05-23-05 PC Agenda
AGENDA
GOLDEN VALLEY PLANNING COMMISSION
Regular Meeting
Golden Valley City Hall, 7800 Golden Valley Road
Council Chambers
Monday, May 23,2005
7pm
I. Approval of Minutes
April 25, 2005 Joint Planning Commission and City Council Meeting
II. Informal Public Hearing - Final Plan Review - PUD No. 91 Amendment #1 -
Rudy Luther Toyota
Applicant: The Luther Company Limited Partnership
Address: 8801, 8909 and 8989 Wayzata Blvd.
Purpose: The amendment would allow for the redevelopment of the Luther
properties including the demolition of the five existing buildings and
construction of a new 70,000 square foot Toyota/Scion building and a
45,000 square foot Jaguar/Land Rover building.
III. Informal Public Hearing - Preliminary Plan Review - PUD No.1 01- Maywood
Applicant: Kingman Building Company
Address: 5609 Olson Memorial Highway and 435 Turners Crossroad North
Purpose: The Planned Unit Development would allow for the construction of 8
single family detached homes.
IV. Informal Public Hearing - Preliminary Plan Review - PUD No. 100 - North
Wirth Business Center
Applicant: KRJ North Wirth LLC
Address: Lot 1, Block 2, North Wirth Parkway - Located on Dahlberg Drive
Purpose: The Planned Unit Development would allow for the construction of an
office condominium project totaling 31,500 square feet comprised of
six buildings, phased over time.
-Short Recess-
V. Reports on Meetings of the Housing and Redevelopment Authority, City
Council, Board of Zoning Appeals and other Meetings
VI. Other Business
A. Revisions to City Code and Council Guidelines Related to Boards and
Commissions.
B. Board/Commission Recognition Dinner - Wednesday, June 29 at 6:30 pm
VII. Adjournment
.
.
.
Joint Meeting
City Council and Planning Commission
1-394 Corridor Study Kick-Off Presentation
April 25, 2005
A joint meeting of the City Council and the Planning Commission was held at the
Golden Valley City Hall, Council Chambers, 7800 Golden Valley Road, Golden Valley,
Minnesota, on Monday, April 25, 2005. Mayor Loomis called the meeting to order at 7
pm.
Those present were Planning Commissioners Cera, Eck, Keysser, R
Schmidgall and Waldhauser and Mayor, Loomis and Council Me r
Grayson, Pentel and Shaffer. Also present were Director of Pia a
Mark Grimes, Assistant City Manager, Jeanne Andre, URS PI
Showalter, Suzanne Rhees and Eric Padget and Administra
I. 1-394 Corridor Study Kick-Off Presentation
Grimes reminded the Council Members and Pia
5:30 pm there will be a tour of several different
redevelopments.
He explained that this presentation is t
the 1-394 corridor and introduced th
Dave Showalter, URS said that assist the City with this corridor study
process and help provide th me vis n and the opportunity to create value
in the Corridor and to find e the process and bring in as many
stakeholders as possibl He referred to the Commercial-Industrial
areas in the Corridor and at they are trying to identify and encourage
opportunities for int d update of some of these properties. He talked about
land use linka and ues and the opportunities to look at north/south
connections in e discussed housing issues and looking at areas that
could pos' s er density residential uses. He referred to storm water
manag regulatory issues in the zoning code. He stated that they are
looking with the 1-394 Corridor being first and the upper level of the
T 55 Co He referred to a timeline chart and stated that they are anticipating
the dy to lete within 12 to 14 months. He explained that they will be using a
regul er' newsletters that would build on Envision Golden Valley. He stated that
they wi! porting some events including a mobile tour, training, surveys, focus
groups and regular joint meetings with the Planning Commission and Council.
here URS is in their study of
Showalter referred to a map showing intersection concerns and capacity and stated that
there are a series of good east/west connections in the corridor and that they are
looking at opportunities to better move north and south through the district. He
explained that as a part of this study they will be looking at the street capacities and the
issues surrounding future land use, the opportunity to combine rails and trails and the
importance of the watershed and storm water management ponding.
Joint meeting of the City Council & Planning Commission
April 25, 2005
Page 2
. Suzanne Rhees referred to a map of the area and stated that they came up with a
different set of land use categories to capture the existing uses in the corridor and to
understand the character of the corridor. She said the first category is corporate and
multi-tenant offices such as Allianz, The Colannade and the Florida West building. She
said the next category, which is more predominant in the corridor area, are office-
showroom-light industrial such as Golden Hills Office Park. The next category is the
general industrial uses which generally have higher truck traffic. Another category is the
auto related uses including dealerships and auto services. She talked about the variety
and character of commercial uses in the corridor such as franchises, 10' nd dining.
The next category she discussed was institutional and multi-family u
.
.
Rhees discussed the residential neighborhoods in the corridor a
an attractive, rustic character which is unusual considering its
neighborhoods have a good pedestrian connections and a
She added that the thing that may be lacking is the vehicular
which may be seen by some people as a strength, rat tha
people living in this area are obviously heavily impa
have
at the
tem.
nections
because
Pentel asked Rhees what led her to think that th
connections. She said that many of the resi
there not be strong north/south connecti
traffic from 1-394. She said she unders
for pedestrians but not vehicular co
connections is not intended to b
addressed and that that is som
around the area. Freiberg s
the neighbors would not
and stated that they wan
they come up with re
more and more tra
creates some n
wan more north/south
ods would prefer that
afraid of cut-through
od north/south connections
id that the north/south vehicular
tudy, ut that it is an issue to be
served while driving and walking
s in that area and he can say confidently that
Laurel Avenue on their streets. Rhees agreed
Council, businesses and residents before
dations, but that it is an issue in this study because
nto the few streets that do go north and south and it
ns.
s zoning districts located throughout the corridor. She stated
oned industrial. She explained that PUDs have been used
r nning in this area because the existing zoning is not quite
chieve that level of design control. She referred to a table and
lot areas and parking and setback requirements. She stated that
interested in learning about is whether there are any conflicts between
the com and industrial districts as far as the way people use the facilities and
how it functions.
Eric Padget pointed out that this is not a traffic study and that there have been several
traffic studies already done in this area. He explained that congestion as a whole is not
so much a daily congestion issue but there are definitely peak times when congestion is
an issue. He discussed some of the recent studies that have been done and stated that
they have not shown a real congestion issue, but the reason they are talking about
traffic is because more intense development will bring more traffic or certain land uses
Joint meeting of the City Council & Planning Commission
April 25, 2005
Page 3
. could bring more traffic. He referred to the LaurellWinnetka Study and improvements
and the desire for trail connections and transit connections in order to tie into the
existing regional system.
Grayson aske
residents. Sho
providing'
added
order to
reo ents
Grimes referred to the issue of public involvement and said that it is critical to the
success of the process. He referred to the Envision process and said that this study
builds on that process. He discussed the primary focus area which is the
commercial/industrial area south of Laurel Avenue and east of Rhode Island, and the
secondary focus area which is the 1-394 neighborhood south of Highwa etween
Highway 100 and Brookview Parkway. He stated that every issue of t swill
have a story on the study and that there will be presentations to va '0 rting
in July. He discussed the various ways the City is looking for fee ck bout
the business and residential surveys and the visual preferenc e
available at the Golden Valley Days festival.
Rhees discussed the visual preference survey and sh
from various development projects that have been
surveys.
.
Pentel asked how much uniqueness would
survey. Rhees stated that there is alway
is not scientific and that it is more subj
Pentel suggested having some mor
survey.
the visual preference
rprise. She agreed that it
ed to get people thinking.
nsity developments in the
Grimes reminded the Coun
tour of other corridor dev
cameras would be given
types of good and b de
nd Commissioners that they will be going on a
Twin Cities on May 2. He explained that
rder for them to take pictures of different
ays that the City is going to try to get input from the
various ways to get feedback from residents including
ks, grocery stores, libraries and community centers. Grimes
to be mailed to all of the residents in the corridor ~rea in
back as possible. Pentel asked that staff make sure that
apartments get a survey as well.
d that the goal of the corridor study is to have URS come up with
concepts en have zoning and ordinances that help realize the chosen concepts.
Showalter reiterated that this study will help the City get ahead of what it will be facing in
the few years. He stated that this is a good opportunity to do something that has not
been done before in creating a model of freeway development.
.
Shaffer said that this is a process he hopes citizens get involved in and have fun doing.
Joint meeting of the City Council & Planning Commission
April 25. 2005
Page 4
.
C. Set Advisory group (2 each Council & Planning Commission)
Loomis said that Pentel and Shaffer will be the representatives from the Council for the
advisory group. Keysser said that he and Hackett will be the representatives from
Planning Commission.
- Short Recess -
II. Reports on Meetings of the Housing and Redevelopment Au
Council, Board of Zoning Appeals and other Meetings
Approval of Minutes from the April 11. 2005 Planning Co
MOVED by Waldhauser, seconded by Rasmussen and mot"
approve the April 11. 2005 minutes as submitted.
III. Other Business
No other business was discussed.
IV. Adjournment
. The meeting was adjourned at 8:35
.
,
.
Hey
Planning
763.593.8095 I 763-593-8109 (fax)
Date:
May.t8,.2005
To:
Golden Valley Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject:
Informal Public Hearing on Final PUD Plan for RL T Addition PUD No. 91,
Amendm.ent No.1, Luther 394 Properties, LLC and The Luther Co. Limited
Partnership, Applicants
.
At the March 28, 2005 Planning Commission meeting, the Commission held an informal public
hearing on the preliminary PUD plan for RL T Addition PUDNo. 91, Amendment NO.1. This
PUD. amendment wiUallow for the expansion of PUD No. 91 by permitting the construction of a
new dealership building for Luther Toyota and a new dealership building for Land Rover and
Jaguar. Afterthe hearing, the Commission unanimously recommended approval of the
preliminary PUD plan. As part of that recommendation, the Commission adopted seven
conditions of approval that are outlined in the minutes of that meeting (attached).
This recommendation was passed along to the City Council. At the April 19, 2005 City Council
meeting, the City Council held a public hearing on the RL T Addition PUD No. 91, Amendment
No. 91. After the public hearing, the City Council unanimously approved the preliminary PUD
planfor RL T Addition PUD No. 91. The City Council's approval was subject to seven
conditions that are outlined in the minutes of that meeting (attached). The conditions of
approval made by the City Council adopted those recommended by the Planning Commission
with the exception ofthe recommendation on signs and the addition of one regarding the
lighting plan for the site. The Council asked the staff to work with the applicant to reduce the
overall lighting level on the site. The sign recommendation was eliminated because the City
Council said the matter of signs was covered by the sign code.
After approval ofthe preliminary PUD Plan by the City Council an applicant has 180 days to
submit a.complete Final PUD Plan. The Final PUD Plan must be consistent with the
Preliminary PUD Plan, the PUD Intent and Purpose provisions, standards and other PUD
provisionsJound in the PUD Chapter of the Zoning Code. Luther has gone ahead and
submitted the Final PUD Plan for Planning Commission recommendation. The Planning
Commission is required to hold an informal public hearing on the Final Plan. After the hearing
is held, the Commission is required to make a report to the City Council with its findings,
. recommended conditions or modifications.
1
I
.
Review of Final PUD Plan for RLT Addition PUD No. 91, Amendment No.1
The Final PUD Plans submitted by Lutherare very similar to the Preliminary PUD Plans that
were approved by the Planning Commission and City Council. The Final PUD Plans reflect the
changes that were required by the City when the Preliminary PUD Plans were reviewed. These
changes include revised trash dumpster locations and fire hydrant locations along the north
side of the site.
The City Council did ask that the lighting plan for the site be reviewed to reduce the amountof
light. The City Council believed that the overall light level on the site was excessive. Since that
meeting, Luther has provided the City with a revised lighting plan that reduces the light level by
about 20%. This new plan is shown on the plan sheet related to the lighting of the site. Staff
will have this lighting plan reviewed by a lighting consultant prior to City Council review of the
Final PUD Plan. The Planning Commission did not raise any concerns regarding the lighting of
the site.
City Engineer Jeff Oliver, PE has submitted a memo to me dated May 9, 2005 regarding the
Final PUD Plan. In this memo, he recommends approval of the Final PUD Plan with six
conditions. These six conditions will become a part of the Planning staff recommendation.
Deputy Fire Marshal Ed Anderson has also written a memo to me dated May 10, 2005 listing
concerns regarding the development. These concerns will also be made a part of the Planning
staff recommendation. The recommendations of both the City Engineer and Deputy Fire
Marshal will be addressed as part of the development process.
The timing of the improvements will be addressed as part of this PUD approval. As noted in a
letter to me from Lynn Robson representing Luther dated April 22, 2005, the total construction
. process will take about 24 months. Staff will suggest that Luther have up to 36 months to
complete the PUD in order to allow for some construction delays.
Recommended Action
Staff recommends approval of the Final PUD Plan for RLT Addition PUD No. 91, Amendment
NO.1 with the following conditions:
1. The plan sheets for Luther Golden Valley- R.L. Toyota and Golden Valley Jaguar-Land
Rover prepared by Baker Associates and dated April 22, 2005 shall become a part of this
approval. There are 17 plan sheets. _
2. The recommendations in the memo from City Engineer Jeff Oliver, PE, to Mark Grimes
dated May 9,2005 shall become a part of this approval.
3. The recommendations in the memo from Deputy Fire Marshal Ed Anderson to Mark Grimes
dated May 10, 2005 shall become a part of this approval.
4. From the date of approval of the Ordinance giving approval to the Final PUD Plan for RL T
Addition PUD 91, Amendment No.1, Luther shall complete construction within 36 months.
Attachments
Location Map (1 page)
Minutes from the March 28, 2005 Planning Commission meeting (5 pages)
Minutes from the April 19, 2005 City Council meeting (1 page)
Memo from City Engineer, Jeff Oliver dated May 9,2005 (5 pages)
. Memo from Deputy Fire Marshal, Ed Anderson dated. May 10, 2005 (1 page)
Applicant's Narrative (3 pages)
Site Plans (17 oversized pages)
Preliminary Plat (1 page)
2
.
I ~I
-I
lQ
U)
-I ~
-I
i
\ -I
~
IU
Z
IU
C)
~
\
\
\
\,
\
,
MILLS BLVD TO WB
NERAL INTERSTATE 394 INTERSTATE 394
NB HWY169 TO EB 1394
IU
\ '\
~"\
~~
V) I"
~O'; ''',
~'l>vN169~Jit.~"'> .
O~~~r1~
flJJ~
. l
/~Y169S
----~ W~
NB 1394 _---- INTERSTATE
----- :TE 394
:E 3:~______ ~EB 139t- /--------
E39~_----. SBHWY169..~/.......<. ~~
f1~ /.....
, /
'llll j/ /
.". / /
cc // //
ir /~b< /
/~ //{S ./
~/~<Q ./
'. -A y,O /
~'_ ~'V'~ /
'3a,Cfo ~~~ >/
/.4.... ./
//~- /
'g,~ i
/~ /
-
IN
~ EB 1394 'J; NB
;11.0,
j lIT 1:/
a^#~~~
u u ,._ '" __'V'I_V'"_"'" Vy Y Y XIX X X x-x.xxxx
~
/:/~:
y/ ./// ///
, ,//
WAYZATA BLVD
z
C)
\
\
\
\
\
/' - /':- /
~,.------;.........:~// -.;./ - /"'
WAYZATA~/'
/
Subject Properties:
8801, 8909 and 8989 Wayzata Blvd.
.
.
Regular Meeting of the
Golden Valley Planning Commission
March 28, 2005
A regular meeting of the Planning Com ssion was held at the Gol alley City Hall,
Council Chambers, 7800 Golden Valley oad, Golden Valley . sota, on Monday,
March 28, 2005. Ch' eysser called th meeting to ord pm.
f the Planning Commission.
I.
Ma , 2005 Planning Commission Meeting
MOVED by Rasmussen, seconded by Waldhauser and motion carried unanimously to
approve the March 7, 2005 minutes as submitted.
II. Informal Public Hearing - PUD No. 91 Amendment #1 - Rudy Luther Toyota
Applicant: The Luther Company Limited Partnership
.
Address: 8801, 8909 and 8989 Wayzata Blvd.
Purpose:
To allow for the demolition of the five existing buildings and the
construction of a new 70,000 square foot Toyota/Scion building and a
45,000 square foot Jaguar/Landrover building.
Grimes explained that the applicant is requesting an amendment to their existing PUD for
their property located at General Mills Blvd. and Miller Street. He stated that in May of
2001 the applicant had a PUD approved for their existing property in order to rebuild their
Toyota site. He added that as part of those plans, the right of way to the south was
vacated. He.explained that their original plans were put off for a period of time be.cause
Toyota's plans and products had changed. He stated that Luther Corporation has
purchased all the property from General Mills Blvd. over to Flag Avenue and their plan is
to completely demolish the existing Toyota building and the old school building, move
those operations temporarily to the other existing auto buildings while they construct a
new facility. Once the new facility is built they would tear down the other buildings and
create a new building for the Jaguar/Land Rover sales and services.
.
Grimes referred to the site plans and discussed the setbacks. He noted that there will be
no setback to the parking lot along the north property line. He explained that this issue
was addressed when their original PUD was approved. There is still a 40 foot green area
between the north property line and the freeway wall so it seems to make sense to allow
them to have their parking lot go right to the north property line. However, there are still
easements along that north property line that would still need to be maintained. He
.
.
.
Minutes of the Golden Valley Planning Commission
March 28,2005
Page 2
referred to the southeast corner of the property and stated that they are proposing less
than the required 35 feet of green area setback space but that they are improving the
existing setback conditions because currently there are parts of the parking lot that go
right upto the property line. He stated that this is a fairly narrow site for a car dealership
and ithasstreets on two sides, but with a good landscape plan, it will be a good design
for this area. He referred to the western portion of the site, in front of the proposed Land
Rover building and stated that there is a display area for vehicles that goes into the 35
foot setback a little bit-He said the City also allowed the Audi dealership to the west to
have a small amount of display area, similar to this proposal. He referred to the west
property line and said there is a substantial green area however, they are planning to
build a small climbing hill feature that people would use when test driving the Land
Rovers. .He.stated that there has been some discussion between the applicant and the
Porsche/Audidealership next to them about the landscaping and how it can be done and
stay sensitive to their needs.
Grimes discussed the parking on the site and noted that there are about 1 ,000 parking
spaces shown .on the plans. He said the spaces can be used for displaying cars,
employee parking and customer parking or for cars waiting to be fixed. He said his
concern is that cars are parked in designated spaces, not in fire lanes or setback areas.
He said that the applicant feels they have adequate space to allow for customer parking
in front of their dealerships, adequate space for their employees and adequate space for
their inventory.
Grimes stated that the. City Engineer's concerns regarding the use of MnDOT's pond to
the east have been addressed and that the applicant does have permission to use that
pond for water quality and rate control purposes.
Schmidgall referred to the City Engineer's concerns about the trash enclosure and the
lighting fixtures being in the MnDOT right of way. Grimes said that he has talked to the
architect about not locating the trash enclosure on the utility lines.
Keysser asked Grimes to discuss the access to the site. Grimes said the main access will
remain on General Mills Blvd. at the signal and that there are three driveways along Miller
Street. He.said that staff has also talked to the applicant about having a sidewalk system
into the site.
Hackett asked Grimes to clarify what the City's guidelines are regarding green space for
the total development. Grimes stated that the PUD ordinance states that in commercial
developments at least .10% of the property needs to be green. space. He stated that this
proposal is approximately 88% hard space and approximately 12% green space, so they
do.meet the requirements.
Keysser stated that he didn't see any reference to excluding lOUdspeakers in this
proposal. Grimes said that is one of the standard requirements for car dealerships and
that he will putJanguage in the PUD Permit regarding loudspeaker use.
.
.
.
Minutes of the Golden Valley Planning Commission
March 28, 2005
Page 3
Eck asked if people would be coming in toward the back of the building when they enter
from General Mills Blvd. Grimes said people would actually be looking more at the side of
the building when they enter from General Mills Blvd.
Keysser asked if people would be driving into residential areas when they test drive cars.
Grimes said that there haven't been any complaints from people in that area. He added
that most people probably get on 1-394 or stay on the frontage road when test driving
cars. He said if it were to become a problem, he would talk to the applicant.
Cera asked if the fire department.issues have been addressed. Grimes said yes.
Keysser asked if there are any underground fuel tanks on the site. Grimes said he didn't
think so, but that is something the applicant could address.
Jon Baker, Architect for the project, gave a brief history of the project and talked about the
design goals of Toyota and Land Rover/Jaguar. He stated that back in 2001 when the
PUD was approved the plans were done in anticipation of the frontage road adjacent to
1-394 being turned back to the property owners and it was the plan at that point to
demolish the small used car building, add a lot of service and showroom capacity to the
existing Toyota building and to remodel the third building for used car sales and storage.
He said shortly after the PUD approval they were informed by Toyota that they were
embarking on new image program that would have significant changes to what had been
done in the past. He stated the original PUD worked, but it was less then ideal, so they
waited until Toyota came out with their design guidelines, acquired the other properties to
the west and now they've got what they consider to be a very good master plan.
Baker discussed the dealership design overview and stated that the idea is to create an
entirely new retail automotive experience and that the design of the Toyota building
expresses Toyota's core values of quality, dependability and reliability. He said the result
according to Toyota is a comprehensive design bringing comfort, warmth, innovation and
authenticity to the Toyota selling, buying and servicing business. He stated that in
addition to the significant design work prepared and provided by the manufacturers, the
history, experience and depth of operational knowledge that the Luther Companies and
Baker Architects assures that this project will result in thoughtfully designed and well
constructed buildings.
Baker referred to the site plan and stated that it has been updated from. the one Grimes
was referring to earlier. He pointed out the new location of the fire hydrants and the trash
enclosure and showed several elevations of the building interiors and exteriors. He
discussed the landscaping plan and the Land Rover test course and stated that there will
be a significant increase in the yard space around the buildings and a lot of energy and
illumination will be put into the entrance point at General Mills Blvd.
Schmidgall referred to the applicant's narrative and asked about the term "bullpen". Baker
explained that the "Bullpen" is the area where the sales people have their own personal
work space and desks.
I
Minutes of the Golden Valley Planning Commission
March 28. 2005
Page 4
.
Keysser asked if there are any underground tanks currently on the site. Baker said no, all
of the tanks that were there have been removed and they are in the process of doing
some environmental testing and that all the new tanks will be above ground.
Cera referred to the landscaping on the Audi dealership side of the test course and asked
what is going to happen in that area. Baker stated that the owners of the Carousel owners
did have someconcems about the test course being close to their property line. He said
thattheyhave had conversations with them about putting some type of landscaping
between the .test course and their property but that they have said they are in support of
this proposal.
Cera asked about the lighting on the site. Baker said the intention is to light the site
sirnilarto the Carousel Audi property. He said they are hoping to do some more
decorative Or architectural lighting at the entrance on General Mills Blvd. to delineate it as
something more exciting. Cera asked if they have looked into energy efficient lighting.
Baker said. they are looking into that and that they will use the most sophisticated
available technology reasonable for this type of project.
Grimes stated that the cell tower currently located on the site will remain for the duration
of the lease.
.
Rasmussen asked if the. access to the Land Rover test track is only from the interior of
the lot. Baker said the only access to the test track would be from the inside of the lot.
Cera ask.edif the lot is secured at night. Baker said it would be blocked at night.
Hackett asked how pedestrians would get to this site and if there are sidewalk
connectionsto other areas in and around the site. Baker explained that there will be an
access connection from the park and ride adjacent to their property and there is a
sidewalk that goes all the way around the site. Grimes stated that the sidewalks in that
area are well used and suggested a connection to the sidewalk to the north on the
General Mills property. Baker said that it would not be a problem to do something with the
sidewalk connections.
Keysser opened the public hearing. Seeing and hearing no one, Keysser closed the
public hearing.
Waldhauser stated that this proposal meets the criteria for a PUD and fits nicely with what
they .are trying to accomplish .
Rasmussen agreed and stated that is a well thought out plan.
Eck stated that thatthis proposal is a significant improvement over what was originally
proposed and he would support recommending approval.
.
MOVED by Eck, seconded by Schmidgall and motion carried unanimously to recommend
approval of the request by The Luther Company Limited Partnership to allow for the
demolition of the five existing buildings and the construction of a new 70,000 square foot
Minutes of the Golden Valley Planning Commission
March 28, 2005
Page 5
.
Toyota/Scion building and a 45,000 square foot Jaguar/Land Rover building with the
following conditions:
1. The Civil and ArchiteCtural Plan Packet (16 sheets) prepared by Baker Associates
and dated 2/11/05 shall become a part of this approval (SUbject to revisions required
by the City Engineer and Fire Marshal).
2. All recommendations and requirements set out in the Engineering Memo to Mark
Grimes from City Engineer Jeff Oliver, PE, and dated February 28, 2005 shall be
made a part of this approval. The Plan Packet must be revised in a manner consistent
with Mr. Oliver's memo prior to the plans going to the City Council for Preliminary
PUD Plan approval.
3. All recommendations and requirements set out in the memo from Assistant Fire
Marshal Ed Anderson to Mark Grimes dated February 22, 2005 shall become a part
of this approval and the Plan Pack must be revised in a manner consistent with Mr.
Anderson's memo prior to the plans going to the City Council for Preliminary PUD
Plan approval.
.
4. The Building Board of Review, as part of the building permit process, must approve
the landscape plans.
5. All signage must meet the requirements for auto dealers in the Industrial zoning
district.
6. The existing cellular tower on the site may remain.
7. No outside speaker systems shall be used on the site.
III. Informal Public Hearing - 11-11 Property Rezoning at 2548 Douglas Drive
orth
Amain Homes, I
Address:
Purpose:
IV.
Subdivision at 2548 Douglas Drive
.
Amain Homes, In
2548 Douglas Driv
l .. .. ...... .. /~hl [7 ~~
MOVE,8 by Pentel, seconded by Grayson and motion carried unanimously to direct staff to develop and execute an agreement
with MEI for soil investigation on the City Hall campus.
*-R~~eipt of March 2005 General Fund Budget Report
~~:~~:~tel,seconded by Grayson and motion carried unanimously to receive and file the March 2005 General Fund
us
Jon Baker, Architect, presented the plan amendment and answered questions from the Council.
Les Eck, Planning Commissioner, presented the Commission report and answered questions from the Council.
Mark Grimes, Director of Planning and Development, presented the staff report and answered questions from the Council. Allen
Barnard answered questions from the Council.
The Mayor opened the meeting for public input and persons present to do so were afforded the opportunity to express their views
thereon.
David Zinn, 3329 Kyle Avenue North, suggested that the lighting standards be looked at closely and asked about the demolition of
the site and future plantings of trees and shrubs.
The Mayor closed the public hearing.
MOVED by Pentel, seconded by Freiberg and motion carried unanimously to approve the Preliminary Design Plan Amendment,
Amendment #1, PUD #91, Rudy Luther Toyota Campus, subject to the following conditions:
1. The Civil and Architectural Plan Packet (16 sheets) prepared by Baker Associates and dated February 11, 2005 shall becomE
.art of this approval (subject to revisions required by the City Engineer and Deputy Fire Marshal).
2. II recommendations and requirements set out in the Engineering Memo to Mark Grimes from City Engineer Jeff Oliver, PE,
and dated February 28, 2005 shall be made a part of this approval. The Plan Packet must be revised in a manner consistent
with Mr. Oliver's memo prior to the plans going to the City Council for Preliminary PUD Plan approval.
3. All recommendations and requirements set out in the memo from Deputy Fire Marshal Ed Anderson to Mark Grimes dated
February 22, 2005 shall become a part of this approval and the Plan Pack must be revised in a manner consistent with Mr.
Anderson's memo prior to the plans going to the City Council for Preliminary PUD Plan approval.
4. The Building Board of Review, as part of the building permit process, must approve the landscape plans.
5. The existing cellular tower on the site may remain.
6. No outside speaker system shall be used on the site.
7. Staff will review the lighting plan and work with the applicant to reduce the amount of lighting on the site.
Public_Hearing - Prelimina
The Mayor opened the meeting for public inpu
thereon. Hearing and seeing no one, the or
mes, Applicant, presented he plan amendment and answered questions from the Council.
Les Eck, Planning Commissioner,
e staff report and answered questions from the Council.
usly to approve the preliminary plat for 2548 Douglas Drive,
1. ared by RLK and dated February 11, 2005.
2. The com ents in the memo from City Eng eer Jeff Oliver, PE, to Mark Grimes, 01 ctor of Planning and Development,
dated March 23, 2005, shall become a part f this approval.
.
toltffiValley
Memorandum
Public Works
763.593.8030 I 763.593.3988 (fax)
Date: May 9,2005
To: Mark Grimes, Director of Planning and Development
From: Jeff Oliver. PE. City Enginee~
Subject: Final Plan Review: PUD 91 Amendment)( ,
Rudy Luther Toyota/Land Rover/Jaguar
Public Works staff has reviewed the proposed Final Plan of Development for Rudy
LutherToyota/Land Rover/Jaguar. This proposed development is an amendment to the
existing PUD at the Rudy Luther Toyota site, which is located west of General Mills
Boulevard and south of Interstate 394. The proposed PUD amendment consists of
removing five existing buildings on two adjacent properties, and constructing two new
. car dealerships.
Preliminary Plat and Site Plan
The proposed plat will consist of two lots, each with one of the car dealerships located
on it. The final plat must include standard drainage and utility easements on lot lines as
outlined in the Subdivision Ordinance. The easement requirements include a 20-foot
wide easement centered over all water mains on site, including fire hydrants and leads,
as required by code.
There are multiple easements on the proposed development site that run in favor of the
City of Golden Valley. All of these easements, except a drainage and utility easement
over the vacated frontage road on the north edge of the site (Doc. No. 3341163), can be
vacated. The developer must submit an application for the vacation of these easements
before the vacation process can begin. The easement vacations must be approved prior
to approval of the final plat for the PUD.
.
The proposed site plan includes removal of several existing driveways onto Wayzata
Boulevard, and installation of three new driveways. The removal and installation of
driveway aprons will result in multiple patches to the existing asphalt trail along the
roadway. Therefore, the developer will be required to remove the existing trail and
reconstruct a new eight-foot wide trail. between the driveway access on General Mills
Boulevard and the point where the trail crosses Wayzata Boulevard to the south. The
new trail must be constructed to City standards and must include City standard
pedestrian ramps at all driveway and street crossings.
G:\Developments-Private\Rudy Luther\Amend2Final 050905.doc
.
.
.
Pedestrian ramps must also be installed on the north side of the driveway at General
Mills BOLllevardand atthe Wayzata Boulevard cross walk near the southwest corner of
the site.
The developer will be required to obtain the appropriate Right-of-Way permits from the
City of Golden Valley for the proposed driveway and trail work associated with the PUD.
The proposed site plan includes common parking lots between the two dealerships, as
well as common driveways throughout the site. The proposed site plan provides
adequate access for emergency vehicles and minimizes conflicts that may impact traffic
on City streets. The site plan is acceptable as proposed.
Utilities
City sanitary sewer and water are currently available to the property included in the
proposed PUD. There is adequate capacity available in both utilities for the proposed
use on the site.
The existing water main that extends across the site parallel to 1-394 is owned and
maintained by the City of Golden Valley. The City will also own and maintain the fire
hydrants and leads to the hydrants that extend off of this water main. Easements over
the hydrant leads must be provided as discussed earlier in this review.
The two-inch diameter domestic water service and the6-inch diameterfire service,
including the fire hydrants on these fire lines, will be owned and maintained by the
developer. The developer will be required to enter into a maintenance agreement for the
fire lines and associated hydrants.
The existing sanitary sewer service into the proposed Toyota building currently provides
service to more than one of the buildings on site, and is owned and maintained by the
City. However, following development of the site this sewer will only provide service to
the Toyota building. Therefore, ownership and maintenance responsibility for this sewer
will be assumed by the developer. The easements over this sewer will be vacated as
part of the easement vacation process discussed above.
The developer will also own and maintain the sewer service into the Jaguar/Land Rover
building.frorTl the manhole within Wayzata Boulevard into the building.
The developer will be required to obtain the appropriate utility permits and right-of-way
permits from the City for work on City sanitary sewer, water and storm sewer systems
on and adJacent to the site.
Gradina, Drainaae and Erosion Control
This proposed PUD is within the Main Stem Subdistrict of the Bassett Creek Watershed.
Therefore, the plans are subject to the water quality standards of the Bassett Creek
Water Management Commission (BCWMC) as outlined in its Requirements for
Improvements and Development proposals. Due to the extent of the proposed work on
G:\Oevelopments-Private\Rudy LutheMmend2Final 050905.doc
.
site, the development will be required to provide water quality ponding according to the
policy.
The developer has worked with the Minnesota Department of Transportation (MnDOT)
to provide the water quality ponding required for the PUD in an existing storm water
pond within MnDOT right-of-way. The existing pond is located east of General Mills
Boulevard inside of a looped exit ramp from 1-394 onto General Mills Boulevard. The
MnDOT Office of Water Resources Engineering has provided preliminary approval of
the excavation of this existing pond to meet the water quality requirements for the PUD,
as outlined in the attached March 21, 2005 memo to the developer's engineer. The
developer will be required to obtain the appropriate permits from MnDOT for the
proposed pond excavation. Maintenance of this pond will be subject to the comments
and requirements of MnDOT.
The proposed Grading, Drainage and Erosion Control Plan must be submitted to the
BCWMC for its review and comments. No work can begin on site until the BCWMC has
approved the plans.
The developer is also required to obtain an NPDES Storm Water Discharge Permit from
the Minnesota Pollution Control Agency. A copy of the permit application, and a copy of
the permit once received, must be submitted to the Public Works Department.
.
A City of a Golden Valley Grading, Drainage and Erosion Control Permit is also required
for this project. The City will not issue this permit until the BCWMC has approved the
project and a copy of the NPDES permit application is received by staff. The developer
will also be required to provide all application fees and securities as required by City
Code.
The City owns and maintains the existing storm sewer systems within the rights-of-way
of General Mills Boulevard. The storm sewer along the north edge of the site within the
1-394 right-of-way is owned and maintained by MnDOT. The developer will be required
to obtain the appropriate permits from the City and MnDOT for the connections to these
systems. All storm sewer extensions, laterals and catch basins extended off these
facilities and into the development will be owned and maintained by the developer.
The removal and replacement of the trail along Wayzata Boulevard, as discussed
earlier in this review, must be shown on the grading plan.
Tree Preservation
This development is subject to the Tree Preservation Ordinance. Therefore, the
developer must obtain a tree preservation permit prior to starting work on site.
Summary and Recommendations
.
Based upon its review, Public Works staff recommends approval of the Final Plan of
Development for the proposed Planned Unit Development Amendmentsubject to the
comments contained in this review, which are summarized as follows:
G:\Developments"Private\Rudy LutheMmend2Final 050905.doc
. '
.
.
.
t
1. The vacation of existing easements, and rededication of the appropriate
easements, occur concurrent with final plat approval.
2. The developer removes and replaces the existing bituminous trail along General
Mills Boulevard and Wayzata Boulevard as discussed within this review.
3. The developer enters into a maintenance agreement with the City for the fire
service lines, and the associated fire hydrants, into each building.
4. Subject to the review and comments of the Bassett Creek Water Management
Commission.
5. Subject to the approval and permitting of the Minnesota Department of
Transportation as discussed in this review.
6. Subjectto the review and comments of the Building Official, Deputy Fire Marshal,
and other City staff.
Please feel free to call me if you have any questions regarding this matter.
C:
Jeannine Clancy, Director of Public Works
AI Lundstrom, Environmental Coordinator
Ron Nims, Public Works Project Coordinator
Eric Eckman, Engineering Technician
Ed Anderson, Deputy Fire Marshal
Gary Johnson, Building Official
Mark Kuhnly, Chief of Fire and Inspections
G:\Developments-Private\Rudy LutheMmend2Final 050905.doc
.
.
.
\l'\lU'ESoI:.,
{(Ii Minnesota Department of Transportation
~OF~ Memo
Metro Division - Water Resources Engineering
Office Tel: 651-634-2077
Fax: 651-634-2411
1500 West County Road 82
Roseville, MN 55113
March 21, 200S
To: Daniel Hughes, P,E., Landform
From: Martin Korthank
Project Manager, Metro WRE
marti n .korthank@dot.state.mn.us
Subject: Pre Permit Approval
1-394/General Mills Boulevard Pond
Dead Pool Expansion
Luther Golden Valley Toyota
City of Golden Valley Review
I have checked over your preliminary plans and computations to alter the pond located inside
the off-ramp loop to General Mills Blvd from eastbound 1-394. The alteration is in response to
the city of Golden Valley's request the pond meet NURP standards. . Your request to deepen
the pond by ten feet, using a 3: I slope below the ten-foot NWL bench, is approved. Drainage
from your proposed design will be decreased, the pond is below the freeway, and the
surrounding roads have low traffic volumes and slow speeds.
Mn/DOr reserves the right to approve erosion control and slope stabilization from each of the
pond's inlets. Depending on the discharge velocities, either rip rap, erosion control matting, or
a combination of the two will be required from the apron to proposed toe of slope. The design
must be sent to Keith VanWagner of Metro Permits for routing to appropriate functional
groups.
Please let me know if you have further questions or if you alter your proposed plans.
Cc: Keith Van Wagner, Permits
E. Buck Craig, Permits
.
PUbIiC~U~y
Memorandum
Fire Department
763-593-8055 I 763-512-2497 (fax)
To: Mark Grimes, Director of Planning and Zoning
From: Ed Anderson, Deputy Fire Marshal
Subject: FinalPlanPUD for Rudy Luther's Toyota Campus
Date: May 10,.2005
The Golden Valley Fire Department has reviewed the final plan PUD application and site plan
for the Rudy Luther's Toyota Campus regarding the development of all 5 of the parcels,
including the additionofthe Land Rover/Jaguar dealership. Listed below are additional
concerns to the site plan:
. 1.
The fire hydrant water mains indicated for the site, are identified as a 6 inch diameter. The
fire suppression water supply for the buildings also indicates 6 inch supply. Therefore,
hydrClulic calculations are required showing the proper fire suppression system and fire
hydrant water main for the total demand at the appropriate pressure for the type and use
of all buildings.
2. The postindicator valves for the fire suppression system for all buildings located on the
proposed site do not indicate physical barriers to prevent vehicle damage to the post
indicator valve. Theinstallation of the vehicle impact protection shall be installed in
accordance. with the Minnesota State Fire Code.
3. The post indicator valve for the Land Rover/Jaguar building is installed incorrectly on the
utility plan. Please make corrections.
4. The fire department connection for the fire suppression system at the Land Rover/Jaguar
building shall not be obstructed by any gas meters or electrical transformers or the access
to the fire department connection be obstructed by any landscaping matter or materials.
5. The installation of No Parking Fire Lane signs and stationary posts shall be installed and
maintained in accordance with the City of Golden Valley city ordinance.
. If you have any questions please call me at 763-593-8065.
r ,<- 0'''''' ~ (....(.. \)e=:..
.
April 22, 2005
Mark Grimes
City of Golden Valley
7800 Golden Valley Road
Golden Valley, MN 55427
Re: PUD Application The Luther Company Limited Partnership
Dear Mr. Grimes:
.
The Luther Company Limited Partnership ("Luther") is submitting a PUD
application for the redevelopment of the five properties located between 8989 Wayzata
Boulevard (the former site of Carousel Audi) and 8801 Wayzata Boulevard {the current
site of Rudy Luther Toyota).
Luther and its associated entities acquired these five properties over the past 30
years. The Rudy Luther Toyota site at 8801 Wayzata Boulevard was acquired in1975.
Since that time, dealership operations at the site have included Motorhomes, GMC Truck,
Honda, Toyota and Scion. The former gas station adjacent to 1-394and contiguous to the
north of the Toyota dealership was acquired in 1978 and is currently being used as a Scion
sales facility. The former school building was acquired in 1999, and is now being used for
parts inventory storage. Luther acquired the former Wilkins Pontiac site at 8909 Wayzata
Boulevard in February 2001 and operated a Pontiac dealership at the sitefor one year. In
June of2004, Luther acquired the former Carousel Audi property at 8989 Wayzata
Boulevard. This property has been used for motor vehicle sales and service since 1973.
Luther proposes a complete redevelopment of these five properties, including
demolition of the five existing buildings and construction of a new 70,000 square foot
Toyota/Scion building and a new 45,000 square foot Jaguar/Landrover building. The
preliminary site and building plans for these two new facilities are included in the PUD
application package. Phasing for the redevelopment is proposed to proceed as follows:
1. After city approvals are received for the project, RL Toyota operations will relocate
to the Carousel and Wilkins properties. The buildings on the RL Toyota site will be
demolished, and construction of the new Toyota building will commence.
2. We anticipate that construction of the new Toyota facility will take approximately
12 months.
3. Upon completion of the Toyota building, Toyota operations will move into the new
building, the Carousel and Wilkins buildings will be demolished, and construction
of the new JaguarlLandrover building will commence.
4. Construction of the J aguarlLandrover building will also take approximately 12
months to complete.
.
701 XENIA AVENUE SOUTH. SUITE 220 . GOLDEN VALLEY, MN 55416
tel: 763.593.5755 0 fax: 763.593.0769 0 web: www.lutherauto.como email: info@lutherauto.com
.
.
.
.
City of Golden Valley
Page 2
4/22/2005
5. It is.anticipated, arid hoped, that the entire redevelopment will be complete within
24 months of the final city approvals.
Wethankyou for.your consideration of this request and look forward to answering any
questions you may have at the May 23,2005 hearing.
Sincerely,
.
.
.
.
Rudy Luther ToyotaPUD Application
Zoning variances:
1. Applicant is seeking a variance for the 35' setback on the east and south yards at
the intersection of Miller Street and General Mills Boulevard.
Justification: General Mills Boulevard and Miller Street both angle into the southeast
comer of the Toyota property. Maintaining a 35'setback all the way to the comer will
result in a loss of approximately 100 parking spaces, and significantly impact traffic
circulation and efficiency. The problem is further complicated by the fixed location of
the General Mills Boulevard curb cut, which was a condition of the PUD approved in
2001 (pUD number 91).
The 10' setback proposed was approved in January 2001 in conjunction with PUD
number 91. The setback proposed also represents a significant improvement over the
existing conditions. As the right of way for General Mills Boulevard has changed over
the years, it has encroached not only up to RL Toyota's parking lot, but alsoiJ.1to it by
approximately 13 feet. The proposed setbacks will increase from the existing setbacks to
a minimum of 10' as approved in 2001.
2. Applicant is seeking a variance from the 20'setback on the north
property line.
Justification: The north property line is on the right of way line for 1-394. This property
line is adjacent to a 30' retaining wall, which supports 1-394. The retaining wall is
separated from the property line by a 30' green space. The proposal is to allow parking
up to the property line, because there is no adjacent use from which to screen or setback.
There is no longer a street or sidewalk on the north side of the site, so there will be no
public use or visibility of this 30' adjacent to the retaining wall.
701 XENIA AVENUE SOUTH. SUITE 220 . GOLDEN VALLEY,MN 55416
tel: 763.593.5755 . fax: 763.593.0769 . web: www.lutherauto.colll . elllail: info@lutherauto.colll
11
\l
.
.
.
Hey
Planning
763-593-8095/763-593-8109 (fax)
Date:
May 17,2005
To:
Golden Valley Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject:
Informal Public Hearing on Preliminary PUD Plan forMaywood PUD No.1 01
(Former 5609 Olson Memorial Highway and 435 Turners Crossroad N.~
Kingman Building Company and Landmark Development Group, Applicants
Background and Description of Request
Kingman Building Company, represented by Dave Kingman, and Landmark Development
Group, represented by David Reed, have entered into agreements to purchase the former tree
service property at 5609 Olson Memorial Highway (three parcels) and the house and property
at 435 Turners Crossroad (one parcel). Their plan is to jointly develop these 1.72 acres into a
planned unit development (PUD) to allow the construction of 8 single-family homes.
The tree service operated on three lots with access from the Olson Memorial Highway frontage
road for over 50 years. Several years ago, the tree service stopped operation and all the
buildings that were on the site were removed. The tree service was considered a
nonconforming use on this property. This property has been zoned R-1 (single-family) for over
30 years. The property at 435 Turners Crossroads is an existing single-family home that
conforms to the zoning code. The lot for this home is about 22,000 sq. ft. in area. This home
was constructed in 1950.
The property is guided on the General Land Use Plan Map for Low Density residential uses
(less than 5 units per acre). The proposed development is 4.6 units per acre and is therefore
consistent with the General Land Use Plan designation. The property is zoned R-1 (single-
family). The proposed use of the property is eight single-family homes within a homeowner's
association. Each home will sit on its own lot that is around 4,400 sq. ft. in area. The remainder
of the property will be owned by the homeowner's association. This includes the private street
and driveway.
Qualification as a PUD
Section 11.55, Subd. 3 of the PUD Chapter outlines Standards and Guidelines that must be
met in order for a development to be considered as a PUD. The staff has reviewed these 5
standards and guidelines and finds that the Maywood development qualifies to be considered
as a PUD. These guidelines include consistency with the intent and purpose p~ovisions of the
PUD Chapter found in Section 11.55 Subd. 1.
1
.
.
.
The intent.of the use .of a PUD is ta pravide for an aptianal methad .of develapment which
permits design flexibility from ather provisian .of the zaning and subdivisiancades including
flexibility in uses, height, setbacks, parking requirements and ather similar regulatians.
The. applicant has provided the staff with all necessary infarmatian needed far the Preliminary
PUD plan ta ga fa rwardas required by the PUD Chapter .of the. zaning cade.
Review of Proposed Development
The sitethaf is pr.opased far the Maywaad develapment is unique. As stated abave, it is a
cambinatian .of the farmer tree service property lacated an Olsan Memarial Highway frantage
road and the property at 435 Turners Crassraad. The tatal area is 1.72 acres .or abaut 75,000
sq. ft. Withaut the use bfthe PUD, the property cauld be used far .only twa single-family
hames, .one an Turners Crassraad (where the existing hame is lacated) and .one .off Olsan
Mem.orial Highway. This is due ta the narrow width .of the praperty.
When staff first met with Mr. Kingman, the plan was ta .only develap the tree service property.
This would have created the need far a lang, private cul-de-sac ta pravideaccess ta the
devel.opment. Mr. Kingman determined that it wauld be best ta incarparate the property at 435
Turners Crossroad inta the plan in .order ta provide a secand .outlet ta a public street. This was
dane and Landmark Develapment was braught in as a partner. Mr. Kingman and Mr. Reed
have. made attempts ta alsa purchase the property at 5605 Olsan Memarial Highway. These
.owners da n.ot want ta sell at this time. Mr. Kingman has tald me that the canversatians he has
had with the .owner at 5605 Olsan Memarial Highway have been cardial. Mr. Kingman said he
will be speaking with the .owner .of that property ta determine haw ta best provide screening .or
a buffer between the Maywaad develapmentand the rear and side yard .of their praperty.
Staff daes have cancern abaut haw the Maywaad develapment and the 5605 Olsan Memarial
Highway hame will caexist. The 5605 hause is lacated an a triangular shaped lat that is abaut
18,000 sq. ft. in area. The property can remain as a single-family hame and i.s well suited far
that use. Mr. Kingman has said that he will again be meeting with the .owners .of the hause ta
determine the type .of screening .or landscaping that is appropriate alang the narth and east
side .of the private street. Mr. Kingman said that he wauld like ta provide plantings alang the
property line adjacent ta the private street as illustrated an the attached landscape plan. In
.order ta properly install the landscaping and far it ta survive, Mr. Kingman needs ta .obtain an
easementfr.om the 5605 .owners far planting an their property. The ather aptian wauld be ta
place a 6ft. waadfence alang the private road. This wauld be passible but it may cause same
snaw starage prablems and allaw far minimum landscaping alang the sauth and west side .of
the fence.
There is a cancern abaut haw c1ase the private road is ta the rear .of the hause at 5605 Olsan
Memarial Highway. With property landscaping .or fencing, staff believes that this prablem can
be mitigated. The private street will nat be busy .or naisy, probably .only 80-90 trips per day.
The trips will be primarily cars, different from when the praperty was used as a tree service.
The develapment is alsa adjacent ta 7 ather single-family lats an bath the west and sauth sides
.of the development. The PUD cade requires that the c1asest that a building can be ta a
praperty zaned far single-family uses is the height .of the prapased buildings.
In this case, the height .of the pr.opased hauses in Maywaad is 24 ft. as defined by the
Inspectians Department. The distance from each .of the hauses in Maywaad ta adjacent
praperties is 24 ft.
2
.
.
.
The attached landscape plan indicates the location of new trees and plantings for the
development. The tree preservation plan also indicates the location of trees that will be
removed and those that will be saved in the development. The tree preservation plan will have
to be approved by the City's Environmental Coordinator and the landscape plan will be
reviewed and approved by the Building Board of Review. Mr. Kingman has told me that he has
already had a neighborhood meeting with some of the surrounding property owners. He plans
to meet with them this week to discuss landscaping along the west and south property line of
Maywood. He has told staff that he is willing to erect a new 6 ft. wood fence along the property
line if that is preferred by the neighbors or work to develop a landscape plan that is acceptable
to them. Mr. Kingman is willing to amend the submitted landscape plan to come up with a
solution that is acceptable to him. and the neighbors.
At the present time, there is 6 ft. high fence along a portion of the west property line and a 10
ft. to 12 ft. fence along another portion of the west property line. The remainder of the property
border is chain link. There is a temporary wood fence along the north property line adjacent to
Olson Memorial Highway frontage road.
The new road serving the site it proposed to be a private, 24 ft. wide street. The PUD chapter
states that public streets are preferred but exceptions can be made for private streets. In this
case, both the Public Works staff and Planning staff agree that a private street is best for this
location and that it meets the criteria for a private street. City Engineer Jeff Oliver, PE, in his
memo to me dated May 16, 2005 states that a private, 24 ft. wide street is best for this location
and situation. The street will be of a 7 -ton design and provide for proper access for emergency
vehicles. In addition, this 24 ft. wide road will permit parking on one side. The other side will
have to be clearly posted for no parking.
Adequate parking is always a concern in private residential developments. In the case of
Maywood, the on-street parking will provide for approximately 20 parking spaces. In addition,
each house will have a two or three car garage with an 18ft, wide driveway that can provide
space for at least two cars without extending into the private street. Staff believes that parking
for Maywood will be more than adequate.
The eight homes in the Maywood development will generate about 80-90 trips per day. There
is adequate capacity in the local street system to handle these additional trips. Because this
property is on a curve, there is some concern about sight lines for drivers exiting Maywood.
This has been reviewed and there appears to be adequate sight distance with the private
street coming out at 90 degree angles to the public street.
Mr. Kingman has told staff that the houses will be subject to a homeowner's association that
will maintain the private streets and provide lawn care and snow removal for the entire
development. The homes will be either 3 or 4 bedrooms with a three car garage. Some of the
homes will have an option of a main level master bedroom to minimize the need to go up and
down stairs. This type of design is encouraged in order to expand life-cycle housing choices in
Golden Valley. The homes will sell in the $500,000 range. There will be architectural
covenants and controls over such things as outdoor storage of boats and recreational vehicles.
Public Safety Department Comments
Deputy Fire Marshal Ed Anderson has written me a memo dated May 10, 2005. In this memo
he outlines his comments. These comments will be made a condition of approval for the PUD.
Most notably, each of the single-family homes will have a residential fire suppression system.
This has been agreed to by the developer and is necessary due to the limited access to the
eight homes.
3
.
Public Works Department Comments
City Engineer Jeff Oliver has written me a memo dated May 16, 2005. In this memo he outlines
his comments and recommendations. As usual, Mr. Oliver has done an excellent job in
reviewing the proposal and providing comments and recommendations that will be included in
the conditions of approval found in this memo.
Recommended Action
Staff has met with. Mr. Kingman and Mr. Reed several times over the past months to discuss
this development. He has been very receptive to suggestions made by City staff and the
proposed Preliminary PUD plan is a result of the meetings and his development expertise.
Staff realizes that his is a difficult site to develop due to its shape. It appears that Mr. Kingman
has developed a plan that efficiently uses the 1.72 acres in a manner that will blend in with the
surrounding single-family neighborhood. With the PUD and the requirement of a homeowner's
association, there is an assurance that the property will be well maintained. The price of the
homes also is an indication of the proposed quality.
Staff makes the following recommendations:
1. The 6 plan sheets prepared by John Oliver and Associates for Maywood and dated 4/27/05
shall become a part of this approval. The plan sheets include the preliminary plat, grading,
drainage and erosion control plan, utility plan, site plan, tree preservation plan and
landscaping plan.
2. As part ofthe Final PUD Plan, the developer shall draft the documents for the homeowner's
association. These documents shall be reviewed by the City Attomey.
· 3. The final pial of Maywood is subjecllo a park dedication fee as outlined in the Subdivision
Code. The fee will be determined by the City Council at the time the final plat is approved.
4. The developer shall continue to work with the surrounding property owners to develop a
suitable landscape plan to provide adequate screening and buffering. This revised
landscape plan shall be submitted as part of the Final PUD Plan.
5. The recommendations found in the memo from City Engineer Jeff Oliver, PE, to Mark
Grimes dated 5/16/05 shall become a part of this approval.
6. The recommendation found the memo from Deputy Fire Marshal Ed Anderson to Mark
Grimes dated 5/10/05 shall become a part of this approval.
Attachments
. Location map (1 page)
Applicant's Narrative (2 pages)
Memo from Jeff Oliver, City Engineer, dated May 16, 2005 (5 pages)
Memo from Ed Anderson, Deputy Fire Marshal, dated May (1 page)
Photos of the property (6 pages)
Preliminary Plat, Grading, Drainage and Erosion Control Plan, Utility Plan, Site Plan, Tree
Preservation Plan, Landscape Plan (6 oversized pages)
.
4
.
5808
I
I l "
--i I ,,/,,/ ./
L~-/ '/~-{/
/p;.C.~
oLsc5ifMEt.IIO~\
!
l.~____
I
L_.
- ---- ---.----
'--.
i \ \ 1
fa \ \ ~
!~~~, I ~ l/;.\
-sBC~~~:y 55 ~~ ,<ilf~~"'~
E8-H~~~\~WAY55~~1 Cfa, HIGHW
t/I\ /J."O ' "0.,>.
(11\ 'It) \ 0\
~\ If! I ~\
------
5
.-.. --'--~_.'--' -. .-..
'------1 T-I~-.~~3)I~Tjf~-iQ.~'l HwY -l-r,. --~:"-,_,
,..5.25 J ~--:'~'--' ,II 520 Il ~=-"" ~~1 J562~r
I L--:~~,! 5735 i, 57291 51. \ \'. 511 "{~515
515 i ' ' ill ' ,-"~" //\,
--~~:--I g/ _500 L L 4,,50 r-5'.'o"o<.,)",T>-;_50~
..~~-II! -- :4-1 ~ (". 'J.~~tT ~ -,--
-~-I 4 ,!,--....'-.-4~34 . 'i 439 ',I,r- 449 ~ r-----'l- / ... -. -- ..
_ 435__1 i i-----J..,--J-.-J 459. 469 I 47> _ ", 425 \ \,
" \ '\_424C'~ 15730 f 5726 5714 5700 1/5630 I I\'\'
'\ \ \" ~40_L_L 5820 5510 _:-~J~;~~
351 \ \ WOUDSTOCK-AVE--_-------:=-r- -.----- 'll
\ ~\r:7:r'''1-- I 407 I
I \ ___40~ ~
I \ . \;:;\ \ i ~1 5620 T ·
\287.1\ c----.'.-. --lL9RIN';LLrN~~ 5&00 5540 .553. ' 5520 '1
\ 285\ ~:45 5515l:45J .57.5 .~ ,II, LORfNG~N ~~j
*"t:-- J Subject Properties I
5oo~~t~~' \ \ \
\ \ \
~, %~ g al
,~ \\ II i,
o ~\ \ "'\
t/I ~\ i I
\'P, - i:
~ \ \
~\ \ \
0\ \
\ \
\ \
\, \
\ \
\
\
MayWood Lane
.
Proposed Development
The attached proposal is to build eight single-family detached homes on a parcel of land that is
currently four individual lots. These lots are located at 5609 Olson Memorial Highway and 435
Turners Crossroad North. The lot at 435 Turners Crossroad North currently has one single
family home on it which will be removed for the proposed development. The other three lots
were the former property of United Tree Service, a family-owned tree-removal service, which
operated on the property for over 50 years. The house, garage, office/shop, other auxiliary
buildings, and materials and equipment that were located on this property have been removed.
The current zoning of the property is R-1 Single Family Residential. Our proposal falls within the
guidelines forJow density residential which allows for less than 5 units per acre. Our proposal
has a density of 4.6 units per acre.
The reason that we are proposing a P.U.D. for this development is because of the unusual
configuration of the three lots that had been the United Tree Service property. Only one of the
lots (lot 2) was contiguous to a city street. The other two lots (lots 3 & 6) had no access to a
street. The following provides an explanation of how this proposal meets the purpose and
provisions of the PUD Ordinance:
.
1. The previous use of the land was often considered an eyesore because of equipment,
machinery, and supplies that were stored on the site and because of the several
buildings that were in various stages of disrepair. Many neighbors said that the site was
anannoyance.because of the loud sounds from equipment being operated and from
smoke and smells from burning and other equipment operation.
2. This plan provides for land use that is compatible with the surrounding single family
neighborhood.
3. The plan .makes use of the landlocked parcels (lots 3 & 6).
4. By combining the property at 435 Turners Crossroad North (lot 4) with the three tree
service lots it is possible to have a street that has two points of access to the city streets
rather than a dead-end cul-de...sac. ,Olclf I're198sal i~ fu, II Ol"l~ n'SY I',;\~tc ~ll ~d. The
overall area of pavement for a public street and cul-de-sac would be much greater than
the proposed street. Our proposal maximizes green space.
5. The proposed homes will be subject to a homeowners association that will maintain the
private street and will provide lawn care and snow-plowing service. These homes will
have an optionfor a main level master bedroom, which along with the snow and lawn
servicewill provide much appeal to empty-nester buyers who are seeking less
maintenance and fewer stairs to climb. With options for 3 or 4 bedrooms, a three-car
garage, a bonus room and a finished basement, these homes will also appeal to families
with kids.
.
6. The homeowners association documents will have architectural covenants that will
provide fora consistent style of design.
7. The proposed homes will be constructed to meet, and/or exceed, all requirements for the
current energyoode, which will mean these homes will be highly energy efficient.
.
.
.
8. Landscaping and fencing around the perimeter of the development will provide for a
pleasant buffer between the new homes and the existing homes in the neighborhood.
.
.
.
G:J}
oGold~n'Vall ey
Memorandum
Public Works
763.593.8030 I 763.593.3988 (fax)
Date: May 16, 2005
To: Mark Grimes, Director of Planning and Development
From: Jeff Oliver. PE, City Engineer ~
Subject: Preliminary Review, PUD 101, Maywood
Public Works staff has reviewed the preliminary plans submitted for the proposed
Maywood Planned Unit Development (PUD). The proposed PUD is located in the
southwest quadrant of Trunk Highway 100 and Trunk Highway 55, and west of
Valleywood Circle. Staff has the following comments based upon this review.
Preliminary Plat and Site Plan
The proposed development consists of eight single-family lots located within two blocks.
There are also two lots (Lot 7, Block 1 and Lot 3, Block 2) that are proposed common
areas that will be maintained by a homeowners' association within the PUD.
The preliminary plat indicates that the two common lots will be entirely covered by
drainage and utility easements. The proposed private street within the development, as
well as the utilities to serve the homes, will be located within these common lots.
The developer is proposing a private street within this PUD based upon the Planned
Unit Development Ordinance. The Ordinance generally discourages private streets
unless the City grants a waiver based upon certain defined criteria. The first criterion
outlined in the Code is "(a) extension of a public street is not physically feasible as
determined by the city". The fourth criterion is "(d) there is no feasible present or future
means of extending a right-of-way from another direction."
The property being developed is 100 feet wide, just south of the Olson Memorial
Frontage Road. As required by the Subdivision Code, the minimum right-of-way for a
public street is 60 feet, which when applied in this situation would leave a 40-foot wide
area for development of homes. When setbacks are applied to this remaining area, it is
not practical to construct a home without variances to the setback requirements.
Therefore, the physical extension of a standard city street into this property is not
feasible. Based upon this determination, staff supports the proposed private street
within this PUD.
G:\Developments-Private\Maywood\PrelimReview.doc
.
.
.
The proposed private street is 24 feet wide with parking permitted on the north/east side
of the street only. The proposed width and parking restrictions will allow traffic
movement through the development. However, the street width and the minimum
amount of boulevard available on the north side of the street in Block 2 presents
concerns during winter months. In order to assure that street widths are not dramatically
reduced due to lack of snow storage, staff recommends that snow clearing by the
homeowners' association include removal of snow on the private street.
In order to avoid long-term maintenance issues on the private street, it must be
constructed to City standards. Valleywood Circle, which is located immediately west of
this development, is being reconstructed as part of the 2005 Pavement Management
Program. The proposed street section on Valleywood includes the pavement section
shown on the grading plan, but also includes three feet of select granular borrow. The
proposed private street must utilize the same section.
The curb radii of the private street onto the Olson Memorial Frontage Road must be
increased to a minimum of 15 feet.
Visibility at the intersections of the private street onto Olson Memorial Frontage Road
appears to be adequate based upon the information provided.
The existing bituminous driveway into this site must be removed as part of the
development. Concrete curb and gutter must be installed through the existing driveway.
The street construction must include installation of City standard pedestrian ramps for
the sidewalk at its intersections with the private roadway.
The developer will be required to obtain a City of Golden Valley right-of-way permit, and
a Minnesota Department of Transportation (MnDOT) permit, prior to the start of work.
The Olson Memorial Frontage Road is scheduled for a mill and overlay as part of the
2005 Pavement Management Program. All work within the right-of-way for this street
must be included as soon as possible in the 2005 construction season to allow the
scheduled overlay to occur in a timely manner.
Utility Plan
City sanitary sewer and water are available to provide service to the proposed PUD.
There is adequate capacity in these utilities for the proposed development.
The sanitary sewer and water systems within this development will be City owned and
maintained following construction. The developer will be required to design and
construct these improvements to City standards and specifications. Construction plan
and profiles must be submitted for review and comment by the City.
G:\Oevelopments-Private\Maywood\PrelimReview.doc
.
.
.
The developer will. be required to enter into a development agreement for the public
improvements. The agreement must include a letterof credit for 150% of the estimated
costs forthe utilities, street patching, pedestrian ramps and all other associated costs
for work on public streets and utilities.
The existing 16-inch diameter water main on the frontage road is labeled as a ductile
iron pipe. The plan must be modified to indicate that the existing water main is a 16-inch
concrete cylinder pipe.
The existing sanitary sewer and water services to the existing structures on the
development site must be removed to the mains as part of the public improvements.
The proposed utility plan includes installation of sanitary sewer and water services to
theexisting.single-family property to the north and east of the private street.
Gradina, Drainaae and Erosion Control
This proposed PUD is located within the Sweeney Lake subdistrict of the Bassett Creek
Watershed. Therefore, the plans are subject to the review and comment of the Bassett
Creek Water Management Commission (BCWMC). The plans must be approved by the
BCWMC prior to the start of any work on site.
The BCWMC's Requirements for Improvements and Development Proposals outlines
requirements for water quality improvements within the watershed. These requirements
define residential development as a site of more than two acres and that.contains four
or more proposed Hving units. Because this site is less than two acres (1.72 acres), the
construction of a water quality pond is not required. However, the developer will be
required to implement other storm water Best Management Practices (BMPs) possible
to. protect water quality.
In order to meet the BCWMC requirement for storm water BMPs, the developer has
proposed an environmental manhole in the northwest corner of the site. Storm water
runoff from the majority of the site, excluding the very eastern portion, will be routed
through the environmental manhole prior to discharge into the City/MnDOT storm sewer
system.
The proposed environmental manhole, as the entire storm sewer system within the
development, will be owned and maintained by the developer, and eventually the
homeowners' association. The developer will be required to enter into a Water Quality
Maintenance Agreement for these facilities.
The proposed environmental manhole must be moved further east than currently shown
on the grading plan. The structure should be located so it can be installed and
maintained without excavation on private property.
G:\Developments-Private\Maywood\PrelimReview.doc
.
The developer will be required to submit a final Grading, Drainage and Erosion Control
Plan as part of the Final Development for this PUD. This grading plan must be prepared
to City standards.
City records indicate that there is an existing 10-inch diameter PVC storm sewer that is
not shown on the plans along the northwest property line of this development. The
developer's engineer must confirm the presence and location of this storm sewer on the
grading plan. If it is possible to remove this storm sewer while maintaining positive
storm drainage in the area, it should be removed.
The developer will be required to obtain a City of Golden Valley Grading, Drainage and
Erosion Control Permit for the proposed work on site. This permit must be obtained prior
to the start of any work on site.
The developer will also be required to obtain a General Storm Water Permit from the
Minnesota Pollution Control Agency prior to start of work on site. A copy of the permit
application, and the permit once it is obtained, must be provided to the City.
Tree Preservation
The proposed development is subject to the City Tree Preservation Ordinance. A Tree
Preservation Plan must be included with the Final Plan submittal and the permit must be
. obtained prior to the start of work on site.
Summary and Recommendations
Public Works staff recommends approval of the Preliminary Plans for Planned Unit
Development 101, Maywood, subject to the comments contained in this review, which
are summarized as follows:
1. The private street within the development must be constructed to City standards.
2. The developer enters into a Development Agreement and posts securities for the
public improvements associated with the PUD.
3. Subject to the review and comments of the Bassett Creek Water Management
Commission.
4. The developer enters into a Storm Water Maintenance Agreement for the
environmental manhole and storm sewer system.
5. The developer obtains the appropriate City permits, including Right-of-Way,
Utility, Grading, Drainage and Erosion Control, and Tree Preservation prior to the Co
start of work on site.
.
G:\Developments-Private\Maywood\PrelimReview.doc
.
.
.
.
6. The developer submits a final Grading, Drainage and Erosion Control Plan and
Tree Preservation Plan as part of the Final Plan of Development.
7. Subject tothe review and comments of the Building Official, Deputy Fire Marshal
and other City staff.
Please feel free to call me if you have any questions regarding this matter.
C: Jeannine Clancy, Ditector of Public Works
AI Lundstrom, Environmental Coordinator
Ron Nims, Public Works Project Coordinator
Eric Eckman, Engineering Technician
Gary Johnson, Building Official
Mark Kuhnly, Chief of Fire and Inspections
Ed Anderson, Deputy Fire Marshal
G:\Developments-Private\Maywood\PrelimReview.doc
.
.
.
Public JJ.~y
Memorandum
Fire Department
763-593-8055 I 763-512-2497 (fax)
To: Mark Grimes, Director of Planning and Zoning
From: Ed Anderson, Deputy Fire Marshal
Subject: PUD 101 Maywood (United Tree Service Property)
Date: May 10, 2005
The Golden Valley Fire Department has reviewed the proposed site plan for the Maywood
addition located at 5609 Olson Highway and 435 Turnerscross Road. Listed below are the
plan review comments:
1. The fire department access road shall be designed and constructed and maintained to
support the imposed loads of fire apparatus and shall be surfaced so as to provide all
weather drivina capabilities.
2. The turning radius for the fire apparatus access road shall be a 45 foot inside turning
radius.
3. The installation of residential fire suppression system forthe proposed site shall be
installed in accordance with the Minnesota State Fire Code and recognized standards.
The water supply for the fire suppression and domestic water system shall be
adequate to maintain the proper fire flow for the type of construction for the building.
4. The fire hydrant located on the site plan shall be installed in accordance with the
requirement of the City of Golden Valley's Engineer office. The fire hydrants shall not
be obstructed by any post, fence, growth, trash, storage, mailboxes and other
materials or objects shall not be placed or kept near fire hydrants.
5. Relocate the fire hydrants located near lot 4 and East driveway to alternative .Iocation.
Placement of all fire hydrants shall be located on the south side of the proposed main
road. Fire hydrants must be accessible for fire department operation at all times.
6. The installation of No Parking Fire Lane signs and stationary posts shall be installed
on the south side of the proposed main roadway.
If you have any questions, please call me at 763-593-8065.
~.
i
.
lIey
Planning
763-593-8095/ 763-593-8109 (fax)
Date:
May 16, 2005
To:
Planning Commission
From:
Mark W. Grimes, Director of Planning and Development
Subject:
Informal Public Hearing on Preliminary PUD Plan for North Wirth Business
Center PUD No. 100, KRJ North Wirth LLC, Applicant
.
Background
KRJ Partners, represented by Rick Martens, has applied for a Planned Unit Development
(PUD) to allow the construction of 6 office condominium buildings (31,500 sq. ft. total) on 4.24
acres of property in the North Wirth Parkway Redevelopment Area. This property is now
owned by the Golden Valley HRA. The HRAhas designated KRJ as the developer of the
property and has entered .into a development agreement with KRJ. This development
agreementstates that KRJ will purchase the property for a stated price and that they will
construct office condominium buildings on the property. They are required to construct a
minimum of 27,000 sq. ft. of office space within six years. The immediate plans of KRJ are to
construct a portion of the buildings now and construct the remaining space as dictated by the
market.The price paid for the property by KRJ includes the cost of environmental
management measures necessary to make the site developable.
The KRJ site is the remaining site in the North Wirth Redevelopment area owned by the HRA.
The HRA established the North Wirth Parkway Redevelopment area in the late 1970's. Since
thaUime, the HRA has worked with private development partners to upgrade the area in a
manner consistent with the redevelopment plan for the area. The new buildings constructed as
part of the redevelopment plan include the M.A. Mortenson corporate headquarters building,
the Dahlberg.corporate headquarters building, the Grow Biz corporate headquarters building
and the Breck Ice arena. The City also constructed the new street and utility systems in the
area and provided the large regional stormwater pond. The HRA also was involved in working
with the Minnesota Pollution Control Agency (MnPCA) to finance and develop environmental
management plans and do necessary work to make the area useable for office uses. The
environmental management of the area was necessary due to the pollution caused in the area
by previous. industrial users.
.
The property proposed for development by KRJ is generally located at the site of the repair
and maintenance facility for the old Minnesota Northfield and Southern Railroad. On this. site,
the railroad company stored diesel fuel and cleaned railroad cars and engines. As a result of
the use of this site by the railroad, there was pollution in the ground.
1
.
I n order to now use the property for office space as proposed by KRJ, an environmental
management plan must be approved by the MnPCA. At this time, the MnPCA and KRJ have
approved preliminary environmental management plans that will allow the construction. Before
construction begins, final plans will have to be approved by the MnPCA.
The site includes one lot with property on both the north and south sides of the railroad tracks.
The 1 .95 acres north of the tracks is connected to the area south of the tracks (2.28 acres) by
a land bridge across the tracks. The land bridge concept means that KRJ actually will own the
land on which the tracks cross rather than the railroad owning the land. This allows KRJ or
whoever owns the property the ability to put in a private railroad crossing. Permission from the
railroad for the crossing would not be required by the owner of the property. At this time, KRJ
does not anticipate the development of the property north of the railroad tracks. In fact, KRJ
will be placing the property into a conservation easement to the City. If KRJ would like to
develop this property in the future, it would first take an amendment to the PUD and the
change of the conservation easement. Due to the location of the area to the north.of the tracks
giving it limited access and the environmentally sensitive nature of the area (wetlands), the
development of the area is unlikely.
The property is designated on the General Land Use Plan map for Industrial uses. The zoning
map indicates the area is zoned Industrial. Office uses that are proposed within the North Wirth
Business Center are consistent with designations given to this property on both the General
Land Use Plan Map and the Zoning Map.
.
Qualification as a PUD
Section 11.55 outlines the requirements for planned unit developments. It indicates that the
purpose of a PUD is to permit flexibility from other provisions of the zoning code including
flexibility in uses allowed, setbacks, height, parking requirements and the number of buildings
permitted on a lot. Subdivision 1 of Section 11.55 also outlines the purpose of the PUD section
of the zoning code. In other words, when should a development be considered as a PUD?ln
the case of the KRJ proposal, it is staff opinion that the proposal is consistent with the purpose
section of the PUD section of the zoning code. The PUD chapter also indicates standards and
guidelines for all PUDs in Subdivision 3. Staff finds that these standards and guidelines are
met. Therefore, the KRJ proposal may be considered as a PUD.
Staff has reviewed the application submitted by KRJ and finds it to be complete and
acceptable for consideration as a PUD. Along with the application, KRJ has submitted all
necessary information for the staff to evaluate the proposal.
Project Details
KRJ has submitted detailed plan sheets for the North Wirth Business Center. The plan sheets
include a site plan, utility plan, grading plan, landscape plan and building elevation plan.
.
The site plan indicates that the six buildings range in size from 4500 sq. ft. to 6000 sq. ft. Four
of the. buildings are along the railroad tracks and two of the buildings are closer to Dahlberg Dr.
The buildings are setback at least 20 ft. from the rear property line adjacent to the railroad
tracks and along all side property lines. The setback of the southernmost building adjacent to
Dahlberg Dr. is 27.8 ft. If these buildings were constructed in the Industrial zoning district
without a PUD, the side yard setback would be 20 ft. and the front yard setback would be 35 ft.
2
.
Only the southernmost building would not meet all building setback requirements in the
I ndustrial zoning district.
The parkinglot setback along Dahlberg Dr. comes as close as 15 ft. This parking lot setback is
the same as was permitted for the construction of the Breck Ice Arena and the Grow Biz
headquarters to the northeast. In this North Wirth Redevelopment area, this setback seems
adequate and will still permit a sidewalk to be constructed on the west side of Dahlberg Dr.
The parking lot is set back at least 10ft. from all side and rear property lines as required in the
Industrial zoning district.
The site plan indicates 129 parking spaces for the 31,560 sq. ft. of office space. This exceeds
the parking requirement of 126 spaces required by the zoning code (one space for each 250
sq. ft. .of office space). The parking is laid out to be very accessible to the tenants or owners of
the buildings with many spaces right in front of the buildings. The spaces are indicated as 18 ft.
deep and 9 ft. wide. The zoning code states spaces should be at least 20 ft. deep and 9 ft.
wide. In this case, the depth should be adequate because there is a 25 ft. wide aisle and there
is some space for cars to "hang over" the curb a foot onto the 5 ft. wide sidewalk in front of the
buildings.
City Engineer Jeff Oliver, PE, does have a concern about several of the parking spaces and
the trash enclosures. Staff will be meeting with KRJ to discuss these concerns and to see if
modifications can be made prior to going to the City Council.
.
The plan is to stage the construction of the buildings over a period of up to six years. The
landscape plan that has been submitted indicates the plan with all construction completed. It is
most likely that only two buildings will be constructed the first year (2005) and the remainder of
the buildings built in the proceeding years. It is unrealistic to have all landscaping put in prior to
the buildings being constructed because much would get destroyed in the construction
process. Staff suggests that the landscaping be done around each of the buildings as per the
landscape plan immediately after completion. For the remainder of the site including the
building pads, it shall be seeded with a mixture acceptable to the City Engineer. It is the intent
that the site will be mowed and the grass kept below 8 inches in height.
Staff also recommends that sod and planting materials shown on the landscape plan be placed
between the parking lots and Dahlberg Dr. at the same time as the first landscaping is done.
Also, that area east ofthe southernmost building and Dahlberg Dr. and along the northeast
corner of the site adjacent to the former Grow Biz property shall have sod placed along with
landscape material planted at the same time as the landscaping is done around the first
building.
There is also a plan for a wood rail fence along the railroad track side of the buildings in order
to provide a separation from the tracks.
.
The buildings elevations are indicated on the elevation plan sheet. The individual, single-story
buildings have a combination of brick, stone and stucco finish. The buildings will have hip roofs
with asphalt shingles giving the buildings a residential look. The buildings will not exceed 24 ft.
in height to the top of the roof.
3
.
The property is within the North Wirth Parkway Redevelopment District. Surrounding uses
include Wirth Park to the north, Room and Board (office and warehouse) to the west,
Packaging Corporation of America (industrial) to the north, Breck Ice Arena to the east, and
the former Grow Biz office building to the northeast. The proposed North Wirth Business
Center will"blend" well with these other uses in the area.
Transportation capacity should not be an issue because there is more than adequate capacity
in the existing street system. There is good access to Olson Memorial Highway by way of both
signalized and non-signalized intersections. With full occupancy of 31 ,500 sq. ft. of office
space, staff would anticipate about 300 trips in and out of this site. Deliveries to the site will be
made to the front door by smaller UPS type trucks. There is good bus service to this site along
Olson Memorial Highway.
Public Works Concerns
City Engineer Jeff Oliver, PE, has written a memo to me dated May 16, 2005. In this memo he
outlines several concerns about the proposed development. This memo has been sent to KRJ
for their review. The issues addressed in Mr. Oliver's memo will be addressed prior to
development of the final plans for the site. None of the issues addressed in Mr. Oliver's memo
are considered ones that would stop the development from going forward.
.
Public Safety Concerns
Deputy Fire Marshal Ed Anderson has written a memo to me dated November 24, 2004
related to this development. This memo was written several months ago when the City first
received plans for review. The comments are still valid. The final plans for the North Wirth
Business Center will reflect the concerns raised by Mr. Anderson.
Recommendation
Staff recommends. approval of the preliminary PU D plan for the North Wirth Business Center.
The proposed 6 building office condominium development will fit well with the other uses in the
North Wirth Redevelopment area. The following are conditions of development recommended
by staff:
1. The following plans shall become a part of this approval: Site Plan dated 11/11/04 prepared
by the Design Partnership; Landscape Plan dated 11/11/04 and prepared by the Design
Partnership; Building Elevation Sheet dated 11/11/04 and prepared by the Design
Partnership; Grading Plan dated 11/11/04 and prepared by Paramount Engineering; and
Utility Plan dated 11/11/04 and prepared by Paramount Engineering.
2. The recommendations found in the memo from City Engineer Jeff Oliver, PE, to Mark
Grimes dated May 16, 2005 shall become a part of these recommendations.
3. The recommendations found in the memo from Deputy Fire Marshal Ed Anderson to Mark
Grimes dated November 24, 2004 shall become a part of these recommendations.
.
4. The plantings and sod indicated on the Landscape Plan shall be completed around each
building after construction of the building. Prior to construction of the buildings, all areas
shall be seeded with a seed mix acceptable to the City Engineer. The area that is seeded
shall be maintained in a manner as to not allow the growth to exceed 8 inches in height.
4
.
.
.
5. The areas along Dahlberg Dr. (between the parking lots and the street and east of the
southernmost building pad) shall have sod laid at the same time as the landscaping is done
around the first building.
6. The area north ofthe railroad tracks shall be placed in a conservation easement with the
City of Golden Valley. Development of the area north of the tracks may only occur with an
amendment tothe PUDand amendment to the conservation easement.
Attachments
Location Map (1. page)
Memofrom Jeff Oliver, PE, City Engineer, dated May 16,2005 (5 pages)
Memo. from Ed Anderson, Deputy Fire Marshal, dated November 24,2004 (2 pages)
Site Plan, Grading Plan, Utility Plan, Landscaping Plan, Elevation Plan, dated 11/11/04 (5
oversized pages)
5
.
-----
",
.
J Subject Property I
//
~/
/
~/
//
I:
I:
HIGHWAY ~5
/
OLSON MEMORIAL HWY
HIGHWAY 55
3:
m
N MEMORIAL HWl)LSON MEMORIAL
HIGHWAY 55
AI;-HW 0
HIGHWAY 55
Y
<:"\ .. \, .. I J!
\, ~ w
\, / ....::' :E 3:
y .~. m
// / ~J.f', rA
\/,,/~#~ \ ~
//\ \ 0
.. \ \/ C
\ /y , C l
X \ ;;0
/ \ \ J%
\ ~
\ /~
z
\ /
Y
", \
O~ "Ju,,~ I
RU~~ ~O'Ol)__ ~
z
z
~
C
s:
o
;;0
m
C
::u
.
~
I
I;
r
I
.
UnldBh Valley
emorandum
Public Works
763.593.8030 /763.593.3988 (fax)
Date:
May 16, 2005
To:
Mark Grimes, Director of Planning and Development
JeffO.llver. PE. City Engineer _iI..
REVISED Preliminary Design W
North Wirth Business Center Planned Unit Development
From:
Subject:
Public Works staff has reviewed the preliminary design plan submittal for the proposed
North.Wirth Business Center Planned Unit Development (PUD). The proposed PUD is
located within the North Wirth Parkway 5th Addition, which is north of Trunk Highway 55
and east of Dahlberg Drive. The following comments are based upon this review:
. Site Plan
It is our understanding that the construction of the buildings within the PUD will be
phased.. Due to the nature of proposed parking lot circulation patterns and utility layouts,
the entire parking lot, storm sewer system, sanitary sewer system and water system
mustbe installed as part of the first phase of development.
The proposed layout ofthe parking lot in the center of the site, immediately adjacent to
Dahlberg Drive, presents several concerns. The north access to this parking lot is from
another parking area with a driveway that has an unusual layout. It appears that this
driveway will be difficult for cars to maneuver through. In addition, as cars proceed into
the parking lot, they are aimed directly at two angled parking stalls on the northeast
corner of the parking lot, creating a conflict with these vehicles. Although this layout
maximizes the total number of parking stalls, it is also confusing, has questionable
drainage and creates a difficult driving situation. The developer should review the layout
of this portion of the site and make modifications as appropriate.
The driveway and parking lot north of Building 1 may extend across the railroad tracks
in the future. However, this extension may not occur for a number of years. Therefore,
concrete curb and gutter must be installed across the future driveway at this time. The
developer will need to remove this curb in the future if expansion to the property across
the railroad tracks is approved.
.
G:\DeveJopments-HRA\North Wirth Business Park\Corres\RevisedPreDesign 050905.doc
t
.
The developer will be required to obtain right-of-way excavation permits from the City
for each of the excavations within the right-of-way of Dahlberg Drive.
The proposed locations of the trash enclosures on the site appear to be located so
access by trash trucks will be difficult. The developer should review the accessibility of
these facilities, especially the need for excess turns and maneuvering, and make
appropriate changes.
All handicap ramps on site must be constructed according to City and MnDOT
standards, including the installation of detectable warning devices.
Utilitv Plan
There are existing city sanitary sewer and water mains within Dahlberg Drive to provide
service to this proposed PUD. There is adequate capacity in these utilities to service the
development.
The proposed sanitary sewer and water systems within the development will be publicly
owned following construction. Therefore, the developer must design and construct these
improvements to City standards, including plan and profile sheets for the improvement?
The developer will also be required to install these utilities within drainage and utility
easements, to be included on the final plat, that extend a minimum of 10 feet each side
. of the pipes.
The developer will be required to enter into a development agreement for the installation
of the sewer and water systems. This agreement will include a security of 150% of the
estimated construction costs. The City will perform inspection of the utility construction
and the developer will be responsible for the costs of the inspection. The development
agreement must be executed, with securities posted, prior to approval of the final plan
of development for the PUD.
The proposed water main shown on the plans must be revised to be located in front of
the buildings in an area that is easily accessible for the City to maintain. In addition,
each of the office condominium units must have its own sanitary sewer and water
services. The individual property owners, or the association, will own and maintain
these services from the City-owned mains into the buildings.
The proposed sanitary sewer on site must be revised to be an eight-inch diameter main.
The existing city water main in Dahlberg Drive is not labeled consistently on the plans.
In some locations the water main is correctly labeled, and in others it is labeled as a
storm sewer.
.
G:\Developments-HRA\North Wirth Business Park\Corres\RevisedPreOesign 050905.doc
~
. GradinQ, DrainaQe and Erosion Control
The proposed PUD is located within the Main Stem Subdistrict of the Bassett Creek
watershed. The development will therefore be subject to the requirements of the Bassett
Creek Water Management Commission (BCWMC). The BCWMC Requirements for
Improvements and Development Proposals includes water quality standards for new
development. However, the water quality requirements for this development have been
provided within the existing storm water management pond located at the intersection of
Dahlberg Drive and Meadow Lane. Therefore, the development of this site will not need
to provide water quality ponding, but will need to implement other storm water Best
Management PractiGes as needed.
This PUD is also subject to the City of Golden Valley Grading, Drainage and Erosion
Control Ordinance, which requires permits for site disturbing activities. Based upon the
anticipated phasing of this project, the permitting will also be phased. The developer will
be required to obtain a permit for the grading of the entire site. In addition, individual
permits will.be required for each of the buildings at the time they are constructed.
The developerwill be required to prepare the final grading plan, to be submitted with the
General Plan for the PUD, according to City Standards. These standards are available
at the. Public Works Department.
.
Because the area being graded for this development is in excess of one acre, the
developer will be required to obtain an NPDES General Storm Water Discharge Permit
from the Minnesota Pollution Control Agency. A copy of the permit application, and the
actual permit when received, must be submitted to the Public Works Department prior to
the start of work on site.
Based upon the information contained on the preliminary grading plan, it is difficult to
determine post-development drainage patterns behind Buildings 4 through 6 and to the
railroad tracks. The developer's engineer should review the plans and provide additional
information as needed to clarify how drainage will be accommodated along the railroad
tracks.
During preliminary design of this PUD, several wetland basins were identified. These
wetlands include the drainage swalealong the southern boundary of the property, a low
area in the vicinity of Buildings 2 and 3, as well as on the portion of the property on the
northwest side.of the railroad tracks. Therefore, development of this site is subject to the
Wetland Conservation Act (WCA).
The developer has already submitted a wetland delineation report and sequencing
analysis consistent with WCA requirements. This sequencing determined that the
wetlands to the southeast of the railroad tracks were created as a result of previous
work on the site, and are therefore not subject to the mitigation requirements of WCA. A
Certificate of Exemption has been issued for these wetlands, and the development
proposal does not require any wetland mitigation for the proposed impacts.
.
G:\Developments-HRA\North Wirth Business Park\Corres\RevisedPreDesign 050905.doc
1
.
.
.
However, any wetland impacts on the basins northwest.of railroad tracks will require
mitigation. There is not currently a proposal for development of the parcel northwest of
the railroad tracks.
There are several locations within the parking lot that do not appear to have adequate
drainage. These locations include the handicap parking stalls between Buildings 5 and
6; and near the southeast corner of Building 2. The developer's engineer should review
the drainage in these locations and provide additional storm sewer as needed.
The grading plan also indicates that breaks in the curb and gutter in the parking lot is
proposed for several locations. This method of providing storm water drainage is very
problematic during winter months when snow and ice typically block these curb cuts. In
order to minimize the possibility of ice build-up and flooding in the parking lot, staff is
strongly recommending that storm sewer catch basins be added in these locations and
the curb breaks be eliminated.
The driveway entrances onto Dahlberg Drive must be constructed as City standard
commercial driveway aprons. The City standard detail plate for these aprons must be
included on the final plans. The costs for these aprons, and restoration of.Dahlberg
Drive, must be included in the cost estimate for the utility improvements.
The storm drainage system includes extension of an existing storm sewer along the
south property line westward from Dahlberg Drive. This storm sewer extension will
accommodate storm water runoff that enters the site from the southwest and flows
within the existing drainage swale. The developer will be required to construct this storm
sewer according to City standards and the City will reimburse the developer for the
construction costs. In addition, the City will own and maintain this storm sewer.
Therefore, a drainage and utility easement, a minimum of 20-feet in width, must be
dedicated over the storm sewer. The developer must submit a legal description for this
easement with the General Pl.a'l submittal, and the City will prepare an easement for
signing and recording. The easement must be submitted to County for recording prior to
forwarding the final plan of development to the City Council for approval.
Tree Preservation
This PUD is also subject to the City's Tree Preservation Ordinance. However, there are
no existing significant trees on the portion of the property being developed, so no Tree
Preservation plan or permit is required.
Summary and Recommendations
Public Works staff recommends approval of the Preliminary Design Plan for the
proposed North Wirth Business Center Planned Unit Development subject to the
comments contained in this report. These comments are summarized as follows:
G:\Developments-HRA\North Wirth Business Parl<\Corres\RevisedPreDesign 050905.doc
\
.
6)
. 7)
8)
.
1) AU proposed site improvements, including sanitary sewer, water main, storm
sewer, driveways and parking lots must be constructed with the first phase of
development. The sanitary sewer, water main and storm sewer across the
south end of the site will be owned and maintained by the City of Golden Valley
and must be constructed to City standards.
2) The developer should review and modify the layout of the north end of the
center parking lot to reduce conflicts and improve access.
3) Concrete curb and gutter must be installed across the future driveway access
to the portion of the property on the northwest side of the railroad tracks with
the first phase of development.
4) The developer should review the location and accessibility of the trash
enclosures and make appropriate changes.
5) The developer must enter into a Development Agreement with the City for the
public improvements as outlined in this review. The agreement must be signed
and securities must be posted prior to Final Design Plan approval.
The final Grading, Drainage and Erosion Control Plan must be prepared to City
specifications.
The Grading Plan must be revised to eliminate aI/ "curb cut" drainage facilities
and additional storm sewer should be instal/ed.
A 20-foot wide drainage and utility easement must be dedicated over the 27-
inch storm sewer across the south end ofthe site. In addition, easements over
the City utilities must be dedicated as outlined in this report.
9) Subject to the review and comments of the City Planner, Public Safety
Department, Building Official and other City staff.
C: Jeannine Clancy, Director of Public Works
AI Lundstrom, Environmental Coordinator
Mark Kuhnly, Chief of Fire and Inspections
Gary Johnson, Building Official
Ed Anderson, Fire Marshal
Ron Nims, Public Works Project Coordinator
Eric Eckman, Engineering Technician
G:\Developments-HRA\North Wirth Business Park\Corres\RevisedPreDesign 050905.doc
~
.
Public J!~y
Memorandum
Fire Department
763-593-8055/763-512-2497 (fax)
To:
Mark Grimes, Director of Planning & Zoning
From:
Ed Anderson, Deputy Fire Marshal
Subject: PUD Preliminary Design Plan for North Wirth Business Center located on Dahlberg
Drive
Date: November 24, 2004
cc: Mark Kuhnly, Chief of Fire & Inspections
Listed below are the Golden Valley Fire Department's Plan Review comments for the
preliminary design of the single level office condos located in the North Wirth Business
. Center, Dahlberg Drive and Olson Memorial Highway.
PLAN C-2
.
1. The proposed fire lane for the fire suppression system for each building shall be a
minimum of 6" with a post indicator valve connected to each fire line. The post
indicator valve shall be installed for each building and be monitored and supervised by
a fire alarm control panel. in accordance with nationally recognized standards.
2. The fire hydrants proposed for this site shall be installed in accordance with the MN
State Fire Code and the City of Golden Valley's City Engineer's requirements.
3. The turning radius for the entire site and including all driveways shall be a 45 ft. inside
turning radius.
4. The no parking fire lane signs and stationary posts shall be installed in accordance
with the City of Golden Valley's City Ordinance and the Golden Valley Fire
Department's installation requirements.
5. Address numbers will be required to be mounted on the exterior wall for each tenant
space. The address numbers shall be legible and visible from the street or roadway.
6. The fire department apparatus access road shall be 26 feet wide with no obstructions
of any portion of the building more than 30 feet in height. If the building is less than 30
feet in height the fire department access road shall be a minimum of 20 feet wide.
.
.
.
.
7. An approved access walkway leading from the fire apparatus road to all exterior
openings will be required. The approved access walkway material shall be designed
and maintained to support the transportation of equipment and fire department
personneL around the exterior of the building.
PLAN C-1
1. The"fire department access road surface shall be designed and maintained to support
the imposed load of the fire apparatus and shall be surfaced so as to provide all
weather driving capabilities.
2. The fire department apparatus access road exceeding 150 feet shall provide a
required turn-around provision in accordance with the Minnesota State Fire Code.
LANDSCAPING PLAN
1. Landscaping materials shall not obstruct in any matter or with any materials in front or
around the circumference of any fire hydrant, post indicator valve and/or the fire
department connection for the fire suppression system for each building.
If you have any questions please contact me at 763-593-8065.