Loading...
12-07-11 JWC Agenda PacketU04 L, 107-11 JOINT WATER COMMISSION 1:30 pm — December 7, 2011 Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Minutes — November 2, 2011 3. County Road 9 Forcemain Replacement (Mathisen) 4. Water Interaction Study Update (Clancy) 5. Air Conditioning Project Update (Tracy) 6. Other Business 7. Adjournment This document is available in alternate formats upon a 72 -hour request. Please call 763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats may include large print, electronic, Braille, audiocassette, etc. JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of November 2, 2011 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:30 pm, in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Staff Present Tom Mathisen, Director of Public Works, Crystal Guy Johnson, Director of Public Works, New Hope Sue Virnig, Finance Director, Golden Valley Bert Tracy, Public Works Maintenance Manager, Golden Valley Dave Lemke, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of October 5, 2011 MOVED by Norris, seconded by Burt, and motion carried unanimously to approve the minutes of the October 5, 2011 meeting. County Road 9 Forcemain Replacement (Mathisen) Hennepin County has agreed to pay 27.5 percent of the project costs. A number of details are yet to be worked out. TAC members are in discussions with Mark Hanson, Stantec-Bonestroo, regarding additional inspections needed, soil corrections, what will happen to the old pipe, etc. The project will be constructed in 2013-2014. Plans and specifications should be done in June or July 2012. Mathisen said the TAC will have answers to many of the outstanding issues at the next JWC meeting. Other Business 1. Virnig distributed a StarTribune article entitled "Minneapolis Proposes New $5 Water -Sewer Fee." The fee is designed to cover a small portion of the fixed costs of running the city's water and sewage utilities whether the residents use the water or not. 2. Crystal is in the process of replacing its 24 -inch valve on Douglas Drive. 3. New Hope, Crystal, and Golden Valley staff met at the New Hope well house on Tuesday, November 1, with Steve Nelson, Bolton & Menk, and staff from MDH to inspect the emergency well. MDH requested that an operating plan be developed describing how and when the well will be used as part of MDH's consideration in reinstating the well for emergency backup. hkint Water Commission\JWC Minutes\2011 JWC Minutes\11-02-11 JWC Minutes.doc Joint Water Commission November 2, 2011 Page 2 of 2 4. Water Interaction Study. Clancy met with Brian LeMon, Barr Engineering Co. The results of the water modeling portion of the study will be ready for the JWC to review at the next meeting. Burt would like to also discuss when and how to communicate information to the three City Councils at the next meeting. 5. Tracy is waiting for price quotes from Total Control for the security system and pump house control upgrades. He will update the JWC at the next meeting. 6. To date, work has not started on the air conditioning project. Adequate funding was budgeted for the equipment, but not for the electrical portion. Funding for the electrical will now come from a portion of the remaining funding balance for the motor starter replacement project. Tracy will put the project approval on the next JWC meeting agenda. 7. The pump motor and starter replacement projects for Golden Valley and Crystal are underway. Keys Well Drilling is the contractor doing the work. Next Meeting- The eetingThe next meeting will be Wednesday, December 7, 2011, at 1:30 pm. Adiournment Chair Burt adjourned the meeting 1:40 pm. Thomas D. Burt, Chair ATTEST: Pat Schutrop, Recording Secretary I:Uoint Water CommissionWWC Minutes\2011 JWC Minutes\11-02-11 JWC Minutes.doc G Id n galley Date: December 6, 2011 To: Joint Water Commission -,,,, i " 91 Public Works 763.593.8030 / 763.593.3988 (fax) Through: Jeannine Clancy, Director of Public Works From: Bert Tracy, Public Works Maintenance Manager Dave Lemke, Utilities Maintenance Supervisor Subject: Air Conditioning Project at Golden Valley Pump House The Joint Water Commission (JWC) 2011-2015 Capital Improvement Program includes $30,000 in 2011 for an air conditioning project and $47,000 for replacement of three motor starters at the Golden Valley JWC pump house. At the May 4, 2011 meeting, the JWC approved a contract with Environmental Process Inc. to develop options, prepare construction documents for mechanical and building modifications, and complete construction project management for a total cost of $10,400. At the June 1, 2011 meeting, the JWC authorized the Golden Valley City Manager to sign an agreement for the JWC Golden Valley pump house air conditioning project at a cost not to exceed $20,000. In order to meet the set budget, Golden Valley staff requested Flag Builders and Metropolitan Mechanical to submit a quote for the project excluding electrical. The quotes are listed below: Flag Builders of Minnesota, Inc. $36,925 Metropolitan Mechanical Contractors $18,323 In order to complete the project, Golden Valley staff requested an electrical installation quote from Detail Electric for the electrical portion. Detail quoted $8,300 for the needed electrical installation. In order to complete the air conditioning project, Golden Valley staff is requesting authorization to utilize the remaining $20,000 in the JWC CIP Replace Air Conditioners budget and utilize $10,000 from the $47,000 in the Replace Pump, Motor, and Starter at GABert TracyUWC DocumentsTump HouseWir Conditioning 2011Wir Conditioning 120611.doc Golden Valley Pump Station JWC CIP budget. The $47,000 in the pump motor starters CIP budget is no longer needed because the remaining motor starter replacements are being replaced out of the Replace Pump Motor and Starter at Pump Stations (Golden Valley and Crystal) new pumps, motors and starters project budget. Recommended Action Authorize the following agreements: 1. Metropolitan Mechanical Contractors in the amount of $18,323 2. Detail Electric in the amount of $8,300 GABert Tracy\.JWC DocumentsTump HouseWir Conditioning 2011 Wir Conditioning 120611.doc