Loading...
03-12-2015 JWC Meeting MinutesJOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of March 12, 2015 The Golden Valley — Crystal — New Hope Joint Water Commission (JWC) meeting was called to order at 1:36 p.m. in the City of Golden Valley Council Conference Room. Commissioners Present Tom Burt, City Manager, Golden Valley Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Staff Present Wayne Houle, Interim City Engineer, Crystal Randy Kloepper, Utilities Superintendent, Crystal Bob Paschke, Director of Public Works, New Hope Bernie Weber, Operations Manager, New Hope Sue Virnig, Finance Director, Golden Valley Jeff Oliver, City Engineer, Golden Valley Bert Tracy, Public Works Maintenance Supervisor, Golden Valley Kelley Janes, Utilities Supervisor, Golden Valley Mark Ray, Street Maintenance Supervisor, Golden Valley R.J. Kakach, Engineer, Golden Valley Pat Schutrop, Administrative Assistant, Golden Valley Others Present Bill Blonigan, Council Member, Robbinsdale Marcia Glick, City Manager, Robbinsdale Steve Nelson, Bolton & Menk, Inc. Brian Simmons, Bolton & Menk, Inc. Jim Curme, Golden Valley Resident Minutes of February 11, 2015 Meeting Sue Virnig pointed out that on page 2, the motion made approving the Preliminary Design Technical Memorandum was not necessary. The only action needed was to receive and file the memorandum. MOVED by Norris and seconded by McDonald to approve the minutes of the February 11, 2015 meeting as corrected. Motion carried. Tri -City Council Meeting Agenda (March 31, 20151 The goal of the meeting will be to communicate the status of the 36 -inch watermain emergency repair and to obtain agreement for each city to pass a resolution for the emergency repair project. The agenda will include the draft resolution; presentation on the 36 -inch watermain emergency repair project, including project cost; a communications plan and a conservation plan; and discussion of the overall JWC distribution system. Bolton & Menk, Inc. will provide a draft of the presentation by March 26 to the Technical Advisory Committee (TAC) for review. 36 -Inch Watermain Emergency Repair and Emergency Backup Water Supply Project Update A bid opening for the JWC Emergency Supply Pumps/Piping/Electrical/Chemical project was held on March 10, 2015, and the following two bids were received: (:\Joint Water Commission\1WC Minutes\2015 JWC Minutes\03-12-20151WC Minutes.doc Joint Water Commission March 12, 2015 Page 2 of 2 * Includes a $60,000 allowance. This bid includes the piping to the Golden Valley well. After review of the bids received, Bolton & Menk, Inc. recommended awarding the contract to Municipal Builders in the amount of $1,524,900 (base bid with alternate vertical turbine pump (Goulds)). MOVED by McDonald and seconded by Norris to award the contract to Municipal Builders in the amount of $1,524,900 for the JWC Emergency Supply Pumps/Piping/Electrical/Chemical project. Motion carried. County Road 9 Project Update Jeff Oliver has been talking with Paul Backer, Hennepin County Construction Division, to discuss the portion of the 36 -inch PCCP repair that will cut into the new County Road 9 roadway. A technical solution has been submitted to the County for discussion and approval. Other Business A discussion of funding and projects listed on the current Capital Improvement Program (CIP) were discussed. Until the 36 -inch PCCP repair and replacement project is completed, no additional projects will be added to the CIP except for the analysis of the overall distribution system. When the final project cost for the 36 -inch PCCP repair and replacement project is known, Virnig will bring the CIP back to the JWC for discussion after the TAC has reviewed the CIP. Next Meeting The next meeting is scheduled for Wednesday, April 1, 2015, at 1:30 p.m. Adiournment Chair Burt adjourned the meeting at 2:19 p.m. Tho as D. Burt, C rair ATTEST: r PY Schutrop, Recording Secretary (:\Joint Water Commission\JWC Minutes\2015 JWC Minutes\03-12-20151WC Minutes.doc LUMP SUM ITEMS Bidders 1 a 1 b Crystal Golden Valley 1 c Total New Hope 1a + 1b + 1c + $60,000 Municipal Builders $676,300 $406,300 $382,300 $1,524,900 Magney Construction $711,500 $622,500 $444,700 $1,838,700 * Includes a $60,000 allowance. This bid includes the piping to the Golden Valley well. After review of the bids received, Bolton & Menk, Inc. recommended awarding the contract to Municipal Builders in the amount of $1,524,900 (base bid with alternate vertical turbine pump (Goulds)). MOVED by McDonald and seconded by Norris to award the contract to Municipal Builders in the amount of $1,524,900 for the JWC Emergency Supply Pumps/Piping/Electrical/Chemical project. Motion carried. County Road 9 Project Update Jeff Oliver has been talking with Paul Backer, Hennepin County Construction Division, to discuss the portion of the 36 -inch PCCP repair that will cut into the new County Road 9 roadway. A technical solution has been submitted to the County for discussion and approval. Other Business A discussion of funding and projects listed on the current Capital Improvement Program (CIP) were discussed. Until the 36 -inch PCCP repair and replacement project is completed, no additional projects will be added to the CIP except for the analysis of the overall distribution system. When the final project cost for the 36 -inch PCCP repair and replacement project is known, Virnig will bring the CIP back to the JWC for discussion after the TAC has reviewed the CIP. Next Meeting The next meeting is scheduled for Wednesday, April 1, 2015, at 1:30 p.m. Adiournment Chair Burt adjourned the meeting at 2:19 p.m. Tho as D. Burt, C rair ATTEST: r PY Schutrop, Recording Secretary (:\Joint Water Commission\JWC Minutes\2015 JWC Minutes\03-12-20151WC Minutes.doc