06-05-2013 JWC MinutesJOINT WATER COMMISSION MINUTES
Golden Valley - Crystal - New Hope
Meeting of June 5, 2013
The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at
1:32 p.m. in the City of Golden Valley Council Conference Room.
Commissioners Present
Tom Burt, City Manager, Golden Valley
Kirk McDonald, City Manager, New Hope
Anne Norris, City Manager, Crystal
Staff Present
Tom Mathisen, Director of Public Works/City Engineer, Crystal
Randy Kloepper, Utilities Superintendent, Crystal
Guy Johnson, Director of Public Works, New Hope
Bernie Weber, Utilities Supervisor, New Hope
Jeannine Clancy, Director of Public Works, Golden Valley
Bert Tracy, Public Works Maintenance Supervisor, Golden Valley
Dave Lemke, Utilities Supervisor, Golden Valley
Sue Virnig, Finance Director, Golden Valley
Pat Schutrop, Administrative Assistant, Golden Valley
Minutes of May 1, 2013 Meeting
MOVED by McDonald, seconded by Norris to approve the minutes of the May 1, 2013 meeting as
presented. Motion carried.
May 23, 2013 Tri -City Council Meeting — Recap
Barr Engineering Co. presented an update on the feasibility of an emergency backup water supply
plan to the Crystal, New Hope and Golden Valley city councils. The three city councils agreed to
move ahead with the project and to consider adoption of a resolution at their council meetings. The
councils wanted the resolution modified to include development of a finance plan.
The commissioners discussed the revised resolution and Norris agreed to modify #3 in the
resolution to clarify the JWC will present the recommended financing plan to a Tri -City Council
meeting later in 2013.
The goal for the fall Tri -City Council meeting will be to discuss the water rates and the financing
plan. Clancy will ask Scott Harder to monitor the Minneapolis progress on the rate study.
The TAC will determine who will prepare the plans and specifications for the project, and who will
develop the request for proposals for the emergency water supply plan.
Update on County Road 9 Trunk Watermain Proiect
Progress on the project is slow and is yet in the design stage.
I:\Joint Water Commission\JWC Minutes\20131WC Minutes\06-05-13 JWC Minutes.doc
Joint Water Commission
June 5, 2013
Page 2 of 3
Resolution 13-04 Adopting the 2014-2018 Capital Proiects for the Golden Valley -Crystal -New
Hope Joint Water Commission
Commissioner Norris introduced the following resolution and moved its adoption:
RESOLUTION 13-04
RESOLUTION ADOPTING THE 2014-2018 CAPITAL PROJECTS
FOR THE GOLDEN VALLEY -CRYSTAL -NEW HOPE JOINT WATER COMMISSION
The motion for the adoption of the foregoing resolution noted on Scheduled A was seconded by
Commissioner McDonald and upon a vote being taken thereon, the following voted in favor
thereof: Burt, McDonald, and Norris; and the following voted against the same: none, whereupon
said resolution was declared duly passed and adopted, signed by the Chair and his signature
attested by the Vice Chair.
Resolution 13-04 Adopting the 2014 General Fund Budget of the Joint Water Commission
Commissioner Norris introduced the following resolution and moved its adoption of the 2014
budget total of $8,460,671 (assuming a 3% increase in rates):
RESOLUTION 13-04
RESOLUTION OF THE JOINT WATER COMMISSION
ADOPTING THE 2014 GENERAL FUND BUDGET
The motion for the adoption of the foregoing resolution was seconded by Commissioner McDonald
and upon a vote being taken thereon, the following voted in favor thereof: Burt, McDonald, and
Norris; and the following voted against the same: none, whereupon said resolution was declared
duly passed and adopted, signed by the Chair and his signature attested by the Vice Chair.
Golden Valley Pump Station Generator Exhaust Upgrade
The US Environmental Protection Agency (EPA) has updated its rules and new source performance
standards. Due to the number of hours used by the JWC generator, the new EPA standards apply
and the generator exhaust system is required to be upgraded. Quotes were received from Zeigler
Power Systems ($39,996) and Titan Energy Systems ($30,493).
MOVED by Norris and seconded by McDonald to award the Golden Valley Pump Station Generator
Exhaust Upgrade to Titan Energy Systems in the amount of $30,493. Motion carried.
Golden Valley Pump Station Generator Maintenance
Quotes were received from Zeigler Power Systems ($28,200) and Titan Energy Systems ($15,947)
for a three-year contract for generator maintenance and monitoring.
MOVED by Norris and seconded by McDonald to award the Golden Valley Pump Station Generator
Maintenance to Titan Energy Systems in the amount of $15,947. Motion carried.
I:\Joint Water Commission\JWC Minutes\20131WC Minutes\06-05-131WC Minutes.doc
Joint Water Commission
June 5, 2013
Page 3 of 3
Other Business
Water Meter Improvement Project Update: Magney Construction installed the pipe at the reservoir
and is currently working on pressure testing. KLM Engineering, Inc. inspected the north and south
tanks and verbally said the tanks were exceptionally clean. The official results will be sent by the
end of the week. Minneapolis is scheduled to install the 48 -inch watermain later this week. The
reservoir should be back online shortly.
Next Meeting
The next scheduled meeting is July 3, 2013 at 1:30 pm.
Adiournment
Chair Burt adjourned the meeting at 2:22 pm.