Loading...
06-05-2013 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of June 5, 2013 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:32 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Kirk McDonald, City Manager, New Hope Anne Norris, City Manager, Crystal Staff Present Tom Mathisen, Director of Public Works/City Engineer, Crystal Randy Kloepper, Utilities Superintendent, Crystal Guy Johnson, Director of Public Works, New Hope Bernie Weber, Utilities Supervisor, New Hope Jeannine Clancy, Director of Public Works, Golden Valley Bert Tracy, Public Works Maintenance Supervisor, Golden Valley Dave Lemke, Utilities Supervisor, Golden Valley Sue Virnig, Finance Director, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of May 1, 2013 Meeting MOVED by McDonald, seconded by Norris to approve the minutes of the May 1, 2013 meeting as presented. Motion carried. May 23, 2013 Tri -City Council Meeting — Recap Barr Engineering Co. presented an update on the feasibility of an emergency backup water supply plan to the Crystal, New Hope and Golden Valley city councils. The three city councils agreed to move ahead with the project and to consider adoption of a resolution at their council meetings. The councils wanted the resolution modified to include development of a finance plan. The commissioners discussed the revised resolution and Norris agreed to modify #3 in the resolution to clarify the JWC will present the recommended financing plan to a Tri -City Council meeting later in 2013. The goal for the fall Tri -City Council meeting will be to discuss the water rates and the financing plan. Clancy will ask Scott Harder to monitor the Minneapolis progress on the rate study. The TAC will determine who will prepare the plans and specifications for the project, and who will develop the request for proposals for the emergency water supply plan. Update on County Road 9 Trunk Watermain Proiect Progress on the project is slow and is yet in the design stage. I:\Joint Water Commission\JWC Minutes\20131WC Minutes\06-05-13 JWC Minutes.doc Joint Water Commission June 5, 2013 Page 2 of 3 Resolution 13-04 Adopting the 2014-2018 Capital Proiects for the Golden Valley -Crystal -New Hope Joint Water Commission Commissioner Norris introduced the following resolution and moved its adoption: RESOLUTION 13-04 RESOLUTION ADOPTING THE 2014-2018 CAPITAL PROJECTS FOR THE GOLDEN VALLEY -CRYSTAL -NEW HOPE JOINT WATER COMMISSION The motion for the adoption of the foregoing resolution noted on Scheduled A was seconded by Commissioner McDonald and upon a vote being taken thereon, the following voted in favor thereof: Burt, McDonald, and Norris; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Chair and his signature attested by the Vice Chair. Resolution 13-04 Adopting the 2014 General Fund Budget of the Joint Water Commission Commissioner Norris introduced the following resolution and moved its adoption of the 2014 budget total of $8,460,671 (assuming a 3% increase in rates): RESOLUTION 13-04 RESOLUTION OF THE JOINT WATER COMMISSION ADOPTING THE 2014 GENERAL FUND BUDGET The motion for the adoption of the foregoing resolution was seconded by Commissioner McDonald and upon a vote being taken thereon, the following voted in favor thereof: Burt, McDonald, and Norris; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Chair and his signature attested by the Vice Chair. Golden Valley Pump Station Generator Exhaust Upgrade The US Environmental Protection Agency (EPA) has updated its rules and new source performance standards. Due to the number of hours used by the JWC generator, the new EPA standards apply and the generator exhaust system is required to be upgraded. Quotes were received from Zeigler Power Systems ($39,996) and Titan Energy Systems ($30,493). MOVED by Norris and seconded by McDonald to award the Golden Valley Pump Station Generator Exhaust Upgrade to Titan Energy Systems in the amount of $30,493. Motion carried. Golden Valley Pump Station Generator Maintenance Quotes were received from Zeigler Power Systems ($28,200) and Titan Energy Systems ($15,947) for a three-year contract for generator maintenance and monitoring. MOVED by Norris and seconded by McDonald to award the Golden Valley Pump Station Generator Maintenance to Titan Energy Systems in the amount of $15,947. Motion carried. I:\Joint Water Commission\JWC Minutes\20131WC Minutes\06-05-131WC Minutes.doc Joint Water Commission June 5, 2013 Page 3 of 3 Other Business Water Meter Improvement Project Update: Magney Construction installed the pipe at the reservoir and is currently working on pressure testing. KLM Engineering, Inc. inspected the north and south tanks and verbally said the tanks were exceptionally clean. The official results will be sent by the end of the week. Minneapolis is scheduled to install the 48 -inch watermain later this week. The reservoir should be back online shortly. Next Meeting The next scheduled meeting is July 3, 2013 at 1:30 pm. Adiournment Chair Burt adjourned the meeting at 2:22 pm. '; - -J-) X-�q- o as . Burt, Ch 61V ATTEST: 4g -A ---VL bLJt-zr7J Pat Sc utrop, Recording Secretary I:\Joint Water Commission\JWC Minutes\2013 JWC Minutes\06-05-131WC Minutes.doc