06-06-2012 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of June 6, 2012 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:01 pm, in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Tom Mathisen, Director of Public Works/City Engineer, Crystal Randy Kloepper, Utilities Superintendent, Crystal Guy Johnson, Director of Public Works, New Hope Bernie Weber, Utilities Supervisor, New Hope Sue Virnig, Finance Director, Golden Valley Jeff Oliver, PE, City Engineer, Golden Valley Bert Tracy, Public Works Maintenance Manager, Golden Valley Dave Lemke, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of April 30, 2012 MOVED by McDonald, seconded by Norris and motion carried unanimously to approve the minutes of the April 30, 2012 meeting. May 7, 2012 Tri -City Council Meeting Minutes The Joint Water Commission received and filed the meeting minutes for the Tri -City Council meeting held on May 7, 2012 at the Crystal Community Center. Recap of May 7, 2012 Tri City Council Meeting and Status of JWC Wells Feasibility Authorization Resolution and Next Steps Golden Valley signed the resolution authorizing the Joint Water Commission to prepare a Feasibility Study to site and drill wells, including coordination with the City of Minneapolis Public Works Department, Water Works at its June 5, 2012 meeting. The TAC will meet with Barr Engineering Co. and determine the scope of work. The TAC would like to have something for the JWC to approve at its next meeting. Mathisen estimated the feasibility report could be completed by the end of the summer. New Hope Well and Health Department Approval Mathisen will contact the Minnesota Department of Health for a progress report and update the JWC at its next meeting. Water Meter Improvements in Golden Valley Stantec is working on the meter vault and waiting for the results of the soil borings. The project is on schedule to go out for bid in July. Leak Detection Contract The contract was sent to Water Conservation Service, Inc. (WCS) for signature. The anticipated project start-up is June 18. Mathisen added that leaks will most likely be found; however, the TAC has not discussed how leakages will be addressed. Once all the leaks have been identified, the (:\Joint Water CommissionUM Minutes\2012 JWC Minutes\06-06-12 JWC Minutes.doc Joint Water Commission June 6, 2012 Page 2 of 2 TAC will be able to do a cost estimate analysis. WCS will be surveying the entire system and the cost will be per hydrant. Tracy will confirm that WSC will provide a hydrant overlay for the JWC when the survey is completed. Authorize Proposal for JWC Unbilled Water Repayment Analysis MOVED by McDonald, seconded by Norris and motion carried unanimously to approve the letter proposal from Environmental Services Group to assist in resolving an unbilled water repayment matter involving the JWC and the City of Minneapolis in an amount not to exceed $15,400. Minneapolis Cost of Service Study Update Minneapolis is preparing an update for the JWC to review. Scott Harder will forward the information to Burt when it is received. Debriefing of DeCola Ponds Discussion Jeff Oliver briefly updated the JWC regarding the DeCola Ponds study. The City of Golden Valley received and filed the DeCola Ponds study at its June 5, 2012 meeting. The City of New Hope is in agreement with looking at the feasibility and what should be done. The cost breakdown to prepare a Phase II study is Crystal ($29,000), New Hope ($29,000), and Golden Valley ($58,000). Some misunderstanding and education of what has already been done and why all three cities should participate may be necessary for some City Council members. Oliver believes that determination of future costs may be premature until the next steps are studied. Other Business 1. Crystal Gate Valves Replacement Project Update. The larger 24 -inch valve is scheduled to be replaced by June 18 and the two 16 -inch valves are scheduled for replacement sometime after July 4. 2. Virnig requested the cities provide CIP budgets to her by June 30. Next Meeting The next scheduled meeting is Wednesday, July 11, at 2 pm. Adiournment Chair Burt adjourned the meeting at 1:22 pm. lomas D. Burt, Ch ATT T:AV , J�"rfx) Pa Schutrop, Recording Secretary (:\Joint Water Commission\JWC Minutes\2012 JWC Minutes\06-06-12 JWC Minutes.doc