Loading...
12-07-11 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of December 7, 2011 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:30 pm, in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Tom Mathisen, Director of Public Works, Crystal Randy Kloepper, Water and Sewer Superintendent, Crystal Paul Coone, Operations Manager, New Hope Bernie Weber, Utilities Supervisor, New Hope Sue Virnig, Finance Director, Golden Valley Jeannine Clancy, Director of Public Works Dave Lemke, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of November 2, 2011 MOVED by Norris, seconded by Burt, and motion carried unanimously to approve the minutes of the November 2, 2011 meeting. County Road 9 Forcemain Replacement (Mathisen) Stantec/Bonestroo submitted a proposal in the amount of $715,000 for the total estimated construction cost for the project that includes installation of a 24 -inch pipe. The TAC recommended approval of the pre -design field work ($7,150) and the engineering portion ($50,050) for a total of $57,200. MOVED by McDonald, seconded by Norris, and motion carried unanimously to approve the Stantec/Bonestroo proposal for pre -design field work and engineering in the amount of $57,200. Discussion took place regarding the inspection of the watermain work during construction. The TAC will discuss the best approach. Stantec included $7,150 in its proposal for inspections, but that amount is for on-call issues that might arise during the project construction. A recommendation from the TAC regarding the inspection will be brought to the JWC. I:Woint Water Commission\JWC Minutes\2011 JWC Minutes\12-07-11 JWC Minutes.doc Joint Water Commission December 7, 2011 Page 2 of 3 Water Interaction Study Update (Clancy) The TAC has not received an update from Barr Engineering Co. Clancy will follow-up and contact Brian LeMon at Barr. Air Conditioning Project Update (Lemke) Currently, there are operational difficulties at the Golden Valley pump house during the summer due to inadequate cooling systems. Environmental Process, Inc. was retained to develop options, prepare construction documents for mechanical and building modifications, and complete construction project management. Two quotes were received for the project, excluding electrical. The low quote received was from Metropolitan Mechanical Contractors in the amount of $18,323. An electrical quote was received from Detail Electric for $8,300. Completion will be done in 2012. Golden Valley staff is requesting $10,000 to be moved from the Replace Pump, Motor and Starter (JWC 2011 CIP project #8) to Replace Air Conditioner (JWC 2011 CIP project #11). MOVED by Norris, seconded by McDonald, and motion carried unanimously to move $10,000 from the Capital Project Financing from #8 Replace Pump, Motor and increase $10,000 Starter to #11 Replace Air Conditioner. CIP #8 will be $37,000 and CIP #11 will be $40,000. MOVED by Norris, seconded by McDonald, and motion carried unanimously to approve the quotes received from Metropolitan Mechanical Contractors in the amount of $18,323 and Detail Electric for $8,300, for a project total of $26,623; and appropriating funds as proposed. Other Business 1. Burt indicated that the Minneapolis Park Board may be interested in building trails near the reservoir in Golden Valley. 2. Cost of services and the Minneapolis contract. This item will be discussed at the next meeting. 3. The backup water supply well at New Hope has a floor drain that needs to be addressed. 4. The JWC would like to have a tri -city council meeting in March or April 2012 to discuss the backup water supply plan. 5. Golden Valley staff met with Bernie Bullert, Minneapolis Water Works, and staff from Stantec/Bonestroo on Monday, December 5, at the JWC Golden Valley pump house to discuss meter replacement. Stantec will provide Golden Valley with a proposal involving digging a new pit and filling in half of the old pit so that Minneapolis can install its new meter. Next Meeting It was the consensus of the JWC to cancel the January 4, 2012 meeting. (:\Joint Water Commission\JWC Minutes\2011 JWC Minutes\12-07-11 JWC Minutes.doc Joint Water Commission December 7, 2011 Page 3 of 3 Adjournment Chair Burt adjourned the meeting 1:50 pm. �", ATT ST: Pqt Schutrop, Recording Secretary (:\Joint Water CommissionUWC Minutes\2011 JWC Minutes\12-07-11 JWC Minutes.doc