Loading...
09-22-98 BZA Minutes . . . 1635 Minutes of a Regular Meeting of the Golden Valley Board of Zoning Appeals September 22,1998 The regular meeting of the Golden Valley Board of Zoning Appeals was held Tuesday, September 22, 1998, in the Council Chambers, 7800 Golden Valley Road, Golden Valley, MN. Chair Mike Sell called the meeting to order at 7pm. Those present were: Chair Sell, Members Lang, Swedberg, and Planning Commission Representative Shaffer. Also present were Staff Liaison Mark Grimes and Recording Secretary Tammi Hall. I. Approval of Minutes - August 25, 1998 MOVED by Swedberg, seconded by Lang and motion carried unanimously to approve the August 25, 1998 minutes as submitted. II. The Petitions: 2945 Regent Avenue North (Map 4) (98-9-32) Ronald J. Schmidt Request: Waiver from Section 11.21, Subd. 7(B) Rear Yard Setback for 5.7 feet off the required 23.7 feet to a distance of 18 feet for the proposed garage addition at its closest point to the rear (west) property line. Purpose: To allow for the construction of an 18' x 18' garage addition onto the rear of the existing garage. Chair Sell read the requested variances. Ronald and Virginia Schmidt were in attendance. Staff Liaison Grimes indicated that Mr. Schmidt originally appeared before the BZA in June of 1998 requesting side and rear yard setback variances for a 20' by 25' garage addition. At that time, the Board requested that Mr. Schmidt take 60-90 days to revise his plans to reduce the requested variances. Mr. Schmidt has made significant changes to his plans and is now presenting a plan that will require only a minor rear yard setback and no side yard setback. Swedberg questioned if the subdivision of Mr. Schmidt's lot had been approved by the City Council. Staff Liaison Grimes indicated the newly created lot meets city requirements and is close to the final approval stage. Lang asked where the access to the new garage would be located. Mr. Schmidt indicated access to the new garage would be through the existing garage. Swedberg commented that the new design is much smaller than the original proposal. He questioned how Mr. Schmidt arrived at the dimensions of 18' by 18' for the new garage. Mr. Schmidt indicated they would have preferred to make the proposed garage at least one foot deeper but this would have exceeded the city's 1000 sq.ft. requirement of garage floor space. Swedberg commented that the proposed garage would be very close to the newly created lot. Mrs. Schmidt commented that it would be better to have the garage next to the new lot than to have the trailer parked outside. Mr. Schmidt indicated that the proposed garage intrudes into the rear setback only by 6 feet. Lang asked about the location Minutes of the Board of Zoning Appeals September 22,1998 Page 2 1636 of windows in the proposed garage. Mr. Schmidt indicated there would be hexagon windows on the gabled ends of the structure. . MOVED by Shaffer, seconded by Swedberg and motion carried unanimously to approve the requested variance as noted above. Swedberg commented that he had previously participated on a city task force whose purpose was to deal with problem areas in residential yards, such as snowmobiles, woodpiles, motor homes, etc. It was the goal of the task force to encourage these types of things be placed inside structures. He commended the proponents for going to great expense to place their trailer within a structure. 7701 Laurel Avenue (Map 18) (98-9-33) Charles E. Bottemiller Request: Waiver from Section 11.21, Subd. 7(A) Front Yard Setback for .8 feet off the required 35 feet to a distance of 34.2 feet for the existing house, at its closest point to Laurel Avenue; and 1.6 feet off the required 35 feet to a distance of 33.4 feet for the existing house, at its closest point to Rhode Island Avenue. Purpose: To allow for the construction of a 14' x 18' conforming deck onto the rear (south side) of the house. Chair Sell read the requested variances. Charles Bottemiller was in attendance. Shaffer commented this item should be viewed as an administrative matter considering the size of the variance. . MOVED by Shaffer, seconded by Lang and motion carried unanimously to approve the requested variances as noted above. 1530 St. Croix Circle (Map 6) (98-9-34) Rick and Sheryl Erickson Chair Sell indicated this item has been pulled from the agenda due to the lack of the applicant supplying a survey. Northeast corner of 1-394 and Colorado Avenue (Map 13) (98-9-35) Duke Realty Investments. Applicant Request: Waiver of Section 11.36, Subd. 6(A) Front Yard Setback for 32 feet off the required 35 feet to a distance of 3 feet for the lack of green space in the front setback. Purpose: To allow for parking in the front setback for a new office/warehouse building on the site. . . . . . Minutes of the Board of Zoning Appeals September 22,1998 Page 3 1637 Chair Sell read the requested variance. Ed Farr, Ed Farr Architects and and Dave Jellison, Vice-President and General Manager for the Minneapolis office for Duke Realty Investments were in attendance. Staff Liaison Grimes noted that this building is part of the overall Golden Hills Redevelopment. He indicated that Duke plans to build an 86,000 sq.ft. office building. The property to the north of this site has also been sold to Duke for the construction of a similar office/warehouse building. The BZA will not be addressing the property to the north since it is going through the Planned Unit Development process due to some shared parking arrangements with the CyberOptics building. Grimes said a one-story building is being proposed which would be bounded on the north by the new extension of Golden Hills Drive, on the south by the existing Wayzata Frontage Road, on the west by Colorado Avenue and to the east by the Holiday Inn Express and a drainage pond. The site includes a portion of vacated Wayzata Frontage Road. The primary access to the site will be from the extension of Golden Hills Drive west to Colorado Avenue. A new driveway from Golden Hills Drive will also be built for access to the Holiday Inn Express. Grimes said the hotel would also have access through the Duke parking lot from Colorado Avenue along the south drive aisle shown on the site plan. Grimes stated that the variance is large in size; however, it is along 1-394 at a point where the freeway is bordered by a wall and is considerably lower than the property. He said the HRA and the developer feel it is more realistic to consider this a side yard setback due to the fact that it is along the freeway wall. The property owners are complying with the setback along both Colorado and Golden Hills Drive. The building will have 428 parking spaces, approximately 100 more than required by city code. The property owners believe addition parking is needed due to the entire building being used for office space. Swedberg questioned who would own and maintain the property where the Wayzata Frontage Road is vacated. Grimes stated that it is now part of the property owned by Duke Realty Investments. He said MnDOT would have an easement on the Duke property for maintenance purposes. Swedberg expressed concern that the proposed building would be surrounded by a sea of asphalt. Grimes responded the building meets the setback requirements on both Colorado and Golden Hills Drive, which are the most visible areas. He stated the property owner has an excellent track record for developing well-designed projects with good landscaping. Shaffer questioned whether the access to the Holiday Inn Express, through the Duke parking lot, is allowed in city code. Grimes stated that city code requires frontage on a public street. The Holiday Inn will have access on Golden Hills Drive. They will also have a permanent easement through the Duke parking lot. Grimes said the city attorney has reviewed and approved the plan. Shaffer questioned whether drivers would use this parking lot as a short cut. Grimes responded the frontage road system is designed for smooth traffic flow and it will probably not be a short cut to go through this parking area. Swedberg commented that the parking area for the building extends into the easement that will be used by MnDOT. Grimes stated that the parking lot boundary is 5 feet from the freeway wall and the MnDOT easement is the first 2 or 3 feet next to the wall. Swedberg requested the architect for Duke explain the necessity of the variance for this building. Jellison responded that there is no additional loss of green space from current conditions under the proposed plan, because the space is currently occupied by the road. He added they have tried to place the green space where it would be most visible and appreciated. Jellison noted that on the west side there is 50 feet of lawn between the building and the parking lot. Farr indicated the landscaping would be similar to the landscaping on the CyberOptics site. Lang expressed his Minutes of the Board of Zoning Appeals September 22, 1998 Page 4 1638 concern regarding the Holiday Inn access through the Duke parking lot and suggested some speed bumps may be helpful. Sell commented that the decision to add speed bumps should be the left to the owners. Farr commented they have added speed bumps on the CyberOptics site because it was believed to be necessary, but they prefer not to use them because building occupants generally do not like speed bumps. He added speed bumps make maintenance, such as snow plowing, more difficult. . MOVED by Swedberg, seconded by Shaffer and motion carried unanimously to approve the requested variance as noted above. 800 Boone Avenue North (Map 21) (98-9-36) 800 Boone Avenue LLC. Applicant Request: Waiver of Section 11.35, Subd. 7(C)(3) Side and Rear Yard Setback for 1.7 feet off the required 20 feet to a distance of 18.3 feet for the existing building at its closest point to the north (side) property line. Waiver of Section 11.35, Subd. 7(C)(4) Side and Rear Yard Setback for 8.5 feet off the required 10 feet to a distance of 1.5 feet for the lack of green space along the south property line. Waiver of Section 11.70, Subd. 7(C) Off-Street Parking and Loading Requirements - Design Standards for a temporary variance that would permit . the owner to construct concrete curb and gutter at a time when the parking lot and/or driveway is repaired or resurfaced. Purpose: To allow for the construction of a 24' x 24' conforming loading dock to the rear of the existing building. Chair Sell read the requested variances. Paul Meyer, architect for the 800 Boone Avenue LLC was in attendance. Staff Liaison Grimes explained that the temporary variance, for the lack of concrete curb and gutter, would allow the parking lot to remain in its current condition until the driveway/parking lot is redone or substantially repaired. He said at that time, the property owner would be required to add concrete curb and gutter in compliance with city code. Grimes also indicated the loading dock addition is conforming. He said the variances are required for several existing conditions. Grimes said the existing trash enclosure should also be required to have a gate. Grimes explained that Jewelmont, the present occupant and owner, has sold the building to the 800 Boone Avenue LLC, and now they would be renting half of the building from the new owner. He said 800 Boone Avenue LLC will occupy the other half of the building and they are requesting the proposed loading dock. There was brief discussion among the Board regarding temporary variances. Grimes indicated that staff feels the variance should be temporary in nature in order to allow the owners to add concrete curb and gutter at a time when the parking lot is upgraded. . . . . Minutes of the Board of Zoning Appeals September 22, 1998 Page 5 1639 MOVED by Swedberg, seconded by Lang and motion carried unanimously to approve the variances as noted above with the condition that curb and gutter be added to the parking lot, as required by city code, at such time when the driveway/parking needs repair, and that a gate be placed on the existing trash enclosure. 401 Meadow Lane North (Map 8) (98-9-37) Robert D. Lana Request: Waiver from Section 11.21, Subd. 7(A) Front Yard Setback for 8 feet off the required 35 feet to a distance of 27 feet for the proposed living addition/attached garage at its closest point to Meadow Lane. Waiver from Section 11.21, Subd. 7(C)(2) Side Yard Setback for .18 feet off the required 11.85 feet to a distance of 11.67 feet for the existing deck at its closest point to the west property line. Purpose: To allow for the construction of an 18' x 12' living addition and 23' x 32' attached tuck-under garage with living space above it onto the existing house. The existing garage would be demolished. Chair Sell read the requested variances. Because Board Member Lang is the petitioner in this case, he stepped down from the Board to become a private citizen presenting his case. Staff Liaison Grimes reported that past variances for the setback from Meadow Lane and Beverly for the existing house had been recorded incorrectly in the minutes. The current variance request is for a proposed addition. A variance of .18 feet is also required for an existing deck. Swedberg questioned how Lang arrived at the dimensions for the addition. Lang indicated the 32-foot width accommodates a three-car garage. He added that he has stayed within the variance that was obtained for the original garage in 1959. MOVED by Swedberg, seconded by Shaffer and motion carried unanimously to approve the requested variances as noted above due to the unusual topography of the lot and because the variance is two feet less than the original variance granted in 1959. III. Other Business No other business was addressed. IV. Adjournment Chair Sell adjourned the meeting at 8:25 p.m. rn:1.u -idL- Mike Sell, Chair Mark Grimes, Staff Liaison