdaa' a'i, > /r �(�, w, I. � � �� �,�-�A�� �i '� . { I �� �t t'3.. y�rr !'C �` C_:� S�. I � a �a ����� �i ���ir) �Ff. .� �� "N�row � � ��1 t� �E�,,i . 1 °,.t �:::v '--�) p'�� �-- 9 .a � _ i � i , . '��;.c O�' { � � ��� ���Z�y� �;. �` � ��: . ��-_ �� ; a �. .. �► � ;�.���L � � , d .�� �:> � � �� ���� � � ' �� :, . � .�civivu�or�mo.�F � ` . � � �: 11GI��A�'/:.11J111 N3r�YMi�t:9'ift(llf�tl II.OJI IYI�NI'1q1 � ' C J/�'•,yh V. 54^�!.V�A�1:�IF1 � ' 1 'Fr £ � a� d Z°i City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 thn, 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Parks - ----` Resurface Courts and Hard Surface Areas P-001 n/a 24,000 24,000 25,000 25,000 25,000 123,000 Asphalt Ovedays:Parks,Walkways,Courts,Lots P-002 n/a 30,000 30,000 30,000 30,000 30,000 150,000 Nsw Playground Equipment&Area Curbing P-003 n/a 225,000 100,000 100,000 100,000 100,000 625,000 Special Assessments:City Parks P-004 n/a 87,400 94,200 76,145 86,210 88,450 432,405 Park Shelter Building Improvements P-005 nla 25,000 25,000 25,000 25,000 25,000 125,000 Chain Link Fence RepaidReplace P-007 nla 15,000 15,000 20,000 20,000 20,000 90,000 Parks Total 406,400 288,200 276,745 286,270 288,450 1,545,405 Park Improvement Fund(5600) 406,400 288,200 276,145 286,210 288,450 1,545,405 Parks Totad 406,400 286,2Q0 276,145 286,210 288,450 1,545,405 Grand Total 406,400 288,200 276,145 286,210 288,459 7,545,405 Page 59 Project# P-001 Department Pazks Contact rro�ect Name Resurface Courts and Hard Surface Areas Type Lnprovement Useful Life Category Park Improvements Priority Description � Resurfacing of City's 23 tennis courts and 17 hard surFace areas in City parks on an"as-needed"basis. Justification -� To maintain quality,safety,and usability of City parks. � Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 24,000 24,000 25,000 25,000 25,000 123,000 TotSl 24,000 24,000 25,000 25,000 25,000 123,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Improvement Fund(5600 24,000 24,000 25,000 25,000 25,000 123,000 Total 24,000 24,000 25,000 25,000 25,000 123,000 ---_ -- --- ---- Project# P-OO2 Department Parks Contact ProjectName �phalt Overlays:Parks,Walkways,Courts,Lots Ty� Improvement - ------__ __ -- -- . . Useful Life Category Pazk Improvements Priority Descriprion 1 Asphalt overlay or reconstruction of tennis courts,hazd surface areas and pazking lots on an"as-needed"basis in the City's pazks. Also includes the rehabilitation of trails in certain parks and open space areas. -____- _ _--- ---- -- �Justificatioa � Maintain quality,safety and usability of City parks for a lifetime active sport. Unpaved Vails are deteriorating,with certain segments subject to serious erosion. Also,certain walking trails are being used year round and paved trails are easier to clear of snow. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 30,000 30,000 30,000 30,000 30,000 150,000 TOtal 30,000 30,000 30,000 30,000 30,000 150,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Park Improvement Fund(5600 30,000 30,000 30,000 30,000 30,000 150,000 Total 30,000 30,000 30,000 30,000 30,000 150,000 Page 60 Project# P-003 - ------ - ---- - Department Pazks Contact r�o�ect Name New Playground Equipment&Area Curbing Type Improvement Useful Life Category Pazk Equipment Priority Description New playground equipment and area curbing on an"as-needed"basis in the City's parks. Justification Old playground equipment is wearing out and will eventually become unsafe. The City is required to meet Consumer Product Safety Commission(CPSC) quidelines,as well as the requirements of the Americans With Disabilities Act(ADA).In 2012,Brookview Pazk playground equipment will be replaced.Brookview Pazk has two shelters that are rented and have many events throughout the summer.This park is Golden Valley's premier park. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 225,000 100,000 100,000 100,000 100,000 625,000 Total 225,000 100,000 100,000 100,000 100,000 625,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Park Improvement Fund(5600 225,000 100,000 100,000 100,000 100,000 625,000 Total 2'15,000 100,000 100,000 100,000 100,000 625,000 --- ---- Pro,ject# P-U04 ---- Department Pazks Contact Project Name Special Assessments: City Parks TyPe Lnprovement Useful Life Category Pazk Improvements Priority �Description � Payment of special assessment installations,levied annually to finance improvements to City streets adjacent to the various City pazks. Each special assessment has a term of ten years. In 2003,Brookview Pazkway,which is adjacent to Brookview Park,was reconstructed,with the first installment of the special assessment was paid in 2004. Justification Special assessments are levied against properry benefiting from the street improvements,including City park property. -- --- -- ---------- -__ _ --� Expenditures 2012 2013 2014 2015 2016 Total Other 87,400 94,200 76,145 86,210 88,450 432,405 Tot31 87,400 94,200 76,145 86,210 88,450 432,405 Funding Sources 2012 2013 2014 2015 2016 Total Park Improvement Fund(5600 87,400 94,200 76,145 86,210 88,450 432,405 Total 87,400 94,200 76,745 86,270 88,450 432,405 Page 61 Pro,ject# P-005 Department Parks Contact rro;ect Name park Shelter Building Improvements � Type Lnprovement Useful Life Category Pazk Improvements Priority Descriprion This on-going program includes various repairs needed,including repairs to interior door frames,sky light replacement and/or repair,e3rterior wood replacement and/or repair and time clock upgrades for lighting systems. Justification Repairs need to be made to keep cucrent buildings usable and accessible.In 2011,the City completed a building condition analysis of all park shelters for future planning of improvements. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 25,000 25,000 25,000 25,000 25,000 125,000 Tot81 25,000 25,000 25,000 25,000 25,000 125,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Improvement Fund(5600 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Project# P-OO7 Department Parks Contact Project Name Chain Link Fence Repair/Replace Type Improvement - ---- ---------- --. Useful Life Category Park Lnprovements Priority Description Repair and Replacement of chain-link fencing at various softball fields,baseball fields and tennis courts. � Justification � To maintain safety and functionability of fencing in City parks. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 15,000 15,000 20,000 20,000 20,000 90,000 Total 15,000 15,000 20,000 Z0,000 20,000 90,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Improvement Fund(5600 15,000 15,000 20,000 20,000 Z0,000 90,000 Total 15,000 75,000 20,000 20,000 20,000 90,000 Page 62 city of olden va e Capital Improvement Program 2012-2016 Brookview Golf Course Section Brookview Golf Course is owned and operated by the City of Golden Valley under the auspices of the Park and Recreation Department. The Brookview golf facility consists of an 18 —Hole Regulation Course and a 9-Hole Par 3, a Driving Range and teaching area, and a Golf Shop and Grill. Brookview's Regulation Course is a challenging, mature course with some tree-lined fairways, 28 moderate bunkers, fairly small greens, and an abundance of water hazards. A maintenance building at 100 Brookview Parkway and Clubhouse are rented from the City. Green fees are the main source of revenue. History: Brookview Golf Course was a private country club until the late 1960s, when the City of Golden Valley purchased the facility to operate as a municipal golf course. In 1976-77, the course underwent major renovations with the addition of the Par 3 nine-hole course and Driving Range. In 1984-85, extensive work was done to bridge the fairways and enlarge the ponds to alleviate flooding. The Regulation Course was closed in 1990 to redesign and rebuild the greens. That same year, the clubhouse was enlarged and remodeled. 63 City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Golf Course --` SpecialAssessment-Street GC-U01 Na 17,190 16,130 33,320 GreenlTee Mowers GG003 nla 26,000 28,000 29,000 30,000 31,000 144,000 Rough Mowers GC-010 n/a 65,000 75,000 140,000 Sand Trep Rake GC-013 Na 23,000 23,000 Five Plex Fairvvay Mower GC-014 n/a 44,000 44,000 Cooking GriIVOven GC-020 Na 10,000 10,000 FreezerNValk-in Cooler GC-021 Na 25,000 25,000 Bridge Approach Improvement GC-023 n/a 30,000 30,000 60,000 Hole#14 Renovation GC-024 Na 50,000 50,000 Verticuts for Fairvvay Mower GC-025 n/a 6,000 6,000 Irrigation System Upgrade GG026 n/a 8,000 8,000 Radio Equipment GG027 n/a 7,000 7,000 Golf Course Total 64,190 77,130 188,000 85,000 136,000 550,320 Brookvlew Golf Coutse Fu►td 64,190 T7,130 188,000 85,000 136,000 550,320 GodfCou►se Total 64,190 T7,730 188,000 85,000 136,000 550,320 Grand Total 64,190 T7,730 188,000 85,000 136,000 550,320 Page 64 Project# GC-001 Department Golf Course Contact Project Name Special Assessment-Street Type Lnprovement Useful Life Category Street Construction Priority �scription � Special assessment for the reconstruction of Brookview Pazkway from Western Avenue south to the driving range,including the parking area The special � assessment will have a term of ten yeazs at an interest rate of seven percent. The project was completed in 2003. �Justification Street was reconstructed as part of the City's pavement management progam. This street provides parking for the golf course in the area adjacent to the Community Center. Expenditures 2012 2013 2014 ZO15 2016 Total Other 17,190 16,130 33,320 Total 17,190 16,130 33,320 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 17,190 16,130 33,320 TOtal 17,190 16,130 33,320 __- P%ject# GC-0�3 Department Golf Course Contact Project Name GPCC11/TeC MOWC15 T ype Equipment Useful Life Category Equipment:Heavy Equip. Priority �Description � - - -- -- - Green/Tee mowers to replace current unit. One unit to be replaced in each year shown._ � �Justification Increased repair and maintenance expenditures on current units. Expenditures 2012 2013 2014 ZO15 2016 Total EquipNehicles/Fumishings 26,000 28,000 29,000 30,000 31,000 144,000 TOtal 26,000 28,000 29,000 30,000 31,000 144,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 26,000 28,000 29,000 30,000 31,000 144,000 Total 26,000 28,000 29,000 30,000 31,000 144,000 Page 65 Project# GC-010 Department Golf Course Contact Project Name ROUgh MOwePS Ty�►ee Equipment Useful Life Category Equipment:Heavy Equip. Priority Description Rough Mower to replace current unit. Justification Increased repair and maintenance expenditures on current units. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 65,000 75,000 140,000 TOt�1 65,000 75,000 740,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 65,000 75,000 140,000 Total 65,000 75,000 140,000 Project# GC-013 Department Golf Course COOGRCt Project Name Sand Trap Rake Type Unassigned —_ —--— --- Usefal Life Category Equipment:Electronics Priority Description � Three wheel machine that rakes thirty-two sand traps every day of the golfing season. Justification 1 --_- - The sand trap rake was purchased in 2002. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 23,000 23,000 Z'p�j 23,000 23,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 23,000 23,000 Total 23,000 23,000 Page 66 Project# GC-014 Department Golf Course Contact rro�ect Name Five Plez Fairway Mower Type unass�gnea Useful Life Category Equipment:Miscellaneous Priority Description � Mows the Golf Course Fainvays five times a week during the gotf season. Justification Increased repair and maintenance expenditures on cwrent unit. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 44,000 44,000 Tota1 aa,000 aa,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 44,000 44,000 Total 44,000 44,000 Project# GC-O2� Department Golf Course Contact Pro,�ect Name Cooking GrilVOven Type Unassigned -- ---- — -- -- -- -------- Useful Life Category Unassigned Priority Description � Food is offered and sold at Brookview Golf Course.The Cooking GrilUOven has had many repairs and needs to be replaced. Justification This giWoven has had many repairs and needs to be replaced.This grilUoven was purchased in 1987. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicies/Fumishings 10,000 10,000 TOtal 10,000 10,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 10,000 10,000 TOtal 10,000 10,000 Page 67 Project# GC-021 Department Golf Course Contact Project Name Freezer/Walk in Cooler Type Equipment Useful Life Category Unassigned Priority Description The Freezer/Walk-in Cooler is a necessary appliance to serve food at the Brookview Grill. Justification The existing freezer/walk-in cooler needs to be replaced. Expenditures Z012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 25,000 25,000 Tota1 25,000 25,000 - - - -- —--- Department Golf Course Pro,ject# GC-023 Contact Pro,ject Name Bridge Approach Improvement Type Unassigned Useful Life Category Unassigned Priority Description Improve the approaches to certain bridges on the Golf Cowse. �Justification Improvement to the a�thetics and safety of bridge approaches. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 30,000 30,000 60,000 Total �o,000 ao,000 so,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 30,000 30,000 60,000 TotSl 30,000 30,000 60,000 Page 68 Pro,ject# GC-024 Department Golf Course Contact Project Name Hole#14 Renovation Type Unassigned Useful Life Category Unassigned Priority Description � 1 Improve Hole#14 flooding issues. 711SC1fiC2t'lOri Renovation to Hole#14 flooding issues. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements � 50,000 50,000 Total 50,000 50,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 50,000 50,000 Total 50,000 so,000 P%ject# (iC-OZ$ Department Golf Course Contact Pro,ject Name Verticuts for Fairway Mower TyPe Unassigned -- ---- — ___- - ----...- — - Useful Life Category Unassigaed Priority Descriptioa � Verticut attachment for the Fairway Mowers to allow thatching of the fa'vways. Jusrificarion IFairways need to be groomed to help assist with play. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicleslFumishings 6,000 6,000 Total s,aoo s,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 6,000 6,000 Total s,000 6,000 Page 69 Project# GC-026 Department Golf Course Contact rro�ecr Name Irrigation System Upgrade Type Equipment Useful Life Category Equipment:Computers Priority Description —� __ — ----- ---------- - 1'he imgation system needs an upgrade to the hardware that runs the system. �Justification Properly run irrigation system helps maintain gceens,fainvays,and tee boxes. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 8,000 . 8,000 Total s,000 s,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 8,000 8,000 'rp�j 8,000 8,000 P%ject# GC-OZ7 Department Golf Course Contact Pro,ject Name �dio Equipment Type Equipment Useful Life Category Equipment:Miscellaneous Priority �Description Federal Communications Commission is reyuiring govemmenal units to cease use of the frequency that allows for communication.Along with employee contact this equioment will also run the irrigation zones. - --- _ - - --- Justificarion � --- Supervisors need a system to communicate to their employees throughout the day due to workload and weather conditions.Radio equipment will need to be — � provided that will allow monitoring. ___ Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 7,000 7,000 Total 7,000 7,000 Funding Sources 2012 2013 2014 2015 2016 Total Brookview Golf Course Fund 7,000 7,000 Tota1 �,000 �,000 Page 70 city of olden g va e Capital Improvement Program 2012-2016 Storm Sewer Section This section includes the storm water infrastructure improvements and the flood damage reduction program for the next five years. Most of these improvements, which include both rate control and water quality projects, coincide with the Pavement Management Program (see section on Streets). Improvements will be funded either through the use of current reserves or the issuance of revenue bonds. The goal is to have enough reserves to account for 50% of the current revenues. 71 City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Storm Sewers Residendal Storm Sewer Improvements SS-01 Na 800,000 9,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Street Sweeper SS-04 Na 150,000 15D,000 Street Sweeper SS-05 n/a 150,000 150,000 Lakeview Park Water Quality Improvements SS-10 Na 150,000 150,000 Brookview Golf Course-Buffer Zone Study SS-12 n/a 30,000 250,000 280,000 Bassett Creek Stream Bank Stabilization SS-20 Na 730,200 730,200 Pickup Truck(Storm Water Utility) SS-22 n/a 26,000 26,000 Storm Water Pand Dredging SS-23 Na 280,000 175,000 455,000 10th Avenue Nortli Culvert Repairs SS-24 nla 185,000 185,000 V-Box Sander(single) SS-26 n/a 40,000 40,000 DeCola Ponds Storm Water Study SS-28 Na 100,000 100,000 Sweeney Lake OuUet Structure SS-29 n/a 250,000 250,000 Wirth Lake OuUet Structure SS-30 n/a 250,000 250,000 Winch Mounted on Heavy Equipment SS-31 nla 20,000 20,000 Anti-Icing Brine Production Room and Equipment SS-32 nla 65,000 65,000 Sump Manhole Retrofits SS-33 nla 60,000 60,000 60,000 60,000 60,000 300,000 Flag Avenue Drainage Study SS-35 n/a 35,000 35,000 Bassett Creek Ponding Areas SS-36 Na 285,000 1,300,000 1,585,000 Storm Sewers Total 2,376,200 1,525,000 2,125,000 2,610,000 1,335,000 9,971,200 Bassetl Creek Watershed M�mt Cohun 1,080,200 285,000 1,300,000 2,665,200 Storna Sewer Ut�lit�Fund(7300) 1,296,000 1,340,000 9,840,000 1,310,000 1,335,000 7,121,000 Unlon Paci/�c Rallroad 185,000 185,000 Storm Sewers Total 2,376,200 1,525,000 2,725,000 2,670,000 7,335,000 9,971,200 Grand Total 2,376,200 1,525,000 2,125,000 2,610,000 1,335,000 9,971,200 Page 72 Project# SS-OI Department Storm Sewers Contact r�o�ect rtame Residential Storm Sewer Improvements Type Improvement ---- -- --- -- -.. Useful Life Category Storm Sewer Priority Description � Construction and repair of storm sewer system in conjunction with the Pavement Management Program(see S#1).. ___ � Justification � Provide an improved storm water runoff drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff,minimize local drainage and flooding issues and protect pavement. Expenditures 2012 2013 2014 ZO15 2016 Total Inftastructure Improvements 800,000 1,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Total 800,000 1,100,000 7,700,OD0 1,100,000 7,100,000 5,200,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 800,000 1,100,000 1,100,000 1,100,000 1,100,000 5,200,000 Tot31 800,000 1,100,000 7,700,000 1,700,000 7,700,000 5,200,000 Project# ss-O4 Department Storm Sewers Contact Project Name Street Swee er �1 Type Equipment -- --- --- — —-- - Useful Life Category Stortn Sewer Priority Description � - __ _ _._ ._.. _ New street sweeper to replace Unit#504,2006 Elgin Sweeper. Justification � Increased repair and maintenance expenditures on Unit 504,which will be eight years old. __ __-- — Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 150,000 150,000 Total 150,000 750,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 150,000 150,000 Total 150,000 150,000 Page 73 Project# SS-OS Department Storm Sewers Contact Project Name Street Sweeper Type Equipment Useful Life Category Stonn Sewer Priority Description New street sweeper to replace Unit#505,2006 Elgin Sweeper. � Justification Increased repair and maintenance expenditures on Unit#505,which will be nine years old. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 150,000 150,000 TOtal 150,000 150,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 150,000 150,000 Total 150,000 150,000 Project# SS-lO Department Stotm Sewers Contact rro�e�c Name Lakeview Park Water Quality Improvements Type Improvement __- — --- --- Useful Life Category Stonn Sewer Priority Description � Water quality improvements in Lakeview Park to improve water quality in Medicine Lake.The scope of this project is to be determined during preliminary project design. Justification To reduce nutnents and sediment from storm water runoff in the Lakeview Heights area that drains to Medicine Lake.This project will be consistent with the Medicine Lake Total Maximin Daily Load(TMDL)Implementation Plan. -� Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 150,000 150,000 Total 750,000 150,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 150,000 150,000 TOtal 750,000 150,000 Page 74 Project# SS-12 Department Stonn Sewers Contact Project Name Brookview Golf Course-Buffer Zone Study Type Improvement Useful Life Category Storm Sewer Priority Description � Perform a study in 2013 to idenNfy locations for the development of native vegetation buffer areas in Brookview Golf Course.Construction of the buffer areas in 2014. Justification Removal of nutrients and sediment from stormwater runoff entering golf course ponds and Bassett Creek. � — -- — Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 30,000 250,000 280,000 TOt21 30,000 250,000 280,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 30,000 250,000 280,000 Tota1 30,000 250,000 280,000 Project# SS-20 Department Storm Sewers Contact Pro,ject Name Bassett Creek Stream Bank Stabilization Type Improvement Useful Life Category Stotm Sewer Priority Description � Stabilize banks along sub reaches of Bassett Creek Main Stem.Need is based on the Bassett Creek Inventory which was completed in 2001 and is updated on an annual basis. 2012: Main Stem(Between Duluth Street and 26th Avenue)-Subreach 2 Justification 1 The Bassett Creek Watershed Management Commission has additional funding for stabilization of the stream banks thorughout the watershed.Based upon the availability of funding the Commission has added the portion of Bassett Creek in Golden Valley between TH 169 and the north City Limits just north of Westbrook , Road.The project funding is available beginning in 2011 and 2012. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 730,200 730,200 TOtal 730,200 730,200 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 580,200 580,200 Storm Sewer Utility Fund(730 150,000 150,000 TOtal 730,200 730,200 Page 75 Project# SS-22 Department Storm Sewers Contact rro�ect Name pickup Truck(Storm Water Utility) Type Ec{uipment Useful Life Category Vehicles Priority Description One half ton pickup truck for the Storm Water Management and other environmental activities to replace Unit#501(2000 Ford F-150). � Justification Increased repair and maintenance expenditures on Unit#501,which will be twelve years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 26,000 26,000 Total 26,000 26,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 26,000 26,000 Tota1 26,000 26,000 ---- — -----_- ------- - Project# SS-23 Department SWmi Sewers Contact Project Name Storm Water Pond Dredging Type Maintenance Useful Life Category Unassigned Priority Description Conrinuation of the pond dredging pmgracri for 2014 and 2016.1'he following ponds are proposed for each year: 2014 Medicine Lake Road between Rhode Island and Nevada Avenue Golden Ridge Pond at Naper Avenue and Gettysburg Court Perpich Center West Pond Bassett Creek Park Pond 2016 Hidden Lakes Pond 2B Golden Meadows ----- - --- - --- - --- -- - Justification � - ---- — -- — __ _--- —� Dredge existing waYer quality ponds to remove accumulaYed sediment and restore nutrient and sediment removal efficiency. Expenditures 2012 2013 2014 2015 2016 Total Other 280,000 175,000 455,000 Total 280,000 175,000 455,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 280,000 175,000 455,000 Total 280,000 175,000 455,000 Page 76 P%ject# SS-24 Department Stom�Sewers Contact Pro,ject Name lOth Avenue North Culvert Repairs Type Improvement -- - ------------ — -- --- -- Useful Life Category Stom�Sewer Priority Description Repair Culverts that convey Bassett Creek under lOth Avenue North and the Union Pacific Railroad. � JUSL1�C31;lOII These culverts are technically classified as a bridge by the Minnesota Depaztrnent of Transportation and are inspected regularly.The last inspecrion identified high level conosion of the culverts at the base flow level.Although not a high risk for collapse,the corrosion needs to be addressed soon.These culverts aze owned by the railroad. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 185,000 185,000 Tota1 185,000 185,000 Funding Sources 2012 2013 2014 2015 2016 Total Union Pacific Railroad 185,000 185,000 Total 185,000 785,000 Project# SS-26 Department Storm Sewers Contact Pro,ject Name �1-Bog Sander(single) Type Equipment Useful Life Category Storm Sewer Priority Description ] �V-Box sander with hook frame for the single axle dump truck#778. Justification V-Box sanders are the most efficient and cost effective way to apply the de-icing chemicals for winter operations.V-Box sanders will reduce the impacts of de-icing chemicals on local lakes and streams. Expenditures 2012 2013 2014 ZO15 2016 Total EquipNehicles/Fumishings 40,000 40,000 Total 40,000 a0,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 40,000 40,000 Total 40,000 40,000 Page 77 Project# SS-2g Department Storm Sewers Contact rro�ecc Name DeCola Ponds Storm Water Study Type Improvement Useful Life � Category Storm Sewer Priority Description � Perfonn a Hydrologic,Hydraulic,and Flood Mitigation Study of the DeCola Ponds subwatershed,located in the north central portion of the City.This study will develop the storm water runoff models for this azea,including inflows&om New Hope and Crystal,and will investigate storm water management strategies for the Winnetka Ave and Medicine Lake Road intersection and residenfial areas around the DeCola Ponds. Additional study is needed in 2012 to furtt►er identify measures to mitigate flood damage at Decola Ponds and the Medicine Lake Road and Winnetka Avenue areas. 1'his study will examine future land uses,retrofitting existing land uses,struchual floodproofing and other measures to reduce and mitigate flooding impacts. Justification ------- -- --- - IThis study wili give information to proceed to make appropriate improvements. � Expenditures 2012 2013 2014 2015 2016 Total Planning/Design 100,000 100,000 Total 100,000 100,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 100,000 100,000 Total 100,000 100,000 Project# $5-29 Department Storm Sewers Contact Project Name Sweeney Lake Outlet Structure Type Improvement Useful Life Category Stoan Sewer Priority Description Reconstruction of the outlet structure from Sweeney Lake to a permanent weir. � Justificarion � — _--- -- ------- -_ Based upon a request by the City of Golden Valley,the Bassett Creek Watershed Management Commission has included the reconswction of the Sweeney Lake outlet in its CIP.The current structure is hand placed concrete that is subject to modification and erosion around each end ofthe structure.The new structure will include engineering cut offwalls to prevent flow azound the ends of and under the structure,greatly reducing the threat of erosion. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 250,000 250,000 Total 250,000 250,000 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 250,000 250,000 Total 2��a� 250,000 Page 78 Project# SS-3� Department Stom►Sewers Contact Project Name wirth Lake Outlet Structure Type Unassigned -- - --— — --- _ Useful Life Category Unassigned Priority Description � Reconstruction of the oudet swcture from Wirth Lake to prevent high water backflow from Bassett Creek from entering the lake. � Justification The Total Maximum Daily Load Study for Wirth Lake identified the backflow of flood waters from the Bassett Creek into Wirth Lake as the primary phosphorus load to the lake,resulNng in failure to achieve water quality goals.A backflow prevention device was identified as part of the study and has been included in tt►e Bassett Creek Water Management Commission CIP.The City of Golden Valley will be the lead agency in implementing this project. Ezpenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 250,000 250,000 Total z5o,0ou 250,000 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 250,OW 250,000 Total 250,000 250,000 -------- ----- ----.. - - - --- -----_ ___ _ . Project# SS-31 Department Stom►Sewers Contact Project Name winch Mounted on Heavy Equipment Type Unassig►ed - —-- _ _ __---- —_ - Useful Life Category Unassigned Priorily Description A winch that mounts on heavy equipment for storm tree damage removal from Bassett Creek. Justification- l - – — Downed tress obstruct the flow in Bassett Creek creating flooding situations and require removal from the creek to establish flows. Eapenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 20,000 20,000 Total 20,000 20,000 Page 79 Project# SS-3Z-- --- ----------- Department StormSewers Contact rro;e�c Name Anti-Icing Brine Production Room and Equipment Type Unassigned Useful Life Category Unassigned Priority �Description Construct a room at the lOth Ave storage to house brine production equipment and storage tanks. —� Justification Anti-icing brine production for reducing anti-icing/de-icing chemical application on city streets to reduce the impacts of de-icing chemicals in our creeks,lakes and wetlands. The brine production equipment was obtained at no cost from another city.This community replaced and upgraded their equipment to increase de-icing capacity. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 65,000 65,000 Tota1 s5,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 65,000 65,000 Tota1 s5,000 65,000 Project# SS-33 neparnneor Stortn Sewers Confact ProjectName Sump Manhole Retrofts Type Improvement ------ -- Useful Life Category Stortn Sewer Priority Description Installation of baftles to increase the removal efficiency of existing sump manholes in the storm sewer system. —� Justification Manhole and catch basin baftles will improve the removal efficiencies for suspended solids and phosphorus.Installation priorities will be in the Sweeney Lake and Medicine Lake sub-watersheds,where 1'MDL studies haue been completed and approved. Expenditures 2012 2013 2014 2015 2016 Total Other 60,000 60,000 60,000 60,000 60,000 300,000 Total 60,000 60,000 60,000 fi0,0U0 60,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 60,000 60,000 60,000 60,000 60,000 300,000 Tota1 so,000 so,000 so,000 so,000 so,000 soo,000 Page 80 Project# SS-35 Department Storm Sewers Contact rro�ecr Name Flag Avenue Drainage Study Type unassignea Useful Life Category Unassigned Priority Descriprion Preparation of a drainage study in the vacinity of Flag Avenue between Earl Street and Duluth Street. Justification This study will address surface water runoff and ground water issues prior to the scheduled 2015 Pavement Management Program. � Expenditures 2012 2013 2014 2015 2016 Total Other 35,000 35,000 Total s5,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Utility Fund(730 35,000 35,000 Total 35,000 35,000 Project# SS-3G Department Storm Sewers Contact Project Name Bassett Creek Ponding Areas Type lmprovement Useful Life Category Storm Sewer Priority Description � Improvements on the Bassett Creek Watershed Area in Golden Valley. Justification The Bassett Creek Watershed Management Commission's Capital Improvement Program includes construction of water quality and rate control ponds adjacent to the main stem of Bassett Cr�k in 2014 and 2015.The BCWMC funding includes preparation of a feasibility report and construction of these ponds. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 285,000 1,300,000 1,585,000 Total 285,000 1,300,000 1,585,000 Funding Sources 2012 2013 2014 2015 2016 Total Bassett Creek Watershed Mg 285,000 1,300,000 1,585,000 TOt81 285,000 1,300,000 1,585,000 Page 81 city of olden va e Capital Improvement Program 2012-2016 Water and Sanitary Sewer Utility Section � A five-year projection of the Water and Sanitary Sewer Fund reveals some potential financial challenges the City may have to address. The contract pricing with the City of Minneapolis and Golden Valley-Crystal-New Hope Joint Water Commission is up for renewal in 2013. The Metropolitan Council Environmental Services (MCES) surcharge program related to inflow and infiltration will have a direct affect on rates as it requires the City to make improvements to the sanitary system that will reduce the rate of inflow and infiltration into the system. Fees from the City's utility bill are the main source of revenue. 82 City of Golden Valley, Minnesota Capital Imp�ove�nent Plan 2012 tt►ru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Water&Sewer Systems Sanitary Sewer&Water Line RepaidRecon. W&SS-001 n/a 400,000 1,100,000 1,100,o00 1,100,000 1,100,000 4,800,000 Inflow/lnfiltration Study and Improvements WBSS-002 Na 200,000 200,000 200,000 200,000 200,000 1,000,000 Toro Dingo with Attachments W&SS-006 n/a 45,000 45,000 Pickup Truck WBSS-014 n/a 30,000 30,000 Utility Building Flooring Upgrade/Replacement W&SS-032 n/a 50,000 50,000 PickupNtility Truck W&SS-035 Na 45,000 45,000 PidcupNtility Truck W&SS-U37 Na 40,000 40,000 Sidewalk Sweeper WB�SS-U44 n/a 15,000 15,000 Air Compressor Mounted on Trailer W&SS-047 Na 25,000 25,000 Televising Equipment W&SS-053 nla 24,000 50,000 74,000 Trailer WB�SS-054 Na 12,000 12,000 RubberTired Excavator W&SS-056 nla 225,000 225,000 Harold and Rhode Island Reconstruction WS�SS-057 n/a 500,000 500,000 Work Stations WB�SS-059 nla 20,000 20,000 Step Van WBSS-060 n/a 45,000 45,000 Pickup Utility Truck W&SS-061 nla 55,000 55,000 Pickup Truck W&SS-062 n/a 85,000 85,000 Radio Meter Reading System WBSS-063 n/a 100,000 100,000 100,000 100,000 400,000 Water&Sewer Systems Total 7,391,000 1,485,000 1,445,000 7,675,000 1,470,000 7,466,000 Water&Sewer UnlitV Fund 1,391,000 1,485,000 1,445,000 1,675,000 1,470,000 7,466,000 Water&Sewer Systems Total 1,397,000 1,485,000 1,445,000 1,675,040 1,470,000 7,466,000 Grand Total 1,391,000 1,485,000 7,445,000 7,675,000 1,470,000 7,466,000 Page 83 Project# w&SS-001 Department Water&Sewer Systems Contact Project Name Sanitary 5ewer&Water Line Repair/Recon. Type unassignea ----- — ----- --- --— Useful Life Category Water and Sewer Priority �Description � Major repairs and reconstruction on the City's sanitary sewer and water systems as needed. Repairs will be done in conjunction with the City's Pavement � Management Program(See S#1). Jli3L1$C1hOII To maintain City's water mains and sanitary sewer mains. 1 Egpenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 400,000 1,100,000 1,100,000 1,100,000 1,100,000 4,800,000 TOtal 400,000 1,100,000 1,100,000 9,100,000 9,700,000 4,800,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 400,000 1,100,000 1,100,000 , 1,100,000 1,100,000 4,800,000 Total 400,000 1,100,000 1,900,000 1,700,000 1,100,000 4,800,000 Project# WBiss-�OZ Department Water&Sewer Systems Contact r�o�ect Name Inflow/Infdtration Study and Improvements Type Unassigned Useful Life Category Water and Sewer Priority Description � Results of an enginnering study in 2005 and 2006 identified the sources of clear water inflow and infiltration(I&n into the cities and the Metropolitan Council Environmental Services(MCES)sanitary sewer systems.Beginning in 2006,the sources identified in the study will be addressed. J119t1f1CSllOII � Consistent with the MCES requirements that the City's I&I problems must be addressed to avoid the surcharge and pending demand charge from the MCES.In � 2013,unaddressed flows were to built into the rates from MCES but will now be used for rehabiliation of the system. J Expenditures 2012 2013 2014 2015 2016 Total Inftastructure Improvements 200,000 200,000 200,000 200,000 200,000 9,000,000 Total 200,000 200,000 200,000 200,000 200,000 1,000,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 200,000 200,000 200,000 200,000 200,000 1,000,000 Tota1 2oo,aoo 200,00o zoo,000 2oo,aoo 2ao,000 �,000,000 Page 84 Project# WBLSS-OOG Department Water&Sewer Systems Contact Project Name TOTO D'lugo wlth AttaChmellts Type Unassigned Useful Life Category Water and Sewer Priority Description Toro Dingo walk behind skid steer loader for removal of snow from the City Hall complex sidewalks. Dingo will be purchased with snow blower and sweeper attachments. The Dingo can also be used as a stump grinder,post hole auger,trencher etc.This unit was purchased in 2006 and is unit 676. Justification Increased repair and maintenance expenditures on Gravely sidewalk machines. Gravely no longer produces the sidewalk machines currently used by the City. The Dingo's multi-use makes it the machine best suited to replace the Gravely machines. The Dingo will be utilized yeaz-round as a skid steer loader and with the rentaVpurchase of additional attachments,it will be utilized as a multi-task piece of equipment. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 45,000 45,000 Total a5,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 45,000 45,000 Total 45,000 45,000 --- —---- --- - -- -- - - - Pro,ject# W&SS-014 Department Water&Sewer Systems Contact Pro,ject Name p1Cku Truck p Type Unassigned -------- --— Useful Life Category Water and Sewer Priority Description _� - - —- - ---- — PickupNtility truck for fihe Utility Department to replace Unit 681,a 2008 Ford F-150 Pickup. 1 Justification - --- ---- --- --- __ - ---__ — Increased repair and maintenance expenditures on Unit 681. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 30,000 30,000 Tot81 30,000 30,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 30,000 30,000 Total 30,000 30,000 Page 85 Pro�ect# w$tiss-�32 Department Water&Sewer Systems Contact Project Name Utility Building Flooring Upgrade/Replacement Type Unassig►ed -— ____—_ _-----. —._. Useful Life Category Water and Sewer Priority �Description Utility Building tile flooring in the main roll call room,restroom,offices,kitchen,steps and entry. � Justification Utility Building flooring withstands heary abuse&om employee tracking and has exceeded its life cycle. � Expenditures 2012 2013 2014 2015 2016 Total Other 50,000 50,000 Total so,000 so,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 50,000 50,000 Total 50,000 50,000 Pro,ject# WBzSS-035 Department Water&Sewer Systems Contact Pro,ject Name piCkup/Utlllty T1'uck Type Unassigned Useful Life Category Water and Sewer Priority Description � Pickup/Utility truck for the Utility Department to replace Unit#673,a 2002 Ford F-150 pickup. 1 Justification ---� Increased repair and maintenance on Unit#673,which will be ten years old. Expenditures 2012 2013 2014 2015 2016 Total Other 45,000 45,000 Total 45,000 45,000 Funding Sources ZO12 2013 2014 2015 2016 Total Water&Sewer Utility Fund 45,000 45,000 Tota1 45,000 45,000 Page 86 Project# w8tss-�37 Department WaYer&Sewer Systems Contact Project Name piCkup/Utility TruCk Type Unassigned Useful Life Category WaYer and Sewer Priority Description —� Pickup/Utility truck for the Utility Deparhnent to replace Unit#677,a 2006 Ford F-350 Utility truck. Justification Ilncreased repair and maintenance on Unit#677. _ __ _ � Expenditures 2012 2013 2014 2015 2016 Total Other 40,000 40,000 Tota1 ao,000 ao,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 40,000 40,000 Tota1 40,000 40,000 Pro,ject# w&SS-044 Department Water&Sewer Systems Contact Pro,ject Name 5idewalk Sweeper Type unassignea __ Useful Life Category Water and Sewer Priority Description � ----- - - ----- - ---- Gravely sidewalk sweeper for complex snow removal and various sweeping duties. _ _ Justification -----� Increased repa'v and maintenance expenditures on Unit 663,a 1998 Gravely sidewalk machine. Expenditures 2012 2013 2014 2015 2016 Total Other 15,000 15,000 Z'p� 15,000 15,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 15,000 15,000 TOt31 15,000 75,000 Page 87 Project# WBiSS-O47 Department Water&Sewer Systems Contact Project Name �r Compressor Mounted on Trailer Type Unassigned Useful Life Category Water and Sewer Priority Description � Air compressor on trailer to replace Unit 662,1997 Ingersol Rand. Justification —I Increase repair and maintenance expendihues on Unit 662,which will be I S years old. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 25,000 25,000 Tot31 25,000 25,000 Deparlment Water&Sewer Systems project# W&SS-053 Contact Project Name Televising Equipment Type Equipment Useful Life Category Water and Sewer Priority Description � Sewer televising camera and transporter for televising sewer mainlines.Main Line Televising equipment to replace equipment purcHased with truck#680.The equipment will be four years old and the computer software will be not compatible. _ _] Justification � - - --- -- ___—--- -- — The equipment will be four years old and the computer soflware will be outdated.In 2016,all equipment will need to be replaced.. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 24,000 50,000 74,000 Total 24,000 50,000 74,000 Funding Sources 2012 2013 2014 ZO15 2016 Total Water&Sewer Utility Fund 24,000 50,000 74,000 Z'p�j 24,000 50,000 74,000 Page 88 Project# W&SS-054 Department Water&Sewer Systems Contact Pro,ject Name Tl'�i]ep Type Equipment --- -- — - -- ---- — - Useful Life Category Water and Sewer Priority Description � Trailer to haul trench box for water main breaks.This is one of two trailers. Justification This would replace Unit#652 thaY will be 21 years old. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 12,000 12,000 TOtSI 12,000 12,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 12,000 12,000 Total 12,000 12,000 project# W&5S-056 Department Water&Sewer Systems Contact rro�ect rtame Rubber Tired Egcavator T ype Equipment Useful Life 15 years Category Water and Sewer Priority Description Rubbet tired excavator to replace Unit#671,which will be 15 years old. � fUSt1F1CSllOri � Increased repair and maintenance on Unit#671,a tractor backhoe that will be 15 years old. Ezpenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 225,000 225,000 Total 225,000 225,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 225,000 225,000 Total 225,000 225,000 Page 89 Project# w8iss-�57 Department Water&Sewer Systems Contact Project Name garold and Rhode Island Reconstruction Type Unassigned Useful Life Category Unassigned Priority Description Major repairs and reconslruction on the City's sanitary sewer and water systems as needed.Repair will be done in conjunction with the City's Pavement � Management Program on Harold Avenue.This project is in addition to the 2012 PMP project area. 7USt1fiCSt10II To maintain City's water mains and sanitary sewer mains. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 500,000 500,000 Total 500,000 500,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 500,000 500,000 Tota.l 500,000 500,000 Project# w8tss-059 Department Water&Sewer Systems Contact Project Name work Stations Type Unassigned Useful Life Category Unassigned Priority Description � Ergonomically wrrect work stations to replace olde style desks that were purchased prior to computers. Justification Utility work station replacements due to age and ergonomics.This would include four workstations. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 20,000 20,000 Tota.l 20,000 20,000 Page 90 Project# W$tiss-�(0 Department Water&Sewer Systems Contact Project Name Step Van Type Unassigned Useful Life Category Unassigned Priority Description Step Van for the Utility Deparlment to replace Unit#674,a 2002 Work Horse Step Van. Justification Increased repair and maintenance expenditures on Unit#674. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 45,000 45,000 Tota1 45,000 45,000 �nding Sources 2012 2013 2014 2015 2016 Total Water&Sewer Utility Fund 45,000 45,000 Total 45,000 45,000 Pro,ject# W&SS-061 Department Water&Sewer Systems Cootact Project Name pickup Utility T1'uCk Type Unassigned ——- -- — _ --— Useful Life Category Unassigned Priority �Description � Utility Truck to replace Unit#677,a 2006 Ford F-350 4 X4 with utility box. Justification --- --- - -- --- --_------ ----- — Increased repair and maintenance expenditures on Unit#677. _ _ _ Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 55,000 55,000 Tota1 55,000 55,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 55,000 55,000 TOt31 55,000 55,000 Page 91 Project# w&SS-062 Department Water&Sewer Systems Contact Pro,ject Name piCkup Tl'uCk Type Equipment -- --— --------- - Useful Life Category Water and Sewer Priority Description � Pickup Truck for the Utility Department to replace Unit#683,a 2008 F-350 4X4 with utility box,large crane hoist and plow.Unit#683 will be transferred to Vehicle Maintenance. 7113t1fiC8'110II �lncreased repair and maintenance expenditures on Unit#683. � Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 85,000 85,000 Total 85,000 85,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 85,000 85,000 Tota1 85,000 85,000 Project# W&SS-063 Department Water&Sewer Systems Contact Project Name g�dio Meter Reading System Type Equipment Useful Life Category Water and Sewer Priority Description �Fixed base radio metering reading system. Justification Existing FCC radio frequency utilized for reading city water meters has been banned by the FCC and city is forced to comply with the rule changes. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Fumishings 100,000 100,000 100,000 100,000 400,000 Total 100,000 700,000 100,000 700,000 400,000 Funding Sources 2012 2013 2014 2015 2016 Total Water 8�Sewer Utility Fund 100,000 100,000 100,000 100,000 400,000 TOt31 700,000 100,000 100,000 100,000 400,000 Page 92 city of olden g va e Capital Improvement Program 2012-2016 Streets Section The City of Golden Valley has over 120 miles of streets. The city is responsible for 90 miles of local streets. Municipal State Aid streets account for the remainder or 30 miles. As streets deteriorate, roads need to be reconstructed or repaired. The City's Pavement Management Program has outlined all roads to be reconstructed by the year 2015. The bond payments on the debt will go until 2036. This plan has been included in the five year program. The revenue sources are city-wide street reconstruction debt levy, state aid debt, benefiting properiy owner assessments and Municipal State Aid Allotments. 93 City of Golden Valley, Minnesota Capital Imp�ovement Plan 2012 tt�ru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Streets PavementManagementProgram S-001 Na 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 Pavement Management Ovedays S-013 nla 500,000 500,000 500,000 500,000 500,000 2,500,000 Count Down P�estrian Signals S-016 n/a 25,000 25,000 Municipal State Aid(MSA)Street Maintenance S-017 nla 100,000 100,000 100,000 100,000 100,000 500,000 City Hall Campus Sidewalk Renovation S-018 n/a 75,000 75,000 75,000 75,000 300,000 MSA Debt Service S-019 Na 189,000 189,000 189,000 191,000 192,000 950,000 Reconstruct New Railroad Crossings S-023 Na 20,000. 28,000 48,000 Replacement of Street Signs S-024 nla 50,000 50,000 50,000 50,000 50,000 250,000 Winnetka Ave and TH 55 Improvements S-025 nla 1,300,000 1,300,000 Reconstru�tion of Harold Ave and Rhode Island Ave S-029 n/a 1,500,000 1,500,000 Sidewalk and Trail System Upgrades S-030 n/a 50,000 50,000 50,000 50,000 50,000 250,000 AutoCADApplication 5-032 n/a 11,200 11,200 11,200 11,200 11,200 56,000 Streets Tota1 5,420,200 4,839,200 5,146,200 6,069,200 5,403,200 26,878,000 Capttallmprovement Fund(6100) 186200 186,200 186,200 186,200 111,200 856,000 MN DOT 702,000 702,000 Mun�'cBpal S'tate Add(MSA-5100) 2,798,000 317,000 289,000 291,OD0 292,000 3,987,000 Special Assessme�at Bonds 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 StreetlmprovementFund 134,000 500,000 500,d00 500,000 500;000 2,134,000 Streets Total 5,420,200 4,839,200 5,146,200 6,069,200 5,403,200 26,878,000 Giand Total 5,420,200 4,839,200 5,146,200 6,069,200 5,403,200 26,878,000 Page 94 Project# 5-001 Department st�eers Contact Project Name pavement Management Program Type Improvement --- -- - — — - Useful Life Category Street Construction Priority �Description � On-going program to upgrade the quality of all of the City's non-MSA residential streets to City standards with adequate drainage.Rehabilitation will involve either reconsiruction or overlays.The method selected will depend on the quality of the individual street surfaces,the sub grade and the uNlity work required. Justification Provide a high quality street system in a long term cost effective manner in accordance with the Pavement Management Policy.The 2012 feasibility study was prepared with the 2011 PMP. 2012-1.2 miles 2013-2.2 miles 2014-23 miles 2015-2.5 miles 2016-2.6 miles Ezpenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 Z'p� 9,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 Funding Sources 2012 2013 2014 2015 2016 Total Special Assessment Bonds 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 TOte.l 1,600,000 3,836,000 4,171,000 5,092,000 4,500,000 19,199,000 Page 95 Project# 5-013 Department sve� Contact Project Name pavement Management Overlays Type Unassigned Useful Life Category Street Construction Priority Description Includes mill and overlays of local and State Aid streets that are constructed to City standards to maintain streets to their pmjected life-spans. The projects include localized replacement of curb and gutter as needed. 2012: Wesrivood Drive:Ravine Trail to Glenwood Avenue W�stwood Lane:End of Street to Weshwood Drive Strawberry Lane:Cul-de-sac to Westwood Drive Maddus Lar►e:Westwood Drive to Glenwood Avenue Mendelssohn Avenue:Golden Valley Road to Plymouth Avenue Golden Valley Road:Mendelssohn Avenue to Decatur Avenue Meadow Lane:Trunk Highway 55 to Cul-de-sac North 1'H 55 Frontage:West of Meadow Iane to Meadow Lane Dahlberg Drive:TH 55 to Meadow Lane 2013 Wisconsin Ave:TH55 to lOth Avenue North Golden Valley Road:Boone Avenue to Wisconsin Avenue Zenith Avenue:Golden Valley Road to 26th Avenue North Rhode Island Avenue North:23rd Avenue North to Medicine Lake Road 23rd Avenue North:Winnetka Avenue to Rhode Island Avenue North 2014: To be determined 2015: To be determined 2016: To be determined rJustification Provides high quality street system in a long term cost effective manner in accordance with the Payement Management Policy. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 500,000 500,000 500,000 500,000 500,000 2,500,000 Ta� �oo,000 5ou,000 �ou,000 soo,000 �oo,aoo z,soo,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid(MSA-51 366,000 366,000 Street Improvement Fund 134,000 500,000 500,000 500,OOD 500,OOD 2,134,000 Tota1 soo,oao soo,000 �oo,000 soo,000 �oo,000 z,�oo,000 Page 96 Project# 5-016 Department Sireets Contact rro�ect rtame Count Down Pedestrian Signals Type Unassigned Useful Life Category Street Construction Priority Description � Installation of count-down pedesirian signals at traffic signals in the City.This is a five yeaz progam beginning with the eight signals in the downwwn azea Justification Count down signals haue been shown to be safer and more understandable method of providing pedestrians information about the time available to cross sigaalized intersections. Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid(MSA-51 25,000 25,000 Total 25,000 25,000 Pro,ject# 5-017 Department streets Contact r�o�e�t Name Municipal State Aid(MSA)Street Maintenance Type Unassigned Useful Life Category Unassigned Priority Description Allotment of a portion of the City's annual Municipal State Aid construction funds to be used for maintenance of designaYed State Aid routes,including maferials and salaries. -------- --- -- -- Justification ------ _� --- - ------- - - Maintenance of Municipal Stafe Aid street system. ___ _ Expenditures 2012 2013 2014 2015 2016 Total Other 100,000 100,000 100,000 100,000 100,000 500,000 TOtcil 100,000 100,000 100,000 100,000 100,000 500,000 Funding Sources 2012 2013 2014 2015 2016 Tatal Municipal State Aid(MSA-51 100,000 100,000 100,000 100,000 100,000 500,000 TOtal 100,000 100,000 100,000 100,000 100,000 500,000 Page 97 Pro,ject# S-01S Department Streets Contact Project Name City Hall Campus Sidewalk Renovation Type Unassigned Useful Life Category Street Construction Priority Descriptioa � This project will perform a comprehensive analysis of the Winnetka Avenue Streetscape and sidewalks,as well as the City Hall campus.l'his analysis will investigate potential ADA compliance issu�s such as pedestrian ramps,and sidewalk cracking.The study will determine the remaining functional life of all landscaping and streetscape materials,determine the estimated costs for rehabiliitation and/or replacement and provide a prioritized schedules for rehabiilitation. Justification Maintenance of existing streetscape materials and pedestrian facilities to provide compliance with ADA requirements and provide an acceptable environment in a cost effective manner. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 75,000 � 75,000 75,000 75,000 300,000 Total 75,000 75,000 75,000 75,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Improvement Fund(61 75,000 75,000 75,000 75,000 300,000 Total 75,000 75,000 75,000 75,000 300,000 Project# S-019 Department Streets Contact Project Name MSA Debt Service Type Unassigned - -- - _ ----- - - - Useful Life Category Unassigned Priority Description Debt Service payment on Municipal State Aid Bonds ending in 2028. --- - ------- - ------ -- --- --- Justification -- - -- ----- ---- � Necessary funding for Staie Aid roads to construct projects needed for safety. Ezpenditures 2012 2013 2014 2015 2016 Total Other 189,000 189,000 189,000 191,000 192,000 950,000 Total 189,000 189,000 189,000 191,000 192,000 950,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid(MSA-51 189,000 189,000 189,000 191,000 192,000 950,000 TOtal 789,000 189,000 189,000 191,000 792,000 950,000 Page 98 Project# 5-023 Department Sireets Contact rro�ect Name Reconstruct New Railroad Crossings Type Lnprovement Useful Life Category Street ConstrucNon Priority Description Reconstruct euisting substandard railroad crossings with concrete crossing. 2012-Pennsylvania Avenue North(north of Golden Valley Road) 2013 Florida Avenue South(south of Laurel Avenue) Justificarion Lxisting substandazd crossings,construction of rubber and timbers,can no longer be patched._ _ _ _ � Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 20,000 28,000 48,000 Total 20,000 2e,000 as,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid(MSA-51 20,000 28,000 48,000 Total 20,000 28,000 48,000 Project# 5-024 Department Streets Contact r�o�ecc Name Replacement of Street Signs Type Unassigned -- ----- ---- ---- - Useful Life Category Unassigted Priority Description ADA requirements for public rights-of-way require that a plan be adopted to maintain minimum reflectivity and visibility standazds be adopted for all street name and traffic control signs.This inclucles replacement of all street name signs that are not replaced with PMP projects. First year of tt►e project(2010)includes purchase of equipment to determine sign reflectivity,gather data and implement a data base and management plan. Following years include inventory of all signs and start replacement of non-compliant signs. Justificarion Compliance with Federal ADA requirements. Expenditures 2012 2013 2014 2015 2016 Total EquipNehicles/Furnishings 50,000 50,000 50,000 50,000 50,000 250,000 Tota1 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Improvement Fund(61 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Page 99 Project# S-O25 Department Streets Contact Project Name winnetka Ave and TH 55 Improvements Ty� unassignea Useful Life Category Unassigned Priority Description The intersection of Winnetka Avenue and Trunk Highway 55 currently experiences significant delays for northbound traffic during the PM Peak hours.The addition of a new northbound to westbound tum lane,other lane modifications and signal modifications will reduce the overall delays eacperienced. �J113t1f1CSt10II IReduction in overall intersection delay and reduction of congestion. _ _ Expenditures 2012 2013 2014 2015 2016 Total ConstructionlMaintenance 1,300,000 1,300,000 Total 7,300,000 1,300,000 Funding Sources 2012 2013 2014 2015 2016 Total MN DOT 702,000 702,000 Municipal State Aid(MSA-51 598,000 598,000 Total 1,300,000 1,300,000 Pro,ject# 5-029 Department stre� Contact Pro,ject Name Reconstruction of Harold Ave and Rhode Island Ave Type Improvement Useful Life Category SVeet Consiruction Priority Description � Reconstruction of Hazold Avenue between Winnetka and Glenwood Avenues to current Municipal State Aid standards and Rhode Island Avenue north of Harold Avenue to current City standards. Justification ---- ---------_----- -- -- --------- Upgrade roadway to current Municipal State Aid and City standards consistent with the Pavement Management Policy. _ Expenditures 2012 2013 2014 2015 2016 Total Infrastructure Improvements 1,500,000 1,500,000 Total 1,500,000 1,500,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid(MSA-51 1,500,000 1,500,000 Total 1,500,000 1,500,000 Page 100 Project# 5-03� Department Streets Contact Project Name Sidewalk and Trail System Upgrades Type Unassigned --- -- ---- - Useful Life Category Street Construction Priority �escription Upgrading the deficient portions of the City's sidewallc and trail system to current standards and to be compliant with State and Federal standards for handicap accessibility.l'his will include the elimination of barriers to access,providing required clearances,installation of stu►dard ramps and pedestrian acrivated push buttons.This work will be performed in association with oveday projects and as independent projects based upon priorities estabished in the Right of Way Accessibility Plan. Justification Provide an accessible pedestrian system that is compliant with the State and Federal Requirements. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 50,000 50,000 50,000 50,000 50,000 250,000 Total so,oao �o,000 50,000 �o,000 so,aoo 2�0,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Improvement Fund(61 50,000 50,000 50,000 50,000 50,000 250,000 Tota1 50,000 50,000 50,000 50,000 50,000 250,000 - --- __ _ ._ _ -- --- Pro,ject# 5-�32 Department Streets Contact Project Name Auto CAD App6cation Type Unassigned Useful Life Category Unassigned Priority Description AutoCAD is a CAD design,drafting,modeling,azchitectural drawing,and engineering software that helps with design and as-built drawings of infrasiructue� 7USt1f1C�lOri � IThis software is the maintenance and upgrades for software to manage ow street and utility systems. � Expenditures 2012 2013 2014 2015 2016 Total Other 11,200 11,200 11,200 11,200 11,200 56,000 Total 17,200 11,200 11,200 11,200 11,200 56,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Improvement Fund(61 11,200 11,200 11,200 11,200 11,200 56,000 Total 11,200 91,200 11,200 11,200 11,200 56,000 Page 101 city of olden va e Capital Improvement Program 2012-2016 Douglas Drive Corridor Section The City of Golden Valley initiated a study of the Douglas Drive Corridor that took place in 2008 and 2009. Following that study the Housing and Redevelopment Authority (HRA) took initiative to develop a Redevelopment Plan for the segment of the corridor from Medicine Lake Road to Trunk Highway 55. The City's Comprehensive plan is in conformance with the Redevelopment Plan. In early 2011, Xcel Energy began collection of the franchise fee ordered by the City Council which will assist in paying for the City's portion of the project. Hennepin County, MnDOT, Transit for Livable Communities and the City are working together to fund and complete this study. 102 City of Golden Valley, Minnesota. Capital Imp�ovement Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Douglas Drive Cooridor Douglas Drive Improvemen� DD-001 n/a 927,350 1,881,100 875,000 6,474,900 13,169,550 23,327,100 Douglas Drive Cooridor Total 927�350 1,881,100 875,000 6,474,100 93,189,550 23,327,100 Franch�se Fees 610,0� 610,000 610,a00 610,000 610,000 3,050,000. Hennep�'ia County 1,357,000 9,254,5� 10,691;500; MNDOT 1,000,000 1,000,000 Sheet Reconstructdon Bonds ' 7,608,250 7;608,25U Trans�t Ldvable Com�rtundtdes(TLC) 375,000 675,000 7.050,000 � Douglas Drfve Cooridor Total 985,000 2,285,000 B90,000 9,575,250 9„864,500 23,319,750 Grand TotPil 927,350 1,881,100 875,000 6,474,100 73,169,550 23,327,100 Page 103 Capital Improvement Plan 2012 rhYU 2016 Department Douglas Drive Cooridor City of Golden Valley, Minnesota cao��t Type Unassigned Project# DD-001 Useful Life Project Name Douglas Drive Improvements cate�ory Street Construction Priority Desctiption Reconstruction of Douglas Drive to current standards.Franchise Fees will pay for any internal or external borrowing needed to fund the project. Justification � Reconstruction to current state and county standards to address pedestrian safety and promote multi-model transportation.This is a cooperative agreement with Hennepin County. In July 2008,the City officially began a study of the Douglas Dr corridor.The study,funded by a grant awarded by Tra.nsit for Livable Communities in parhiership with the Federal Highway Administration,and the Minnesota Department of Transportation,focused on a redesign of Douglas Dr and on establishing a long-term vision for the corridor. Expenditures 2012 2013 2014 2015 2016 Total Land Acquisition 675,000 2,454,000 3,129,000 Construction/Maintenance 1,881,100 13,169,550 15,050,650 Other 252,350 875,000 4,020,100 5,147,450 Total 927,350 1,881,100 875,000 6,474,700 13,169,550 23,327,100 Funding Sources 2012 2013 2014 2015 2016 Total Franchise Fees 610,000 610,000 610,000 610,000 610,000 3,050,000 Hennepin County 1,357,000 9,254,500 10,611,500 MN DOT 1,000,000 1,000,000 Street Reconstruction Bonds 7,608,250 7,608,250 Transit Livable Communities(T 375,000 675,000 1,050,000 Total 985,000 2,285,000 610,000 9,575,250 9,864,500 23,319,750 Page 104 city of olden va e Capital Improvement Program 2012-2016 Appendix Section 105 Exhibit A Special Assessment Policy for The City of Golden Valley January 17, 1995 Amended February 21, 1995 Amended June 7, 2005 Amended July 18, 2006 Amended January 20, 2009 General Minnesota State Law, Chapters 429.010 to 429.11, provides municipalities the ability to make public improvements such as installation of sanitary sewer, water, storm sewer, sidewalks, and street improvements (including grading, curb and gutter, surFacing, and lighting). The procedures that Cities must follow, including reports, notices, and public hearings, are well defined within the laws. The Statute allows municipalities to assess all or portions of the costs of any improvements to property owners based on the benefits received from the project. The Statute is not specific regarding the determination of benefits to a property, or how to apportion the costs to the benefiting properties. Rather, the law makes the municipality responsible for developing an equitable method of cost sharing among the benefiting property owners. The purpose of this special assessment policy is to provide a guide, to be used by City Staff, for preparing assessment rolls for approval by the City Council. This policy is meant to assure uniform and consistent treatment to all properties within the City as improvements occur. The special assessment policy will not cover all possible assessment situations. Special cases and variations of standard cases that are not specifically discussed under this policy will be evaluated during preliminary project studies, and assessments will be determined that do not violate the benefit principles as required by Statute. No special assessments will be levied against designated floodplains, municipal storm water ponds or wetland areas on private property as determined by criteria in the Wetland Conservation Act of 1991 and the Minnesota Department of Natural Resources. The limits of wetlands will be determined by the City on a case-by-case basis at the time of preliminary project design and feasibility report preparation. No special assessments will be levied against railroad, county highway or state highway rights-of-way. Properties fronting County Roads and County Highways will be subject to special assessments for reconstruction projects based upon this policy. 106 Special assessments levied by the City will include an administrative fee, to be established annually by ordinance, to finance indirect costs associated with the assessment that are incurred by the City. Sanitary Sewer and Water Main Assessments Reconstruction and Repairs No special assessments will be levied for repair and reconstruction of existing sanitary sewer and water main systems, except for properties that have not been previously assessed for these utilities. For properties not previously assessed that are adjacent to sanitary sewer or water main reconstruction projects, the amount of special assessments will be calculated on a case-by-case basis at the time of preliminary design and feasibility report preparation. Property owners are responsible for maintenance, repair and replacement of sanitary sewer services from, and including the connection to the main, and the building being served. Pavement Management street reconstruction projects will include an opportunity for property owners to reconstruct or repair their sanitary sewer services. All costs, including construction, administration and other indirect costs, will be specially assessed to the property being served by the sanitary sewer service. The City is responsible for maintenance, repair and replacement of water services from the connection to the water main up to and including the curb stop or valve on the service line. The property owner is responsible for maintenance, repair and replacement of the water service from the connection of the service pipe to the valve or curb stop, to the building being served. New Construction In instances where property is developing or redeveloping, public sanitary sewer and water main may need to be installed. The construction of City sanitary sewer, water mains and storm sewer to serve these properties will be constructed as public improvement projects, unless the City opts to have the developer design and construct the improvements. The developer of such properties will be responsible for the entire cost of public utilities, including construction, administration and other indirect costs, whether construction is performed as a City Improvement Project or by the developer. At the time such a development project is proposed, the Public Works Department will determine if the project is to be constructed publicly or privately. If the utility installation is to be constructed privately, the developer will be responsible for preparing construction plans and specifications consistent with City standards. These construction plans and specifications must be reviewed and approved by the Public Works Department. The utility installation must also be inspected by the Public Works Department during construction. The developer will be responsible for 100% of the costs of City construction io� observation and plan review, which will be billed directly to the developer. Any unpaid costs incurred for these services will be assessed against the developing properties. An irrevocable letter of credit must be posted by the developer in an amount equal to 150% of the estimated construction costs to ensure timely completion of the project. If a public sanitary sewer or water main project is to be installed as a City Improvement Project, the developer will be responsible for 100% of the direct and indirect costs incurred by the City. These costs may include, but are not limited to: feasibility report preparation, preliminary survey, preliminary design, final design, construction staking, construction observation, as-built surveying and drafting, and administrative and legal costs. The developer may ele�t to have these costs assessed against the property being developed or pay the costs directly to the City. Storm Water Drainage Street Storm Sewer No special assessments will be levied for construction or reconstruction of storm sewer systems within the City right-of-way as part of the Pavement Management Program. However, in instances where storm sewer construction is incorporated into Pavement Management Projects to resolve rear yard drainage issues, as discussed in this policy, the costs associated with these improvements will be specially assessed to the benefiting property owners. In instances where storm sewer installation is required for development and redevelopment projects, it shall be specially assessed to the property being developed according to the Sanitary Sewer and Water Main Assessments section of this policy. Rear Yard Storm Sewer In certain instances, storm sewer is necessary in rear yard areas to correct existing drainage problems. City staff will visit such problem areas at the request of a homeowner to evaluate the situation and provide engineering assistance to encourage property owners to remedy the drainage problems without City involvement. If a property owner or owners cannot remedy the rear yard drainage problems, they may petition the City for installation of storm sewer. Upon receiving a request for petition for rear yard storm sewer, engineering staff will determine the properties that contribute storm water runoff to the problem area. The petitioner must then circulate the petition to the contributing property owners for signatures. Each contributing property owner must be made aware that special assessments will be levied against their property for the corrective storm sewer work. A minimum of 35% of the contributing property owners must sign the petition for the City Council to consider the project. Upon receipt of the petition and after a public hearing, the City Council may either deny the request or order the storm sewer improvements. If the improvements are ordered, the contributing property ios owners will be assessed for 100% of the construction and indirect costs for the storm sewer installation. The method of assessment and the pro-ration of costs will be determined on a project-specific basis. Affected property owners in rear yard drainage projects will also be required to dedicate all drainage and utility easements for the installation of the storm sewer at no cost to the City. If the City must purchase or condemn in order to obtain the easements, the entire acquisition costs will be included in the project costs for assessment or the City may decline to undertake the project. Street Improvements DevelopmenURedevelopment Prolects When property is developed or redeveloped that has street frontage on roadways that are scheduled for construction or reconstruction, the development will be required to pay an escrow for the future street rehabilitation. The escrow shall be based upon the assessment methods and land uses contained in this policy, and shall be based on the assessment rates in effect at the time the development is approved. The property or properties within the development will not be specially assessed at the time street rehabilitation occurs. Sidewalks No special assessments will be levied for sidewalk construction that is in accordance with the goals and recommendations of the City of Golden Valley Sidewalk Committee. Requests for sidewalks that are not on the current Sidewalk and Trail Plan will be forwarded to the Sidewalk Committee for consideration. The Sidewalk Committee will forward its recommendations for the requested sidewalks to the City Council, which will determine if the proposal should be included in the Sidewalk Plan. Street Lighting, Street lighting is available to the residents of Golden Valley on a petition basis according to the Street Lighting Policy. New Street Construction As property within the City develops or redevelops, it may be necessary to install public streets. The Public Works Department will determine if the project is to be installed publicly or privately. The procedures, policies, and requirements for street construction will be the same as discussed for new sanitary sewer installations. Sealcoatina No special assessments will be levied for street sealcoating. Bituminous Milling and Overla�rs No special assessments will be levied for bituminous milling and overlays. 109 Street Reconstruction Special assessments for street reconstruction projects will be in accordance with this policy and Minnesota Statutes, Chapter 429. The total amount of the special assessments will be a minimum of 20% of the street reconstruction costs not to exceed the benefit received by each property. Special assessment rates for all land uses and street classifications will be determined annually by ordinance. Local Streets 1. Properties with residential and duplex residential land use, parks and other City- owned properties subje�t to reconstruction will be assessed on a per-unit basis, with one unit assessed to each property unless the property has the potential to be further subdivided into two or more lots that each meets City subdivision ordinance requirements. Such lots that may be so subdivided shall be assessed for the number of units that equals the number of such lots that the property may be subdivided into. However, residential properties that are subject to multiple unit assessments will have all but one of such unit assessments deferred at the time of the initial assessment. Such deferral will be made each year until such time as the property is subdivided. At that time, the deferred unit assessments shall be due. 2. Special assessments against properties with Multiple Dwelling land use will be on a front-foot basis, with 100% of the frontage being improved subject to assessment. 3. Properties with church, school and other tax exempt land uses will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. 4. All other land uses, including commercial, industrial, business and offices will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. 5. Residential properties adjacent to local streets being reconstructed may participate in voluntary programs to have their driveways reconstructed and sanitary sewer service repaired or reconstructed at contract unit prices. Residents will be notified of these programs at informational meetings for each street project. If a resident participates in these programs, staff will coordinate construction with the contractor and will measure the quantities installed. The construction costs, along with an administrative fee, established annually by ordinance, will be assessed to the property owner. 6. When a corner residential lot has frontage on two local streets, it will be assessed for one-half unit assessment for each street subject to reconstruction. No more than one total unit assessment will be charged against a parcel for street reconstruction. Corner properties adjacent to State Aid and local streets will be charged one-half of the appropriate unit assessment at the time of reconstruction of each street. iio 7. Corner residential properties adjacent to a local street and a state or county roadway will not be subject to special assessments by the City for state highway or county road reconstruction. However, these properties will be assessed the appropriate number of unit assessments for the entire frontage along the local streets when reconstruction occurs on the local street. 8. Residential properties adjacent to frontage roads of state highways will be considered to be on local or Municipal State Aid streets and will be assessed consistent with this policy. 9. Special Assessments for properties not specifically covered in any of the above cases will be addressed on a parcel-specific basis at the time of the feasibility report. State Aid Streets 1. Properties with residential and duplex residential land uses that have frontage on a Municipal State Aid Street will be assessed on a per-unit basis. The per-unit assessment rate will be approximately 25% of the standard residential rate for properties on local streets. Assessments for oversized parcels with the potential for subdivision are to be consistent with the previously discussed policy for local streets. 2. Properties with Multiple Dwelling land use that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. Properties with church, school, and other tax-exempt land uses that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. All other land uses, including commercial, industrial, business and offices that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. 3. Special assessments for properties not specifically covered in any of the above cases will 6e addressed on a parcel-specific basis at the time of the feasibility report. 4. Residential properties adjacent to State Aid streets being reconstructed will be given the option of having their driveways and sanitary sewer services repaired or reconstructed under the same terms discussed in the local street reconstruction portion of this policy. Coun Roads 1. Properties with residential and duplex residential land uses adjacent to county roads will be assessed according to the previously discussed methods for local streets, except for corner lots with local streets, which will be assessed in full at tt� the time the intersecting local street is reconstructed. Special assessments to residential properties will be at State Aid street rates. 2. All other land uses, including commercial, industrial, business, and tax-exempt uses will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. The assessment rate shall be the rates used for State Aid streets as established by ordinance. Low Income Senior Citizen and Disability Deferments As required by Minnesota Statute, the City has a special assessment deferral policy for low income senior citizens and disabled persons meeting all of the following criteria: 1. The property upon which the assessment is deferred must be homesteaded; 2. The property is owned by a person at least 65 years of age on January 1 st of the year in which payment of the first installment of the subject assessment is due; or is owned by a person who is retired due to permanent and total disability. 3. The applicant must have a "financial hardship" defined as: a) An annual income at or below a level established annually by ordinance and; b) The aggregate total of all special assessments levies will exceed one and one- half percent (1-1/2%) of the applicant's annual income. More information is available at General Services Office (763.593.8020). Street Reconstruction Special Assessment Rates Special assessment rates as discussed in this policy will be established yearly with the Annual Fee Resolution. The rates will be based on the percentages of construction and indire�t costs as discussed above. Indirect costs are estimated to be 30% of the constru�tion costs and include administration, engineering, construction observation, and legal fees. These rates will be subject to revision each year based on the actual construction costs in the City from the previous year and for inflation based upon the ENR Index for construction costs. 112 �it�r- __ ��f �\ ,— , \ 11 o , � � e VEHICLE AND EQUIPMENT REPLACEMENT GUIDELINES Public Works Department Vehicle Maintenance Division Management Methodology To manage the City's fleet in a manner that theoretically all of the City's motorized equipment and vehicles are maintained and disposed of by the Public Works Department Vehicle Maintenance Division. The Vehicle Maintenance Division has full responsibilifiy for vehicle and equipment maintenance and the equipment users are charged an hourly repair rate for all service and repairs. 1. Expected Life When new vehicles or equipment are purchased, it is given an expected life (years in service) based on a variety of factors. Below are the estimated life expectancies for some of the significant pieces of equipment: a. Engine Pumpers 20+ years (refurbish half way through life cycle) b. Tandem Dump Trucks 12 years c. Single Axle Dump Trucks 12-14 years-some longer d. Wheel Loaders 15-18 years e. Backhoe/Excavators 10-12 years f. Jet Truck 10 years g. One-Ton Trucks 9-10 years h. 3/ and '/Ton Pickups 10 years-some longer i. Skid Steers 8-10 years j. Street Sweeper 8 years k. Tractors Varies (15 years average) I. Vactor Truck 10 years m. Mowers Varies (6-10 years) n. Sport Utility Vehicle 10 years o. Passenger Cars/Vans 10 years p. Squad Cars 100,000 miles/4 years q. Trailers 15 years r. Sidewalk Machines 10-12 years 113 2. Replacement Factors When a particular piece of vehicle or equipment achieves its expected life and reaches its anticipated replacement year, it is analyzed to determine if it should be replaced based on the following factors: a. Critical nature of the equipment or vehicle and the availability of a backup or alternative equipment or vehicle. For example, the Sewer Jet is a critical piece of equipment for which there is no backup except to contract for those services. It is important to have this equipment operational with minimal downtime. b. Use of the equipment or vehicle (hours and/or miles). The duration and intensity of use are also important factors. For example, squad cars typically achieve their expected life of 100,000 miles and are retired in approximately 4 years while other vehicles (cars and light trucks) may never achieve 100,000 miles and can last for many years. c. Appropriateness of the equipment or vehicle for the assigned tasks. Public Works and the user examines whether the equipment or vehicle is still capable of doing its intended work, whether it is the right equipment, and determine if the work changed causing the equipment or vehicle to be obsolete. d. Repair history, costs, and downtime. Mechanics provide critical input and assessments of the overall condition of the equipment. Near the end of the expected life of the equipment or vehicle, repair costs can exceed the value of the equipment or vehicle and replacement is appropriate. e. Suitability of the equipment or vehicle for other tasks. Other departments provide input regarding the ability to reassign equipment and vehicles to other less frequent or intense duties. For example, Public Works have re-assigned used marked squad cars and light pickup trucks to other departments. 3. Life Cycle Costing This accounting method is used as much as possible in managing the City's fleet management. Life cycle costing includes the purchase cost of the equipment or vehicle, lifetime maintenance and operation costs, and the residual value at the time of disposal. This is the true cost of equipment or vehicle ownership. The goal is to replace the equipment during its economic life. This is the period when the maintenance costs are the lowest. 4. Fire Department Vehicle Replacement Practice Fire apparatus is historically refurbished half way through its life cycle (approximately 10-12 years) and replaced after 20 to 24 years of service, or a couple of years longer depending on condition. This general rule applies to "major" apparatus, engine, and ladder trucks. The replacement of a particular piece of apparatus is based upon several factors including the general mechanical and structural condition, required vehicle and safety upgrades, technological changes, 114 current and anticipated use, anticipation of future mission changes; and the current mechanical history (including mileage). The apparatus replacement schedule is revised to refle�t a philosophy of validating the replacement of a vehicle, as opposed to replacement based solely upon the age of the vehicle. To this end, vehicles have been moved back in the replacement schedule and not replaced at the time mark historically associated with replacement schedules. Refurbishing pumpers and ladders to extend the "life" of fire apparatus is a common practice. Refurbishing pumper and ladder fire vehicles extends vehicle life. - 115