Loading...
11-02-11 JWC Agenda PacketAGENDA JOINT WATER COMMISSION 1:30 pm — November 2, 2011 Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Minutes — October 5, 2011 3. County Road 9 Forcemain Replacement (Mathisen) 4. Other Business 5. Adjournment JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of October 5, 2011 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:30 pm, in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Sue Virnig, Finance Director, Golden Valley Jeannine Clancy, Director of Public Works Bert Tracy, Public Works Maintenance Manager, Golden Valley Tom Mathisen, Director of Public Works, Crystal Randy Kloepper, Water and Sewer Superintendent, Crystal Guy Johnson, Director of Public Works, New Hope Pat Schutrop, Administrative Assistant, Golden Valley Minutes of September 7, 2011 MOVED by Norris, seconded by McDonald, and motion carried unanimously to approve the minutes of the September 7, 2011 meeting. Update on 24 -Inch Valve Replacement (Mathisen) Crystal is proposing to replace the 24 -inch valve at the 34th and Douglas location this fall and not replace the valve at Bass Lake Road and Broadway as shown on the CIP until next year. Hennepin County wants to keep the intersection open at Bass Lake Road and Broadway due to work the County is doing in the area. Costs will be comparable. Water Interaction Study Proposal (Clancy) The TAC met with Barr Engineering Co. on Monday, October 3, to discuss the backup water supply proposal submitted by Barr. The proposal was narrowed to fit the first steps and expectations of the JWC. Barr submitted a revised proposal for a water interaction study that would help understand the potential for unintended and undesirable chemical interactions if a groundwater source is mixed in the current water system. The study would include modeling, a bench scale study, meetings, analysis, and report preparation at a cost of $19,000. The modeling component will also show how the well water will interact with the distribution system. I:\Joint Water Commission\JWC Minutes\2011 JWC Minutes\10-05-11 JWC Minutes.doc Joint Water Commission October 5, 2011 Page 2 of 2 The Commission discussed what stage of the study process should be presented to the three city councils. The consensus was to wait until the interaction study was complete to eliminate the unknowns regarding the use of groundwater as an emergency backup supply and determine how it will interact with the current water supply and its effects on the distribution system. MOVED by McDonald, seconded by Norris and motion carried unanimously to direct Barr Engineering Co. to perform the Water Interaction Study. Other Business County Road 9 Project—The TAC has not heard back from Hennepin County regarding cost sharing for the project. Norris will contact Jim Grube, Hennepin County Transportation Department Director, and Mathisen will also contact Hennepin County staff the TAC has been working with in the project process. Next Meeting The next meeting will be Wednesday, November 2, 2011, at 1:30 pm. Adjournment Chair Burt adjourned the meeting 2 pm. Thomas D. Burt, Chair ATTEST: Pat Schutrop, Recording Secretary I:\Joint Water Commission\JWC Minutes\2011 JWC Minutes\10-05-11 JWC Minutes.doc