Loading...
11-07-2012 JWC Agenda PacketAGENDA JOINT WATER COMMISSION 1:30 p.m. — November 7, 2012 Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Minutes —September 5, 2012 3. Approval of Revised JWC 2013 General Fund Budget 4. Update on Emergency Water Supply Feasibility Study (Clancy) 5. Water Meter Improvements Project (Tracy) 6. New Hope Well (Mathisen) 7. County Road 9 Project Update (Mathisen) 8. Other Business 9. Adjournment This document is available in alternate formats upon a 72 -hour request. Please call 763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats may include large print, electronic, Braille, audiocassette, etc. 2 JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of September 5, 2012 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:31 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Tom Mathisen, Director of Public Works/City Engineer, Crystal Guy Johnson, Director of Public Works, New Hope Bernie Weber, Utilities Supervisor, New Hope Jeannine Clancy, Director of Public Works, Golden Valley Sue Virnig, Finance Director, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of Auizust 1.2012 MOVED by McDonald, seconded by Norris and motion carried unanimously to approve the minutes of the August 1, 2012 meeting. Wells Discussion Chair Burt suggested the JWC consider putting the JWC development and drilling of new wells on hold until Minneapolis has completed its emergency backup water supply study. Norris would like to keep it in the Capital Improvement Program and move ahead as directed by the three city councils at the May 7, 2012 tri -city council meeting. Burt is willing to keep it in the CIP; however, he wants to continue to monitor the progress Minneapolis makes on its study. Leak Detection Survey Water Conservation Service, Inc. completed the survey and submitted reports for each city. A total of 15 leaks were discovered, mostly with hydrants. Each city will repair its own leaks. Water Meter Improvements Prosect Clancy updated the JWC on the schedule of the water meter improvements project. Bid documents have been prepared and the bid opening is scheduled for Tuesday, September 18, 2012. This week, the City of Minneapolis notified Golden Valley that the bid documents include some items it would prefer to do in-house and will pay for that work. An addendum will be prepared and will be distributed. Clancy noted this change will not affect the bid opening. Stantec also reported that the number of changes requested by Minneapolis may increase its project costs. Clancy will communicate any change in the project cost to the JWC. 1:\ioint Water Commission\JWC Minutes\2012 JWC Minutes\09-05-12 JWC Minutes.doc Joint Water Commission September 5, 2012 Page 2 of 2 New Hope Well The Minnesota Department of Health notified the Minnesota Department of Natural Resources (DNR) of its approval to reactivate the New Hope Well #1 as an emergency water source for the City of New Hope. The DNR requests a DNR Appropriation Permit for an emergency supply system. Before making application, Guy Johnson will discuss the need for the permit with Steve Nelson of Bolton & Menk, Inc. Cgunty Road 9 Project U,Rdate Mathisen reported that the soil testing is completed and results should be received shortly. Stantec is on hold until construction begins. New Pumps and Motor Upgrade The new pumps and motor upgrade seems to be functioning and Crystal is continuing to monitor. Valve Replacement Update Most of Crystal's valve replacements are completed, New Hope has ordered parts for its one valve replacement, and Golden Valley did not have any valve replacements scheduled for 2012. Approve Fundinx/Contract for Bass Lake Road/West Broadway Valve Replacement In 2011, Crystal had budgeted for the valve replacement at the intersection of Bass Lake Road and West Broadway. However, because of the detour for the reconstruction of the County Road 81 project, Crystal shifted the valve replacement project to the 34th and Douglas location. Crystal is now ready to replace the valve at Bass Lake Road and West Broadway. MOVED by Norris, seconded by McDonald, and carried unanimously to approve the funding and contract for the Bass Lake Road/West Broadway valve replacement project. Other Business 1. Memorandum of Understanding for the 2008-2011 Billing Adjustment between the City of Minneapolis and the JWC was forwarded to Bernie Bullert for signatures from Minneapolis. Eight originals were mailed and an original will be distributed to each city after signatures have been obtained. 2. New water rates with Minneapolis have been approved and distributed. The new rates lower the JWC purchase by $256,800. Next Meeting The next scheduled meeting is Wednesday, October 3, at 1:30 pm. Adloumment Chair Burt adjourned the meeting at 1:51 pm. Thomas D. Burt, Chair ATTEST: Pat Schutrop, Recording Secretary (:\Joint Water Commission\JWC Minutes\2012 JWC Minutes\09-05-12 JWC Minutes,doc Resolution 12 -XX Corrected 7/11/2012 RESOLUTION OF THE JOINT WATER COMMISSION ADOPTING THE 2013 GENERAL FUND BUDGET BE IT RESOLVED by the Joint Water Commission that the appropriations for the General Fund Program for the calendar year 2013 as follows: GENERAL FUND Expenditures Original Budget Water Purchased: $6,599,760 2.3% increase - 2.80% Mpls; consumption avg 2,568,000,000 gallons assumes a 2.57/1000 price .02/consumption $51,360 Insurance: $30,000 25% decrease Utilities $240,000 (4% decrease) Electricity 230,000 Phone 10,000 Labor $45,000 no increase Professional Services: $115,000 Consumer Confidence Report - Total Control, Corr Pro, Audit 15,000 Professional Services 100,000 Capital Improvement $850,000 $7,931,120 3.09 Joint Water cost/1000 gallons K, BE IT FURTHER RESOLVED by the Joint Water Commission that the sources of financing the sums appropriated shall be: GENERALFUND Revenue Savings City of Golden Valley $3,471,451 3583853 $112,402 City of Crystal $2,138,230 2207463 $69,233 City of New Hope $2,321,439 2396604 $75,165 $7,931,120 $256,800 , Joint Water Chair ATTEST: Susan M Virnig Schutrop, Pat From: Clancy, Jeannine Sent: Thursday, November 01, 2012 3:54 PM To: Schutrop, Pat Subject: FW: Update on the Well Feasibility Study For the JWC. Jeannine Clancy I Director of Public Works I City of Golden Valley 7800 Golden Valley Road I Golden Valley, MN 554271763-593-8035 1763-593-3988 (Fax) 1763-593-3968 (TTY) I iclan y0goldenvalleymn.aov T'lease note new small address.* From: Brian K. LeMon [mailto:BLeMon@barr.comj Sent: Thursday, November 01, 2012 3:28 PM To: Clancy, Jeannine Cc: Michelle A. Stockness Subject: RE: Update on the Well Feasibility Study Jeannine, 4 a w� We are planning to get the draft report to you just before Thanksgiving, or in about 2-1/2 weeks. The final will depend on when comments are returned and how significant they are. The delay in getting you a draft is tied to the delay in obtaining some of the data needed for the work. Let me know if you need anything else. Thanks for working with Barr Engineering Co. Brian K. LeMon, PE Vice President Senior Civil Engineer Minneapolis office: 952.832.2774 cell: 612.669.6797 blemon@barr.com www.bc.rr.com From: Clancy, Jeannine jmailto:JClancy0cioldenvalLeymn.gov] Sent: Thursday, November 01, 2012 3:23 PM To: Brian K. LeMon Subject: RE: Update on the Well Feasibility Study Do we have a date for the report to be completed? Jeannine Clancy I Director of Public Works I City of Golden Valley 7800 Golden Valley Road I Golden Valley, MN 55427 1763-593-80351763-693-3988 (Fax) 1763-593-3968 (TTY) I jgi�pgy(�ggldenvalleymn.aov 'Please note new email address.* From: Brian K. LeMon [mailto:BLeMon0barr.coml Sent: Thursday, November 01, 2012 3:22 PM To: Clancy, Jeannine Subject: RE: Update on the Well Feasibility Study Hello, I wanted to provide everyone with an update on the Emergency Supply Feasibility Study. We are currently working on the draft report which will have groundwater modeling results, well and piping layouts, and cost estimates of the alternatives, and are planning to have a draft for your review before Thanksgiving. I'll probably be contacting you individually for specific information on existing infrastructure before the draft is complete. If you have any concerns with the schedule, please let me know. Thanks, Michelle Michelle A. Stockness, PE, LEED AP Environmental Engineer Minneapolis office: 952.832.2754 MStockness@barr.com www.barr.com From: Clancy, Jeannine [mailto:]Clancy@gpldenvalleymn.Qovi Sent: Thursday, November 01, 2012 12:42 PM To: Brian K. LeMon Subject: Update on the Well Feasibility Study Brian: Can you resend the email on the well feasibility study update? I accidentally deleted it. P1, city0f lgoldal�vY Date: November 7, 2012 Public Works Department 763-593-8030 / 763-593-3988 (fax) To: Golden Valley - Crystal - New Hope Joint Water Commission From: Mitchell Hoeft, EIT MPA, Engineer Subject: JWC/MPLS Water Metering Improvements Project Update C: Jeannine Clancy, Director of Public Works Project Update: The following information will update the JWC on the current status of the JWC/MPLS Water Metering Improvement Project: The City of Golden Valley has received the signed construction documents and other project submittals back from Magney Construction on Monday, November 5th, 2012. The documents are now being reviewed by the Golden Valley city attorney prior to the official award of the project. In the next couple of weeks the City of Minneapolis will be preparing a schedule which outlines the coordination of their work with Magney Construction. Minneapolis anticipates being ready to work on their portion of the project in early March. Magney anticipates starting construction of the concrete metering vaults in the next few weeks to be ready for the City of Minneapolis' work. A Pre -Construction Meeting will be scheduled in the next two weeks to further the coordination between all parties. The project is anticipated to be completed in mid -late spring. G:\PROJECTS\JWC Water Meter Improvements (12-10)\Memos\Project Update 11.7.12.docx