Loading...
11-02-11 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of November 2, 2011 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:30 pm, in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Staff Present Tom Mathisen, Director of Public Works, Crystal Guy Johnson, Director of Public Works, New Hope Sue Virnig, Finance Director, Golden Valley Bert Tracy, Public Works Maintenance Manager, Golden Valley Dave Lemke, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of October 5, 2011 MOVED by Norris, seconded by Burt, and motion carried unanimously to approve the minutes of the October 5, 2011 meeting. County Road 9 Forcemain Replacement (Mathisen) Hennepin County has agreed to pay 27.5 percent of the project costs. A number of details are yet to be worked out. TAC members are in discussions with Mark Hanson, Stantec-Bonestroo, regarding additional inspections needed, soil corrections, what will happen to the old pipe, etc. The project will be constructed in 2013-2014. Plans and specifications should be done in June or July 2012. Mathisen said the TAC will have answers to many of the outstanding issues at the next JWC meeting. Other Business 1. Virnig distributed a StarTribune article entitled "Minneapolis Proposes New $5 Water -Sewer Fee." The fee is designed to cover a small portion of the fixed costs of running the city's water and sewage utilities whether the residents use the water or not. 2. Crystal is in the process of replacing its 24 -inch valve on Douglas Drive. 3. New Hope, Crystal, and Golden Valley staff met at the New Hope well house on Tuesday, November 1, with Steve Nelson, Bolton & Menk, and staff from MDH to inspect the emergency well. MDH requested that an operating plan be developed describing how and when the well will be used as part of MDH's consideration in reinstating the well for emergency backup. I:Uoint Water CommissionUWC Minutes\2011 JWC Minutes\11-02-11 JWC Minutes.doc Joint Water Commission November 2, 2011 Page 2 of 2 4. Water Interaction Study. Clancy met with Brian Letson, Barr Engineering Co. The results of the water modeling portion of the study will be ready for the JWC to review at the next meeting. Burt would like to also discuss when and how to communicate information to the three City Councils at the next meeting. 5. Tracy is waiting for price quotes from Total Control for the security system and pump house control upgrades. He will update the JWC at the next meeting. 6. To date, work has not started on the air conditioning project. Adequate funding was budgeted for the equipment, but not for the electrical portion. Funding for the electrical will now come from a portion of the remaining funding balance for the motor starter replacement project. Tracy will put the project approval on the next JWC meeting agenda. 7. The pump motor and starter replacement projects for Golden Valley and Crystal are underway. Keys Well Drilling is the contractor doing the work. Next Meeting The next meeting will be Wednesday, December 7, 2011, at 1:30 pm. Adjournment Chair Burt adjourned the meeting 1:40 pm. ATTEST: J L�z L A wa 2 - Pat kchutrop, Recording ecretary I:Uoint Water CommissionUWC Minutes\2011 JWC Minutes\11-02-11 JWC Minutes.doc