08-06-2014 JWC MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of August 6, 2014 The Golden Valley — Crystal — New Hope Joint Water Commission meeting was called to order at 1:37 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Kirk McDonald, City Manager, New Hope Anne Norris, City Manager, Crystal Staff Present Tom Mathisen, City Engineer, Crystal Randy Kloepper, Utilities Superintendent, Crystal Bernie Weber, Operations Manager, New Hope Dave Lemke, Utilities Supervisor, New Hope Sue Virnig, Finance Director, Golden Valley Bert Tracy, Public Works Maintenance Supervisor Kelley Janes, Utilities Supervisor, Golden Valley Mitch Hoeft, Utilities Engineer, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Minutes of July 2, 2014 Meeting MOVED by McDonald and seconded by Norris to approve the minutes of the July 2, 2014 meeting as presented. Motion carried. Minutes of July 25, 2014 Special Meeting MOVED by McDonald and seconded by Norris to approve the minutes of the July 25, 2014 special meeting as presented. Motion carried. Emergency Backup Water Supply Project Update Traut Wells started work in Crystal. The Crystal Streets Department constructed the road to the other well site. The contract to relocate the Golden Valley generator has been completed and forwarded to Killmer Electric for signature. The Minneapolis Park and Recreation Board (MPRB) is finalizing the easement agreement. The MPRB has decided to remove the recommended water use portion of the agreement and may consider at a later date. Minneapolis has expressed it is willing to give the easement to Golden Valley at no charge. The next step is for a Golden Valley representative to attend a MPRB meeting to explain the purpose of the easement. Water Tower Inspections and Valve Replacements The North and South Towers are due to be inspected in 2014. The CIP includes $45,000 for these inspections. A valve replacement will be completed at the same time the tower is taken out of service for the inspection. SEH, Inc. and KLM Engineering, Inc. were interviewed and the TAC recommends awarding the inspection to KLM Engineering, Inc. at a not -to -exceed cost of $8,800. MOVED by Norris and seconded by McDonald to approve the contact with KLM Engineering, Inc. in the amount of $8,800 to inspect the North and South Water Towers in the City of New Hope. Motion carried. (:\Joint Water Commission\1WC Minutes\20141WC Minutes\08-06-20141WC Meeting Minutes.doc Joint Water Commission August 6, 2014 Page 2 of 2 County Road 9 Project Update Due to a number of issues with the pilings at the JWC mainline, delays by the subcontractor and numerous inspections, Stantec is requesting approval to increase the engineering budget by $30,000 to cover the cost of the remaining work. MOVED by Norris and seconded by McDonald to amend the 2014 construction project budget by $30,000 and requested the TAC to submit 2015 costs at the next JWC meeting. Motion carried. Crystal Pump Station Generator Project Update The generator is now online with only minor punch list items remaining. The generator will be exercised on a monthly basis. Other Business None. Next Meeting The next meeting is scheduled for Wednesday, September 3, 2014, at 1:30 p.m. Adjournment Chair Burt adjourned the meeting at 1:54 p.m. Thomas D. Burt, Ch ATTEST: J- kAt Schutrop, Recording Secretary (:\Joint Water Commission\JWC Minutes\2014 JWC Minutes\08-06-2014 JWC Meeting Minutes.doc