Loading...
11-07-2012 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of November 7, 2012 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:32 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Tom Mathisen, Director of Public Works/City Engineer, Crystal Guy Johnson, Director of Public Works, New Hope Jeannine Clancy, Director of Public Works, Golden Valley Dave Lemke, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of September 5, 2012 Meeting MOVED by Norris, seconded by McDonald and motion carried unanimously to approve the minutes of the September 5, 2012 meeting as presented. Resolution 12-05 Amending the Adopted 2013 General Fund Budget of the Joint Water Commission Commissioner McDonald introduced the following resolution and moved its adoption of the amended 2013 budget total of $7,931,120: RESOLUTION 12-05 RESOLUTION OF THE JOINT WATER COMMISSION AMENDING THE ADOPTED 2013 GENERAL FUND BUDGET The motion for the adoption of the foregoing resolution was seconded by Commissioner Norris and upon a vote being taken thereon, the following voted in favor thereof: Burt, McDonald, and Norris; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Chair and his signature attested by the Vice Chair. Update on Emergency Water Supply Feasibility Study Clancy received an updated schedule from Brian LeMon, Barr Engineering Co., for the Emergency Water Supply Feasibility Study. Due to a delay in getting some of the necessary data for the report, LeMon anticipates a draft will be ready during the week of November 19. Water Meter Improvements Project Clancy reported the City of Golden Valley has approved a contract in the amount of $759,257 with Magney Construction. The estimated JWC construction costs are $399,628.50. The contracts have been signed by the contractor and staff is in the process of getting Golden Valley signatures. Some portions of the work will be done by the City of Minneapolis and staff is coordinating that work with Minneapolis and the contractor. I:\Joint Water Commission\JWC Minutes\2012 JWC Minutes\11-07-12 JWC Minutes.doc Joint Water Commission November 7, 2012 Page 2 of 2 New Hope Well Mathisen reported work is ongoing with the Minnesota Department of Natural Resources, County Road 9 Project Update Mathisen reported that the soil testing is completed and results have been received. Some pilings will be necessary. The cost for the piling should be covered by the contract amount. Construction is still scheduled for 2014-2015. Other Business 1. Burt received an email from Scott Harder on the water rate study with the City of Minneapolis. He thought the negotiation process with Minneapolis will take place in the spring or early summer 2014. 2. Mathisen discussed the changes in climate and how it appears to be affecting the recent number of storms and the amount of water that is overloading cities infrastructure. Cities may have to look at how infrastructures are designed in the future. Based on experience, FEMA is predicting more localized flooding. 3. The next Minneapolis Water Advisory Board meeting is scheduled for Thursday, December 5. McDonald reported that New Hope will not have a representative attending the meeting. Next MeetinjR The next scheduled meeting is December 5 at 1:30 pm. Adiournment Chair Burt adjourned the meeting at 1:46 pm. Thomas D. Burt, ATTEST: Z;�J— Q Ptt Schutrop, Recording Secretary I:\Joint Water Commission\JWC Minutes\2012 JWC Minutes\11-07-12 JWC Minutes.doc