Loading...
05-07-2014 JWC Agenda PacketAGENDA JOINT WATER COMMISSION May 7, 2014 —1:30 p.m. Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Minutes—April 2, 2014 3. Update on Emergency Backup Water Supply Project (Mathisen) a. Advertising for Bids 4. Update on County Road 9 Project (Mathisen) 5. Update on Crystal Pump Station Generator Project (Mathisen) 6. Other Business 7. Adjournment This document is available in alternate formats upon a 72 -hour request. Please call 763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats may include large print, electronic, Braille, audiocassette, etc. JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of April 2, 2014 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:31 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Kirk McDonald, City Manager, New Hope Anne Norris, City Manager, Crystal Staff Present Tom Mathisen, City Engineer, Crystal Randy Kloepper, Utilities Superintendent, Cryst Bob Paschke, Director of Public Works, New Hd Sue Virnig, Finance Director, Golden Valley Kelley Janes, Utilities Supervisor, Golden Valley Pat Schutrop, Administrative Assistar4baQlden Minutes of February 5, 2014 Meeting Sue Virnig noted the minutes should be purchased the generator t Ziegl Powers Alliance" and �R�ler MOVED by McDonald meeting with the corr Minneapolis has Crystal negotiated ane. of its wells to be buried Crystal. ng information: "Crystal i called National Joint the minutes of the February 5, 2014 sts of tOWells in Crystal and one well in Golden Valley. nd easements with the Minneapolis Park & Recreation Wthe wells in one bid package. Kelley Janes said the in two sites, north or south of the reservoir. Fchase at 4047 Douglas Drive to allow the watermain from one easement cost is $1,842.30 and will be dedicated to the City of MOVED by McDonald and seconded by Norris to approve the easement purchase in the amount of $1,842.30. Motion carried. Update on County Road 9 Project Two bids were received on this project. The total project cost is $1,494,586.89. The total expenditures for the JWC amount to $1,450,009.32 (minus $44,577.57 for Hennepin County's credit (27.5%) of JWC items at 10%). The JWC budget amount is $1,300,000 leaving an unfunded balance of $150,009.32. Virnig said there is enough in the budget to cover the balance. (:\Joint WaterCommission\JWC Minutes\2014JWC Minutes\04-02-2014 JWC Minutes.doc Joint Water Commission April 2, 2014 Page 2 of 2 Crystal finished the installation of the backflow connection for its reservoir. It will be shut down for a period of time during construction. Update on Crystal Pump Station Generator Project Crystal requested quotes for installation of the generator and pad. The estimate was $90,000. The following quotes were received: Stinson Electric Killmer Electric Peoples Electric AID Electric Mayer Electric $101,700 $118,450 $137,100 $147,055 $166,827 The total project budget is $500,000. The design contract for the generator, transfer switch and r $421,508. The low quote amount of $101,700 over budget. MOVED by Norris and seconded by of $101,700 from Stinson Electric. P Other Business The Minneapolis Water Plant. Next Meeting The next meeting is sch Pat Schutrop, Recording Secretary 12,500 and the Cat Ziegler t�et/main switch is project cost $35,708 , 2014, at 1:30 p.m. I:Voint Water Commission\JWC Minutes\2014 JWC Minutes\04-02-2014 JWC Minutes.doc the low quote at the Fridley Filtration