10-24-16 PC Agenda AGENDA
Planning Commission
Regular Meeting
Golden Valley City Hall, 7800 Golden Valley Road
Council Chambers
Monday, October 24, 2016
7 pm
1. Approval of Minutes
October 10, 2016, Regular Planning Commission Meeting
2. Presentation of Capital Improvement Program 2017-2021 — Sue Virnig, City
Finance Director
--Short Recess--
3. Discussion — Outdoor Storage — Auto Dealership Inventory
4. Reports on Meetings of the Housing and Redevelopment Authority, City
Council, Board of Zoning Appeals and other Meetings
5. Other Business
• Council Liaison Report
6. Adjournment
,, T}�is docu�7�er�t is�vailahle ir��Iterr��te fic�r��a�ts��pon a 72-f����r r�q��est. i�i�ase ca11
��� 7�3-593-�OOb (TTV: 76�-593-;3�G�}ta r��ake a r�quest. E�xan����le�of��ternat�f�rn�a�s � � �
���� r�n�y ir�cl��de larc��print,elect�c�nic,Br�ill�,a�Icli�cass�tE�,etc.
Regular Meeting of the
Golden Valley Planning Commission
October 10, 2016
A regular meeting of the Planning Commission was held at the Golden Valley City Hall,
Council Chambers, 7800 Golden Valley Road, Golden Valley, Minnesota, on Monday,
September 12, 2016. Chair Segelbaum called the meeting to order at 7 pm.
Those present were Planning Commissioners Baker, Blenker, Blum, Johnson, Kluchka,
Segelbaum, and Waldhauser. Also present were Planning Manager Jason Zimmerman,
Associate Planner/Grant Writer Emily Goellner, Planning Intern Chloe McGuire Brigl,
and Administrative Assistant Lisa Wittman.
1. Approval of Minutes
September 12, 2016, Regular Planning Commission Meeting
Waldhauser referred to the fourth paragraph on page two and asked that the size of
federally mapped floodplain areas be added to Mr. Eckman's response.
Waldhauser referred to the last paragraph on page four and asked Commissioner Blum to
clarify what he meant in regard to small area plans, overlay districts, or other types of
tools. Blum stated that his thought was that neighborhoods could have a decision making
process or a neighborhood association and if a neighborhood wants special treatment,
they should pay for it.
Waldhauser referred to the first paragraph on page five and stated that the word
"associates" should be changed to the word "associations."
Baker referred to the fifth paragraph on page four and stated that the third sentence
should be amended to state that he (not Zimmerman) suggested asking people at the
open house what they would like Golden Valley to look like in 10 years...
MOVED by Waldhauser, seconded by Baker and motion carried unanimously to approve
the September 12, 2016, minutes with the above noted corrections/changes.
2. Discussion — Outdoor Storage in Non-Residential Zoning Districts
McGuire Brigl noted that this is a continuation of the discussion from the August 22, 2016,
Planning Commission meeting. She explained that the focus of this discussion is on non-
residential properties to help clarify the existing regulations and the potential negative
impacts on surrounding properties.
McGuire Brigl stated that staff is proposing a new definition for outdoor storage since the
current Zoning Code doesn't define it. Staff is also proposing that there be one
comprehensive section of the Zoning Code that regulates storage and screening. She
explained that the International Property Maintenance Code regulates outdoor storage of
rubbish, waste, garbage, yard trimmings, woodpiles, etc. and that those types of
complaints are managed by the City's Fire Department. Items regulated by the Planning
Minutes of the Golden Valley Planning Commission
October 10, 2016
Page 2
Division are not garbage or waste and include commercial items, vehicles, materials,
supplies, merchandise, etc.
Waldhauser referred to the items managed by the Fire Department and asked if they also
regulate screening of those items or just the safety issues. McGuire Brigl said just the
safety issues. Zimmerman added that staff is trying to be as clear as possible about who
would handle each issue.
Kluchka asked if there is a definition for the amount of time allowed for storage.
Baker asked what principal use means. Kluchka asked if that means principal land use or
principal business use. Zimmerman said that is not currently clearly defined but the Code
could tie it to permitted uses. Segelbaum added that it could also be hard to separate
principal uses and accessory uses.
McGuire Brigl reviewed the staff recommendations for the Light lndustrial and Industrial
zoning districts which include: no storage of items unrelated to the principal use, all
properties must be screened if adjacent to a residential or institutional property,
materials/equipment associated with principal use must be screened from ground level of
adjacent properties and adjacent right-of-way with 90% opacity, and allowing a maximum
fence height of 8 feet, 12 feet if used for screening outdoor storage.
Baker referred to the requirements from other cities and noted that Golden Valley is the
only one to require 90% opacity for screening. McGuire Brigl clarified that other cities also
have opacity requirements. Kluchka questioned if the 90% opacity requirement means
year-round opacity. Zimmerman stated that it refers to vegetative screening and fencing.
Segelbaum asked about the difference between a maximum height of 8 feet, but allowing
12 feet if it is screening storage. McGuire Brigl stated that an 8-foot tall fence or screening
would be allowed regardless, but a 12-foot tall fence or screening would be allowed in
order to screen storage.
McGuire Brigl reviewed the staff recommendations for the Commercial, Business and
Professional Offices, and I-394 Mixed Use zoning districts which include: outdoor storage
must be related to the principal use and screened from ground level of adjacent
properties with 90% opacity, a maximum fence height of 6 feet, 8 feet if used for
screening outdoor storage, no storage of items unrelated the principal use, and only in-
use vehicles relating to the principal use may be on-site and unscreened.
Waldhauser stated that she would like to require screening for businesses that are
located next to residential properties. Zimmerman added that if a use requires a
Conditional Use Permit the City could require screening as a condition of approval.
Blum questioned if it would be easier to say that all parking lots have to be screened.
Zimmerman stated that people would probably prefer to look at open space if items aren't
being stored. Johnson noted that property owners could store anything outdoors if they
install a fence and the City wouldn't be able to see what is being stored. He said he
Minutes of the Golden Valley Planning Commission
October 10, 2016
Page 3
doesn't want to see fences everywhere and that they are bad for security. He added that
he thinks there may be more opportunities for landscaping and berms which would
respect people's property rights and what citizens want. He suggested that maybe the
City could budget to give some allowance for landscaping. Johnson suggested requiring
"living fences" and if that is not possible the property owner could ask for a variance.
Baker stated that not all sites lend themselves to vegetative fences. Kluchka noted that
"fence" isn't used in the definition, "screening" is. He suggested a requirement that
screening has to be 100% opaque if it is a structure and 50% opaque if it is vegetation.
Waldhauser agreed that some greenery with open-type fencing is better than nothing, but
she would not want solid fences installed. Segelbaum agreed that the code should
encourage different types of fences.
Kluchka questioned if storage, in terms of time, should be defined. Zimmerman noted that
typically this issue comes to the City as a complaint when the storage issue has been
occurring for quite some time. Segelbaum suggested that staff research what other cities
have done in regard to defining a length of time allowed for storage.
Segelbaum said he noticed that other cities codes don't allow front yard storage and
others state that storage is not allowed within setback areas. Baker said he doesn't think
the City would want to restrict storage in the front yard areas of commercial properties.
Zimmerman noted that the current Zoning Code does not allow parking or storage in the
front setback area. Waldhauser added that new developments are required to have green
space all around the property. Zimmerman agreed.
Baker asked if the City can require existing properties to conform to new requirements.
Zimmerman said he would talk to the City Attorney, but he believes that existing
properties would be grandfathered in and would not be required to conform to any new
requirements. Blenker asked if there is a complaint if the property owner could be held to
the new regulations. Zimmerman said if the property is consistent with the old regulations
the City can't force them upgrade their property.
Segelbaum questioned the requirements about screening from Institutional properties.
McGuire Brigl stated that requirement is currently in the Industrial zoning district, but not
in Light Industrial. Baker said he thinks the premise is that commercially zoned properties
don't store as much outside as Light Industrial and Industrial properties might.
Zimmerman stated that the City receives many fewer complaints about Commercial and
Business and Professional Offices properties than Industrial.
Segelbaum noted that Golden Valley is currently in the middle regarding strictness. He
questioned if the City should be stricter, less strict, or stay in the middle. Waldhauser said
she doesn't want to be overly strict.
Kluchka asked what category auto repair falls under. Zimmerman stated that auto uses in
any zoning district require a Conditional Use Permit. Kluchka asked if there are
requirements regarding parking lot striping and bringing lighting up to code. Zimmerman
stated that parking lots have to be re-striped if a lot is being resurfaced and lighting has to
be brought into conformance if new poles are installed.
Minutes of the Golden Valley Planning Commission
October 10, 2016
Page 4
Segelbaum asked if a minimum height requirement for fences is needed. McGuire Brigl
stated that the current code requires at least 6 feet of fence height. Zimmerman stated
that the current requirement for fences in non-residential zoning districts states that all
exterior storage shall be screened by a wall, fence, or vegetation not less than six feet in
height and of 90% opacity.
Segelbaum referred to the existing language in the Zoning Code that allows fences to be
12 feet tall. Zimmerman explained that a fence not exceeding 12 feet in height is
permitted in Commercial, Industrial, and Light Industrial zoning districts solely for the
purpose of screening exterior storage areas. Kluchka questioned if visual articulation, or
additional trees and shrubs should be required for fences over 8 feet tall. Blum suggested
allowing a 12 foot tall fence if it is a year-round vegetative fence.
Zimmerman said staff will take the feedback from the Commissioners and prepare code
language for their review.
,, .
3. Discussion — Comprehensive Plan — Land Use
Zimmerman discussed the Comprehensive Plan Open House that was held on
September 19. He stated that approximately 60 people attended and gave their feedback
on the 2030 Comprehensive Plan goals. He added that the City will continue to receive
additional comments through the on-line survey and that the final work scope and
Comprehensive Plan theme will be considered by the City Council in December.
Segelbaum asked how the on-line survey is being advertised. Zimmerman said it is on the
City's Facebook page, the City's website, the newsletter, and on cable news. Blum asked
Zimmerman to send the Commissioners a link to the on-line survey.
Zimmerman explained that some common land use themes have emerged from the
surveys and open house and include: minimizing conflicts between residential and non-
residential areas, continuing to strengthen the downtown area, supporting and enhancing
the bicycle and pedestrian infrastructure, protecting the environment/green space,
preserving single family neighborhoods, and integrating transit options.
Zimmerman showed the Commissioners a proposed existing land use map that will be
updated every couple of years and a future land use map that will help the City focus on
the goals in the Comprehensive Plan. He explained that four focus areas or districts have
surfaced and he showed a map of the four districts that are most likely to change and will
be addressed in the Comprehensive Plan update. These areas include: The Greater
Downtown area, The Douglas Drive Corridor, The I-394 Mixed Use Corridor, and the Light
Rail Station area. Waldhauser asked if the Greater powntown area goes all the way west
to Highway 169. Zimmerman said yes. Waldhauser asked if the Douglas Drive Corridor
district encompasses Duluth Street. Zimmerman explained that it did in the Douglas Drive
Corridor study. Johnson asked about the genesis of focusing on the Douglas Drive
Corridor. Zimmerman stated that the study was done as part of the last Comprehensive
Plan update because the City knew Douglas Drive was being re-constructed. Zimmerman
said he would send the Commissioners a link to the Douglas Drive study.
Minutes of the Golden Valley Planning Commission
October 10, 2016
Page 5
Waldhauser said she would like to see a similar study done for Winnetka Avenue.
Johnson questioned the risks of striving for too much. Zimmerman stated that the City will
look at other areas, but the four areas that are likely to change will be the major areas of
focus. Baker agreed that focusing on these four areas doesn't preclude them from
focusing on other places. Segelbaum questioned if the comments from the survey and
open house can be incorporated in these four focus areas. Johnson stated that he doesn't
want sub-groups of really dense neighborhoods and questioned how two or three acre
parcels get re-designated to something better. Zimmerman said it depends on the value
of the land and the type of redevelopment.
Goellner referred to a map of the Golden Valley Road light rail station area and discussed
transit supportive density and the Metropolitan requirements for density in that area.
Johnson asked how those requirements are enforced. Zimmerman stated that the City
can have tools in place, plan for density, and build in triggers to start upzoning once
certain thresholds are reached.
Kluchka asked how the parkland fits in with the density requirements. Goellner said the
parkland will probably be taken out of the requirement calculations. She explained that
there will be grant money and funding available to encourage density and she discussed
the density of some of the recently approved proposals in the City.
Segelbaum asked what type of feedback staff wants. Goellner said they would like to
know if the Planning Commission is comfortable with the focus areas that have been
highlighted. Baker said he would like a better definition of the Douglas Drive Corridor
area. Kluchka suggested looking at the entrances to the City like at 13th/Plymouth.
4. Reports on Meetings of the Housing and Redevelopment Authority, City
Council, Board of Zoning Appeals and other Meetings
Baker reported on the last light rail meeting he attended. Zimmerman stated that there will
be a Metro Blue Extension open house on November 10.
5. Other Business
• Council Liaison Report
Council Member Schmidgall reviewed the October 5 City Council meeting and reported
on the groundbreaking event for the new Brookview Community Center.
6. Adjournment
The meeting was adjourned at 9:04 pm.
John Kluchka, Secretary Lisa Wittman, Administrative Assistant
�;���� �:�� ;'��
� ,*� � `` � ��
bq �yi�,�. �' ;1 �� -�:. � , n m�j i�r,�
��%1� �ii`r� �'��� �9/J��3��` �� � „o � / �. �,,,,.-�� �i,�, ��
�'hysical D+evelvpmen� I3e art�rnen�
�
�a��-ss�-sc���r a��-���-s���t����
Date: October 24, 2016
To: Golden Valley Planning Commission
From: Sue Virnig, Finance Director
Jason Zimmerman, Planning Manager
Subject: 2017-2021 Capital Improvement Program
Finance Director Sue Virnig will be in attendance to present the 2017-2021 Capital Improvement
Program (CIP). Chapter 11 of the Comprehensive Plan is the CIP which is amended annually. As
stated in the by-laws of the Planning Commission, it is the duty of the Commission to review
major capital improvement plans against the goals and policies incorporated into the
Comprehensive Plan and to determine if they are consistent.
The CIP was discussed at the Council/Manager meetings of August 8 and September 13, 2016.
Key initiatives in the current CIP include implementing the construction of the Brookview
Community Center, coordinating the reconstruction of Douglas Drive, and working towards
completion of the Pavement Management Program. These efforts align with the Comprehensive
Plan goals of Creating a Complete Community, Implementing Bicycle and Pedestrian Facility
Improvements, Visually Integrating the Transportation System, and Preserving and Enhancing the
Transportation System.
Recommended Action
Staff recommends approval of the 2017-2021 Capital Improvement Program as it is consistent
with the goals and policies of Golden Valley's Comprehensive Plan.
Attachments:
2017-2021 Capital Improvement Program (144 pages)
cit o
y
o e�
va �
_
ro ose
.
a �ta
m rove m e n t
ro ram
city of
o en
va e
Consideration
2017-2021 Capital Improvement Program
December 5, 2016
Reviewed by Council
August 8, 2016
September 13, 2016
Reviewed by Planning Commission
October 24, 2016
Mayor
Shepard M. Harris
Council
Joanie Clausen, Larry Fonnest, Steve Schmidgall, Andy Snope
Management Team
Tim Cruikshank City Manager
Rick Birno Director of Parks and Recreation
John Crelly Fire Chief
Chantell Knauss Assistant City Manager
Marc Nevinski Physical Development Director
Jason Sturgis Police Chief
Sue Virnig Director of Finance
Cheryl Weiler Communications Manager
CITY OF GOLDEN VALLEY, MINNESOTA
2017-2021 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
Page
Introduction �
Financing 3
Exhibit I - General Fund Projects 7
Exhibit II - Water& Sewer Utility Fund Projects g
Exhibit III - Brookview Golf Course Fund Projects and Working Capital Projection g
Exhibit IV - Equipment Replacement Fund Projects and Cash Balance Projection 10
Exhibit V - Building Funds —Buildings, Cablecasting and Brookview Community Center 11
Exhibit VI - Park Improvement Fund Projects and Cash Balance Projection 12
Exhibit VII - Storm Sewer Utility Fund Projects and Cash Balance Projection 13
Exhibit VIII - City Municipal State Aid Street Fund Projects and Cash Balance Projection 14
Exhibit IX - Capital Improvement Fund Projects and Cash Balance Projection 15
Exhibit X - Douglas Drive Corridor Fund Project and Cash Balance Projection 16
Exhibit XI - General Obligation Bonded Debt Tax Levy Projections �7
Exhibit XII - Summary of Capital Improvement Expenditures by Category by Year 18
Exhibit XIII - Financing Summary by Source by Year �g
Vehicles & Equipment (V&E) 20
Parks (P) 51
Golf (GC) 63
Buildings (B)
Buildings 74
Cablecasting (C) 78
Brookview Community Center $�
Storm Sewers (SS) 84
Water& Sanitary Sewer Utility (W&SS) 96
Streets (S) 107
Douglas Drive Corridor(DD) 116
Appendix 119
Special Assessment Policy
Fleet Operation, Maintenance, and Replacement Policy
Projects & Funding Sources by Department Summary
August 5, 2016
The Honorabie Shepard Harris, Mayor
Members of the City Council
Dear Mayor Harris and City Council Members:
The Proposed Capital Improvement Program (CIP) for years FY 2017-2021 is presented with
this transmittal.
The Capital Improvement Program is a five-year fiscal planning instrument that is used to
identify needed capital projects and to delineate the financing and timing of the associated
projects. Generally these projects exceed $10,000 in cost and require long-term financing. An
annual capital improvement budget, encompassing the projects outlined for the first year of the
CIP, is presented to the Council with the City budget. The capital improvement also identifies
bond issues necessary to fund the year's improvements. Each project is brought forth in the
upcoming year for final approval by Council.
The adoption of a CIP is a requirement for each city in the metropolitan area. As part of the
Metropolitan Land Planning Act passed by the State legislature in 1976, each city is required to
adopt a Comprehensive Plan. In 2009, the City's Comprehensive Plan was approved and
accomplished:
• Updated zoning and subdivision codes;
• Housing implementation programs;
• Capital Improvement Program related to transportation, sewers, parks and open space
facilities
Starting this year, staff will be working on an update to the current comprehensive plan and witl
make revisions and approval by 2018.
Because of its relationship to the Comprehensive Plan, the CIP is reviewed by the Planning
Commission.
The CIP should be viewed as a vehicle to accomplish the goals outlined in the City's
Comprehensive Plan. The goals in the plan cover housing, sanitary and storm sewers, public
facilities, transportation and parks and open spaces. An orderly expenditure of funds on capital
items is a means of accomplishing the Plan.
A complete CIP is an indispensable tool for the City Council and the City staff as they manage
and control the timing and financing of capital improvements needed to maintain the current
high level of City services. A CIP is also used by the bond rating agencies to not only evaluate
the current and future financial condition of a city, but also to evaluate the quality of a city's
management. Adoption of this comprehensive CIP for 2017-2021 will enhance the City's ability
to maintain its current Aa1 bond rating.
Finally, a CIP is a valuable document for commission members and citizens to use to gain an
understanding of how their City works and the means to accomplish its overall plan.
Page 1
The process for compieting the 2017-2021 CIP was much the same as the process for the
2017-2018 Budget. Project requests were submitted by all the divisions and reviewed by the
Management Team and appropriate supervisors to establish the feasibility and priority of the
projects and match with available financing.
The CIP is a planning document or guide for the future capital improvements in the City which in
no way constitutes formal approval of the various projects. All of the projects will be formally
approved through the City's purchasing or public improvement process.
Each section lists the upcoming projects, project overview, and an estimated cost of the project.
The Financing section includes a narrative analysis of financing sources involved in the program
along with exhibits analyzing some of these sources, with special emphasis on the City's Capital
Project Funds. Also included is an exhibit which provides an analysis of the estimated future tax
levies needed to finance the City's current general obligation debt and the future general
obligation debt identified in the program. There are also two exhibits which summarize projects
by year, source of financing by year and the category for each project. The sections are:
Financing
Vehicles and Equipment
Parks
Golf Course
Buildings
Cablecasting
Brookview Community Center
Storm Sewers
Water& Sanitary Sewer Utility
Streets
Douglas Drive Corridor Study
Construction of the new Brookview Community Center financing was added to the 2017-2021
Capital Improvement Program.
I look forward to compfeting these important projects in the coming fiscal year. As we move
forward with this FY 2017-2021, I hope that this CIP meets your approval and provides a useful
toot for the Council as it makes decisions regarding these projects.
Timothy Cruikshank
City Manager
Page 2
CITY OF GOLDEN VALLEY, MINNESOTA
2017 -2021 CAPITAL IMPROVEMENT PROGRAM
FINANCING
The 2017-2021 Capital Improvement Program (CIP), which is detailed on the following pages, is financed
from a variety of sources. The purpose of this section is to describe and analyze these sources, in as much
detail as possible, so that the users of this CIP can be certain that the program as outlined can be financed
from available financing sources.
General Fund
The General Fund is the main operating fund of the City, and as such contains most of the City's operating
divisions. The main revenue source for this fund is real estate taxes. Large, non-recurring capital outlay
expenditures are usually made from one of the City's capital project funds. Level annual transfers from the
General Fund to these funds help to even out the annual budgeting process. The General Fund fund balance
as of December 31, 2015 was $10,727,064. Exhibit I lists the General Fund transfers to Funds for projects in
the CIP.
Water 8� Sewer Utilitv Fund
The Water& Sewer Utility Fund is an enterprise fund, which is involved in the operation and renewal &
replacement of the City's water and sanitary sewer systems. The main sources of revenue for this fund are
the user charges to those residential and commercial/industrial customers connected to the systems and
franchise fees to help with infrastructure improvements. Per City policy, new lateral water and sewer system
projects are assessed at 100% of cost unless there are unusual circumstances involved, in which case the
City would pay for the difference from the reserve account. Since the City is essentially fully developed, there
should be fewer and fewer of these projects in future years. These lateral water and sewer system projects
are usually requested by property owners, so it is very hard to project when they might occur and the total
cost.
The trunk water system is owned and operated under a joint powers agreement with the cities of Golden
Valley, New Hope and Crystal. This organization is known as the Joint Water Commission. The operating
and capital improvement expenditures of the trunk water system are shared by the three cities. In 2014, an
Emergency Water Supply was approved. Financing was through an interfund loan with an additional fee on
water consumption. In 2015, another interfund loan was used to finance the break on the water main that
carries water from Minneapolis to Crystal through Robbinsdale.
The trunk sanitary sewer system is owned by Metropolitan Council Environmental Services to which the City
makes monthly payments for the operation of and the capital improvements to the trunk system.
The fund balance or net position of the fund at 12/31/15 was $5,009,385. The financial position of this fund is
extremely important because the City is facing large expenditures in future years for the renewal and
replacement of aging water and sewer lines. Exhibit II is a list of projects in the program financed by the
Water& Sewer Utility Fund.
Brookview Golf Course Fund
The Brookview Golf Course Fund is an enterprise fund, which is involved in the operation and improvement
of the City's golf course and newly developed Lawn Bowling Course in 2014. The main revenue source is
green fees paid by the golfers. The golf course consists of an 18 hole regulation course, a 9 hole par 3
course and a driving range. Other revenue sources come from the lawn bowling course, pro shop and grill.
Many of the improvements to the course are part of regular course maintenance, but where specific projects
Page 3
can be defined and costs estimated, they are included in the program. Major pieces of equipment used by
the golf course are also included in the program. The net position in this fund as of December 31, 2015 was
$1,103,511. This was higher than the previous year due to the great weather and activity from the course.
Exhibit III is a list of the major course improvements and equipment included in the program and the
projected working capital balances of this fund.
Storm Sewer Utilitv Fund
The Storm Sewer Utility Fund is an enterprise fund, which is involved in the maintenance and improvement
of the City's storm water system including storm sewers and holding ponds. The fund is financed from
charges to all the property in the City based on the level of estimated storm water runoff from a given class
of property. Projects funded are those related to the Pavement Management Program, the City's adopted
Storm Water Management Plan and projects constructed in conjunction with the other cities that are
members of the Bassett Creek Water Management Commission. Exhibit VII is an analysis of the projected
revenue, expenditures and cash balances in this fund. In 2016, the 2006 C bonds were retired five years
early. The proceeds of this issue were used to finance the storm water costs of the T.H. 55 & Boone Ave.
project. The net position in this fund as of December 31, 2015 was $5,799,262.
Equipment Replacement Fund
This capital project fund is used to finance major vehicle and equipment purchases for General Fund
divisions. One of the revenue sources of this fund is the proceeds of the sale of Certificates of Indebtedness.
Exhibit IV is an analysis of the projected revenue, expenditures and cash balances in
this fund. The estimated future annual tax levies that will be needed to repay the debt service on current and
future certificates of indebtedness issues are detailed in Exhibit XI.
Buildinq Fund
This capital project fund is used to finance major improvements to buildings used by the General Fund
divisions. Wold Architects completed a city facility analysis in 2006. This plan has been incorporated into the
Building Fund and the 2015 General Fund Buildings Budget as funding permits. A major source of financing
in this fund is transfers from the General Fund. Exhibit V is an analysis of the projected revenue,
expenditures and cash balances of this fund.
Cablecastinq Fund
This capital project fund was separately designated in 2014 to account for the franchise fees collected for
cablecasting. These monies are designated for any future improvements for the council chambers to provide
cablecasting of public meetings. Northwest Cable Television (NWCT) provides service and programing for
the city.
Brookview Communitv Center Fund
This capital project fund is used to finance the new Brookview Community Center building. The new building
construction will start in fall of 2016 and be completed in 2017. The City will enter into a lease with the
Housing and Redevelopment Authority of the City of Golden Valley and payments on the lease will be paid
with a debt service levy.
Park Improvement Fund
This capital project fund is used to finance major park and open space improvements. One of the revenue
sources in this fund is an annual transfer from the General Fund along with park dedication fees. Exhibit VI is
an analysis of the projected revenue, expenditures and cash balances of this fund.
' Page 4
Municipal State Aid (MSA) Fund
This fund is used to account for moneys held in account both by the City and the State of Minnesota for use
in the maintenance and improvement of municipal state aid streets located in the City. Streets are
designated as municipal state aid based on criteria established by the State. Each city is allowed a maximum
number of miles of these designated streets. Every improvement project involving these streets must first be
approved by the State. If approved, a certain portion of the projected cost is advanced to the City from its
MSA account at the State, with the balance being paid upon completion. The monies that finance the City's
MSA account at the State come from the State gasoline tax.
The City's MSA account at the State is essentially the City's money, and the amount in the account at any
one time is included as an asset of this fund. The State also participates directly in various street and storm
sewer improvement projects with the City, when the particular project benefits or involves State highways
and rights of way. On the worksheets for street and storm sewer projects, the designation under the
financing analysis of MSA refers to the City's MSA account at the State, and State of Minnesota refers to
direct State participation. Exhibit VII is an analysis of the projected revenue, expenditures and cash balances
of the Municipal State Aid Fund.
Douqlas Drive Proiect
In October 2010, and January 2013, the City passed an ordinance requiring a franchise fee with Xcel Energy
and Centerpoint. The franchise fees will be the funding source for improvements related to the Douglas Drive
project. The City shall use the franchise fees collected by the Company for infrastructure costs of the
Douglas Drive Project which include City expenditures for the project, including those financed by bonds.
Franchise fee revenue started in 2011 and will be accounted for separately in this capital projects fund.
Capital Improvement Fund
Revenues for this fund will primarily come from a portion of the franchise fees that are not designated for
payment of debt services from the Douglas Drive project. Monies in this fund finance infrastructure
improvements. Exhibit VIII is an analysis of the projected revenue, expenditures and cash balances of this
fund.
General Obliqation Bonds
To finance certain projects the City must borrow funds externally by issuing general obligation municipal
bonds. The method(s) of financing the repayment of these bonds differentiates the various types of bonds
used in the program.
Tax Increment Bonds
The proceeds of these bond issues are used to pay for public improvements in specially designated tax
increment districts. The debt service on the bonds is repaid from property taxes on the increased value in
the district over a base year's value. The property taxes on the increased value (increment) are not
distributed to the various taxing jurisdictions, but are retained by the City to pay off the debt service on
the bonds. The increased value in the district comes from the increased commercial/industrial
development made possible by the public improvements financed by the bonds. The City currently has no
tax increment districts with following bonded indebtedness as of December 31, 2015. In 2016, the City
will sell bonds to help finance the storm improvements that coincide with The Liberty development. The
City has four tax increment financing districts, three of which were approved in 2015. A pay-go note was
used to finance the North Wirth District No. 3.
Page 5
Special Assessment Bonds
Per State Statute, if at least 20% of the bond principal for a public improvement is financed by special
assessments against benefited properties, the balance can be financed from tax levies against all the
property in the City without the need of a bond referendum. On the project worksheets, if special
assessment bond financing is involved, we have indicated the amount of bonds to be repaid from special
assessments and tax levies.
The pavement management program uses special assessment bonds for financing along with
assessments from benefiting properties. These street projects will extend over a longer period than is
included in the 2016-2020 CIP and will be financed by annual special assessment bond issues. On the
project worksheet for the pavement management program, the method of financing is indicated as just
Special Assessment Bonds.
Certificates of Indebtedness
Certificates of Indebtedness are used to help finance capital equipment that is outlined in the Equipment
Replacement Fund. These are short-term general obligation debt instruments issued for a term of four
years and repaid from annual tax levies. Current legislation has allowed cities to extend the term of these
certificates up to ten years if the life of the asset is that in length. We may extend the term for those
certificates that will finance fire pumper replacements.
Municipal State Aid (MSA) Revenue Bonds
MSA bonds were sold in 2007 for the first time for the City of Golden Valley. The project was Golden
Valley Road and Bridge replacement. The debt service payments will be repaid over twenty years with
State Aid Allotments used to improve and maintain Municipal State Aid roads.
Tax Abatement Bonds
These bonds will be repaid from the abated City taxes on the General Mills' headquarters expansion,
which has been completed. The abatement agreement was signed between the City and General Mills in
2001 and the bonds were sold in 2004. The City taxes generated by the expansion will not be used to
finance general City operations, but will be used to pay the debt service on the bonds. The term of the
abatement agreement is fifteen (15) years. On the project worksheets, if tax abatement bond financing is
involved, we have indicated the amount of bonds to be repaid from the annual tax abatement. In 2016,
the City transferred $275,000 to this fund from the positive performance from 2015. This will eliminate the
special debt levy for the repayment of these bonds. General Mills will still be responsible for their share of
the debt service payment per contract.
Exhibit XI is an analysis of the projected tax levies needed to finance the current general obligation bonded
debt of the City of Golden Valley.
Page 6
CITY OF GOLDEN VALLEY
2017 - 2021 CIP
GENERAL FUND (FUND 1000)
EXHIBIT I
EXPENDITURES
PROJECT (1) 2017 2018 2019 2020 2021
Transfer to Building Fund $300,000 $400,000 $450,000 $500,000 $500,000
Transfer to Park Improvement Fund 250,000 300,000 325,000 350,000 375,000
Transfer to Street Reconstruction 300,000 400,000 500,000 500,000 500,000
for Overlays
Totals $850,000 $1,100,000 $1,275,000 $1,350,000 $1,375,000
Notes:
(1) The individual building and park projects funded by these transfers
are included in the Building and Parks Sections of the CIP. All transfers are
included and approved with the General Fund budget.
Page 7
CITY OF GOLDEN VALLEY
2017-2021 CIP
WATER AND SEWER UTILITY FUND (FUND 7120)
EXHIBIT II
2017 2018 2019 2020 2021
Net Position @ 1/1 $5,329,940 $4,248,195 $2,800,010 $2,401,350 $2,102,942
Revenue:
Franchise Fees 400,000 400,000 400,000 400,000 400,000
Positive Performance
Operating Revenue 8,379,300 8,630,680 8,889,600 9,156,288 9,430,977
Total Revenue for Operations 8,779,300 9,030,680 9,289,600 9,556,288 9,830,977
Total Available 14,109,240 13,278,875 12,089,610 11,957,638 11,933,919
Expenditures:
Operating Expenditures:
Administration (609,610) (564,800) (578,920) (593,393) (608,228)
Sewer Maintenance (2,809,045) (2,923,495) (2,981,965) (3,041,604) (3,102,436)
Water Maintenance (4,772,390) (5,180,570) (5,232,376) (5,284,699) (5,337,546)
Sub-TotalOperations (8,191,045) (8,668,865) (8,793,261) (8,919,697) (9,048,211)
Capital Outlay:
2016
2017 (1,670,000)
2018
2019 (1,810,000)
2020 (895,000)
2021 (935,000)
(610 000)
Sub-Total Capital Expenses (1,670,000) (1,810,000) (895,000) (935,000) (610,000)
Total Expenses (9,861,045) (10 478 865) (9 688 261) (9 854 697) (9,658 211)
Net Position @ 12/31 $4,248,195 $2,800,010 $2,401,350 $2,102,942 $2,275,708
Page 8
CITY OF GOLDEN VALLEY
2017-2021 CIP
BROOKVIEW GOLF COURSE FUND (FUND 7150)
EXHIBIT III
2017 2018 2019 2020 2021
Net Position @ 1/1 $1,136,886 $914,156 $708,731 $603,168 $626,760
Revenue:
Total Course Revenue 2,043,565 2,048,565 2,110,022 2,173,323 2,238,522
Capital Loan for Carts
Total Available 3,180,451 2,962,721 2,818,753 2,776,491 2,865,283
Expenses:
Operating Expenses: (1,981,295) (2,018,990) (2,029,085) (2,039,230) (2,049,427)
Capital Outlay
2016
2017 (285,000)
2018 (235,000)
2019 (186,500)
2020
2021 (110,500)
Total Expenses �2,2g6, (39 000)
295) (2,253,990) (2,215,585) (2,149,730) (2,088,427)
Net Position @ 12/31 $914,156 $708,731 $603,168 $626,760 $776,856
Page 9
CITY OF GOLDEN VALLEY
2017-2021 CIP
EQUIPMENT REPLACEMENT FUND(FUND 5700)
EXHIBIT IV
2017 2018 2019 2020 2021
Fund Balance @ 1/1 2,883,056 2,231,932 1,290,181 1,023,013 1,051,173
Revenue:
Proceeds-Certificates of Indebtedness 800,000 800,000 800,000 800,000 800,000
Proceeds-Certificates of Indebtedness 400,000
Sale of Assets(Auction proceeds): 35,000 35,000 35,000 35,000 35,000
Interest Earnings(Beginning Balance) 28,831 22,319 12,902 10,230 10,512
Total Available 3,746,887 3,489,251 2,138,083 1,868,243 1,896,685
Expenditures:
Bond Issuance Costs (20,000) (20,000) (20,000) (20,000) (20,000)
2017 (1,494,955)
2018 (2,179,070)
2019 (1,095,070)
2020 (797,070)
2021 (899,070)
(1,514,955) (2,199,070) (1,115,070) (817,070) (919,070)
Fund Balance @12/31 2,231,932 1,290,181 1,023,013 1,051,173 977,615
Page 10
CITY OF GOLDEN VALLEY
2017-2021 CIP
BUILDING FUND(FUND 5200)
EXHIBIT V
2017 2018 2019 2020 2021
Fund Balance @ 1/1 $434,829 $623,090 $667,763 $907,772 $1,084,580
Revenue:
Transfer From General Fund 300,000 400,000 425,000 450,000 500,000
Interest Earnings 3,261 4,673 5,008 6,808 8,134
Total Available 738,090 1,027,763 1,097,772 1,364,580 1,592,714
Expenditures:
(115,000) (360,000) (190,000) (280,000) (150,000)
Total Expenditures (115,000) (360,000) (190,000) (280,000) (150,000)
Fund Balance @ 12/31 $623,090 $667,763 $907,772 $1,084,580 $1,442,714
CABLECASTING FUND(FUND 5500)
EXHIBIT V
2017 2018 2019 2020 2021
Fund Balance @ 1/1 $168,534 $181,294 $194,200 $207,171 $220,207
Revenue:
Franchise Fees 34,000 34,000 34,000 34,000 34,000
Interest Earnings 760 906 971 1,036 1,101
Total Availabie 203,294 216,200 229,171 242,207 255,308
Expenditures:
(22,000� �22,000� �22,000� �22,000� �22,000�
Total Expenditures (22,000) (22,000) (22,000) (22,000) (22,000)
Fund Balance @ 12/31 $181,294 $194,200 $207,171 $220,207 $233,308
BROOKVIEW COMMUNiTY CENTER FUND(FUND 5550)
EXHIBIT V
2017 2018 2019 2020 2021
Fund Balance @ 1/1 $993,854 $8,ggg,g23
Revenue:
Bond Proceeds 18,000,000 p
Interest Earnings 4 969 C C C
Total Available �g g98 823 $99$$23 L L �
� � O
Expenditures: S S S
E E E
(10,000,000) (g,ggg,g23) D p p
Total Expenditures (10,000,000) (8,998,823)
Fund Balance @ 12/31 $8,998,823 $0
Page 11
CITY OF GOLDEN VALLEY
2017-2021 CIP
PARK IMPROVEMENT FUND (FUND 5600)
___.__.._.'....__.__..._� .._..__e_... _.. EXHIBIT VI
2017 2018 2019 2020 2021
Cash Balance @ 1/1 $721,380 $531,790 $455,779 $516,197 $548,069
Revenue:
Transfer From General Fund 250,000 300,000 325,000 350,000 375,000
Little League Payment 10,000
Hennepin County Youth Sports Grant 300,000
Park Dedication Fee
ISD#281 12,500
Golden Valley Youth Associations 12,500
Mug/Tshirt Revenue for Gazebo
Interest Earnings 5,410 3,988 3,418 3,871 4,111
Total Available 1,286,790 835,779 784,197 895,069 927,179
Expenditures:
2017 (755,000)
2018 (380,000)
2019 (268,000)
2020 (347,000)
2021 (317,000)
Total Expenditures (755,000) (380,000) (268,000) (347,000) (317,000)
Estimated Net Assets @ 12/31 $531,790 $455,779 $516,197 $548,069 $610,179
Page 12
CITY OF GOLDEN VALLEY
2017-2021 CIP
STORM SEWER UTILITY FUND (FUND 7300)
EXHIBIT VII
2017 2018 2019 2020 2021
Net Position @ 1/1 $2,128,382 $787,662 $1,846,132 $2,629,448 $3,031,259
Revenue:
Storm Sewer Charges 2,375,000 2,475,000 2,475,000 2,475,000 2,475,000
Bassett Creek Watershed Management Commission 501,000 1,200,000 900,000
InterFund Loan-Water/Sewer 207,775 203,300 198,830 194,360 189,875
Interfund Loan-Liberty Crossing 110,000 110,000 110,000 110,000
Interest Earnings 50,000 50,000 18,461 26,294 30,313
Total Revenue 2,632,775 2,838,300 3,303,291 4,005,654 3,705,188
Total Available 4,761,157 3,625,962 5,149,423 6,635,103 6,736,446
Expenditures:
Operating Expenditures:
Storm Sewer Maintenance (524,930) (352,185) (362,751) (373,633) (384,842)
Street Cleaning (128,000) (130,855) (134,781) (138,824) (142,989)
Environmental Services (317,565) (321,790) (331,444) (341,387) (351,629)
Sub-Total of Operations (970,495) (804,830) (828,975) (853,844) (879,459)
Capital Outlay:
2016
2017 (3,003,000)
2018 (975,000)
2019 (1,691,000)
2020 (2,750,000)
2021 (2,174,000)
Sub-Total of Capital Expenditures (3,003,000) (975,000) (1,691,000) (2,750,000) (2,174,000)
Total Expenditures (3,973,495) (1,779,830) (2,519,975) (3,603,844) (3,053,459)
Net Position @ 12/31 $787,662 $1,846,132 $2,629,448 $3,031,259 $3,682,987
Page 13
CITY OF GOLDEN VALLEY
2017-2021 CIP
CITY STATE AID CAPITAL PROJECT FUND(FUND 5100)
EXHIBIT VIII
2017 2018 2019 2020 2021
Fund Balance @ 1/1 2,574,759 2,701,168 2,820,440 2,940,606 3,019,468
Revenue:
State Aid Bond Payments 105,000 105,000 105,000 105,000 105,000
Annual Maintenance Allotment From State 292,983 292,983 292,983 292,983 292,983
Special Assessments-State-Aid Bonds(Harold) 20,000 20,000 20,000 20,000 20,000
Special Assessments-State-Aid Bonds;
Golden Valley Rd.-Douglas Dr.to T.H. 100 7,875
Harold Avenue Reconstruction 2,415 2,415 2,415
MN DOT Grant
Interest Earnings (°/a of Beg. Bal.) 19,311 20,259 21,153 22,055 22,646
Total Available 3,022,343 3,141,825 3,261,991 3,380,643 3,460,097
Expenditures:
Maintenance 125,000 125,000 125,000 125,000
MSA Debt Service(ends 2027) 196,175 196,385 196,385 196,175 189,000
TH 55-Shaper Dr Flashing Arrows 40,000
Plymouth Ave Reconstruction 125,000
Total Expenditures 321,175 321,385 321,385 361,175 314,000
Fund Balance @ 12/31 $2,701,168 $2,820,440 $2,940,606 $3,019,468 $3,146,097
Page 14
CITY OF GOLDEN VALLEY
2017-2021 CIP
CAPITAL IMPROVEMENT FUND (FUND 6100)
EXHIBIT IX
2017 2018 2019 2020 2021
Fund Balance @ 1/1 $986,491 $826,375 $854,979 $92g,189 $1,009,461
Revenue:
Charge to Street Reconstruction Projects to
Finance CAD&Pavement Management Systems 20,000 20,000 20,000 20,000 20,000
Franchise Fees(CenterpoinUXcel) 200,000 200,000 200,000 200,000
Intertund Loan from Utility Fund 222,120 217,440 212,760 208,080 203,400
Bond Sale 1,200,000
City of Crystal 35,000
Interest Earnings (1%of Beg. Bal.) 9,865 8,264 8,550 9,292 10,095
Total Available 2,473,475 1,272,079 1,296,289 1,366,561 1,442,955
Expenditures:
Streetscape and City Hall Complex Renovation 50,000 50,000
Sidewalk and Trail Upgrades 100,000 100,000 100,000 100,000
AutoCad Application 12,100 12,100 12,100 12,100 12,100
Cartegraph Street Maintenance Software 20,000 20,000 20,000 10,000 10,000
Comprehensive Plan 67,500
Additional Comprehensive Plan Costs 127,500
Debt Service Payments 135,000 135,000 135,000 135,000
Xenia Ave Construction 1,200,000
_ TH 100 Pedestrian Bridge 70,000
Retaining Wall Replacement 100,000 100,000 100,000 100,000 100,000
Total Expenditures 1,647,100 417,100 367,100 357,100 357,100
Fund Balance @ 12/31 $826,375 $854,979 $92g,�gg
$1,009,461 $1,085,855
Page 15
CITY OF GOLDEN VALLEY
2017-2021 CIP
DOUGLAS DRIVE CORRIDOR (FUND 6200)
EXHIBIT X
2017 2018 2019 2020 2021
Fund Balance @ 1/1 $3,453,299 $727,332 $761,390 $800,289 $838,777
Revenue:
Transit for Livable Communities
Franchise Fees 400,000 400,000 400,000 400,000 400,000
Hennepin County
Street Reconstruction Bond
Interest Earnings (1%of Beg. Bal.) 34,533 7,273 7,614 8,003 8,388
Total Available 3,887,832 1,134,605 1,169,004 1,208,292 1,247,165
Expenditures:
2016
2017 (3,160,500)
2018 (373,215)
2019 (368,715)
2020 (369,515)
2021 (369,515)
Total Expenditures (3,160,500) (373,215) (368,715) (369,515) (369,515)
Fund Balance @ 12/31 $727,332 $761,390 $800,289 $838,777 $877 650
Page 16
CITY OF GOLDEN VALLEY
2017-2021 CIP
GENERAL OBLIGATION-CURRENT DEBT PAYMENTS
EXHIBIT XI-(does not include issues that are in escrow)
TO BE
PRESENTED
AT A LATE R
DATE
Page 17
CITY OF GOLDEN VALLEY
2017-2021 CIP
CAPITAL IMPROVEMENT EXPENDITURES BY CATEGORY BY YEAR
EXHIBIT XII
TO BE
PRESENTED
AT A LATE R
DATE
Page 18
CITY OF GOLDEN VALLEY
2017-2021 CIP
FINANCING SUMMARY BY SOURCE BY YEAR
EXHIBIT XIII
TO BE
PRESENTED
AT A LATE R
DATE
Page 19
city of
olden
�
va e
Capital Improvement Program 2017-2021
Vehicles and Equipment Replacement Section
This section includes all capital equipment and vehicles that help employees have the tools to fulfill
their job requirements. The Vehicle Maintenance department maintains all equipment and vehicles
except for Brookview Golf Course Enterprise Fund. The City's Information Technology Coordinator
maintains the computers, printers and phone system. Each year each piece of equipment is reviewed
before replacement. This schedule allows the City to finance upcoming purchases for the next five
years.
Financing for this fund comes from selling Equipment Certificates. Certificates are paid back in four
years by a debt levy.
20
City of Golden Valley, Minnesota
Capital Improvement Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
�--_ - _ _. _
!Vehicles and Equipment `
Marked Squad Cars(Police) V&E-001 n/a 80,000 120,000 80,000 80,000 80,000 440,000
Computers and Printers(Finance) V&E-002 n/a 105,000 80,000 95,000 95,000 95,000 470,000
Pickup Truck(Engineering) V&E-008 n/a 40,000 40,000
Front End Loader(Street) V&E-009 n/a 260,000 260,000
Portable Computers(Police) V&E-020 nla 50,000 50,000
Vibratory Asphalt Roller(Street) V&E-021 n/a 45,000 45,000
Sign Truck(Street) V&E-022 nla 100,000 100,000
Pickup Truck(Park) V&E-026 n/a 40,000 40,000
Dump Truck(Park) V&E-029 n/a 80,000 80,000
AsphaltMelter(Street) V&E-033 n/a 45,000 45,000
Crime Prevention Vehicle(Police) V&E-034 n/a 30,000 30,000
AerialLadderTruck(Fire) V&E-037 n/a 400,000 700,000 1,100,000
Streetscape Banners(Street) V&E-038 n/a 25,000 25,000
Utility Tractor(Park) V&E-039 n/a 75,000 75,000
RotaryMower(Park) V&E-048 nla 25,000 25,000
Asphalt Cold Planer(Street) V&E-052 nla 25,000 25,000
Fire Hose(Fire) V&E-058 n/a 28,000 28,000
Rescue Vehicle(Fire) V&E-060 n/a 90,000 90,000
Pickup Truck(Street) V&E-063 n/a 35,000 35,000
Single Axle Dump Truck(Street) V&E-070 n/a 225,000 225,000
SidewalkSnowblower(Street) V&E-073 n/a 110,000 110,000
Passenger Vehicle(Fire) V&E-083 n/a 40,000 40,000
Marked Squad Digital Recording System(Police) V&E-092 n/a 120,000 120,000
Asphalt Hot Box(Street) V&E-099 n/a 45,000 45,000
Pickup Truck(Fire) V&E-102 nla 40,000 40,000
Polaris 6 X 6(Fire) V&E-106 n/a 15,000 15,000
Bobcat Utility Truckster(Park) V&E-107 n/a 55,000 55,000
Unmarked Police Vehicle(Police) V&E-108 n/a 40,000 40,000
Single Axle Dump Truck(Street) V&E-109 n/a 225,000 225,000
Dump Truck(Street) V&E-110 n/a 225,000 225,000
Bobcat Toolcat(Park) V&E-116 n/a 50,000 50,000
Field Line Painter(Park) V&E-120 n/a 20,000 20,000
Tasers(Police) V&E-121 nla 16,000 16,000
Tack Sprayer(Street) V&E-126 n/a 60,000 60,000
Utility Tractor(Park) V&E-128 n/a 105,000 105,000
Rotary Mower(Park) V&E-130 n/a 25,000 25,000
800 MHz Radios(Public Works Maintenance) V&E-133 n/a 183,000 183,000
Body Cameras(Police) V&E-135 n/a 53,955 24,070 24,070 24,070 24,070 150,235
Outboard Motor(Fire) V&E-137 n/a 5,500 5,500
PassengerVehicle(Fire) V&E-138 nla 40,000 40,000
PassengerVehicle(Fire) V&E-139 n/a 40,000 40,000
Utility Trailer(Park) V&E-140 nla 5,500 5,500
Pickup Truck(Park) V&E-141 nla 35,000 35,000
Dump Truck(Park) V&E-142 n/a 80,000 80,000
Trash Compactor(Park) V&E-143 n/a 65,000 65,000
Single Axle Dump Truck(Street) V&E-144 n/a 230,000 230,000
Page 21
Department Project# Priority 2017 2018 2019 2020 2021 Total
Skid Steer Loader(Street) V&E-145 n/a 55,000
Dump Truck(Street) 55,000
V&E-146 n/a 80,000 80,000
Marked Squad(Police) V&E-147 n/a 40,000
SWAT Van(Police) 40,000
V&E-148 n/a 100,000 100,000
Water Truck(Street) V&E-149 n/a
Asset Management Software 215,000 215,000
V&E-150 n/a 60,000 60,000
Fire Pumper Truck(Fire) V&E-151 n/a 600,000
Passenger Vehicle(fire) 600,000
V&E-152 n/a 40,000 40,000
Equipment Trailer(Street) V&E-153 n/a
20,000 20,000
Vehicles and Equipment Total 1,494,955 2,179,070 1,095,070 795,070 899,070 6,463,235
GRAND TOTAL 1,494,955 2,179,070 1,095,070 795,070 899,070 6,463,235
Page 22
Project# V&E-001 Department Vehicles and Equipment
Contact
Project Name Marked Squad Cars (Police) Type Equ�p�,�c
Useful Life
Category Vehicles
Priority
Description 1
iMarked squad cars for the Police Department per replacement schedule for the City's ten squads.
�Justifica6on �
- __ -- - -
Each year all ten squads aze looked at based on the number of miles,accidents and overall safety.The number replaced may vary based on these factors.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 80,000 120,000 80,000 80,000 80,000 440,000
Total 80,000 720,000 80,000 80,000 80,000 440,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 80,000 120,000 80,000 80,000 80,000 440,000
TOtal 80,000 120,000 80,000 80,000 80,000 440,000
Project# VBiE-�OZ Department Vehicles and Equipment
Contact
Project Name Computers and Printers(Finance) Type Equipment
Useful Life
Category Equipment:Computers
Priority
' Description �
- --- __ ____ _ -__ -- -_. _-
iReplacement of computers and printers in the City. Most computers are scheduled to be replaced every four to five years and printers every eight. The City has a
�total of 140 computers and printers. Also includes upgrades to the City's computer network system,which includes switches,hubs and fiber connection hardware.
��In 2017,switches(10)will be replaced.
-__ - - ---- ____
�Justification �
- -_-- ---
Technology changes make personal computers obsolete af[er five years for business purposes. The computers will be replaced on the basis of need.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 105,000 80,000 95,000 95,000 95,000 470,000
Total 105,000 80,000 95,000 95,000 95,000 470,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 105,000 80,000 95,000 95,000 95,000 470,000
Total 105,000 80,000 95,000 95,000 95,000 470,000
Page 23
Project# V&�+-QQ$ Department Vehicles and Equipment
Project Name Contact
Pickup Truck(Engineering)
Type Equipment
Useful Life
Category Vehicles
r -- — --—---, Priority
D� escriphon I
-- —
—. — _— _
--_—
Pickup Truck for the En ineerin Division to replace Unit#233.2009 Ford Ranger with topper.
—. _—. -
g —
Justificafion -- — __ — -- -- --- —
�_-- I
— --.
---
. _— _
�creased repair and maintenance expenditures on Unit#233 This vehicle will be 10 years old.
---
-- ——
— - ----- �
— --
—___ _ — - -. — ——-- . —
Expenditures 2017 2018 2019 2020 2021 Total J
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000
40,000
Total 40,000 40,000
Project# V&E-009 Department Vehicles and Equipment
Project Name Front End Loader(Street) Contact
Type Equipment
Useful I.ife
Category Vehicles
Priority
�Description �
3 4 cubic yard front end loader for the Str et Department to replace Unit 766(2003 Caterpillar 950G Front End Loader). — 1
— -- —_ — — — — — -- — -- J
�Justification 1 —
�——
—_—— —_—_— �_—
—___ _
——__—.
L creased repair and mamtenance expenditures on Unit 766,which will be fifteen years old, —
—.—_- . —--_
— --- —
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 260,000
260,000
Total 260,000 260,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 260,000
260,000
Total 260,000 260,000
Page 24
Project# V&E-�20
Department Vehicles and Equipment
Contact
Project Name portable Computers (Police) T e ui ment
YP E9 P
Useful Life
Category Equipment:Computers
Priority
- —
- - ___�
Description
r---- - -- - _ _- _ - _ -_ _.. - -- —�
�Replacement of portable computers in squad cars. There are currently ten Toughbook PCs with docking stations
--- __ -
_. _ — -
---- -
_ __
�Jushfication
--. _
-__ . _ __ _ _ -- - _ _ _ _- - -
The current machmes were acquired in 2016 Increased repau and maintenance occurs as machines age. New Technology requires current hardware.These portable
computers are replaced every four years.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 50,000 50,000
TOtal 50,000 50,000
Project# V&�+-�21 Department Vehicles and Equipment
Contact
Project Name Vibratory Asphalt Roller (Street) Type Equ�pm�,t
Useful Life
Categor,y Equipment:Heavy Equip.
Priority
Description ]
_ _ _- - _-
_ _-- -_ - - -- - - __ _ _ _ - - -- - -- -
�New 2.5 ton dual-drum drive asphalt roller for the Street Department to replace Unit#765(2002 Ingersoll Rand roller). This piece of equipment is used for �
compacting asphalt and granular materials.
Justifica6on.-- - . _ ._ ___ _- - . - __J
�__ ' __ _ � - --_ _ _ _ _ _____ _ -- - __ _
Increased repair and maintenance expenditures on Unit#765,which will be fifteen years old.
. -- - . - __ _-- -_ --- _ __ - -__ __ �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 45,000 45,000
Total 45,000 45,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 45,000 45,000
Total 45,000 45,000
Page 25
Project# V&�+-Q22 Department Vehicles and Equipment
Project Name Sign Truck(Street) conca�c
Type Equipment
Useful Life
Category Vehicles
- ---- -� Priority
Description
r-- —= — ———
— . - _. __ .
__. . _. --
ign truck far the Street Division to replace Unit#776(2008 Ford F-450)truck with flat bed,tool boxes and sign removal crane.
_-- --
-- - --
�Justification _ � — . --- .
— — - --
. . _
—— .____
creased repair and mamtenance expenditures on Unit#776 which will be ten years old -
-- -- -
- --- ---
- - -
- ---
-- _. _ -__ _--
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 100,000
100,000
Total 100,000 100,000
Project# V&E-026 Department Vehicles and Equipment
rro�e�r rraroe pickup Truck(Park) con�a�r
Type Equipment
Useful Life
Category Vehicles
- - - -----
DesCriptlOn � Priority
�c p Truck far the Park Division to replace Unit#476(2007 Ford F-150)
- - ----
- -_- -_ -. --- - -- �
i- . . - -_-. _ -
__ -- --
Jus6fication � ---
L�_ -- :——_—_ —___�
lncreased repair and maintenance expenditures on Unit#476
------
-_. -- -----
-- __-. --.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000
40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000
40,000
Total 40,000
40,000
Page 26
Project# V&E-029 Department Vehicles and Equipment
Contact
Project Name Dump Truck(Park) Type Equipment
Useful I.ife
Category Vehicles
�-- _____ _ Priority
�Description - .J
- -- __ ___ __-- - - - _ -- -
Ford F-550 truck with swaploader hook system for the Park Department to replace Unit 480 a 2011 Ford F-550 diump truck with Swaploader hook system.
-- -
__ __ _ _ -- --
— —� -- _
- - -
iJustification
_ _�
___ _ _ _ __ - -- -- - _-- _ -
]ncreased repair and maintenance expenditures on Unit#480,which will be ten years old.
_ .__ — .__ __ _ _ _. _ . - _ _ - _ _ - - - _ _ -- -�
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 80,000 80,000
Total 80,000 80,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 80,000 80,000
Total 80,000 80,000
Project# V&E-033 Department Vehicles and Equipment
Contact
Pr°�e�r Na'"e Asphalt Melter (Street) T e ui ment
yp � p
Useful Life
Category Equipment:Heavy Equip.
- _ --
Priority
Description �
- _ -- . - _ -- . - - - - - -
�Crack sealant melter for the Street Division to to replace Unit#785(2009 Stepp Asphalt Melter). �
- -- - - _ __ __ __ _ ;
Jushfication �
: _
,Increased repair and maintenance expenditures on Umt#785. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 45,000 45,000
Total 45,000 45,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 45,000 45,000
Total 45,000 45,000
Page 27
Project# V&E-034 Department Vehicles and Equipment
Project Name Contact
Crime Prevention Vehicle(Police)
Type Equipment
Useful Life
Category Vehicles
— -- — �� Priority
Descrip6on
--- 1
- — -----
New crime prevention vehicle for the Police Department to replace Unit#804(2008 Dodge Caravan).
--—
_-- �
— — __—.
— —. _ —--
Justifica6on l
I� -- - -_�__ --
. _ - _—. . —
creased repair and maintenance expend�tures on Unit#804 which w�ll be eleven years old.
– - -
__ — ------�
— — --
__- – ----
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 30,000
30,000
Total 30,000
30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 30,000 30,000
Total 30,000 30,000
' Project# V&E-037 Department Vehicles and Equipment
Project Name Aerial Ladder Truck(Fire) conca�c
Type Equipment
Useful Life
Category Vehicles
i —— —._—-- Priority
Description j
--
. __—
— — —_— —J
—. --.
Replace aerial ladder fire pumper Unit#334 that was ori inall — - ---
_g y purchased in 1993 and refurbished in 2009. - - ---
— _— _ — . — -- -- — . . __ �
�Justific afion j —
�—_=--_-- --._.. :—
_ _ _ __ ----
This aerial pumper will be twenty five years old. - -
— —---------—
� __—_—
—_ . --
— .- - —
—_ _ —. _ _
— . - . _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 400,000 700,000
1,100,000
Total 400,000 700,000 1,100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 400,000 700,000
1,100,000
TOtal 400,000 700,000 1,100,000
Page 28
Project# V&E-038
Department Vehicles and Equipment
Project Name Streetscape Banners (Street) coTta��
ype Equipment
Useful Life
Category Equipment:Miscellaneous
�-- — — -- -
Priority
�escription �
— -
— - — _--_ ___ _ —_ _ - - _- _ _
Replacement of banners for streetscape along Winnetka Avenue and Golden Valley Road. There are two different sets of banners with 216 banners in each set. The
two sets(summer and winter)were purchased in 2007 and will be replaced with one type..
�_ — - _- - - ---� _ -
�Jushfication J
—=_ —
Project# V&E-048 Department Vehicles and Equipment
Project Name Contact
Rotary Mower (Park)
Type Equipment
Useful Life
Category Equipment:Heavy Equip.
-- Priority
- -__- __-
Descripfion
— _ — JI ----------. _
T mower for mowing City Hall Complex,Fire Stations and Neighborhood Parks.
- - ---
- - -- - �
.11lStlflCatloll ----- , . - - . .
� .- _ _ . ._-. _ I
- .-
. _ . _ _- _ __
Increased repair and maintenance expend�tures on Unit#485
--
-- - --_ -
�__ - ---- . -
-_
. _ .-- ---- -
- - -
- -
Expenditures 2017 2018 2019 2020 2021 Total - - ---
EquipNehicles/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 25,000 25,000
Total 25,000 25,000
Project# V&E-Q52 Department Vehicles and Equipment
Pro�e�c N$me Asphalt Cold Planer(Street) conra�r
Type Equipment
Dseful Life
Category Equipment:Heavy Equip.
�-_-_ - . _ .. - Priority
, Description l
—._
,
— _ ---__
-- —----
�old planer attachment for Bobcat T 190 skid streer loader for Street Department to replace Unit#784(MT trackless implement).
----
---.-
- .- . _ - ._ __ -
-. . - - _. - .
�Justification - � . . _. _—
�_--- —�— —
—=_—_
--- —
_— ___. _
� creas repair and maintenance expenditures on Unit#784,which will be twelve years old.
. . -__-. - --. _
_ . - - _-
-. -
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings
25,000 25,000
T�� 25,000 25,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 25,000 25,000
Total 25,000 25,000
Page 30
Project# V&�+-QS$ Department Vehicles and Equipment
Project Name Fire Hose(Fire) conta�c
Type Equipment
Useful Life
Category Equipment:Miscellaneous
— --- Priority
_ �
Description I
L3/4" — _ — -----
,3",and 5"hose. — ---
Justification � �
LR p e hose that failed during annual testing. — — — --- --
___ — - — —
_ _. _ __—. —---- --- --— __ __
__ __ —_—
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 28,000 28,000
TOtal 28,000 28,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 28,000 28,000
Total 28,000 28,000
Project# V&E-060 Department Vehicles and Equipment
Pro�e`t Na"'e Rescue Vehicle (Fire) c°"ra`�
Type Equipment
Useful Life
Category Vehicles
�Description � Priority
— �
-- --_ -
--—_ _— .
New Rescue Veh�cle to replace Unrt 339,a 2001 Fard Excursion.
-- — --
--I
--- . _ — _ -- �J
�Jushfication � —
— _ ---
.. __— ._ .
�Increased repair and maintenance expenditures on Unit 339. - ---—
-- —
— —— —--------_—— ---
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 90,000 90,000
Total 90,000 90,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 90,000 90,000
Total 90,000 90,000
Page 31
Project# V&E-063
Department Vehicles and Equipment
� Contact
Project Name pickup Truck(Street) TyPe Equ;pm�,t
Useful Life
Category Vehicles
_ Priority
. -- - —
Descrip6on �
----
_ __ —-- —_ _. _ — _ __ _ _ _ __ -- --�
One half ton pickup truck for the street department to replace unit#790,a 2011 Ford F-250 pickup.
_ _ _ _ - - -
—. _— - -
Jusfification �i
_ __ _ __ _ - —__ _ ---- — -- --- �
�Inc ear sed repair and maintenance expenditures on Unit#790,which will be seven years old.
_- - — - —
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 35,000 35,000
Total 35,000 35,000
Project# VBi�+-07� Department Vehicles and Equipment
Contact
Project Name Single Axle Dump Truck(Street) Type Equipment
Useful Life
Category Vehicles
-------
Priority
; Description �
� _ _ _
-- -- — - _ _ __ - —--- �
Single Aacle dump truck for the Street Division to replace unit#761,a 2005 Sterling dump truck.
___ _
_ — — -� _ _ _ - - —__
Jushficahon
-
�_.— _. _-
Increased repair and maintenance expenditures.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 225,000 225,000
Total 225,000 225,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 225,000 225,000
Total 2z5,000 225,000
Page 32
Project# V&E-073 Department Vehicles and Equipment
Project Name Contact
Sidewalk Snowblower(Street)
Type Fquipment
Useful Life
Category Equipment:Heary Equip.
�DeSCriptiOn ! Priority
_ --�
— — — — —_ _—
__ ---- . .- . _
�Sidewalk maintenance tractor for the Street Division to replace Unit#712,a 2003 Trackless MT. �
— — — — __. —
�Justification �
,—_— -- ----�
-- -- _-.
-_-- -
-------
-- - _
creas repair and mamtenance expenditures on unit 712.This was to be replaced in 2016 but Unit 767 was moved ahead. 1
-- — — . ——— —— -- _—_—_— —J
—_. — —
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 110,000 110,000
Total 110,000
110,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 110,000 110,000
Total 110,000
170,000
Project# V&E-083 Department Vehicles and Equipment
� Project Name Contact
Passenger Vehicle(Fire)
Type Equipment
Useful Life
Category Vehicles
_ _.——— _—__ — —_— Priority
. _._
Description I
�-----
�-- - - . - , - -----
ssenger vehicle for the Fire Department to replace Unit#350(2009 Ford Crown Victoria).
--- — �
. - -- — --- _J
--—
__— --——
Justification - _ _-_ - ____- - . -- _-. _ _ . - --
�
IlnsrectionrDivis ond maintenace on Unit 35
- - - -- — ___
— —
_ — ------- ---
—_—__ . _
eP 0 on an emergency response vehicle,which will be eight years old.This passenger vehicle will be re-assigned to the �
p_ .
- — -- _ __ _ �
-- — _. _ __ __.—.— _ _— —
---— ——__
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000
40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000
40,000
Page 33
Project# V&E-092 Department Vehicles and Equipment
Project Name Contact
Marked Squad Digital Recording System (Police)
Type Equipment
Useful I,ife
Category Equipment:Miscellaneous
� —_ _ _-- Priority
�escripfion �
mainten n�cetof recordm ordm m ment
- - -- —_ __ _ _ _
— — —_.
— --_— _
. _ — -- -
- --—
— --
g eq p in ten mar police patrol vehicles and associated communications and computer infrastructure to support storage and i
�. — g
— _ ---- -- --
—— _
. _ __
-- — — _ —___ _—_—. --
— - --
�Justifica6on 1
� �_
—
Video recording in a police car�s invaluable for any officer-citizen contact,citizen transport in police car,and probable cause related uestions. T
9 ypical benefits are I
increased conviction rates,less time in court proceedings and reduced litigation,increased officer awareness of their conduct,training situations and reinforcement, I
land overall easier understanding of any(recorded)situation. Many officer-citizen contacts are one-on-one situations,resulting in factual disputes when citizens
ichallenge officer conduct. In car video would have proven invaluable in evaluating the facts in several recent citizen encounters. In car video recording capability is I
fastly becoming standard equipment in most squad cars.
—_ -- —--
_— — — -- _
—-- - —
_ —__ _— — -
- - ___ ___—
_— - _
_—_ - _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 120,000 120,000
Total 120,000 120,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 120,000 120,000
Total 120,000 720,000
Project# V&E-099 Department Vehicles and Equipment
Project Name Contact
Asphalt Hot Box(Street)
Type Equipment
Useful Life
Category Vehicles
— -- -- Priority
- - -
Description
— . --
�Asphalt hot box for the Street Divison to replace Unit#786.New hot box swaploader hook frame will be utilitilized on single axle Sterling dump truck.Asphalt hot
— — — —
Ibox is used to keep asphalt hot during patching operations.
— - - -
I _ —. — _ - . __ — — -- —
. _ - --
--- � —-
Jushfication -- —
�— �— —— —
Increased repa�r and mamtenance expenditures on Unit#786. — — --- --
� — _ __ _ �I
_— — __ -- - -__— —
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 45,000 45,000
Total 45,000
45,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 45,000 45,000
Total 45,000
45,000
Page 34
Project# V&E-102 Department Vehicles and Equipment
Contact
Project Name P1CkU Truck Fire
p � � Type Equipment
Useful Life
Categor,y Vehicles
___
_ Priority
Description _�
--T—_ — ___ . _ _ _ __ __ ___ ----_ ____ _ —�
rour door pickup truck with storage box for Fire Department.
_ __ — — -_
Justificahon �
--_ _---- _ - _ _ __ _ _ __- —--- ----
Vehicle to transport firefighters to emergency calls and training.Currently they are taking a fire engine out of service to these types of calls and training. �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
eroject# V&E-106
Department Vehicles and Equipment
Contact
Project Name polaris 6 X 6(Fire) Type Equipment
Useful Life
Category Equipment:Miscellaneous
__ Priority
--- p __ _ -- — ,
�� Descri tion �
- - - -- - - - - - -�
One new 6X6 off road rescue vehicle to replace unit#341.
—
—.. _ _._ -- -
�Jushficahon
�' 1,
�This umt is util�zed for off road rescue o erations and fire fighting.This unit was donated in 2004 from Poloris. �
p
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 15,000 15,000
Total 15,000 15,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 15,000 15,000
Total 15,000 15,000
Page 35
Project# V&E-1Q'] Department Vehicles and Equipment
Project Name gobcat Utility Truckster(Park) conta�r
TYPQ Equipment
Useful Life
Category Vehicles
Descnption —� Priority
� --- _—�
New utility truckster to replace unit#469(2005 Bobcat).
--- ----
;saficafion _ __ , — — —�
�Increased repair and maintenance expendit res on Unit#469. - —"----
—_._ — -- _
_— .
. _ . ._ _—_—.—__
_ __ _ __ _ __--
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 55,000 55,000
Total 55,000
55,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 55,000
55,000
Total 55,000
55,000
Project# V&E-jQ$ Department Vehicles and Equipment
Project Name Unmarked Police Vehicle(Police) Contact
Type Equipment
Useful Life
Category Vehicles
r. .—_— .------ -- Priority
LDescripaon I
— _ =_ =
_ - ------—_—__ _ ___
New unmarked police vehicle to replace Unit 899(2007 Ford Crown Victoria) — —�
�ustification — — i — —_ ----- ---- —
r— -- _--.
�Increased repair and maintenance expenditures on Unit 899. —
—--
. — _ . . — —
—--
. _ . —.—. — _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000
40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000
40,000
Page 36
Project# VBiE-1�9
Department Vehicles and Equipment
Contact
Project Name Single Axle Dump Truck(Street) Type Equipment
Useful Life
Category Equipment:Heavy Equip.
- — --
Priority
Descrip6on J
__ -_ _—- _ _ _ - ___ _ �
!S g e axle dump truck for the Street Division to replace Unit 768,a 2005 Sterling 7500 dump huck.
_ - - _ . _
_ -- - -- __ _ - -
�dustification �
_. _ - -- - _ _ - --- - — - -
Increased repair and maintenance expenditures on Unit#768. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 225,000 225,000
Total 225,000 225,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 225,000 225,000
Total 225,000 225,000
Project# V&E-110 Department Vehicles and Equipment
Contact
Project Name �llmp 'TpUCk�StI'e0t� Type Equipment
Useful Life
Category Vehicles
� _ P __ _ _ - Priority,
Descn hon 1,
� — _ __ _ _ _ _ --- -
Single axle dump huck for the Street Deparhnent to replace Unit#772(2007 Sterling Dump Truck).new single axle dump truck w�ll be equipped with swaploader 1
hook system,plows,wind and controls.
__ -- —_
- -- --
-- _ - _ _
_ _ ._ __.
� - --_.
Jushfication _
�= --
-_
_ _ _ _ _ ___ _ - .�
��Increased repair and maintenance expenditures on Unit#772,which will be thirteen years old.
- _ _ _ __ - _ _ __ . __—_ _-- --_ _ _ _�
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 225,000 225,000
Total 225,000 225,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 225,000 225,000
Total 225,000 225,000
Page 37
Project# V&E-116 Department Vehicles and Equipment
Contact
Project Name gobcat Toolcat(Park)
Type Equipment
Useful Life
Category Unassigned
r—__ _--__-- -------- Priority
Description �
Bobcat Toolcat for the Street Division to�
-- - — ---
� � � lace unit#703,a 2011 Bobcat Toolcat. ---
— —_ �
Jusfification - � — --
— -- - —--
— _ _— ___
--- -- —
'�crease repair and mamtenance expenditures on Unit 703.When replaced,the Park Department will move Unit 498 to Streets. �
_ . _ . __ —_ _ �
— _ —-- -- -- —
._-- --
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 50,000 50,000
Total 50,000 50,000
Project# V&E-120 Department Vehicles and Equipment
Project Name Contact
Field Line Painter(Park) Type �u�pment
Useful Life
Category Equipment:Miscellaneous
�— - - Priority
� Descnption �
�Pla field line amter for Park Div�sion to r � � � �� �
_ — _ �
�Y _ P � ' eplace unit#482(201 I). — . . _ — - . —— - �
_ _ -- — —
�— -- ---_
�ustification
_ —_ �
_- —_ _�—
-- — _ -- - _—__
Llncreased repair and maintenance on Unit#424,which will be 6 years old.
_ - —_ _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 20,000 20,000
Total 20,000 20,000
Page 38
Project# V&E-121 Department Vehicles and Equipment
Contact
Project Name Tasers (Police) Type Equipment
Useful l.ife
Category Equipment:Miscellaneous
- -- _ ---
Priority
� Description �
_ - _ __ - - - _ _ _
_ _ — - - __
30 Tasers were originally purchased in 2005.Thes warrenty runs three years. 19 were purchased in 2013.The remaining will be purchased in 2017. �
_ - - - _ _ ___ _ _ _ _
�Justifica6on
= _ _ - - - �
_ _ _ __— _ _ _ - - -- _--
Maintenance on each taxer runs around$800 per time after the warranty expires.This will allow new units to be purchased and less maintenance costs due to the
warianty period.The police department believes that the use of the Taser both through deployment and threatened deployment continues to reduce the incidence of
�injuries to both officers and suspects. �
_ _ _ _ --_ --- --- ---- - __ _-_ _ ____ _-_ ___ __- ---
.__. - - _ _ _ �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 16,000 16,000
Total 16,000 16,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 16,000 16,000
Total 16,000 16,000
Project# V&E-126 Department Vehicles and Equipment
Contact
Project Name TaCk SpPByCT�Stl'CCt� Type Equipment
Useful Life
Category Equipment:Miscellaneous
._ __ __ Prioritv
- -- _—__
�Description �
- - _ _
_ _ __ __ _ _ __ -
New tack sprayer for the Street Division to replace unit#775(2007 Bomag 250 Tack Sprayer)utilitized for street,trail and parking lot operations.Tack is sprayed on�
ei xisting asphalt prior to paving.
- _ --
_ _ _ -_
_ ._ -
�Justification _ _ _I _ -_ _ _
�- -
_ _ _ - -- -
`Increased repair and maintenance expenditures on unit#775,which is ten years old �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 60,000 60,000
Total 60,000 60,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 60,000 60,000
Total 60,000 60,000
Page 39
Project# VBiE-I2g Department Vehicles and Equipment
Contact
Project Name Utility Tractor(Park)
Type Equipment
Useful Life
Category Equipment:Heavy Equip.
� _ _ _ -__ __ _ _ Priority
DI escription � �
- �
_ ----- - -
_ _ _ _ — ---- �
Utility Vactor with loader and three point hitch with PTO for the Park Division to replace Unit#461 (2002 John Deere Tractor).
— -__ —.
— --- - J _ .
Jushfication
� . ----
_ _ - - ----- _ . _ _-- --
_— _— —_.— _
�Increased repair and maintenance expenditures on Unrt#461. �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 105,000 105,000
Total 105,000 105,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 105,000 105,000
Total 105,000 105,000
Project# V&E-130 Department Vehicles and Equipment
Contact
Project Name Rotary Mower(Park)
Type Equipment
Useful Life
Category Unassigned
Priority
�Description - . . . . J
- -- _---
-
— -- -- -
_ _ _ _ --
Rotary mower for mowing City Hall Complex,Fire Stations and Neighborhood Parks. �
— _ __ _ __ —__ --
'�ust� — _ -.-�
ificafion �'
� __ - -
_ _ -- - _ _ _ _ -
Replace cunent walk behmd mower that was purchased in 2011. - �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 25,000 25,000
Total 25,000 25,000
Page 40
Project# V&E-133 Department Vehicles and Equipment
Contact
Project Name g00 MHz Radios Public Works Maintenance
� � Type Equipment
Useful Life
Category Unassigned
- _ __ _ Priority
�Description �
� - __ - - � - -� -
__ - _ _---
�800 Mtix portable radios and accessories for communication in the field. 1
- _ __ _ _ I
Justi�cation �
- - _ - _ _-,
-- _- _-
_ _ __ -_ __ -
Replace current radios purchased m 2008.Manufacturer and Hennepin County will no longer support radios with parts due to age.In-service life is]0-12 years.New
radios P25 Phase II modification compliant.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 183,000 183,000
Total 183,000 183,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 183,000 183,000
Total 183,000 183,000
Project# V&E-135 Department Vehicles and Equipment
Contact
Project Name gody Cameras (Police)
Typc Equipment
Useful Life
Category Unassigned
�_ _ _ __ _ _ _ _ -,
Priority
�Descrip6on J
- - - �
quisition of body cameras,maintenance agreement and server storage for officers.
�Jus6tication -- _ � _-
- - -_ _i_ _- _- _ - ---
- - ---
- - -- _ _ - - --
The Police Department will need to add body cameras(maintenance and video storage)to the array of technology tools for officers to wear while on-duty.The �
estimate is for the purchase of 15 body cameras,assessories and storage.This was delayed in 2016 for the state legislature to set up guidelines. �
__ _- _-_.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 53,955 24,070 24,070 24,070 24,070 150,235
Total 53,955 24,070 24,070 24,070 24,070 150,235
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 53,955 24,070 24,070 24,070 24,070 150,235
Total 53,955 24,070 24,070 24,070 24,070 150,235
Page 41
ProjeM# V&E-137 Department Vehicles and Equipment
Contact
Project Name Outboard Motor(Fire)
Type Equipment
Useful Life
Category Equipment:Miscellaneous
-P . __ ___ Priority
�Descri tton �
- __
- _ _ _ _ -- — - -- - _ _
---_ �
Zodiac water rescue boat outboard motor utilized by the Fire Department for water rescues to replace Unit#352 a 2010 Yamaha outboard motor.
��Justification _ � - - - - - _ __ -
- _ __ _ _ __ _ __ - -- _-- ---
Increased repair and maintenance expenditures on Unit#352. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 5,500 5,500
Total 5,500 5,500
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 5,500 5,500
Total 5,500 5,500
Project# V&E-138 Department Vehicles and Equipment
Contact
Project Name passenger Vehicle(Fire)
Type Equipment
Useful Life
Category Vehicles
i -_ -_ __ —__ Priority
�Description �
�assenger vehicle for the Fue Department to replace Unit#354,a 2013 Ford Explorer. �
�ushfication . .- -
_ _ -- . J - -_ - _ - - _ __
��Increased repair and maintenance on Unit#354 on an emergency response vehicle which will be ssix years old.This vehicle will be reassigned to the Inspections�
epartment.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
Page 42
Project# V&E-139 Department Vehicles and Equipment
Contact
Project Name passenger Vehicle(Fire)
Type Equipment
Useful Life
Category Vehicles
r- _ . Priority
�Description _ �
- - _— __- _ _ __ — _.
_ �
Passenger vehicle for the Fire Department to replace Unit#355,a Ford Explorer.
- -- -- - - — _ --
-- -
Justification �
_ _ _ __ _ _
_ - -- _ _ —_ __ _ _
_ _ _ _- ___ __._ _ _ _ __—_
Increased repair and maintenance on Unit#355 on an emergency response vehicle which will be six years old.This vehicle will be re-assigned to the Inspections
�artment.
Expenditures 2017 2018 2019 2020 2021 'Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
Project# V&E-140 Department Vehicles and Equipment
rro�ec�Name Utility Trailer(Park) co�rac�
Type Equipment
Useful LiTe
Category Park Equipment
-- -_ _. —
Priority
L Description _�
--- ---_
Utility trailer for the Park Division to replace Unit#468,a 2005 utility trailer. -�
---... —.
�Justification �
Ae,wear and tear on utility trailer Unit#468,which will be fifteen years old.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 5,500 5,500
Total 5,500 5,500
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 5,500 5,500
Total 5,500 5,500
Page 43
Project# V&E-141 Department Vehicles and Equipment
Contact
Project Name pickup Truck(Park) Type Equipment
Useful Life
Category Vehicles
Priority
�scrip6on �
_ _ _ __ _ - -- - - --�
Hal Tf on pickup truck for the Park Division to replace Unit#475,a 2009 Ford Ranger.
Justification - - - J ___ -- --
_ _ _ - -- .
Increased repair and maintenance expenditures on Unit#475.
_ ___ _ _ _ _ - -_ - - --- __ __ --- - - - - -�
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 35,000 35,000
Total 35,000 35,000
Project# V&E-142 Department Vehicles and Equipment
Contact
Project Name Dump Truck(Park) Type Equipment
Useful Life
Category Vehicles
DesCripfion Priority
�- I
�ord� __- __ - -- - - -
F-550 Dump Truck with Swaploader hook system for the Park Division to replace Unit#477,a 2010 Ford F-550 Dump Truck with Swaploader hook system.]
__- -- - - -- -- _ _ _ _
�Justification _ - . �
_ - �-
��creased repair and maintenance expenditures on Unit#477. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 80,000 80,000
Total 80,000 80,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 80,000 80,000
Total 80,000 80,000
Page 44
Project# V&E-143 Department Vehicles and Equipment
Contact
Project Name Trash Compactor (Park)
Type Equipment
Useful Life
Category Equipment:Miscellaneous
-- -_ __ Priority
C escription _ �
- - - _ - --- - __ _ _-- —
-- -- -
-- —
Trash compactor for the Park Division to replace Unit#479,a 2011 Wayne trash compactor with hook frame to be used with F-550 dump trucks with Swaploader �
�hook system.
_ _ - -- - ---
. -- - -
- -__. _ _
--- - - --
, Justification �
�eased reoair and maintenance expenditures on Unit#479. —�
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 65,000 65,000
Total 65,000 65,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 65,000 65,000
1'a� 65,000 65,000
Project# V&E-144 Department Vehicles and Equipment
Contact
Project Name Single Axle Dump Truck(Street)
Type Equipment
Useful Life
Category Vehicles
� Priority
�scription _�
i3ingle axle dump huck for the Sh�eet Division to replace Unit#778,a 2008 Sterling 7500 dump truck with hook system.
- - _ _ -_ __ �
- - — -
[ushfica6on �
� _ _ - -
_—_ __ __- _ _ ___ _ _--
Increased repair and maintenance expenditures on Umt#778. - �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 230,000 230,000
Total 230,000 230,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 230,000 230,000
Total 230,000 230,000
Page 45
Project# V&E-145 Department Vehicles and Equipment
Contact
Project Name Skid Steer Loader Street
� � Type Equipment
Useful Life
Category Vehicles
- - --- -—
Priority
Descripfion �
� _ -- -- _ - ._ _ __ _ _
'�Skid steer loader for the Street Division to replace Umt#797,a 2013 Bobcat T650 skid steer loader.
__
- - -_ — _ _ -- _�
Justification
_
__ � ----_— _ _ ___ .- _ _ _ - -- -
iIncreased repair and maintenance expenditures on Unit#797.
�_ _ _
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 55,000 55,000
Total 55,000 55,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 55,000 55,000
Total 55,000 55,000
Project# V&E-146 Department Vehicles and Equipment
Contact
Project Name Dump Truck(Street) Type Equipment
Useful Life
Category Vehicles
_. _ Priority
�escription - ._ i
_ __ - _- _ _ - - _ _ - -
. - __
Ford F 550 dump truck with Swaploader hook system for the Street Division to replace Unit#791,a 2010 Ford F-550 dump truck with Swaploader hook system. �
- - - - - - - - - - - �
_
�usttficafion �'
- _ - J - _ _ — -- -- _ _ __-- __ _ - -
�creased repair and maintenance expenditures on Unit#79L
_ --- - _ _ _ - --- —_ —__ . -- —_ __ __ --�
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 80,000 80,000
Total 80,000 80,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 80,000 80,000
Total 80,000 80,000
Page 46
Project# V&E-147 Department Vehicles and Equipment
Contact
P''°�e�r Ne"'e Marked Squad(Police)
Type Equipment
Useful Life
Category Vehicles
_ _ � Priority
�Description
_ - - - - _ _ ___ -
Police commander vehicle for the Police Department to replace Unit#821,a 2012 Ford police interceptor sedan. _�
Justification 1
- _ I __ _. _
— - - - - _- - - --
Increased repair and maintenance expenditures on Unit#821. �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
Project# V&E-148 Department Vehicles and Equipment
Contact
�� rro�ect Name SWAT Van (Police)
Type Equipment
Useful Life
Category Vehicles
Priority
r� Description _ _- -- �
�Replace SWAT Vehicle for Police Department to replace Unit#812,a 1988 Ford L7000. �
Justi�cation �
_ : _ _ - - -- -- -- - _
I eased repair and maintenance expenditures and unavailable parts on Unit 812.
�- _ _ __ - -
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 100,000 100,000
Total 100,000 100,000
Page 47
Project# V&E-149 Department Vehicles and Equipment
Contact
Project Name water Truck(Street) Type Unassigned
Useful Life
Category Unassigned
Priority
- — - _— __�
Descripfion
� _ _ - - -- _ ___ _ _
__ — _. _ -
�Water truck for the Street Department to replace Unit#770(2006 Sterling L7500 Tanker).This truck�s utilized for street sweeping,skating nnk flooding and
watenng landscaping.
- _ _ _—__ — ____ _ __
_-- -- ---_ __ _ _-- -
r _ _ _ _ —
JushfiCahOn _ _�
= - - - - __ _ _
Increased repair and maintenance expenditures on Unit#770,which will be sixteen years old.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 215,000 215,000
Total 215,000 215,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 215,000 215,000
Total 215,000 215,000
Project# V&E-150 Department Vehicles and Equipment
Contact
Project Name Asset Management Software Type Unassigned
Useful Life
Category Unassigned
_ ._ _ � Priority
Descripflon J
__ _ - _ _ _ _-- - _ - - _- _ _ _ _�
Conversion from the existing Cartegraph Software Navigator desktop software to a web-based Asset and Work Managemement Software with mobile component.
'Includes software purchase,data migration,implementation,and training.50%of purchase from the Vehicle and Equipment CIP,25%Water and Sewer CII'and I
�25%from the Storm Sewer CIP.
— — — _ _ ._ _ _-- --
___ _—_ _—_
_— __
__ _ _
— — -- —_
Justi�cation ;
� -- __�
- _ _ _ __ __ _ _ _ _ _
---- _
The move to a mobile web-based work management system will improve efficiencies within the organization and service delivery to extemal customers.The software
will be utilized to manage routine tasks and business workflows,track inspections and maintenance,and assist in programming future expenditures.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 60,000 60,000
Total 60,000 60,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 60,000 60,000
'j'p� 6Q000 60,000
Page 48
Project# V&E-151 Department Vehicles and Equipment
Contact
Project Name Fire Pumper Truck(Fire)
Type Equipment
Useful LiTe
Category Vehicles
Priority
Description �
-- _ i
- --- __ _ __ _ -
-- - — --I
Fire Pumper truck to replace Unit#337(1995 Peterbuilt).
Justtfication J
- - - - - ---
�Increased repair and maintenance expenditures on Unit#337,which will be twenty-three years old.
--_ -- - _ _.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 600,000 600,000
Total 600,000 600,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 600,000 600,000
Total 600,000 600,000
Project# VBtE-ISZ Department Vehicles and Equipment
Contact
Project Name passenger Vehicle(Fire)
Type Equipment
Useful Life
Category Vehicles
Priority
�Descripdon �
�-
_ -_ - — ._ —. __
Passenger vehicle for the Fire Department to replace Unit#356(2015 Ford Crown Victoria). 1
_ _ — -- . _ _ _ _ �
— _.
Jushfication ]
-- _ _ -- - -- -
;�Increased repair and maintenace on Unit 356 on an emergency response vehicle,which will be six years old.This passenger vehicle will be re-assigned to the �
�spection Division.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 40,000
Page 49
Project# V&E-153 Department Vehicles and Equipment
Contact
rro�ect Name Equipment Trailer(Street) �
Type Equipment
Useful l.ife
Category Equipment:Miscellaneous
__ _ __ Priority
�Description �
'-- �
- _- - _ — _ — --- - - — _—.
Equipment Tra�ler for the Street Division to replace Unit 774,a 2007 Felling equ�pment trailer. �
� — _ - — - -
�Justificafion j
,Inl crease repair and maintenance expenditures on Unit 774. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2017 2018 2019 2020 2021 Total
Equipment Replacement Fund 20,000 20,000
Total 20,000 20,000
Page 50
��tyo�
olden
�
va e
Capital Improvement Program 2017-2021
Park Improvement Section
The City Council reviews the submissions from the Open Space and Recreation Commission, Park &
Recreation, and Public Works staff for the development and improvement of the City's park system.
The commission consists of nine members that are appointed by the City Council and serve as an
advisory board to the City Council.
In 2006, as part of the City's parks pfanning initiative on park facilities, the City Council focused this
year on developing a vision for Golden Valley parks and recreation facilities. The City solicited citizen
input via information meetings in parks, a survey of youth athletic association leaders and a citizen
survey was created with the help of the Open Space and Recreation Commission. All information will
be gathered to help plan the future of the park improvements for the next five years. The City will afso
use the results from the building survey and ADA consultant.
51
Golden Valley
Parks Activity Areas
m �
N C N C 01 'O N
� a N `N "� p� C L �> (0 L
� N d ` N U N � � Y C C m � � C N
� L v m LL � u" V- U � � 2 � � L ~ � � —
� Vl (0 @ T J N J � �p
�n a� a� a� w 3 n a� m � v, � o, � �m N t � a
� U E � T Y N N � U c � Y � � N U C C C C �
Parks/Facilit Q �j = a � m m �° �° � � _° y U �j � a � U a °
Brookview Park 33 • • L • 2/4L . Z � .
Brookview Golf Course 144 '
Geart Park 4.7 L • • 1 1L L L .
Glenview Terrace Park 5 . 2� '
Golden Oaks Park p � . , � `
Ham shire Park 14 L L • 2 L L *
Isaacson Park 11 1L/3 �
Lakeview Park 5 L • L • 1 *
Lions Park 19 L • L • 4 1/3F 2 L L • • �
Medle Park 12.6 L • L • 2 3L L L • •
Per ich Center for Arts Field 1.5 1 L
Natchez Park 5 L L � �
North T ol Park g.4 , , � '
Paisle Park 0.31 �
Sandbur Athletic Facilit 20 2L 4-11 *
St Croix Park �.q , '
Scha er Park ��.3 , 2� '
Scheid Park 9.8 • L 1 1 1 F 2L L L *
Seeman Park 4.6 L • � 2 �
South T rol Park 3.6 L � � �
Stockman Park 1.5 L � . �
Sweene Lake Park 0.5 �
Wesle Park 19.9 L L 3 1/2F 3L L L • •
Wildwood Park q,p . , , 2 2 ' "
Yosemite Park 1.4 L . � � �
Nature Areas "
Adeline Nature Area 1.2
Bassett Creek Nature Area 7.6 �
Briarvvood Bird Sanctua 20
General Mills Nature Preserve 27
General Mills Research Nature 57 .
Golden Rid e Nature Area 2.5 .
Laurel Avenue Greenbelt 33.1 .
Sochacki Park Nature Area 23.2 .
Penns Ivania Woods 22,g .
Tree Farm 1.5 .
Western Avenue Marsh 21.6
F=Fall Use
L=Lighted
"Recreation building restrooms are open seasonally during program hours
52
�
x �
�� �0 3 �
: � � ��'� ��g'� �;�T �
v
� , °' �? ° � ���' � � g� w �- ; �
€_ � y�j v�i�hv°��na,3`3ra°��raa � u � N � �
rw:�..:.�.�. � .Nr .Mi .�i .Ni� .�i� �N N N 0�$ � 1�+'� U �
s.
v �+ �
7�+i r . � 4) c� �O�. � � � �, �� � p O �
.. � U � G O� � ia `�{ •N � o � n' ��
0
'ay �� � � �F � � zxa � � � � � �„ �
�1 = � °3'O'� 03' a,aNi�'� '" � ai gd ' a � a � U � �, �UA a � NR �
41 � �''S v d,'S �;�: x ° �w � ,c ��, �'� E � '� � '� c �-r� ai L ��
O' d R a�i�° � � o�°a,�oUx z a R � c �'° c `� a -_°� '° '�" q �j �g
0 ; c�i�7c�x��3�zzvrn ¢ a�i .� a� 3t� � w� 4u' v�iao°c ��{g `
,: ci a���n�o �m O�� .'", ' Ci Ci C� A W W C7 x .; ti � ro.n u
lpf�.
�a��ez — ---- y�--- ��:._ .N.�•'� �"�"i
� �,Y.d rM t m �
�. �
� �`'� a� m
� ° � (
1 � � ; �
. �-
,
. ,�
� _
_ _ -- -------
� _ � ,: --•--
. _
� 1 _ � ��
� - ' r � � u�mopeayy "
�.'>�.,—' z , ' I
�_.._..I_..�� ,,
� �� ��, � � �
> � � � � � .,�
�
� a �. I !
� ��
I �r �
(,
� a. _..! � N eAd e�qoN � t� �_:_..,.f� , . �.. yJ�. 1
� � any zayoleN �
v �i¢ � � _ �
I . . . � a emeAO �
. � .
� ��a
.
��,
� ; ., r � � .
y N . `�
��� �.._ , ,� _ �-,
' �� U � . ; �� ' ... � 71 � > � r"�"�'
�
i 3 • �N � ' . ,y,�� ;f� ,. �
� ,, i!� ...— . �� _
�I� � �
�� • J j! .. a .-- - ' 1 �
.:�r�-����.___. _"_" �..p,.' `� .- �l�"" .�_. ... i, ' � .,,. �
� . i'$��-�87M4..!}�"' .....�.� . ..� � _..`_ �— "�_� . . �\",.. S 4+i
1 , . o ! �-.�� XgmaA�te �j
� �` �� '�� °� Yosemite 1_a. �
' . __�T ..... ' . �I;
� � i . � V '�. �
� t � C�_- � � �,
a�
� _
� � ��Gt� ,- � � � . � -� � �
y--'�"" N`.
;% f �', N ' � J
_y��p se�Bnad _ ; ; �
���� ; ,�
rc i
� j � �, a a
� � y any�anysdweH i ' �
w � `
m � � i ' �
.� N f ,� � a;
d r �tY' �i anydas�a� i �
c O d • 7 .
� i N � eueismo7 ` any eueisino� r �!
,
epenaN 4 v�', >! (p ; i�
i' � A a •
_, ......__ __•.__� . �. . V` # �o v �
-i e�uen�llsuuad i y,,. j. . � � Q
1-7- ( x
i '.
any e�� uuyy� y ���
� sa��� � , .���� � ianVe�Ilau��M �r��
.� �� f l. aMa'�y �
� �� y' '.._�_1 1 � 00,� . �
a �� � �,� � � ,
v 3 \lA, .
M � !
� -__ ....... �. :� �.'..., PN8 SII!W le�aua� . �
_
� 6�t,: �� .. . ..
s, , �'�'
an � 3 '; ' �, Fo', � ��. , � , .. {
_. ��� ! ��� � .
,
�1
� � `
� . i��oqs���H � '
:-_- .__... __ . ." S'�' � ' "�" � -+'*e!. ,e..�a:.+ew,s�T-.,#:S�'s'�� ���_�
.______... ,- ,....... .. �{ __,
>.,�.
_ . , .. _ ..__ - .... .
.H I 69l emy iH , ...,.a�_,,.s�,,.._.,.a
iy
1'' `1
City of Golden Valley, Minnesota
Capital Improvement Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
_---- ---
�Parks �
BleacherReplacement P-001 n/a 25,000 30,000 20,000 75,000
Park Trail and Parking Lot Improvement P-002 n/a 30,000 40,000 50,000 40,000 150,000 310,000
Play Structure Replacement P-003 n/a 170,000 55,000 55,000 55,000 55,000 390,000
Ball Field Lighting-Isaacson Park P-014 n/a 360,000 360,000
Outdoor Basketball and Hoop Replacement P-015 n/a 28,000 28,000 28,000 28,000 25,000 137,000
Park Signage Replacement P-016 n/a 10,000 10,000 10,000 10,000 10,000 50,000
Sun Shelter Replacements and Additions P-017 n/a 25,000 25,000 25,000 50,000 25,000 150,000
Tennis Court Resurfacing P-018 n/a 32,000 32,000 10,000 24,000 12,000 110,000
Brookview Entrance Signage Replacement P-019 n/a 50,000 50,000
Wildwood Park Pickleball Courts P-020 n/a 120,000 120,000
Sidewalk Connection and Crosswalk Partnership P-021 n/a 25,000 25,000
Ball Field Reconstruction P-022 n/a 25,000 25,000 25,000 25,000 100,000
Re-Lamp Athletic Field and Rink Lights P-023 n/a 15,000 15,000 15,000 15,000 60,000
Wildwood Park Athletic Field P-024 n/a 100,000 100,000
Community Gardens P-025 n/a 30,000 30,000
Parks Total 755,000 380,000 268,000 347,000 317,000 2,067,000
GRAND TOTAL 755,000 380,000 268,000 347,000 317,000 2,067,000
Page 54
Project# P-0�1 Department Parks
Project Name Contact
Bleacher Replacement Type Improvement
Useful Life
Category Park Improvements
- - Priority
Descripfion �
- - _-
- _ . _ -- - --
- _
- _ _ __ __ _ _-
iReplacement of Bleachers at the following: -- - - -
2017-Isaacson Park Fields#1-#3,Scheid Fields#1
i2018-Lions Field#1-#4
2019-Hampshire Fields#1Natchez Park field#1;Gea Park field#1
- _ - _
rty
--- - - -_ �
--- -
- - - -- -
___ -_
Justi�cation I
,The City of Golden Valley has 36 sets of bleachers which need to meet the ADA and safe - �
�--_ __ ty guidelines.
_ -_ -
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 25,000 30,000 20,000 75,000
Total 25,000 30,000 20,000 75,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 25,000 30,000 20,000 75,000
(5600)
Total 25,000 30,000 20,000 75,000
Project# P-��2 Department Parks
Project Name Contact
Park Trail and Parking Lot Improvement
Type Improvement
Useful Life
Category Park Improvements
� - -� - -- - - Priority
�escripfion �
�-Reconstruct intemal ark tra�ls and atch/s -
P � p_ealcoat parking areas located throughout the park system.The Scheid Park Parking Lot addition is scheduled for 202�
- _
L Jushfication � . -
- _ i _-� _ -_
Maintain uali - - - - -
q ty,safety and usability of City parks for a lifetime active sport and meet ADA accessibility standards.Paved trails are deteriorating,with certain �
segments subject to serious erosion. Trails and parking areas will be evaluated to determine priorities. �
_ . _ __ __ _- -- -_ __
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 30,000 40,000 50,000 40,000 150,000 310,000
Total 30,000 40,000 50,000 40,000 150,000 310,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 30,000 40,000 50,000 40,000 150,000 310,000
(5600)
Total 30,000 40,000 50,000 40,000 150,000 310,000
Page 55
Project# P-��3
Department Parks
Contact
Project Name pla Structure Re lacement
3' p Type Improvement
Useful Life
Category Park Equipment
__ _ Priority
--
�escription 1
- -
__ _---- _ -- - _
New playground equipment and area curbing on an"as-needed"basis in the City's parks.
2017-Medley Park;St Croix Park;Schaper �
2018-Wesley Park
2019-Scheild Park ,
�2020-Yosemite Park '
021-Soth Tyrol Park .,I
__- - - _. _ -----
_ - _ .--. _- -
__ __ __ __
__ _� __ __ . - ----
�Jusdfication
-- - --
Play structures are used frequently and nced repairs and periodic replacements dye to wearing out and will eventually become unsafe. The City is required to me�
Consumer Product Safety Commission(CPSC)guidehnes,as well as the requirements of the Americans With Disabilities Act(ADA). i
_ _ _ __ _ _ -- _ -__ -- --
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 170,000 55,000 55,000 55,000 55,000 390,000
Total 170,000 55,000 55,000 55,000 55,000 390,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 170,000 55,000 55,000 55,000 55,000 390,000
(5600)
'ra� 170,000 55,000 55,000 55,000 55,000 390,000
Project# P-014
Department Parks
Contact
Project Name gall Field Lighting-Isaacson Park T
ype Improvement
Useful Life
Category Park Improvements
_ ___- _ Priority
�� Description
_.._ _ . �
Replace field light fixtures on Isaacson field#1,add new field lights and poles to Isaacson fields#2 and#3.This is a partnership project with the Golden Valley
Little L,eague and will be pmviding funding to support and apply for a Hennepin County Yourh Sports Grant fall of 2016.Without the grant,the project will not be
done.
_- - - - _ -
- -- -_ _ - _
�_ __ - _ _ _ --- -
_ _ _ . _- ___
�Justification �
-- _=
- -_ __ _ - --- _ -- ___ -- ,
The baseball field lights at Isaacson Park are becoming problematic for consistent use due to their age and require new fixtures.Adding lights to Issacson fields#2 '
and#3 will allow other fields within the park system to open up for community and youth athletic associations use.By combining fiscal resources the potential to be
;successful with a grant application for the facility improvements increases exponentially.
GV Little League would contrbute$10,000.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 360,000 360,000
Total 360,000 360,000
Funding Sources 2017 2018 2019 2020 2021 Total
GV Little League 10,000 10,000
Hennepin County Sports Grant 300,000 300,000
Park Improvement Fund 50,000 50,000
(5600)
Total 360,000 360,000
Page 56
Project# P-�is Department Pazks
Project Name Contact
Outdoor Basketball and Hoop Replacement TyPe Maintenance
Useful Life
Category Park Improvements
--_ _ --_ _- -- � Priority
�Description ,'
__-_
-_ __ __ __ _-_- --
Replace old and deteriorating outdoor basketball courts and hoops.Replacement schedule is the following
- - _ . __
_ _ _- -i
2017-Hampshire,L.akeview;Stockman i
I2018-Wesley;Brookview
2019-Lions;Seeman
2020-Sheid,Natchez '
2021-N Tyrol,S Tyrol
- - -_.. - - . ._ _ ___ _- -- -_ __ _-
- --- - �
r _ . _ _-- ---
. - _- --- - - --
�usdfication I
- . - _
- __ _-
IOutdoor basketbal courts are detenoratmg qmckly and need to be systematically replaced.Most of our basketball hoops are 1970's vintage and need updating.All
new hoops will be replaced wrth ad�ustable unrts which will make then accessible for family use and younger park patrons. I
_. - �
- -_ _ - - ---
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 28,000 28,000 28,000 28,000 25,000 137,000
Total 28,000 28,000 28,000 28,000 25,000 137,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 28,000 28,000 28,000 28,000 25,000 137,000
(5600)
Total 28,000 28,000 28,000 28,000 25,000 137,000
Project# P-QI( Department Parks
Project Name Contact
Park Signage Replacement
Type Maintenance
Useful Life
Category Park Improvements
Priority
Description �
_ _�
- _ _ --- _
�eplace deteriorating and aging park signs at all community parks,neighborhood parks,nature areas and open spaces.Park Maintenance staff will utilize a worst
�
first scenerio as to a replacement schedule.
_---
- - 1 - _- - _- - - --
�Justification _ - _ . _ . _
�-_
Current park signs are detenorating and ne
� ed to be replaced. New signs will be added to locations which currentl do not have ark si na e.Re lacement schedule
�Lwill be to add/replace five park signs annually. Y p g g p �
- -_ _ _. _-- . - _ _
- - - --
--
-- - -
- . __ - _ _ _ __
Expenditures 2017 2018 2019 2020 2021 Total
Other 10,000 10,000 10,000 10,000 10,000 50,000
'rptaj 10,000 10,000 10,000 10,000 10,000 50,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 10,000 10,000 10,000 10,000 10,000 50,000
(5600)
Total 10,000 10,000 10,000 10,000 10,000 50,000
Page 57
Project# P-�17
Department Parks
Contact
Project Name Sun Shelter Replacements and Additions T
ype Improvement
Useful Life
Category Park Improvements
__ - -- --
Priority
Description �
-- ----- :
- _ --- - -_ --- __ --- _--_ _ ._ _ -- - _--- _---- _-
Replace Sun Shelters in various parks:
�2017-Stockman Park
'2018-Yosemite Park �i
2019-Seeman Park
2020-North Tyrol,South Tyrol
2021-Glenview Terrace Park
-- _
r _ - ___ - - __ _
' Justification
rain and rovide a sta m area with icmc
-=
�Various summer mobile park playground programs are being offered and do not have any cover for the program.New sun shelteis will allow cover from the sun and 1
I � p g� g � p ' tables for supplies and the program. J
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 25,000 25,000 25,000 50,000 25,000 150,000
'rp� 25,000 25,000 25,000 50,000 25,000 150,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 25,000 25,000 25,000 50,000 25,000 150,000
(5600)
Total 25,000 25,000 25,000 50,000 25,000 150,000
Project# P-01g
Department Parks
Contact
Project Name Tennis Court Resurfacin
g Type Maintenance
Useful Life
Category Park Improvements
_ Priority
�Descri 6on - - _J
i P
-- _,
Fill cracks and bir[hbaths,resurface and paint tennis couRs.Add Pickleball and Quick Start Tennis Lines were appropriate.
2017-Brookview,Lions Park
2018-Scheid,Medley,Wesley
�2019-Gearty Park
'2020-Wesley,Medley '
2021-Schied
ITennis courts will be evaluated in 2016 on number,use and need.The Open Space and Rec Commisison will also be involved. Wildwood and Glenview Terrace are
�complete reconstructions.
- _. -
_-- -
Justificafion �
- -- _ ___ __ __ _ _ _ __ _ -
M na y of Golden Valley's Tennis courts are in need of reconstruction along with fencing and lighting replacement.Generally a tennis court resurfacing needs to be �
done every 5-7 years.
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 32,000 32,000 10,000 24,000 12,000 110,000
Total 32,000 32,000 10,000 24,000 12,000 110,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 32,000 32,000 10,000 24,000 12,000 110,000
(5600)
Total 32,000 32,000 10,000 24,000 12,000 110,000
Page 58
Project# P-�19 Department Parks
Project Name Contact
Brookview Entrance Signage Replacement
Type Unassigned
Useful Life
Category Unassigned
� Priority,
- _. - _ - -
' Descrip6on J
— _ _ - -— ___
R lace two detenontin — -
' � --- ---�
eP � g park entrance signes m Brookview Park for the new amenities at Brookview.
-- - _ _
�Justification — -- I _ _ — _
—_- - -- — _
-- -------
Current signage at Brookview entrances is deteriorating and no longer meets the needs of the Brookview amenities. �
- -- --—
_ _ - - -
-- _. __ ---
- -- _-_- J
Expenditures 2017 2018 2019 2020 2021 Total
Other 50,000
50,000
Total 50,000
50,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 50,000 50,000
(5600)
Total 50,000 50,000
Project# P-�2� Department Parks
Project Name Contact
Wildwood Park Pickleball Courts
Type Unassigned
Useful Life
Category Park Lnprovements
� - ---- - Priority
Description �
_ — —
�eplace the two deteriorated tennis courts at Wildwood Park with a six court Pickleball fac�lity.
---- —�
- -- -- _ _ _
. _
Justification � ----
� = — =—
— _ .� — . - ___
— — — — -- --- -- _— —
Pickleball has exploded in popularity and Golden Valley currently does not have any outdoor exclusive courts for the activity.Six new Pickleball Courts will fit in
Ithe same area as the two tennis courts.The new facility will provide a specific location for Pickleball,open up current tennis court areas and replace a tennis court
t�hat is no longer able to be repaired.
__ _ -_ _ _ ___ _. _.
- _- - -- -- _ __ __
-- -- - __ .
_ _ __
-- - - - --
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 120,000 120,000
Total 120,000 120,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 120,000 120,000
(5600)
Total 120,000 120,000
Page 59
Project# P-021 Department Parks
Contact
Project Name Sidewalk Connection and Crosswalk Partnershi
p Type Improvement
Useful Life
Category Sidewalks
_ __ __
Priorit,y
�cription I
— - _
--
-- -- - - - __ _
- --- - _ —_ —
_-- __
�Partner with the trail and sidewalk budget to connect sidewalk and add crosswalk to the south end of Brookview Community CenterBrookview Golf Course to createl
�a safer access and a connection to Brookview Park. I
_ _ — __ _ _ _
_ _ -- --- -- -- _. —
_ _--- _
, Justification �
A sidewalk/tre�l connect�on has been a oal
_ - = - -- - --
_ _ - ---- _
� g for many years at this location.Neighboring residents have highlighted this improvement as a key amenity needed for �
safety with the addition of the new Brookview Community Center. i
- _ _ _ -- _- _ . _ __ _ —_ 1
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 25,000 25,000
Total 25,000 25,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 25,000 25,000
(5600)
Total 25,000 25,000
Project# P-�ZZ Department Parks
Contact
Project Name gall Field Reconstruction
Type Maintenance
Useful Life
Category� Park Improvements
� _ --
Priority
�Descripflon I
- - . _ _ -- - - _
Reconstruction one ballfield each fall season beginning in 2018 to maintain the current inventory of useable athletic facilities.
_ _ _ _ . __ - -�
�ustification
, - _- - _ __
All ballfields are active dail with cit s onlsored ro ams and Golden Valle ' ' ' � p - • - - '
Y Y P P �' y youth athlet�c associat�ons use.Wrthout field im rovements,staff will not be able to
mamtam the current level of use.
�__� _
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 25,000 25,000 25,000 25,000 100,000
Total 25,000 25,000 25,000 25,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 25,000 25,000 25,000 25,000 100,000
(5600)
Total 25,000 25,000 25,000 25,000 100,000
Page 60
Project# P-�23 Department Parks
Contact
Project Name Re-Lamp Athletic Field and Rink Lights T
,ype Maintenance
Useful Life
Category Park Equipment
r- -- - _ _ Priority
Description �
� __�
-- --- - -
._ -- - - -
�ace athletic field and outdoor�ce rink lamps and fixtures. -- �
-- - -_ _
�shficafion J
- = __. . --
�utdoor athletic field and rink light systems require regular mamtenance and replacement to operate properly. -�
- _-- -
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 15,000 15,000 15,000 15,000 60,000
Total 15,000 15,000 15,000 15,000 60,000
Funding Sources 2017 2018 2019 2020 2021 Totai
Park Improvement Fund 15,000 15,000 15,000 15,000 60,000
(5600)
Total 15,000 75,000 15,000 15,000 60,000
Project# P-�24 Department Parks
Contact
Project Name wildwood Park Athletic Field
Type Maintenance
Useful Life
Category Park Improvements
-_ _ _--_
� Priority
Descripfion _�
�---.
�ditioncof rngation,turf improvement and new goads ood Park and the ISD 281 proper[y for community and school use.Project would include regrading field area,�,
IJushficabon - _ ___ _ J
- - -
- --
_ -I _- _ _ -
, __ _ _
. - -- -- -
r-`Commum outh athletic rou s and scho
-.. _ - . - -- _ _
• • _ _- - --
tY Y g p ol district are in need of additional green field space for youth recreation,physical dducation classes and athletics.This �
project would be a joint partnership project with the City of Golden Valley,ISD#281 and Golden Valley Youth Athletic Associations. I
_ __
-. . - ._ _
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 100,000 100,000
Total 100,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Golden Valley Youth 12,500 12,500
Associations
ISD#281 12,500 12,500
Park Improvement Fund 75,000 75,000
(5600)
Total 100,000 100,000
Page 61
Project# P-�25
Department Parks
Contact
Project Name Communi Gardens
�' Type Unassigned
Useful Life
Category Park Improvements
Priority
�Descripfion �
__ _ _- _ _ ___-- -- _ -- - — ___ __�
�Add 1-2 Community Garden areas in the Golden Valley Park system.
Justification _ J — _
re�dents and the Open Space a d Recreation Commission tonden ify p tenhal locations and make rgeocmmenda on o he City Coun�t.Staff will work with �i
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 30,000 30,000
Total 30,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Park Improvement Fund 30,000 30,000
(5600)
Total 30,000 30,000
Page 62
��tyof
olden
�
va e
Capital Improvement Program 2017-2021
Brookview Golf Course Section
Brookview Golf Course is owned and operated by the City of Golden Valley under the auspices of the
Park and Recreation Department. The Brookview golf facility consists of an 18 —Hole Regulation
Course, 9-Hole Par 3, Driving Range and teaching area, Golf Shop, Grill and Lawn Bowling.
Brookview's Regulation Course is a challenging, mature course with some tree-lined fairways, 28
moderate bunkers, fairly small greens, and an abundance of water hazards. A maintenance building
at 100 Brookview Parkway and Clubhouse are rented from the City.
User fees are the main source of revenue.
History:
Brookview Golf Course was a private country club until the late 1960s, when the City of Golden Valley
purchased the facility to operate as a municipal golf course. In 1976-77, the course underwent major
renovations with the addition of the Par 3 nine-hole course and Driving Range. In 1984-85, extensive
work was done to bridge the fairways and enlarge the ponds to alleviate flooding. The Regulation
Course was closed in 1990 to redesign and rebuild the greens. That same year, the clubhouse was
enlarged and remodeled. In 2014, a Lawn Bowling Course was added. In 2017, the Pro Shop and
Grill will be located in the new Brookview Community Center.
63
City of Golden Valley, Minnesota
Capital Improvement Plan
2017 t1,n, 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
'�Golf Course `
GreenlTee Mowers GC-003 n/a 33,000 42,500 75,500
GolfCarts GC-009 nla 220,000 220,000
Rough Mowers GC-010 n/a 37,500 37,500
Grinders Reel and Bedknife GC-011 n/a 55,000 55,000
Sand Trap Rake GC-013 n/a 18,000 18,000
Five Plex Fairway Mower GC-014 n/a 39,000 39,000 78,000
Driving Range Nets �C-015 n/a 15,000 15,000 30,000
Topdresser GC-019 n/a 22,000 22,000
Bridge Improvements GC-023 n/a 30,000 30,000
Sprayer GC-031 n/a 49,000 49,000
Core Harvester GC-032 n/a 16,000 16,000
Skid Loader GC-033 n/a 45,000 45,000
Passenger Shuttle Cart-Used GC-036 n/a 15,000 15,000
Driving Range Building-Siding GC-037 n/a 30,000 30,000
Par 3 and Lawn Bowling Building GC-038 n/a 65,000 65,000
Bunker Improvements GC-039 n/a 70,000 70,000
Golf Course Total 285,000 235,000 186,500 110,500 39,000 856,000
GRAND TOTAL 285,000 235,000 186,500 110,500 39,000 856,000
Page 64
Project# �iC-0�3
Department Golf Course
ContacY
Project Name Green/Tee Mowers Type Equipment
Useful Life
Category Equipment:Heavy Equip.
_ _ __ Priority
Description 1
— -- --J
_ __ _ - - -- -- - - -- - --�
�Gi reen/Tee mowers to replace current unit. One unit to be replaced in each year shown.
_ — -
�Justificafion �
--- - --_ _ _ - - _ _- ---- - _ _ _ �
Increased repair and maintenance expenditures on current units
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 33,000 42,500 75,500
'ra� 33,000 42,500 75,500
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 33,000 42,500 75,500
Total 33,000 42,500 75,500
Project# GC-009 Department Golf Course
Contact
Project Name Golf Carts Type Equipment
Useful Life
Category Equipment:Heavy Equip.
Priority
Descripfion �
_ _ -- __ ___
60 carts were purchased in 2010 for rental income while playing golf.Carts will be traded in to offset the purchase and is included m this estimate.This purchase�
was fmanced with a 3_year lease from the City of Golden Valley and may be looked at again for the purchase in 2018.
_ - -- _ _ _— -.
-- — - - __
_ _ -- __ _
Jus6fication
-. _ _ . _ _
_ ___
Golf carts are a needed commodity at any golf course.Ownersh�p of golf carts has tumed out to be much more profitable than renting and the lease from the City
�made it more affordable than using an extemal source.The previous carts lasted eight years.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 220,000 220,000
Total 220,000 220,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 220,000 220,000
Total 220,000 220,000
Page 65
Pro�ect# GC-010
Department Golf Course
Contact
Project Name Rough Mowers Type Equipment
Useful Life
Category Equipment:Heavy Equip.
___ — ---
Priority
; Description
�- -- - - ----�
.._ -- ----- — _- -_- ____ _ ___�
Rough Mower to replace units.
__ ---
—_ _-- — -
Jusdfication
-- _ _ _ _-- -- --- -- --- - -
_ ___
Increased repair and maintenance expenditures on current units. �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 37,500 37,500
Total 37,500 37,500
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 37,500 37,500
TOtal 37,500 37,500
Project# CiC-�11
Department Golf Course
Contact
Project Name Grinders Reel and Bedknife Type Unassigned
Useful Life
Category Unassigned
Priority
�i Descrip6on _ �
-- -
-- --- - _- - - ._ - -- _ ___ _- —�
Maintenance equipment that sharpens reels and blades of mowing equipment.
--- - -
— --- — —
--
— — — — _�
Justific ation
_- --�- __ _ __ _-- --
CReplacement of current unrt purchased in 1998.
_ _ _ _— __ _-- -—-- --- — �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 55,000 55,000
Total 55,000 55,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 55,000 55,000
Total 55,000 55,000
Page 66
Project# GC-013 Department GolfCourse
Project Name Sand Trap Rake conca�r
Type Unassigned
Useful Life
Category Equipment:Electronics
— — --- Priority
— �
Descrip6on I
-- — _ _ --—
_ _ _ _
— — -----
Three wheel machine that rakes th�rty two sand traps every day of the golfing season. --
— — — ---
— --- _— __
Jusfifica6on �
—_-- —
_ __ — __. _ —
LThe sand trap rake was purchased m 2002. — ---
._ — . -- —
__—.
— — — -- -
— ——
- _ _- __ _ —_— —
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 18,000 18,000
Total 18,000
18,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 18,000 18,000
Total 18,000
18,000
Project# GC-014 Department Golf Course
Project Name Contact
Five Plex Fairway Mower
Type Unassigned
Useful Life
Category Equipment:Miscellaneous
�- _._ .—
LDesCription � r�or�ty
__ _�
—-- --
-- ----
Mows the Golf Course Fairways five times a week during the golf season.
——. --
— — --- . _. �
— -- —
�Jushfication , —
-- ---
--- —_
_ _.
'�Increased repair and maintenance expenditures on current unit. --
— —
_— _——- _ J
— --- --—
--_—
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 39,000 39,000 78,000
Total 39,000 39,000 78,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 39,000 39,000 78,000
Total 39,000 39,000 78,000
Page 67
Project# GC-015 Department Golf Course
Project Name Contact
Driving Range Nets
Type Equipment
Useful Life
Categor,y Unassigned
-- —_ -- Priorit
�escriplion � y
— —
— _ —�
— - — ---
—_- __—_ __—_--.
` ight 105'x 50'Driving Range Nets that keep golf balls from entering the highway. -----
- — — — _— — �
,-- . --—
Justifica6on -� — --
-- — _— —�-
__ __
_- - - - -_ __
Life span of net with weather patterns is about 10 years.For complete protection,these will need to be replaced.There is a total of 16 nets.
II�n 2019,the nets along 394 and Hole#1 will be replaced.
_ - -
_ __ — --
---------
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 15,000 15,000 30,000
Total 15,000 15,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 15,000 15,000 30,000
Total 15,000 15,000 30,000
Project# GC-019 Department Golf Course
Project Name Topdresser Contact
Type Unassigned
Useful Life
Categor,y Unassigned
— — -- Priority,
�Description
�—
�—— — — — ! .
- ---
_ — -- — —
�This unit adds sand to�eens for a smoother putting surface.
-- — —
--
-- _ --_ — _— — —_ — — — — �
J su h'fication �
_--_. —J_- _
The current unrt needs to be replaced.Smoother greens allow better puttmg ability.
—_ — — —
—.—. -
-- —--—— -
_ __ —.---
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 22,000
22,000
Total 22,000 22,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 22,000 22,000
Total 22,000 22,000
Page 68
Project# GC-023 Department Golf Course
Project Name Contact
Bridge Improvements TyPe Unassigned
Useful Life
Category Unassigned
_ -- —_.
_.
Priority�
Descriplion �
--- ___
__. — _. —
--
_ __ _ __ __
___ __.----�
� ,one s�de of the support abutment was repa�red and tested for settlement.In 2014 and 2015,more concrete approaches w�ll be replaced.
— — - - — —.-
-- � . _
Justification
— — — —._ � —
— _ —
_ __ — ____ _ —_
Inprovement to the structure and safety of bridges. -
___ __
� - - — -- —_- __ _ —
_. . _ __ — — --
_- - -
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 30,000 30,000
Total 30,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 30,000 30,000
Total 30,000
30,000
Project# GC-031 Department Golf Course
Project Name Contact
Sprayer Type Unassigned
Useful Life
Category Unassigned
r—_ ._. ._—_ _ _— , Priority
Descriphon _ J
�--_— —
--
-- — - —--- —
�aintenance equipment that sprays fungicide and herbicide.
---- - __ _.— — ---
---�— ----
I_Justification �
I—_-- - —=—
Replacement of sprayer previously purchased in 2004.
— ---
__ __ - _ _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 49,000 49,000
Total 49,000 49,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 49,000 49,000
Total 49,000 49,000
Page 69
Project# GC-032 Department Golf Course
Project Name Contact
Core Harvester Type Unassigned
Useful Life
Category Unassigned
� Priority
__ _ —_
— --- �
�Description �
— _ - ----. _
_-- - -- --
— -- —
'�aintenance machinery that cleans up after aeration. �
-- —
`Justification
_— _ J
,Re�p acl ement of current unit Purchased in 2000. -- "- -
-- — -- — — —_
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 16,000 16,000
Total 16,000 16,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 16,000 16,000
Total 16,000 16,000
ProjeM# GC-033 Department GolfCourse
Project Name Skid Loader Contact
Type Equipment
Useful Life
Category Unassigned
r_ _ _ — ., Priority
�Description
— - --�
----- .
__
--- - —
iEngine powered machine with lift arms to attach a wide variety of tools to perform various maintenance operations. I
� --- - — _ —_ _ —_ —J
— __�
�Justtfication _ J
—--
——_—
- --- -- -
--- - -
`Replacement of current unit that was purchased in 2001.
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 45,000 45,000
Total 45,000 45,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 45,000 45,000
Total 45,000 45,000
Page 70
Project# �iC-�3( Department Golf Course
Project Name Contact
Passenger Shuttle Cart-Used TyPe Unassigned
Useful L,ife
Category Unassigned
-----__--_.-- � Priority
Description
-- _ — —
— - --_--- ------
Purchase a Used Passenger Shuttle Cart. - --- —
` ---
— — -
—_—_— . —- — — --
�ustification
Cart to be used for shutthn customers and
— — --— _
— _ _.
- - —__
g emp oyees during and after Community Center construction.
_ — —
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 15,000 15,000
Total 15,000 15,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 15,000 15,000
Total 15,000
15,000
Project# GC-037 Department Golf Course
Project Name Contact
Driving Range Building-Siding
Type Unassigned
Useful l.ife
Category Unassigned
— Priority
— __ —__---- ----
I Description J
— --
— — ---
- -
-- —
---- -
p te and install vinyl sidmg to the Driving Range building to match the look of the new community center. -
_ ---
— — --
�Justification --�
---
�Siding has deterioted and is over 20 ears I� _
-- —— __—
y ld. — _ —_. —
_ —_ --__ _ .
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 30,000 30,000
'ra� 30,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 30,000 30,000
Total 30,000
30,000
Page 71
Project# ('iC-�3$ Department Golf Course
Contact
Project Name par 3 and Lawn Bowling Building
Type Unassigned
Useful Life
Category Unassigned
- _-__ — -
Priorit,y
-- - -�
Description
-- -- —
—— —
_ __ _ —
Constructing a new buildmg for the Par 3 and Lawn Bowling area. --- -
— —_ --- - - �
�-- _ ---
�stification �
_ --=
— __ _ _—
--- _ _— — _ --- -
i urrent buildmg was built in 1976 and will be demolished with the construction of the new communiry center �1
- __. ---
_ ——_- _ _
-- _ _
-- - -- -._. --
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 65,000 65,000
Total 65,000 65,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 65,000 65,000
Total 65,000 65,000
Project# GC-039 Department Golf Course
Contact
Project Name gunker Improvements
Type Unassigned
Useful Life
Category Unassigned
� - --------- Priority
- . _— - -
LDescription �
— __—
— - _ — _ ----- _
�Reconstruct ten bunkers on the golf course. — - -- -�
- -- ----- -
_ - —---
'�— — ---
�JushGcation �
_— _-- --�
�— � _ _ _ _ _ — ---
�The cond�tion of the sand bunkers on the golf course warrants contruction.
-- —
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 70,000 70,000
Total 70,000 70,000
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Golf Course Fund 70,000 70,000
Total 70,000 70,000
Page 72
city of
olden
g
va �
Capital Improvement Program 2017-2021
Building Improvement Section
The City owns and or/maintains the following facilities for the purpose of carrying out its mission of
providing needed services to the community and bringing people together by fostering inviting public
spaces where people work and play, encounter their fellow citizens and discover common interests.
This has incorporated the Wold Architects and Engineers city-wide comprehensive facility
assessment building analysis that was completed late 2006.
Golden Valley Buildings
Total Square Feet
Cit Hall 26,350
Public Safety (Police and Fire Station #1) 28 000
Streets and Park Maintenance 29,100
Utilities Maintenance 12,950
Vehicles Maintenance 12,500
Warehouse & Animal Impound 11,490
Golf Maintenance 12,050
Fire Station No. 2 5,785
Fire Station No. 3 6,030
Community Center/Golf Operations* 17,900
*existing building
A transfer from the General Fund is the main source of revenue.
74
City of Golden Valley, Minnesota
Capital Plan
2017 � 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Totai
_ _ _ -- - __
__ ___ ___ �
Buildings
Carpet Replacement:City Buildings B-011 n/a 50,000 40,000 40,000 130,000
Installation of Building Security Systems B-027 n/a 50,000 50,000 100,000
Public Buildings Roof Replacements 8-041 n/a 270,000 150,000 150,000 150,000 720,000
City Hall Boiler Replacement 8-043 n/a 130,000 130,000
Vehicle Maintenance-Window Replacement B-045 n/a 15,000 15,000
Buildings Total 115,000 360,000 190,000 280,000 150,000 1,095,000
GRAND TOTAL 115,000 360,000 190,000 280,000 150,000 1,095,000
Page 75
Project# B-011 Department Buildings
Contact
Project Name Carpet Replacement: City Buildings
Type Improvement
Useful Life
Category Buildings
_ __ --
Priority
i Description �
_ --
_ _ -- -- _ _ -
— — — _
On-going program to replace wom out carpet in City buildings. Decision as to which carpet to replace in a given year will be based on an annual inspection of the �
condition of the carpets in the various buildings.
2017-Upstairs of City Hall:General Services,Finance,Managers Office,Council Chambers
2018-Golf Maintenance,Police Department
2019-TBD
- - — -- _. __- -- I
—_ _ _ —____
_ —_
. _-- -- _—_ _
Jushfication
� __ _ - - - --- __ - -
ICarp om beyond its useful life.lt is difficult to clean and in some areas is warn and frayed resulting in tripping hazards.Some areas have been delayed since 1
I2006.
-- -
_— -- ---
. -- . _ _
_ �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 50,000 40,000 40,000 130,000
Total 50,000 40,000 40,000 130,000
Funding Sources 2017 2018 2019 2020 2021 Total
Building Fund(5200) 50,000 40,000 40,000 130,000
Total 50,000 40,000 40,000 130,000
Project# 8-027 Department Buildings
Contact
Pro�e�c Name jnstallation of Building Security Systems
Type Improvement
Useful Life
Category Buildings
_- _ Priority
I Descripfion
� —_ _ _
Installation of building security systems in all City owned facilities. — - " �
—-- _ _
_ i _
�Justification �
—., -
- —_ -- — _ . — __ _
—
The City has installed a security system for primarily the City Hall Campus.2017 securiry projects include installation of vidoe suveillance.2018 prjects include
�security systems in other buildings
__. _ - -
_— ___ _ _
Expenditures 2017 2018 2019 2020 2021 Total
Other 50,000 50,000 100,000
Total 50,000 50,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Building Fund(5200) 50,000 50,000 100,000
Total 50,000 50,000 100,000
Page 76
Project# B-041 Department Buildings
Contact
Project Name public Buildings Roof Replacements
Type U�assigned
Useful Life
Category Unassigned
—.__ Priority,
�Description �
-__ — __ -_ _ —
-- - - - - -- - -
Replace roofs on buildings that are thirty-years old or greater. 1
— __� —- --- --- J
Justification
--- __.-_ ;_
�- - — __ _— -- ___
— _- _ __ _ --- _ _ . _-
_ _ - --_ _ __ -
, e o owing roofs will be at least 40 years old or greater and are leaking and in need of replacement.Replacements are scheduled for the following:
I2018-Wesley Park; lOth Avenue Cold Storage Building
I2019-Lakeview Park
2020-Scheid Park
. _ —_ _ —_ _ __ _ l
- _ _— _— --- ---
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 270,000 150,000 150,000 150,000 720,000
TOtal 270,000 150,000 150,000 150,000 720,000
Funding Sources 2017 2018 2019 2020 2021 Total
Building Fund(5200) 270,000 150,000 150,000 150,000 720,000
Total 270,000 150,000 150,000 150,000 720,000
Project# B-043 Department Buildings
Contact
Project Name City Hall Boiler Replacement
Type Unassigned
Useful Life
Category Unassigned
.p — _ _ Priority
�escn hon �
- _ -' . - -- __ —
— _— - - ---
IReplace the City Hall Bo�ler System. �
__
_ - -- -
�Justitication �
,— - - _ _ — _
_ _ _ __ _ —�
jThe existing boiler system for City Hall is over 40 years old and is not efticient according to today's standard.The system would require total replacement.
_ _ .— __ _ _ _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 130,000 130,000
Total 130,000 130,000
Funding Sources 2017 2018 2019 2020 2021 Total
Building Fund(5200) 130,000 130,000
Total 130,000 130,000
Page 77
Project# B-045 Department Buildings
Contact
Project Name Vehicle Maintenance-Window Replacement
Type ]mprovement
Useful Life
Category Buildings
- —_. __- -__- - Priority
�Description J
� _ _ l —_ _ _-- _ __ --
_ __ _ _ —-- _ -- -
JUShtICafi011 — �tenance building. �
R lace office windows m the Vehicle Ma
r----
__
,— -- _� — - - — ----
Veh�cle Maintenance building office windows are in need of replacement. �
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 15,000 15,000
Total 15,000 15,000
Funding Sources 2017 2018 2019 2020 2021 Total
Building Fund(5200) 15,000 15,000
TOtal 15,000 15,000
Page 78
��tyof
olden
�
va e
Capital Improvement Program 2017-2021
Cablecasting Improvement Section
The City of Golden Valley partners with Northwest Community Television (NWCT) to bring you a wide
variety of city video programming featuring information about your local government as well as
activities and events in the community. This capital project fund plans for major improvements to
provide access for city meetings.
Historv
NWCT started in 1982 and is funded by a joint powers agreement that supports public access and
local programming activities through local Franchise and Community Television fees. Nine adjacent
cities are part of the franchise agreement between Comcast and the Northwest Suburbs Cable
Communications Commission (NWSCCC). They include Brooklyn Center, Brooklyn Park, Crystal,
Golden Valley, Maple Grove, New Hope Osseo, Plymouth, and Robbinsdale.
Franchise fees is the main source of revenue.
78
City of Golden Valley, Minnesota
Capital Improvement Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
__ —_ _ -
�Cablecasting Improvements �
Cable Equipment Replacement C-001 n/a 22,000 22,000 22,000 22,000 22,000 110,000
Cablecasting Improvements Total 22,000 22,000 22,000 22,000 22,000 110,000
GRAND TOTAL 22,000 22,000 22,000 22,000 22,000 11Q000
Page 79
Project# C-��1 Department Cablecasting Improvements
Contact
Project Name Cable Equipment Replacement
Type Improvement
Useful Life
Category Cablecasting Improvements
�-- — - -
� Priority
Descripfion
�—- — ---
- — - _
�lace aging equipment in cable TV control room with updated equipment employing digital technology.
�— - .- _ _
. _ - ---
�ustification �
_ - -� — __ _
- -- —
�pment ages,the use for compatible software and hardware changes over time which requires new equipment.
- _ _ _ —_ _ _ - --
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 22,000 22,000 22,000 22,000 22,000 110,000
Total 22,000 22,000 22,000 22,000 22,000 110,000
Funding Sources 2017 2018 2019 2020 2021 Total
Cablecasting Improvements 22,000 22,000 22,000 22,000 22,000 110,000
Total 22,000 22,000 22,000 22,000 22,000 110,000
Page 80
���yof
olden
�
va e
Capitai Improvement Program 2017-2021
Brookview Community Center Section
The new Brookview Community Center, designed to serve the community in all seasons and for all
ages. The new building will have much more functional space, including six to eight multi-use rooms,
expanded banquet facilities and senior program rooms, an improved restaurant/grill, and an indoor
play area to promote winter activity and family gatherings.
This section is accounting for the building only.
81
City of Golden Valley, Minnesota
Capital Improvement Plan
2017 t1,ru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
— - — --- -- —
jBrookview Community Center �
Brookview Community Center BC-001 n/a 10,000,000 8,998,823 18,998,823
Brookview Community Center Total 10,000,000 8,998,823 18,998,823
GRAND TOTAL 10,000,000 8,998,823 18,998,823
Page 82
Project# BC-�01 Department Brookview Community Center
Contact
Project Name grookview Community Center
Type Improvement
Useful Life
Category Brookview Community Center
, -- _ _ Priority.
�escription �
__ . _ - _
. __ _ - _ _ --- - _-
--- - -
,Starting late 2016,the construction of the new Brookview Community Center will begin.This fund is to account for the bonds sold for the construction of the �
�ilding.Once built and funds disbursed,this section will no longer be included in the CIP
__ _ _ _ _—
_ _ — _ _ _._ _ . _ _ - _
�- - — - � __
� Justification
- - - -
- — -�
Brookview's original building,which dates to the 1920s,has been expanded and remodeled several times over the ears since the Cit
Y y purchased the building in
I1967..The question was whether the City continues investing in maintenance of an aging structure or if it invests in a new facility that serves the needs of today's
Golden Valley.
IThe replacement process began in 2014 and included a feasibility study and design proposal,work by a City Council-appointed a citizen task force to focus on �
;vision,guiding principles,and potential program areas,and public input.In November 2015,the City Council authorized staff to move forward on a proposed design I
Ifor a 37,000-square-foot building to be constructed just south of the existing 19,000-square-foot commun�ty center,which means the existing building won't have to I!
be demolished until its replacement is up and running. i
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 10,000,000 8,998,823 18,998,823
Total 10,000,000 8,998,823 18,998,823
Funding Sources 2017 2018 2019 2020 2021 Total
Brookview Community Center 10,000,000 8,998,823 18,998,823
Total 10,000,000 8,998,823 18,998,823
Page 83
city of
olden
�
va e
Capital Improvement Program 2017-2021
Storm Sewer Section
This section includes the storm water infrastructure improvements and the flood damage reduction
program for the next five years. Most of these improvements, which include both rate control and
water quality projects, coincide with the Pavement Management Program (see section on Streets).
Improvements will be funded either through the use of current reserves or the issuance of revenue
bonds. The goal is to have enough reserves to account for 50% of the current revenues.
84
City of Golden Valley, Minnesota
Capital Plan
2017 thr,z 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
-__ _._ _ _ -- _
- _ - -
IStorm Sewers �
Residential Storm Sewer Improvements SS-Ol n/a 600,000 750,000 750,000 750,000 750,000 3,600,000
Street Sweeper SS-05 n/a 230,000 230,000
Brookview Golf Course-BufferZone Study SS-12 n/a 50,000 50,000 100,000
Storm Water Pond Dredging SS-23 n/a 150,000 300,000 450,000
V-Box Spreaderand Anti-Ice(tandem) SS-25 n/a 67,000 67,000
V-Box Spreader and Anti-Ice(tandem) SS-26 n/a 67,000 67,000
Grounds Sweeper SS-27 n/a 40,000 40,000
Flood Mitigation SS-34 n/a 500,000 250,000 250,000 250,000 1,250,000
BobcatToolcat SS-41 n/a 55,000 55,000
V-Box Spreader SS-42 n/a 56,000 56,000
Bassett Creek Restoration Project SS-43 n/a 110,000 110,000
Sandburg-Louisiana Pond SS-48 n/a 221,000 330,000 551,000
Medley Park Stormwater Treatment Facility SS-49 n/a 110,000 440,000 550,000
Sweeney Lake Watershed Water Quality Impr SS-50 n/a 440,000 440,000
800 MHz Radios SS-51 n/a 40,000 40,000
10th Avenue North Culbert Rehabilitation SS-52 n/a 1,500,000 1,500,000
Mill&Overlay Storm Sewer Repairs SS-53 n/a 25,000 75,000 50,000 50,000 50,000 250,000
Bassett Creek Water Quality Improvement SS-54 n/a 330,000 880,000 1,210,000
Asset Management Software SS-55 n/a 30,000 30,000
Asset Management Equipment SS-56 n/a 12,000 12,000
Storm Sewers Total 3,003,000 975,000 1,691,000 2,765,000 2,174,000 10,608,000
GRAND TOTAL 3,003,000 975,000 1,691,000 2,765,000 2,174,000 10,608,000
Page 85
Project# .SS-01 Department Storm Sewers
Contact
Project Name Residential Storm Sewer Improvements
Type Improvement
Useful Life
Category Storm Sewer
-- Priority
Description �
-- _— -_
— — —
Consriuction and repair of storm sewer drainage system in conjunction with the Pavement Management Program(see S#1)..
--_ �
_ - ---
Justificafion l
— — --
� -- = — -- —
_—_ _
_ —_ ----- _- --
rov�de an improved storm water runoff drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff,minimize local
I�drainage and flooding issues and protect pavement. I
_— . _
_— — -- —_
_ - _ — -- -- —
— __ _ — —_ __ __ . --
— -- —_ __ —
_ �
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 600,000 750,000 750,000 750,000 750,000 3,600,000
Total 600,000 750,000 750,000 750,000 750,000 3,600,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 600,000 750,000 750,000 750,000 750,000 3,600,000
(7300)
Total 600,000 750,000 750,000 750,000 750,000 3,600,000
Project# SS-�$ Department Storm Sewers
Contact
Project Name Street Sweeper
Type Equipment
Useful Life
Category Stomi Sewer
- _—__ __— � Priority
Description �
— - - _ — _ _
� _ _--_— _ __ _
• - -- — -- --
--_ ___ __ �
I Justificahon P J 07 Elgin Sweeper. I
__ - - ---
ew s eet swe er to re lace Umt#505,2
rIncreased r air and mamtenance ex endit
�— ----
---
. - — _ _ _ _
�L eP p ures on Unit#505.
_ -- J
- ._ — — _--
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 230,000 230,000
Total 230,000 230,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 230,000 230,000
(7300)
Total 230,000 230,000
Page 86
Project# SS-IZ Departmenk Storm Sewers
Contact
Project Name grookview Golf Course-Buffer Zone Study TyPe I,,,pro�e,,,�,t
Useful Life
Category Storm Sewer
Priority
___. _
---
Descripfion �
-- - — -
_ -- - ---- --- --- _ __ __ - . _
In 2013,a study was performend to�dentify locations for the development of native vegetation buffer areas in Brookview Golf Course.Construction was approv�
Ifor some areas to be constructed and maintained in 2015 2016 and 201�.Additional monies are allocated in 2017 and 2019 for additional areas.
_ __ .. ---
i Jus6fica6on ,
� - _ ' _ __ _-- -__ ___ _ _ �
Removal of nutrients and sediment from stormwater runoff entering golf course ponds and Bassett Creek.
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 50,000 50,000 100,000
Total 50,000 50,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 50,000 50,000 100,000
(7300)
1'p� 50,000 50,000 100,000
Project# SS-23
Department Storm Sewers
Contact
Project Name Storm Water Pond Dred lri
g g Type Maintenance
Oseful Life
Category Storm Sewer
Priority
�� Description �
��___ _ -
- - - ---- __ _ --- -- -- - - - ___ _ --
Pond Dredging program to remove accumulated sediment and hazardous materials such as Polycyclic Aromatic Hydrocarbons(PAH),including the proper disposal ,,
of dred ed materials. I
g —..- -- _ __ --
._ __. _. __ __
_ __
� _—- __----- -
�Justificafion � ��
_ -____ - _ - _ __ _
!Significant sedimentation reduces the water quality volume in ponds and contributes to degradation of downstream waters.Periodic dredging removes accumulated I
sediment and hazardous inaterials and restores nutrient and sediment removal efficiencies. J
Expenditures 2017 2018 2019 2020 2021 Total
Other 150,000 300,000 450,000
Total 150,000 300,000 450,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 150,000 300,000 450,000
(7300)
Total 150,000 300,000 450,000
Page 87
Project# SS-25 Department Storm Sewers
Project Name Contact
V-Box Spreader and Anti-Ice(tandem)
Type Equipment
Useful Life
Category Storm Sewer
- - - Priority
Descripfion 1,
_ — J —_ _ — __
V oB z sander with liquid applicat�on for pre-wet and anti-icing for tamdem axle dump truck.This unit is 508 �
- -
� _ _ __.-
- . . , ---- -----
- ---
�ustification I
--- — —_= ----
— — __ __ _ — __ __
__ —
_ _- -
I V-Box sanders are the most efficient and cost effective way to apply de�cing chemicals for winter operations V-Box sanders will reduce the impacts of de-icing
- - -
bhemicals on local lakes and streams. i
_ __ ___
-- _ _ _
__ __ ____ - _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 67,000 67,000
Total 67,000 67,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 67,000 67,000
(7300)
Total 67,000 67,000
Project# S,�-2( Department Storm Sewers
Project Name Contact
V-Box Spreader and Anti-Ice(tandem)
Type Equipment
Useful Life
Category Storm Sewer
I� __ _ - -- I Priority
Descriphon
_ — — — -- J
— . _ - _ _ . _. _ _ ——_—__
V-Boz sander with l�quid application for pre-wet and anti-icing for tamdem axle dump truck This umt is 511.
� _ -- -- -. � -- --- - - --- -- - -_- —�
�ustitication
�. -. — i
. _ —_ _ — — —__
---
I V-Box sanders are the most efficient and cost effective way to apply the de-icing chemicals for winter operations.V-Box sanders will reduce the impacts of de-icing ,
- - - - - - - - -1
chemicals on local lakes and streams.
� _ __ - . - - _-
- - --- --
__ _ _ - -- _ _ _ - - - _ - - --
__ - _ _
_ _ _ -- - -
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 67,000 67,000
Total 67,000 67,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 67,000 67,000
(7300)
Total 67,000 67,000
Page 88
Project# S,�-Z'] Department Storm Sewers
Contact
Project Name Grounds Sweeper
Type Equipment
Useful Life
Category Storm Sewer
�_ _ __ _— _— Priority
�Description ._J
---
_ _ —--— —
;Grounds sweeper to replace Unit#506,a 2011 Smithco gmmmds sweeper. --- �
�._ _
__ — —
�Increased r air and mamtenance on Unrt#
Jushfication
� _ __ __ _ __
--_ _
—_ _ _ -----_l
ep � 506,which will be nine years old.
_—_ �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 40,000 40,000
(7300)
Total 40,000 40,000
Project# SS-34 Department Storm Sewers
Contact
ero�e�t Name Flood Mitigation
Type Improvement
Useful Life
Category Storm Sewer
---
-- — — .�
Priority
I Description
jDedicahon of funds to damage from flooding on Bassett Creek and its tnbutaries,including City storm water ponds. _—1
-- -
- - — —
I Justi6cation �I
_ _ _
— --
— -- _
——
Flood mrtigation may include working with homeowners and the Bassett Creek Watershed Commission on a program. �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 500,000 250,000 250,000 250,000 1,250,000
Total 500,000 250,000 250,000 250,000 1,250,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 500,000 250,000 250,000 250,000 1,250,000
(7300)
Total 500,000 250,000 250,000 250,000 1,250,000
Page 89
Project# SS-41 Department Storm Sewers
Project Name Contact
Bobcat Toolcat Type Equipment
Useful Life
Category Storm Sewer
Priority
_-- -- — --- — _ __ —_ I
Description
_ —— ---_ ----:-' __ _
_ _ _ __ __ _
_ — __ — . .
_ -- -- — --
Bobcat Toolcat will be purchased with snow blower and sweeper attachments. This is a multipurpose loader that can also be used as a stump grinder,post hole
�auger,trencher etc.This unit was purchased in 2013 and is unit 510.
-- _ �
___ __ __ — _ -- ---- --
— -__ _— _ - _ _ .- ___ _ - .. _ —_
LJusUficafion i
—_ _ —=- - -
Ll�ncreased repair and maintenance on Unit 510. —�
- _ _-- . _ — - _ ___—_ _ _�
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 55,000 55,000
Total 55,000
55,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 55,000 55,000
(7300)
Total 55,000 55,000
Project# SS-42 Department Stonn Sewers
Contact
Project Name V_gox Spreader
Type Equipment
Useful Life
Category Storm Sewer
�— -— -—-- —_— � Priority
� Description �
— — — — _ — — —._.
LV-box sander with liquid applicaUon for pre wet and anti-icing for single axle dump truck.
. --- -�
� — . _ _ _
'r�shfication -- -- � - _ __ _ _ _ _—
— - _ — _ — ---— — _
— - �
V-box sander with liquid application is the most efficient and ccost effective way to apply the de-icing chemicals for winter operations.V-Box sanders reduce the
impacts of de-icing chemicals on local lakes and streams. �
— - —. _— __
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 56,000 56,000
Total 56,000 56,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 56,000 56,000
(7300)
Total 56,000 56,000
Page 90
Project# SS-43 Department Storm Sewers
Contact
Project Name Bassett Creek Restoration Pro ect
� Type Unassigned
Useful Life
Category Stonn Sewer
Priority
___ ----
Descripaon
— --____ _ _ — _ ------ --- -- --- _---- ----- ___ _
Streambank stab�lization,erosion repair,and native vegetation establishment in a portion of the stream between Regent Avenue and Golden Valley Road to help
remove sediment and nutrient loads within Bassett Creek and downstrean waters
___ _ __ _- _ ,
rJustification _�
__- __ — — _-- —__-
�The Bassett Creek Watershed Management Commission Capital Improvement Program includes the construction of this project and provides funding to protect and ',
�Iimprove the water quality of Bassett Creek.Bassett Creek is listed as an impared water and this project will help meet water quality goals for the stream. '
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 110,000 110,000
Total 110,000 110,000
Funding Sources 2017 2018 2019 2020 2021 Total
Bassett Creek Watershed 100,000 100,000
Mgmt Comm
Storm Sewer Utility Fund 10,000 10,000
(7300)
Total 110,000 110,000
Project# SS-4g Department Storm Sewers
Contact
Project Name Sandbur -Louisiana Pond
g Type Unassigned
Useful Life
Category Stonn Sewer
Priority
� Descripfion �
�--
___ _ - -- - — __--- —__ _ _---
�Consriuct a new pond in or near Isaacson Park with native vegetation buffer,and install storm sewer to divert runoff from adjacent areas to the pond. �,
Jus6fication — . . J', ..
C _— ___-_ __ _— ---_ _ _ __ ---- _
ond will help alleviate Decola Pond area flooding.The pond and srorm sewer pipe project will also provide water quality benefits for Bassett Creek and downstrean ',
water bodies.
_ _--— ---- —_ �
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 221,000 330,000 551,000
Total 221,000 330,000 551,000
Funding Sources 2017 2018 2019 2020 2021 Total
Bassett Creek Watershed 201,000 300,000 501,000
Mgmt Comm
Storm Sewer Utility Fund 20,000 30,000 50,000
(7300)
Total 221,000 330,000 551,000
Page 91
Project# ss-49 Department Storm Sewers
Project Name Contact
Medley Park Stormwater Treatment Facility T
ype Improvement
Useful Life
Category Stottn Sewer
- ------ Priority
-
Description �
�--—
_ --- — -: --_—J
_ __ _-
__ _ _ _ _
_—-- -- --
Construction of a water quality treatment pond or similar facility to help remove sediment and nuh-ient loads within the Medicine Lake sub-watershed of the Bassett I
�Creek watershed.
- - ---- J
- - - _ - -- _ - --
_--- - - - - . _
- __ -_ - __ - __- --
Justification �
— _— - --=J_
— _—— —
—__ _
The Bassett Creek Watershed Management Co�nmission Capital Improvement Program includes the construction ofthis project and provides fundin to maximize
Ithe rate control and water quality within this area of the watershed.Medicine Lake is impaired for the nutrients(phosphorus)and this project will help to meet water I
!quality goals for the lake.
.-- - _. ._
_ - _ . _- __ _ _ _ __ _
_ __ _ __
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 110,000 440,000 550,000
Total 110,000 440,000 550,000
Funding Sources 2017 2018 2019 2020 2021 Total
Bassett Creek Watershed 100,000 400,000 500,000
Mgmt Comm
Storm Sewer Utility Fund 10,000 40,000 50,000
(7300)
Total 110,000 440,000 550,000
Project# SS-$0 Department Storm Sewers
Project Name Contact
Sweeney Lake Watershed Water Quality Impr
Type Unassigned
Useful Life
Category Storm Sewer
-- Priority
I Description �
—
I�— — - —. _ . __ - .— .
_Construction of a stormwater treatment system for dissolved phosphorus within the Sweeney Lake sub-watershed to help reduce nutrient loads with Sweeney Lake.
_ - _- - - I
- - - . -
�sfificafion = _ — -- — — —� — - _.
�—--
_ _ — __ _ _ _ _
__ _ _ __ _- -- - — _ — — — —— — _ ___
lThe Bassett Creek Watershed Management Commission Capita]Improvement Program includes the construction ofthis project and provides funding to protect and I
improve the water qualiry of Sweeney Lake.Sweeney Lake is lisYed as impaired for nutrients(phosphorus)and this project will help meet water quality goals for the i
�lake.
- __ _ _ __ _- - - _ - - _ __ _ _ _ _J
_ __ _-
__ - . _- -
_ _ __ -- -
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 440,000 440,000
Total 440,000 440,000
Funding Sources 2017 2018 2019 2020 2021 Total
Bassett Creek Watershed 400,000 400,000
Mgmt Comm
Storm Sewer Utility Fund 40,000 40,000
(7300)
Total 440,000 440,000
Page 92
Project# SS-51
Department Storm Sewers
Contact
Project Name g00 MHz Radios Type Unassigned
Useful Life
Category Storm Sewer
—_ - __ _-�
Priority
Description
---- - �
_ _- --_ -- ---- __ __---- - __ —__ ---- -�
8-800 MHz portable radios and accessories to be purchased in 2019.
___— --- - -- — ---�
�Justification '
___ _-__ _ ----_ ._ --__ _------ _-- --_ _
- -
Replace current raidos purchased in 2008.Hennepiin County will no]onger support the current 800 Mhz radios past December 31,2019.New radios P25 Phase II
modulation compliant. I
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 40,000 40,000
1'p� 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 40,000 40,000
(7300)
Total 40,000 40,000
Project# S,S-SZ Department Storm Sewers
Contact
Project Name lOth Avenue North Culbert Rehabilitation Type u„ass;gn�a
Useful Life
Category Storm Sewer
Prioritv
�Description_ . .__. __- _ `
�_ �
__ _ _- _- -- _ . - __ _ __ - - . --�
Repair the portion of the culverts owned by the City that convey Bassett Creek under lOth Avenue North and the Union Pacific Railroad track.
--- - -
_ _ _ _ ____
_ - --- _ --- ---
� _- _-- -
�Justificafion �
---=-
- = _ _
Culverts are technically classified as a bridge by the Minnesota Department of Transportation and are inspected regularly.The last inspection identified high level
corrosion of the culverts at the base floor level and a risk for collapse.The Union Pacific Railroad is addressing and funding its portion of the culverts under th�
railroad.The City is addressing the portion under I Oth Avenue.
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 1,500,000 1,500,000
Total 1,500,000 1,500,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 1,500,000 1,500,000
(7300)
Total 1,500,000 1,500,000
Page 93
Project# SS-S3 Department Storm Sewers
Project Name Contact
Mill & Overlay Storm Sewer Repairs
Type Maintenance
Useful Life
Category Storm Sewer
�. _ - . __ ___ - -- __ Priority
�Description
_.- - --- - - __ _ _ _ __ __ _-
-- - - - -
--
--_---- _
- ---
i orm sewer an repa�rs in conjunction with the annual asphalt overlay program.Repairs include but are not limited to manhole adjustments,manhole sealing,and
pipe replacement.
- - -- -
-- _-
__ - -- __ _-
__ - - --
-- __ _- __
.-- --_
-- - - - .- - - -- . _. �
;Justi�cation
�_ = I
.- :- _ __ -- - . _- _-_-
To mamtain the City's storm water and drainage system in conjunction with the asphalt overlays. -�
�- _ _- _
__ ----
.- . - __ -_ . . -_ _ __
. - -- - . _ -
-- - ---- -_ _J
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 25,000 75,000 50,000 50,000 50,000 250,000
TOtal 25,000 75,000 50,000 50,000 50,000 250,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 25,000 75,000 50,000 50,000 50,000 250,000
(7300)
TOtal 25,000 75,000 50,000 50,000 50,000 250,000
Project# SS-54 Department Storm Sewers
Project Name Contact
Bassett Creek Water Quality Improvement Type Improvement
Useful Life
Category Stonn Sewer
r -- - __-- _ _- _- -- l Priority.
LDescrip6on
_- _ _ ___i
-- - _-_. . _.. _ __
_ _ _ _ - - --- -- -_
iConstitution of a water quality treatment pond or similar facility generally located between Golden Valley Road and Plymouth Avenue east oF Theodore Wirth
iParkway to help remove sediment and nutrient loads within the Bassett Creek watershed. '
- . _. _ -- ---- - - --
� _-- _- -_- - -- __ - . I
�Justification . � . . -
� -=- _ .- __ �
_ - _- . -
. :- __ . _ - _ _- - _ - _ _- ---
----- -
__ . _ - _
e Bassett Creek Watershed Management Commission Capital Improvement Program includes the construction of this project and provides funding to maximize I
Ithe rate control and water quality within this area of the watershed.Bassett Creek is listed as an impaired water and this project will help to meet water quality goals I
Ifor the stream.
_ _ _ _
- _ __ -___ __
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 330,000 880,000 1,210,000
Total 330,000 880,000 1,210,000
Funding Sources 2017 2018 2019 2020 2021 Total
Bassett Creek Watershed 300,000 800,000 1,100,000
Mgmt Comm
Storm Sewer Utility Fund 30,000 80,000 110,000
(7300)
Total 330,000 880,000 1,210,000
Page 94
Project# SS-55
Department Storm Sewers
Contact
Project Name Asset Mana ement Software
g Type Unassigned
Useful Life
Category Storm Sewer
Priority
�- ---. _
! Descripfion �
_ ___ --- - __ ___ _ - ---- - -
Conversion from the existing Cartegraph Sofrware Navigator desktop sofrware to a web-based Asset and Work Managemement Software with mobile component. ,
'Includes sofrware purchase,data migration,implementation,and training.50%of purchase from the Vehicle and Equipment CIP,25%Water and Sewer CIP and ,
25%from the Storm Sewer CIP. ,
— __ -
�_Justificafion
_ __ - _ _-- _----_ __.- __ . . - — -- -�
The move to a mobile web-based work mana ement s stem w�ll im rove efficienc�es within the or anizat�on and service deliv
will be utilized to manage routine tasks and business workflows,track inspect�ons and maintenance,and assist in programmmg futu e xpendituremers.The software
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 30,000 30,000
(7300)
Total 30,000 30,000
Project# SS-56
Department Storm Sewers
Contact
Project Name Asset Mana ement E Ul ment
g q p Type Equipment
Useful Life
Category Stonn Sewer
Priority
— __ -- -
Description
- - _ _ - --- _ _ _ - -- - _ _ - -- -- - ___ -�
Purchase of hardware,mobile devices and equipment necessary to support the implementation of the new mobile web-based Asset and Management Software system•I
— -
_ _ _ ._ - _ _ __
�- -- - - - -
�Justi�cation
The m vo e to a mobile w�eb-based work management system will improve pfficiencies within the organization and p�ieae delivgry to extep al customers.The software'
�Iwill be utilized to inana e routme tasks and business workflows,track ins ections and maintenance,and assist�n m mmm future ex enditures.
, _-— _-_ _—
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 12,000 12,000
Total 12,000 12,000
Funding Sources 2017 2018 2019 2020 2021 Total
Storm Sewer Utility Fund 12,000 12,000
(7300)
Total 12,000 12,000
Page 95
city of
Olden
g
va e
Capital Improvement Program 2017-2021
Water and Sanitary Sewer Utility Section
A five-year projection of the Water and Sanitary Sewer Fund reveals some potential financial
challenges the City may have to address. The contract pricing with the City of Minneapolis and
Golden Valley-Crystal-New Hope Joint Water Commission was renewed in 2013. The Metropolitan
Council Environmental Services (MCES) surcharge program related to inflow and infiftration will have
a direct affect on rates as it requires the City to make improvements to the sanitary system that will
reduce the rate of inflow and infiltration into the system.
Fees from the City's utility bill are the main source of revenue.
96
City of Golden Valley, Minnesota
Capital Plan
2017 tl�ru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
--___ _ _- -----------------
Water&Sewer Systems �
Sanitary Sewer&Water Line RepaidRecon. W&SS-001 n/a 870,000 500,000 500,000 500,000 500,000 2,870,000
Sewer Jet Truck W&SS-012 n/a 190,000 190,000
Multiquip Portable Generator W&SS-041 n/a 10,000 10,000
Mill and Overlay WatedSewer Repairs W&SS-051 n/a 50,000 50,000
Portable Generator W&SS-052 n/a 10,000 10,000
Televising and Electroscan Equipment W&SS-053 n/a 225,000 225,000
RubberTired Excavator W&SS-056 n/a 245,000 245,000
Step Van W&SS-O60 n/a 80,000 80,000
RadioMeterReadingSystem W&SS-063 n/a 355,000 355,000 355,000 100,000 1,165,000
Utility Building Locker Room RepaidUpgrades W&SS-065 n/a 100,000 100,000
Valve Replacement/Watermain Lining W&SS-O66 n/a 100,000 100,000
Tractor Loader Backhoe W&SS-070 nla 150,000 150,000
I-394 Inflow/Infiltration Project W&SS-074 nla 300,000 300,000 600,000
Sewer Flow Meters W&SS-076 n/a 35,000 35,000
Asset Management Software W&SS-079 n/a 30,000 30,000
Asset Management Equipment W&SS-080 n/a 20,000 20,000
800 MHz Radios W&SS-081 n/a 40,000 40,000
Water&Sewer Systems Total 1,670,000 1,810,000 895,000 935,000 610,000 5,920,000
GRAND TOTAL 1,67Q000 1,810,000 895,000 935,000 610,000 5,920,000
Page 97
Project# wc�ss-��1 Department Water&Sewer Systems
Contact
Project Name Sanitar Sewer& Water Line Re air/Recon.
y P Type Unassigned
Useful Life
Category Water and Sewer
,p__ _.._ __ _ _-- Priority
Descn tion �
_ — — __ -- - - _--
Major repairs and reconstruction on the City's sanitary sewer and water systems as needed. Repairs will be done in conjunction with the City's Pavement �
Management Program(See S#1).
-- _ - - - _ _ _- -- --
- --- � - -- - -
— _ _ _ _-
�Justtfic ation
. - —=:
ITo maintain City's water mains and sanitary sewer mains.
i -
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 870,000 500,000 500,000 500,000 500,000 2,870,000
Total 870,000 500,000 500,000 500,000 500,000 2,870,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 870,000 500,000 500,000 500,000 500,000 2,870,000
Total 870,000 500,000 500,000 500,000 500,000 2,870,000
Project# w8iss-�IZ Department Water&Sewer Systems
Contact
Project Name Sewer Jet Truck Type Unassigned
Useful Life
Category Water and Sewer
- _ _ _--
_ Priority
Description �
-- — _ _ _ _ __—
;gh pressure sewer jeUrodder truck for the Utility Drvision,Unit 678 is an essential piece of equipment For mamline sewer cleaning. �I
-_ _ - - - - _ - - _ _
- _ _J
-_
Jushfication
—_ - - _ _ -- -_ __— __
Increased repair and maintenance expenditures on Unit 648,which will be I 1 years old. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 190,000 190,000
Total 190,000 190,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 190,000 190,000
'rp� 190,000 190,000
Page 98
Project# w8iss-041
Department Water&Sewer Systems
Contact
Project Name Multi ui Portable Generator
q P Type Unassigned
Useful Life
Category Water and Sewer
Priority
- — --
, Descripflon
-- — ___—�
--_ __ _—--- _ _--- _ __-- ____ __ __ 1
A Multiquip portable generator Unit 692,a 2010 portable generator.
- - —__-_ --
'Jusfification '
-_ — _
- --- --- - --
Increased repair and maintenance expenditures on Unit 692. l
_ - - - _ -_ -- --_ _ _-- - -
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 10,000 10,000
Total 10,000 10,000
Project# WBLSS-�SI Department Water&Sewer Systems
Contact
Project Name Mill and Overla Water/Sewer Re airs
3' p Type Improvement
Useful Life
Category Water and Sewer
Priority
- -- __------ -
DescripUon �
-- ----__ _ . - _
-- . __ __
Water and Sanitary Sewer repairs willl be made in conjuction with the annual Asphalt Overlay program.Repairs include but not limited to valve and hydrant
�ireplacement,manhole adjustments,manhole sealing,and pipe replacement.
Justi�ca6on -- - -- __ _ _ __ _ _ ._ _ _ - ---
� 1
_
- - -- - - —_ __-- --- _
��To maintain the City's sanitary sewer and water systems.
_ __ __ __ __-- . - __- __- _.-__ __ �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 50,000 50,000
'ra� 50,000 50,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water 8�Sewer Utility Fund 50,000 50,000
Total 50,000 50,000
Page 99
Project# WBLSS-O52 Department Water&Sewer Systems
Contact
Project Name portable Generator Type Equipment
Useful Life
Categor,y Water and Sewer
_ - - --_ _
Priority
Description '
__ J
-_ _ -- _ __ _ __ _---- _ ___- _ --�
Generator to replace Unit 692 a 2010 standby generator utilitized for emergency response.
— _ __ -
Justi icf afion - .� _ _ . —
'�__ --
___--- - - _ _ --- _ _ ___ ___ _ �
'Increased repair and maintenance expenditures on Unit#692 which will be eight years old.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 10,000 10,000
1'p� 10,000 10,000
Project# w&.�s-�53 Department Water&Sewer Systems
Contact
Project Name Televisin and Electroscan E ui ment
g q p 7'ype Equipment
Useful l.ife
Category Water and Sewer
__
Priority
�i Descnption
- --- -- - -
__ _ __ - - __
Sewer televising mainline computer and electronic equipment purchased with the televising truck will be five years old.The televismg equipment will be replaced
lalong w�th new Electroscan equipment.
_ _ _
Justi�caaon
If = _. _ _ ' __ _. _-- - - __-__ ___ ---- - -- ------ _--_ _- --
Update computer and electronic equipment that will televise and incorporate electroscan into the upgraded televising equipment.Enhanced sanitary sewer inspection '
,to identify,quantify and prioritize defects in the sanitary sewer system.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/VehicleslFurnishings 225,000 225,000
Total 225,000 225,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 225,000 225,000
T'p� 225,000 225,000
Page 100
Project# W&SS-056 Department Water&Sewer Systems
Contact
Project Name Rubber Tired Excavator Type Equipment
Useful Life 15 years
Category Water and Sewer
_ _ —__ _ -
Priority
,Description �
- --
_- - -- -- _ _ - - - _ _ _ - - _—
CRubber tired excavatar to replace Unit#671,a 2000 Caterpillar Excavator. �
- _ _ -
�Justificahon - lI
- -- - --J -
__ - -- -- ----- - - - --- - _
Increased repair and maintenance on Unit#671,a tractor backhoe that will be eighteen years old. �
_ -- - - - _- _ _ _ -_ - _ __- _
__ _
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 245,000 245,000
'rp� 245,000 245,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 245,000 245,000
Total 245,000 245,000
� Project# w�Gss-�6� Department Water&Sewer Systems
Contact '
Project Name Step Van
Type Unassigned
Useful Life
Category Unassigned
_ - - _ _.__ 1 Priority
Cescription �
--_ __ _ -
---. __ - _ _ - _ �
iStep Van for the UUlity Department to replace Unit#674,a 2002 Work Horse Step Van.
_ __ - _ - __ ._ -- - -
___ __ _
r Jushfication �
�� : _. _ - - ___ _ _-- --- _--- - -
Increased repair and maintenance expenditures on Unit#674.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 80,000 80,000
Total 80,000 80,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 80,000 80,000
Total 80,000 80,000
Page 101
Project# W&SS-063 Department Water&Sewer Systems
Contact
Project Name Radio Meter Reading System
Type Equipment
Useful Life
Category Water and Sewer
- - — - —
Priority
Description �
_ -
_ __ __ _ _ _ _- _ -- -- - - ----- _ _ _
. . ---�
�Fixed base rad�o metering reading system for utility billing.
�- - - -- �
_ _ _ -- �
Justification
�_ _ .— _ _ _ _ ___— _— —_ _ __ - --
LExisting FCC radio frequency utihzed for reading city water meters has been banned by the FCC and city is forced to comply with the rule changes.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 355,000 355,000 355,000 100,000 1,165,000
Total 355,000 355,000 355,000 700,000 1,165,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility- 100,000 100,000
Operating
Water&Sewer Utility Fund 355,000 355,000 355,000 1,065,000
Total 355,000 355,000 355,000 100,000 1,165,000
Project# W&SS-065 Department Water&Sewer Systeins
Contact
Project Name Utility Building Locker Room Repair/Upgrades T
ype Unassigned
Useful Life
Category Unassigned
Priority
_ ---_ _--_ _— �
Description
. __
- - - -- - _ — --_ __ _ _— - _ _ _
�lity Building is the oldest maintenance building and is in need of locker room repairs and upgrades to meet current staffin
_ -- —_ _ __ _ g• _ _ �,
- - - -- _ __ . _
�Justification '
�UtiliTy buildinp locker room was designed�r a smaller staff levels.Currently utility division gas twelve staff utilizing a locker room that was designp for a staff size I
oF 6-8 utilrt o erators.The health and safe issue with the current locker room size and confi uration is that staff is forced to use the shower stall s ace as a
ichangmg and clothing locker area.This�s a problem for utilrty staff that needs to shower after a day of sewer system maintenance.Staff also is using the shop/garage
area for lockers and changing area.
__ ___ -_ ___ _ -- -- ___ �
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 100,000 100,000
'ro� 100,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 100,000 100,000
Total 100,000 100,000
Page]02
Project# W&SS-066 Department Water&Sewer Systems
Contacl
Project Name Valve Re lacement/Watermain Linin
P g Type Unassigned
Useful Life
Category Unassigned
_ Priority
Description I
— _- -- -- _-- --- - ____ --- _—_ _-----
Watermam valve replacement and strategic wateimain lining associated with future overlay pro�ect. _�
_ _ -- —_ _
�- - — --
�Justification
_—_ � - _ _ _ _ _ _ _— __ —
Includes the cost to replace leaking water valves and line minor portions of the public watermain in conjunction with the future overlay program. �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 100,000 100,000
Total 700,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 100,000 100,000
Total 100,000 100,000
Project# wc�ss-�70 Department Water&Sewer Systems
Contact
Project Name Tractor Loader Backhoe Type Unassigned
Useful Life
Category Unassigned
. __ _ __ Priority
Description ��
�
_ _ - _ _ - - — _ _ _ _ __ -- �
,Tractor loader backhoe to replace Unit 675,a 2004 Cat tractor loader backhoe.
_ _ _-- _ _ --- _- — _-�
— —
�Jushtication �
- - — __ _ _ _ —_ — __ _
�Increased repair and maintenance expenditures on Unit 675,which will be 14 years old.
_ _ ___ _--- _ _ _— -- _ . _ _ _ _ -- - - _ �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 150,000 150,000
Total 150,000 150,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 150,000 150,000
'rp� 150,000 150,000
Page 103
Project# w8iss-074 DepartmenY Water&Sewer Systems
Contact
Project Name I_394 Inflow/Infiltration Project T
ype Unassigned
Useful Life
Category Unassigned
Priority
_ _- - __�
�Description
. - _ - _ _._ - .__ - --- __ _ -- - �
Reduce inflow/mfiltration in the I-394 sewer shed distnct.
r _ - -- � -- _ _ — _ - -- --
Jushfication
- ___ _,. _.
__ --- __ _ _ _ _. _--- --- ___ ____
�The sanitary sewer in the I-394 sewer shed is cunently near capacity following large storm events.The reduction of UI in the sewer shed is necessary in order to
continue to allow future redevelopment of the comdor. J
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 300,000 300,000 600,000
Total 300,000 300,000 600,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 300,000 300,000 600,000
Total 300,000 300,000 600,000
Project# w&SS-�76 Department Water&Sewer Systems
Contact
ProjeM Name Sewer Flow Meters Type Unassigned
Useful Life
Category Unassigned
Priority
� Descripfion
� __ �
[� _ _ __ _ _ . _ _ -�
Portable sewer flow meters for monitoring inflow and infiltration in sanitary sewer system.
— _ _ -- - - -
� ___ �
'Justification
�� - _ - -- - _ _ -- ___ �
eplace older portable sewer flow meters to accurately monitor sewer flows.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 35,000 35,000
Total 35,000 35,000
Page 104
Project# W&SS-�79
Department Water&Sewer Systems
Contact
Project Name Asset Management Software T e E ui ment
YP 9 P
Useful Life
Category Water and Sewer
Priority
� Descripfion �
�__ -- --____ __ __ _ -----_ --- - __ -- _ ___ _ __ __ __-
Conversion from the existing Cartegraph Software Navigator desktop software to a web-based Asset and Work Managemement Software with mobile component.
Includes software purchase,data migration,implementation,and training.50%of purchase from the Vehicle and Equipment CIP,25%Water and Sewer CIP an�
25%from the Storm Sewer CIP.
- -_ _-- -- _ _
. . _____ _ _----
---_—___ -_ __
- --- -- --
� Jushfication
:__ _ -
�— _ __ - -- -----_ __ _ _
— _ --- --_ ---- -- _--- - -
The move to a mobile web-based work management system will improve efficiencies within the organization and service delivery to external customers.The software
will be utilized to manage routine tasks and business workflows,track inspections and maintenance,and assist in programming future expenditures. �
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 30,000 30,000
'rp� 30,000 30,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 30,000 30,000
Total 30,000 30,000
Project# w&SS-�g� Department Water&Sewer Systems
Contact
Project Name Asset Mana ement E ui ment
g 9 p Type Equipment
Useful Life
Category Water and Sewer
Priority
-- _ - -- _
Descripfion _''
___ _ �
_ __ _ - ----_ _ - _— — ___ __
__ --
iPurchase of hardware,mobile devices and equipment necessary to support the implementation of the new mobile web-based Asset and Management Sofrware system.
__
- _ _ __ _ — _ __ ---
�I Jushfication
_-- - = _--�_
- - -- -- --- _ _ _ ___- -
___ _
The move to a mobile web-based work management system will improve efficiencies within the organ�zation and service delivery to extemal customers.The software I
will be utilized to manage routine tasks and business workflows,track inspections and maintenance,and assist in programming future expenditures.
_�_ _- -- _ _ __— __ __ _ — _- _---- —_ _ _ __J
Expenditures 2017 2018 2019 2020 2021 Total
EquipNehicles/Furnishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 20,000 20,000
Total 20,000 20,000
Page 105
Project# w&SS-�$1 Department Water&Sewer Syste�ns
Contact
Project Name g00 MHz Radios Type Equipment
Useful Life
Category Water and Sewer
Priority
_ -- -- i
Description
---- --
� .__ —. _ _ _- -_ ._ _ __ _ _
5-800 MHz portable radios and accessories to be purchased in 2019.
— __ — _ _. _ _ _ - -- —-�
;—__ -_- J
Justificaaon
�-- - -=
_ _ __ _ ---- __ __ __ _ _ _ _ _ -
Replace current raidos purchased in 2008.Hennepiin County will no longer support the current 800 Mhz radios past December 31,2019.New radios P25 Phase I�,
modulation compliant.
Expenditures 2017 2018 2019 2020 2021 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2017 2018 2019 2020 2021 Total
Water&Sewer Utility Fund 40,000 40,000
Total 40,000 40,000
Page 106
city of
Old ert
�
�ra e
Capital Improvement Program 2017-2021
Streets Section
The City of Golden Valley has over 120 miles of streets. The city is responsible for 90 miles of tocal
streets. Municipal State Aid streets account for the remainder or 30 miles. As streets deteriorate,
roads need to be reconstructed or repaired.
The City's Pavement Management Program has outlined all roads to be reconstructed by the year
2021. The bond payments on the debt will go until 2042. This plan has been included in the five year
program.
The revenue sources are city-wide street reconstruction debt levy, state aid debt, benefiting property
owner assessments and Municipal State Aid Allotments.
107
City of Golden Valley, Minnesota
Capital Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
_-- - _
Streets `
Pavement Management Program S-001 n/a 2,840,000 3,330,000 3,870,000 4,200,000 4,450,000 18,690,000
Pavement Management Overlays S-013 nla 200,000 300,000 500,000 500,000 1,500,000
TH 100 Pedestrian Bridge Walk Maintenance 5-014 n/a 70,000 70,000
Municipal State Aid(MSA)Street Maintenance 5-017 n/a 125,000 125,000 125,000 125,000 125,000 625,000
Streetscape and City Hail Complex Renovation S-018 n/a 100,000 50,000 150,000
MSA Debt Service S-019 n/a 196,175 196,385 196,385 196,175 189,000 974,120
Sidewalk and Trail System Upgrades S-030 n/a 100,000 100,000 100,000 100,000 400,000
Xenia Avenue and Golden Hills Dr Improvements S-031 n/a 1,200,000 1,200,000
Auto CAD Application S-032 n/a 12,100 12,100 12,100 12,100 12,100 60,500
Cartegraph Street Management Software S-034 n/a 40,000 20,000 20,000 10,000 10,000 100,000
Comprehensive Plan Update S-035 n/a 195,000 195,000
Retaining Wall Repairs S-036 n/a 100,000 100,000 100,000 100,000 100,000 500,000
Debt Service Payments(xenia/Golden Hills) S-037 n/a 120,000 120,000 120,000 120,000 480,000
Highway 55 West Redevelopment Project S-038 n/a 1,615,000 1,615,000
TH 55 and Schaper Dr Flashing Yelloe Arrows S-039 n/a 40,000 40,000
Streets Total 6,693,275 4,053,485 4,843,485 5,403,275 5,606,100 26,599,620
GRAND TOTAL 6,693,275 4,053,485 4,843,485 5,403,275 5,606,100 26,599,620
Page 108
Project# S-��l
Department Streets
Contact
Project Name pavement Mana ement Pro ram
g g Type Improvement
Useful Life
Category Street Construction
�-- - - _
Priority
�escription i
- __ - - __ _—__ _— - _—_ _ _ _
On-gomg program to manage the City's street system m a long term cost effective manner by reconstructing deficient roadways to City standards.
- - - -- - -
___ -_ .__
�Jus�h'fication �
�-- -- ____ _-
- __ —— -__ . .- _ _ -_ _ _ _ ----
Re tiuction of sub-standard roadways to City standards followed by proper and effective maintenance will reduce the long range costs of street maintenance�
2017-1 11 miles
2018-130 miles
2019-1.51 miles
�2020-1.64 miles
2021-1.74 miles
_ _ - --- ---- __ __ _--- _ _ _ - _—_ _-- __-_ _-- _ _
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 2,840,000 3,330,000 3,870,000 4,200,000 4,450,000 18,690,000
Total z,840,000 3,330,000 3,870,000 4,200,000 4,450,000 18,690,000
Funding Sources 2017 2018 2019 2020 2021 Total
Special Assessment Bonds 2,840,000 33,300,000 3,780,000 4,200,000 4,450,000 48,570,000
Total 2,840,000 33,300,000 3,780,000 4,200,000 4,450,000 48,570,000
Project# 5-013
Department Streets
Contact
Project Name pavement Mana ement Overla s
g Y Type Unassigned
Useful Life
Category Street Construction
_- __
_-- --
Priority
;Description �
�- - ____ -
_ ___ _ _ _ _ _. . _ __ _ __ - -
Pavement overlays for streets constructed to City standards to maximize the lifespan in a long teim cost effective manner.
�Future projects determined annually based upon needs.
Jushfication � - - _ -
_ _ -_
�Provides high quality street system in a long term cost effective manner in accordance with the Payement Management Policy.
_- _ _ _ _ — _ - _ _ _ __ _ _ _ — �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 200,000 300,000 500,000 500,000 1,500,000
Total 200,000 300,000 500,000 500,000 1,500,000
Funding Sources 2017 2018 2019 2020 2021 Total
Street Improvement Fund 200,000 300,000 500,000 500,000 1,500,000
Total 200,000 300,000 500,000 500,000 1,500,000
Page]09
Project# 5-�14
Department Streets
Contact
Project Name TH 100 Pedestrian Bridge Walk Maintenance T
ype Unassigned
Useful Life
Category Street Construction
� - -- - I
Priority
i Description
_ _ _ _ _ - _ _ _ _ __
Replace approach sidewalk on the Golden Valley side of the Trunk Highway 100 Pedestrian Bridge;and repaint and seal hand railings on entire bridge. _�
_ -_ _-
--- _ - _ _ _ -
_ - . _ _ _ _
�Justification �
�� - __ - _ _ _ _ _ _ _ __ -- --
,The existing concrete sidewalk on the approach to the TH 100 Pedestrian Bridge has settled and created a large gap between concrete panels,resulting in a hazardous
�condition for bicyclists using the bridge.Replacement walk will not have a center joint and will be reinforced to minimize settlement.The railings have been subject I
to repeated graffiti and must be repainted and sealed.
_ __ _ __ __ _ --- _ ---- __ _ -- _ -_ ___ _. _ --_ _-__ �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 70,000 70,000
Total 70,000 70,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 35,000 35,000
(6100)
City of Crystal 35,000 35,000
Total 70,000 70,000
Project# 5-�17
Department Stteets
Contact
Project Name Munici al State Aid MSA Street Maintenance
p � � Type Unassigned
Useful Life
Category Unassigned
_- -- __ -
Priority
�Description J
- _ - - - - _ _ _ _ _ _ _ _ _ _
�Allotment of a portion of the City's annual Municipal State Aid construction funds to be used for maintenance of designated State Aid routes,including materials �
'and salaries.
i-_-
_ _ _ -- - -- _ _ _ __ _ _-- __ - ;
�Jushfication �
_ -_ -_
� _ _ _ _ __ _-- �
Maintenance of Municipal State Aid street system.
Expenditures 2017 2018 2019 2020 2021 Total
Other 125,000 125,000 125,000 125,000 125,000 625,000
Total 125,000 125,000 125,000 125,000 125,000 625,000
Funding Sources 2017 2018 2019 2020 2021 Total
Municipal State Aid(MSA- 125,000 125,000 125,000 125,000 125,000 625,000
5100)
Total 125,000 125,000 125,000 125,000 125,000 625,000
Page 110
Project# S-�ig
Department Streets
Contact
Project Name Streetsca e and Cit Hall Com lex Renovation
p 3' p Type Unassigned
Useful Life
Category Street Construction
_ Priority
_ --
Description
---
---�
, _ - --- --- - __ _ _ - --- __- _ - _
Comprehensive rehabilitation of the Winnetka Avenue Streetscape and City Hall Complex streetscape landscape and pedestrian facilities based upon the 'i
recommendation in the 2012 Streetscape Asset Management Plan. I
- _ - - --- _ _ __ _ __ - . �
�Jushfication �
�2017 Rehab retaining wall planters
2018 Rehab bollards
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 100,000 50,000 150,000
Total 100,000 50,000 150,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 100,000 50,000 150,000
(6100)
Total 700,000 50,000 150,000
Project# 5-019
Department Streets
Contact
Project lVame MSA Debt Service Type Unassigned
Useful Life
Category Unassigned
___ _ _ Priority
-
Description
�- - _ _�
� - _ . _ _ __ __ _ 1
Debt Service payment on Municipal State Aid Bonds ending in 2027.
--
--_ - -- __
-- - _
�Jushfication
�_
__ � _
- - - - -
LNecessary funding for State Aid roads to construct projects needed for safety. �
Expenditures 2017 2018 2019 2020 2021 Total
Other 196,175 196,385 196,385 196,175 189,000 974,120
Total 196,175 196,385 196,385 196,175 189,000 974,120
Funding Sources 2017 2018 2019 2020 2021 Total
Municipal State Aid(MSA- 196,175 196,385 196,385 196,175 189,000 974,120
5100)
Total 196,175 196,385 196,385 196,175 189,000 974,120
Page 111
Project# 5-�30
Department Streets
Contact
Project Name Sidewalk and Trail System Upgrades T
ype Unassigned
Useful Life
Category Street ConstrucYion
_ - _-
Priority
Descripfion _ �
_.___ _ _ — _ _ _____ _ _ _ - --- - ---- - _ _— _— -__ _
rUpgrading the deficient portions of the City's sidewal and trail systems to current standards including compliance with accessibility standards.This project also
�includes construction of new sidewalks and trails throughout the City consistent with the Comprehensive Transportation plan.
_ _ _-- - _ _.— _ - - - - - _ _ _ _- - _. _ -_ ___
_ — _�
Jushfication
�'Completion of the City's sidewalk and trail system as identified in the Comprehensive Transportation Plan will provide greater mobility for non-motorized
transportation wrthin the City that is fully accessible far users of all physical abilities. �
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 100,000 100,000 100,000 100,000 400,000
Total 100,000 100,000 100,000 100,000 400,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 100,000 100,000 100,000 100,000 400,000
(6100)
Total 100,000 100,000 100,000 100,000 400,000
Project# 5-�31
Department Streets
Contact
Project Name Xenia Avenue and Golden Hills Dr Im rovements
p Type Improvement
Useful Life
Category Street Reconstruction
� __ --- . ___ Priority
� Description �
� _ __
_. — _ _ _ _ __ _ __ _�
�Modification to streets,traffic signals and pedestrian system at and near the intersection of Xenia Avenue and Golden Hills Drive.
__ - _ _
_ _ _ _
_.__ --- -
,Justification �
�—_ - _ __ - _'
_ _ _ ____ . _ ____ __ - - ___ _--- _--_ _—
Modification to the traffic signals,street system and pedestrian system in the vicinity oF Golden Hills Drive and Xenia Avenue to accommodate redevelopment in the I
area.The proposed improvements include the railroad crossing improvements,installation of sidewalk on the north side of Golden Hills Drive between the raikoad
'tracks and Colorado Avenue,completing the sidewalk on the south side of Golden Hills Drive at the railroad crossing and a pavement overlay of portions of Xenia
Avenue,Laurel Avenue and Golden Hills drive.
�_.
Expenditures 2017 2018 2019 2020 2021 Total
Other 1,200,000 1,200,000
1'0� 1,200,000 1,200,000
Funding Sources 2017 2018 2019 2020 2021 Total
Special Assessment Bonds 1,200,000 1,200,000
Total 1,200,000 1,200,000
Page 112
Project# 5-�32
Department Streets
Contact
Project Name AUtO CAD A lication
PP Type Unassigned
Useful Life
Category Unassigned
�_._ __ Priority
Description I
�
__. _
-- -- -- -- _ -- --- - . __ ---
CAutoCAD is a CAD design,draftmg,modehng architectural drawing,and engineering software that helps with design and as-built drawings of infrastructure. �
- - - � __ _ _ _ _ - -
__ _ _ -
,J su h�cation
�is software is the maintenance and upgrades for sofiware to manage our street and utility systems. �,
Expenditures 2017 2018 2019 2020 2021 Total
Other 12,100 12,100 12,100 12,100 12,100 60,500
Total 12,100 12,100 12,100 12,100 12,100 60,500
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 12,100 12,100 12,100 12,100 12,100 60,500
(6100)
Total 12,100 12,100 12,100 12,100 12,100 60,500
Project# 5-�34
Department Sh-eets
Contact
ProjeM Name Carte ra h Street Mana ement Software
g p g Type Unassigned
Useful Life
Category Unassigned
_.__ _ _ _ - �
Priority
Descripfion �
- -- -- _�
-- - - _ ___ ----- - -- - - --- __ __ -
Implementation of Cartegraph Asset Management software applications to manage public utilities,roadways,bridges,sidealks,trails and utilities. ,
In 2018,a new version will be purchased.
_ _ _ __ _--_ _--
_-_ . _ _ -_
- _ . __- _-- _-
_ __ __-- - -
--
�Justification ��
- - - _- _ P _-
_ _ _ __ _---- -_ -- --.
Infrastructure management software to maintain data on all spublic infrastructure including capiital and maintenance costs.In 2018,software u date and hardware �
are included.Future applications include bridges,sidewalks and trails,call tracking,and others.
Expenditures 2017 2018 2019 2020 2021 Total
Other 40,000 20,000 20,000 10,000 10,000 100,000
'j'p�] 40,000 20,000 20,000 10,000 10,000 100,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 40,000 20,000 20,000 10,000 10,000 100,000
(6100)
Total 40,000 20,000 20,000 10,000 10,000 100,000
Page 113
Projecl# s-�35
Department Streets
Contact
Project Name COIYl rehensive Plan U date
P P Type Unassigned
Useful Life
Category Unassigned
__ _-- -- ___ __ -
Priority
Description '
_ __ - _ _ _ _ _ _ __ _ -- -_ - ___ _.
IAll chapters of the Comprehensive Plan needs to be updated by 2018.
-_
_ - --- -
�_ _-_ __ _ _ _
i�Justification �
_ -_ - ___
__ -_--- _ ----- - - -___ _- - __ __ _-- _-
IThis comprehensive plan involves updating the land use,transportation,water resources,parks and trails,housing,resilience,economic competiveness and
implementation sections.
An additional$127,500 was added in 2017.
Expenditures 2017 2018 2019 2020 2021 Total
Other 195,000 195,000
Total 195,000 195,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 195,000 195,000
(6100)
Total 195,000 195,000
Project# 5-036
Department Streets
Contact
Project Name Retainin Wall Re airs
g p Type Maintenance
Useful Life
Categor,y Unassigned
_ _ _ __ --
Priority
� Description I
_ . _ - __ _ _ -- - _ __ _ __ - - _ _ -
--
Repair and replacement of retaining walls and other assets within the city right-of-way.
_ - . - -- - - -- --�
i� -_ _ _ -
Justification
Retairun walls need to be r aired within t �
- --
I � g ep ' he city right-of way.
Expenditures 2017 2018 2019 2020 2021 Total
Construction/Maintenance 100,000 100,000 100,000 100,000 100,000 500,000
Total 100,000 100,000 100,000 100,000 100,000 500,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 100,000 100,000 100,000 100,000 100,000 500,000
(6100)
Total 100,000 100,000 100,000 100,000 100,000 500,000
Page 114
Project# 5-�37
Department Streets
Contact
Project Name Debt Service Payments (xenia/Golden Hills) Type Unassigned
Useful Life
Category Unassigned
C.__-.p Priority
Descn hon �
---- _ _ _-__ _ - _ - _- _- - -- - _- - �
�onds were sold to help finance the infrastruture improvements for Xenia Avenue and Golden Hills Drive.
_ _ _ --
___ _ _
---- -- --
__ - --
Jushficadon �
_ - - _ _ -- -__- - - - __ _ _ __— _
Debt Service payments for the Xenia Avenue and Golden Hills Drive project.This project will be 100%assessed. �
� -- _ - -- -- - -- _ _ _ _ _ _ _ __ - ---
Expenditures 2017 2018 2019 2020 2021 Total
Debt Service Payments 120,000 120,000 120,000 120,000 480,000
Total 120,000 120,000 120,000 120,000 480,000
Funding Sources 2017 2018 2019 2020 2021 Total
Capital Improvement Fund 120,000 120,000 120,000 120,000 480,000
(6100)
Total 120,000 120,000 120,000 120,000 480,000
Project# S-�3g
Department Streets
Contact
Project Name Highway 55 West Redevelopment Project T
ype Improvement
Useful Life
Category Street Construction
Priority
�Descrip6on �
_- --
_ --- - --
Rehabilitation and realignment of Golden Valley Road and Decatur Avenue,installation of pedestrian amenities and burial of overhead utilities.
_ _ _ __ _ _ - - - __— _ __ - __ _�
_ __ _-- -
Jus6fication �
� -- _ _ --
-- ___ _.. -- _ _
----_ _ _- -- __
Due to a development project in the vicinity of this intersection and establishment of a Tax Increment District,infrastructure upgrades are proposed on Golden Valley
�Road,Decatur Avenue,and 7th Avenue.New development will bring increased traffic and pedestrians to the area.The project aims to maintain safety and establish 'i
an aeshetic and pedestrian friendly corridor. I
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 1,615,000 1,615,000
Total 1,615,000 1,615,000
Funding Sources 2017 2018 2019 2020 2021 Total
Special Assessments 500,000 500,000
Tax Increment Bonds 1,115,000 1,115,000
Total 1,615,000 1,615,000
Page 115
Project# 5-039
Department Streets
Contact
Project Name TH 55 and Schaper Dr Flashing Yelloe Arrows Type Unassigned
Useful Life
Category Street Construction
_-_ - _ — Priority
. -
�Description _�
-- _ --- - -- — _ _ —�
�stallation of flashing yellow arrows for left turns from Highway 55 at Schaper Drive.
- --
�-- - -_ _ - -- - -
i Justification �
--- - _.
_ ___ _ _ - - - — - _ __ _ _ _ _ -
Flashuig yellow arrows will reduce delay for left turning vehides on Highway 55 onto Schaper Drive and the South Frontage Road during non-peak traffic hours. �
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 40,000 40,000
Totat ao,000 ao,000
Funding Sources 2017 2018 2019 2020 2021 Total
Municipal State Aid(MSA- 40,000 40,000
5100)
Total 40,000 40,000
Page 11�'A
��tyof
olden
g
va e
Capital Improvement Program 2017-2021
Douglas Drive Corridor Section
The City of Golden Valley initiated a study of the Douglas Drive Corridor that took place in 2008 and
2009. Following that study the Housing and Redevelopment Authority (HRA) took initiative to develop
a Redevelopment Plan for the segment of the corridor from Medicine Lake Road to Trunk Highway
55. The City's Comprehensive plan is in conformance with the Redevelopment Plan.
In early 2011, Xcel Energy and in 2013, Centerpoint began collection of the franchise fee was
ordered by the City Council which will assist in paying for the City's portion of the project. Hennepin
County, MnDOT, Transit for Livable Communities and the City are working together to fund and
complete this study.
116
City of Golden Valley, Minnesota
Capital Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
_ __ _ _ _ _
iDouglas Drive Corridor �
Douglas Drive Improvements DD-001 n/a 3,000,000 3,000,000
Debt Service Payment DD-002 n/a 160,500 373,215 368,715 369,165 369,515 1,641,110
Douglas Drive Corridor Total 3,160,500 373,215 368,715 369,165 369,515 4,641,110
GRAND TOTAL 3,160,500 373,215 368,715 369,165 369,515 4,641,110
Page 117
Project# DD-��1 Department Douglas Drive Corridor
Contact
Project Name Dou las Drive Im rovements
g p Type Unassigned
Useful Life
Category Street Construction
-- --
Priority
-- -
Description �
-- - - -
�- _- --_ --- - -- _ _ _ _- --_ -
�Reconstruction of Douglas Drive to current standards Franchise Fees will pay for any internal or extemal bonowing needed to fund the project. l
_ __ _ __— _ _ --- __ --J
� _.__ ___
Jushfication J
_ _ __
_ __ _ _ __ _ — - __ _--
iReconstruction to current state and county standards to address pedestrian safety and promote multi-model transportation.This is a cooperative agreement with �
Hennepin County. �
iIn July 2008,the Ciry officially began a study of the Douglas Dr corridor.The study,funded by a grant awarded by Transit for Livable Communities in partnership �
with the Federal Highway Administration,and the Minnesota Department of Transportation,focused on a redesign of Douglas Dr and on establishing a long-term
'vision for the corridor.
Expenditures 2017 2018 2019 2020 2021 Total
Infrastructure Improvements 3,000,000 3,000,000
Total 3,000,000 3,000,000
Funding Sources 2017 2018 2019 2020 2021 Total
Douglas Drive Corridor Capital 3,000,000 3,000,000
Improvement Fund
Total 3,000,000 3,000,000
Project# DD-��2
Department Douglas Drive Comdor
Contact
Project Name Debt Service Pa ment
3' Type Unassigned
Useful Life
Categor,y Unassigned
Priority
� Description .. ._ �
--_ —_
� -- _ _ __ _ _ _ ___ -- -_ __ ___�
Bonds were sold to help fmance the infrnstruture improvements for pouglas Drive.
-- _ - -- --- — --
�Justifca6on
-:_-- -_
-
_ _ _ _ _ --- --
Debt Service payments for the Douglas Drive Corridor Improvements.All payments will be made with Franchise Fees and not with a lery.
- -- _ _ __ _ __ _ __ __ _ -— - -�
Expenditures 2017 2018 2019 2020 2021 Total
Debt Service Payments 160,500 373,215 368,715 369,165 369,515 1,641,110
Total 160,500 373,215 368,715 369,165 369,515 1,641,110
Funding Sources 2017 2018 2019 2020 2021 Total
Franchise Fees 160,500 373,215 368,715 369,165 369,515 1,641,110
Total 160,500 373,215 368,715 369,165 369,515 1,641,110
Page 118
city of
olden
�
va e
Capital Improvement Program 2017-2021
Appendix Section
119
Exhibit A
Special Assessment Policy
for
The City of Golden Valley
January 17, 1995
Amended February 21, 1995
Amended June 7, 2005
Amended July 18, 2006
Amended January 20, 2009
General
Minnesota State Law, Chapters 429.010 to 429.11, provides municipalities the ability to
make public improvements such as instaflation of sanitary sewer, water, storm sewer,
sidewalks, and street improvements (including grading, curb and gutter, surfacing, and
lighting). The procedures that Cities must follow, including reports, notices, and public
hearings, are well defined within the laws.
The Statute allows municipalities to assess all or portions of the costs of any
improvements to property owners based on the benefits received from the project. The
Statute is not specific regarding the determination of benefits to a property, or how to
apportion the costs to the benefiting properties. Rather, the law makes the municipality
responsible for developing an equitable method of cost sharing among the benefiting
property owners.
The purpose of this special assessment policy is to provide a guide, to be used by City
Staff, for preparing assessment rolls for approval by the City Council. This policy is
meant to assure uniform and consistent treatment to all properties within the City as
improvements occur.
The special assessment policy will not cover all possible assessment situations. Special
cases and variations of standard cases that are not specifically discussed under this
policy will be evaluated during preliminary project studies, and assessments will be
determined that do not violate the benefit principles as required by Statute.
No special assessments will be levied against designated floodplains, municipal storm
water ponds or wetland areas on private property as determined by criteria in the
Wetland Conservation Act of 1991 and the Minnesota Department of Natural
Resources. The limits of wetlands will be determined by the City on a case-by-case
basis at the time of preliminary project design and feasibility report preparation.
No special assessments will be levied against railroad, county highway or state highway
rights-of-way. Properties fronting County Roads and County Highways will be subject to
special assessments for reconstruction projects based upon this policy.
i2o
Special assessments levied by the City will include an administrative fee, to be
established annually by ordinance, to finance indirect costs associated with the
assessment that are incurred by the City.
Sanitary Sewer and Water Main Assessments
Reconstruction and Repairs
No special assessments will be levied for repair and reconstruction of existing
sanitary sewer and water main systems, except for properties that have not been
previously assessed for these utilities.
For properties not previously assessed that are adjacent to sanitary sewer or
water main reconstruction projects, the amount of special assessments will be
calculated on a case-by-case basis at the time of preliminary design and
feasibility report preparation.
Property owners are responsible for maintenance, repair and replacement of
sanitary sewer services from, and including the connection to the main, and the
building being served. Pavement Management street reconstruction projects will
include an opportunity for property owners to reconstruct or repair their sanitary
sewer services. All costs, including construction, administration and other indirect
costs, will be specially assessed to the property being served by the sanitary
sewer service.
The City is responsible for maintenance, repair and replacement of water
services from the connection to the water main up to and including the curb stop
or valve on the service line. The property owner is responsible for maintenance,
repair and replacement of the water service from the connection of the service
pipe to the valve or curb stop, to the building being served.
New Construction
In instances where property is developing or redeveloping, public sanitary sewer
and water main may need to be installed. The construction of City sanitary
sewer, water mains and storm sewer to serve these properties will be
constructed as public improvement projects, unless the City opts to have the
developer design and construct the improvements. The developer of such
properties will be responsible for the entire cost of public utilities, including
construction, administration and other indirect costs, whether construction is
performed as a City Improvement Project or by the developer.
At the time such a development project is proposed, the Public Works
Department will determine if the project is to be constructed publicly or privately.
If the utility installation is to be constructed privately, the developer will be
responsible for preparing construction plans and specifications consistent with
City standards. These construction plans and specifications must be reviewed
and approved by the Public Works Department. The utility installation must also
be inspected by the Public Works Department during construction. The
developer will be responsible for 100% of the costs of City construction
121
observation and plan review, which will be billed directly to the developer. Any
unpaid costs incurred for these services will be assessed against the developing
properties. An irrevocable letter of credit must be posted by the developer in an
amount equal to 150% of the estimated construction costs to ensure timely
completion of the project.
If a public sanitary sewer or water main project is to be installed as a City
Improvement Project, the developer will be responsible for 100% of the direct
and indirect costs incurred by the City. These costs may include, but are not
limited to: feasibility report preparation, preliminary survey, preliminary design,
final design, construction staking, construction observation, as-built surveying
and drafting, and administrative and legal costs. The developer may elect to
have these costs assessed against the property being developed or pay the
costs directly to the City.
Storm Water Drainage
Street Storm Sewer
No special assessments will be levied for construction or reconstruction of storm
sewer systems within the City right-of-way as part of the Pavement Management
Program. However, in instances where storm sewer construction is incorporated
into Pavement Management Projects to resolve rear yard drainage issues, as
discussed in this policy, the costs associated with these improvements will be
specially assessed to the benefiting property owners.
In instances where storm sewer installation is required for development and
redevelopment projects, it shall be specially assessed to the property being
developed according to the Sanitary Sewer and Water Main Assessments
section of this policy.
Rear Yard Storm Sewer
In certain instances, storm sewer is necessary in rear yard areas to correct
existing drainage problems. City staff will visit such problem areas at the request
of a homeowner to evaluate the situation and provide engineering assistance to
encourage property owners to remedy the drainage problems without City
involvement.
If a property owner or owners cannot remedy the rear yard drainage problems,
they may petition the City for installation of storm sewer. Upon receiving a
request for petition for rear yard storm sewer, engineering staff will determine the
properties that contribute storm water runoff to the problem area. The petitioner
must then circulate the petition to the contributing property owners for signatures.
Each contributing property owner must be made aware that special assessments
will be levied against their property for the corrective storm sewer work. A
minimum of 35% of the contributing property owners must sign the petition for
the City Council to consider the project. Upon receipt of the petition and after a
public hearing, the City Council may either deny the request or order the storm
sewer improvements. If the improvements are ordered, the contributing property
122
owners will be assessed for 100% of the construction and indirect costs for the
storm sewer installation. The method of assessment and the pro-ration of costs
will be determined on a project-specific basis.
Affected property owners in rear yard drainage projects will also be required to
dedicate all drainage and utility easements for the installation of the storm sewer
at no cost to the City. If the City must purchase or condemn in order to obtain the
easements, the entire acquisition costs will be included in the project costs for
assessment or the City may decline to undertake the project.
Street Improvements
Development/Redevelopment Proiects
When property is developed or redeveloped that has street frontage on
roadways that are scheduled for construction or reconstruction, the development
will be required to pay an escrow for the future street rehabilitation. The escrow
shall be based upon the assessment methods and land uses contained in this
policy, and shall be based on the assessment rates in effect at the time the
development is approved. The property or properties within the development will
not be specially assessed at the time street rehabilitation occurs.
Sidewalks
No special assessments will be levied for sidewalk construction that is in
accordance with the goals and recommendations of the City of Golden Valley
Sidewalk Committee. Requests for sidewalks that are not on the current
Sidewalk and Trail Plan will be forwarded to the Sidewalk Committee for
consideration. The Sidewalk Committee will forward its recommendations for the
requested sidewalks to the City Council, which will determine if the proposal
should be included in the Sidewalk Plan.
Street Liqhtinq
Street lighting is available to the residents of Golden Valley on a petition basis
according to the Street Lighting Policy.
New Street Construction
As property within the City develops or redevelops, it may be necessary to install
public streets. The Public Works Department will determine if the project is to be
installed publicly or privately. The procedures, policies, and requirements for
street construction will be the same as discussed for new sanitary sewer
installations.
Sea�coatinq
No special assessments will be levied for street sealcoating.
Bituminous Millinq and Overlavs
No special assessments will be levied for bituminous milling and overlays.
123
Street Reconstruction
Special assessments for street reconstruction projects will be in accordance with this
policy and Minnesota Statutes, Chapter 429. The total amount of the special
assessments will be a minimum of 20% of the street reconstruction costs not to exceed
the benefit received by each property. Special assessment rates for all land uses and
street classifications will be determined annually by ordinance.
Local Streets
1. Properties with residential and duplex residential land use, parks and other City-
owned properties subject to reconstruction will be assessed on a per-unit basis,
with one unit assessed to each property unless the property has the potential to
be further subdivided into two or more lots that each meets City subdivision
ordinance requirements. Such lots that may be so subdivided shall be assessed
for the number of units that equals the number of such lots that the property may
be subdivided into. However, residential properties that are subject to multiple
unit assessments will have all but one of such unit assessments deferred at the
time of the initial assessment. Such deferral will be made each year until such
time as the property is subdivided. At that time, the deferred unit assessments
shall be due.
2. Special assessments against properties with Multiple Dwelling land use will be
on a front-foot basis, with 100% of the frontage being improved subject to
assessment.
3. Properties with church, school and other tax exempt land uses will be assessed
on a front-foot basis, with 100% of the frontage being improved subject to
assessment.
4. All other land uses, including commercial, industrial, business and offices will be
assessed on a front-foot basis, with 100% of the frontage being improved subject
to assessment.
5. Residential properties adjacent to local streets being reconstructed may
participate in voluntary programs to have their driveways reconstructed and
sanitary sewer service repaired or reconstructed at contract unit prices.
Residents will be notified of these programs at informational meetings for each
street project. If a resident participates in these programs, staff will coordinate
construction with the contractor and will measure the quantities installed. The
construction costs, along with an administrative fee, established annually by
ordinance, will be assessed to the property owner.
6. When a corner residential lot has frontage on two local streets, it will be
assessed for one-half unit assessment for each street subject to reconstruction.
No more than one total unit assessment will be charged against a parcel for
street reconstruction. Corner properties adjacent to State Aid and local streets
will be charged one-half of the appropriate unit assessment at the time of
reconstruction of each street.
124
7. Corner residential properties adjacent to a local street and a state or county
roadway will not be subject to special assessments by the City for state highway
or county road reconstruction. However, these properties will be assessed the
appropriate number of unit assessments for the entire frontage along the local
streets when reconstruction occurs on the local street.
8. Residential properties adjacent to frontage roads of state highways witl be
considered to be on local or Municipal State Aid streets and will be assessed
consistent with this policy.
9. Special Assessments for properties not specifically covered in any of the above
cases will be addressed on a parcel-specific basis at the time of the feasibility
report.
State Aid Streets
1. Properties with residential and duplex residential land uses that have frontage on
a Municipal State Aid Street will be assessed on a per-unit basis. The per-unit
assessment rate will be approximately 25% of the standard residential rate for
properties on local streets. Assessments for oversized parcels with the potential
for subdivision are to be consistent with the previously discussed policy for local
streets.
2. Properties with Multiple Dwelling land use that front on a Municipal State Aid
Street will be assessed on a front-foot basis for the frontage being improved.
Properties with church, school, and other tax-exempt land uses that front on a
Municipal State Aid Street will be assessed on a front-foot basis for the frontage
being improved.
All other land uses, including commercial, industrial, business and offices that
front on a Municipal State Aid Street will be assessed on a front-foot basis for the
frontage being improved.
3. Special assessments for properties not specifically covered in any of the above
cases will be addressed on a parcel-specific basis at the time of the feasibility
report.
4. Residential properties adjacent to State Aid streets being reconstructed will be
given the option of having their driveways and sanitary sewer services repaired
or reconstructed under the same terms discussed in the local street
reconstruction portion of this policy.
Countv Roads
1. Properties with residential and duplex residential land uses adjacent to county
roads will be assessed according to the previously discussed methods for local
streets, except for corner lots with local streets, which will be assessed in full at
i2s
the time the intersecting local street is reconstructed. Special assessments to
residential properties will be at State Aid street rates.
2. All other land uses, including commercial, industrial, business, and tax-exempt
uses will be assessed on a front-foot basis, with 100% of the frontage being
improved subject to assessment. The assessment rate shall be the rates used
for State Aid streets as established by ordinance.
Low Income Senior Citizen and Disability Deferments
As required by Minnesota Statute, the City has a special assessment deferral policy for
low income senior citizens and disabled persons meeting all of the following criteria:
1. The property upon which the assessment is deferred must be homesteaded;
2. The property is owned by a person at least 65 years of age on January 1 st of the
year in which payment of the first installment of the subject assessment is due; or is
owned by a person who is retired due to permanent and total disability.
3. The applicant must have a "financial hardship" defined as:
a) An annual income at or below a level established annually by ordinance and;
b) The aggregate total of all special assessments levies will exceed one and one-
half percent (1-1/2%) of the applicant's annual income.
More information is available at General Services Office (763.593.8020).
Street Reconstruction Special Assessment Rates
Special assessment rates as discussed in this policy will be established yearly with the
Annual Fee Resolution. The rates will be based on the percentages of construction and
indirect costs as discussed above. Indirect costs are estimated to be 30% of the
construction costs and include administration, engineering, construction observation,
and legal fees. These rates will be subject to revision each year based on the actual
construction costs in the City from the previous year and for inflation based upon the
ENR Index for construction costs.
126
city of
o en
va e
eet r '
e at� on
�
.
a � nten
ance , an
e acement '
o � c
127
Message from the Manager
Motor vehicles and equipment are vital to day-to-day operations and service delivery
activities of the City of Golden Valley. The Public Works Department Vehicle
Maintenance Division is responsible for the stewardship of the City's fleet and
equipment assets and for meeting the fleet and equipment service requirements of City
departments. The division also develops fleet and equipment utilization and
replacement policies and schedules. The Vehicle Maintenance Division is an internal
service division of the Public Works Department of which the costs are allocated to the
other City departments for services provided.
The main goal of the Public Works Department Vehicle Maintenance Division is to
provide vehicles that are dependable, flexible, efficient, and responsive so that City
departments and divisions can operate in a cost-effective manner, minimizing the City's
vehicle equipment budget. The division is also committed to maintaining the City's fleet
and equipment so that the equipment is readily available for performing City operations
and keeping downtime to a minimum. The Public Works staff works with all departments
to embrace a philosophy which emphasizes the value of the importance of vehicle and
equipment availability, safety, reliability, and efficiency as well as preserving the City of
Golden Valley's major capital investment in fleet and equipment.
The City has established a capital replacement schedule to replace aging vehicle and
equipment. The vehicle and equipment replacement schedule, in conjunction with the
5-year Capital Improvement Program (CIP) and operating budgets, is used to plan any
major capital investment (the CIP reflects only those investments that exceed $10,000).
New equipment or other items, which are not part of a replacement schedule, are
funded annually out of the originating or requesting department's operating budget.
Approved February 2010
128
Purpose
The purpose of this policy is to assign responsibility to the City of Golden Valley's Public
Works Department Vehicle Maintenance Division for the operation, maintenance,
acquisition, and replacement of vehicles and equipment owned and operated by the
City, with the exception of vehicles and equipment used by Brookview Golf Course,
which are acquired, operated, maintained, and replaced by Golf Maintenance.
Policy
This policy is intended to ensure the availability of funds for the operation, maintenance,
acquisition, and replacement of fleet and equipment. Adherence to this policy will
provide effective and efficient fleet and equipment services for operating
departments/divisions to provide the best services for the residents and businesses of
Golden Valley. This policy establishes a sound business approach associated with the
evaluation of vehicle and equipment cost and capabilities, purchasing and funding
methodology, and making decisions on acquisition and replacement considering the
level of usage and demonstrated needs. Departments are asked to review vehicle and
equipment needs with a goal of increasing fuel efficiency, consideration of alternative
and/or flexible fuels, reducing the number of vehicles, conversion of the diesel vehicle
and equipment to bio-diesel, and promoting the anti-idling policy.
1. Vehicle and Equipment Replacement
A vehicle and equipment replacement schedule is maintained by the Public Works
Department Vehicle Maintenance Division and Finance Department. Replacement of
vehicle and equipment will generally follow the attached Equipment and Vehicle
Replacement Guidelines and are summarized as follows and listed as Attachment A:
a. Description
b. Unit number
c. Classification
d. Year purchased
e. Purchase price
f. Expected service life
g. Projected replacement cost
h. Annual fuel, maintenance, and overhead costs by vehicle classification
2. Vehicle and Equipment Maintenance
Vehicle and equipment preventative maintenance schedules are maintained by the
Public Works Department Vehicle Maintenance Division with the goal of keeping
vehicles and equipment available 95% of the demand time.
129
a. Generally, maintenance standards and procedures are as recommended by the
vehicle/equipment manufacturer or other recognized authority, or utilizing the
Public Works Department Vehicle Maintenance Division Preventative
Maintenance Schedules.
i. Daily maintenance inspections are performed by operators and
maintenance personnel using the Pre-operation Inspection Form.
ii. Scheduled maintenance is performed by the maintenance mechanics
considering the above-referenced Preventative Maintenance Schedules.
iii. Demand maintenance is generated by user activities and may require
outside services. The Service Request Form is used to request demand
maintenance.
iv. All maintenance done by the operator shall be coordinated with the
Vehicle Maintenance Division.
b. The Public Works Department Vehicle Maintenance Division may remove
equipment or vehicles from service based on the Commercial Vehicle Safety
Alliance (CVSA) Out-of—Service Criteria (OSC) or other recognized criteria.
3. Vehicle and Equipment Operation
The use of City vehicles or equipment is approved only for matters related to City job
responsibilities or for City business. Operation of City vehicles and equipment shall
be in accordance with the Employee Handbook, Section 5.0, Subd. 5.25, Vehicle
Use, January 1, 2006. Care and cleaning of vehicle and equipment is the
responsibility of the user.
The Public Works Department Vehicle Maintenance Division will manage and
maintain the central fuel system. This includes fuel system access assignments and
records management.
a. Dedicated department vehicles shall be assigned to departments whose job
duties require the immediate availability of a vehicle.
i. Dedicated vehicle use shall be subject to the same limitations and
conditions as identified in the Vehicle Use Policy.
b. Shared vehicles should be considered for employees with similar job duties and
should be considered in lieu of a dedicated vehicle.
130
Funding
Vehicle and equipment replacement will be funded through the CIP. The Public Works
Department Vehicle Maintenance Division will maintain a current and complete
inventory of all vehicles and equipment in coordination with all users and the Finance
Department. These inventories will establish all divisions/department vehicle and
equipment replacement schedule. All vehicles and equipment maintained by the Vehicle
Maintenance Division will be reviewed on an annual basis for replacement. If a
department/division has requested replacement or an addition to the fleet, Vehicle
Maintenance will make a recommendation on the purchase for the CIP to the City
Manager. The CIP will be presented to the City Council for consideration and approval
during the budget process.
1. Funding New and Replacement Vehicles and Equipment
Fleet and equipment projected for replacement, or additional vehicles and
equipment, will be funded through the CIP process. Upon acquisition, all fleet and
equipment purchased shall be included in the vehicle and equipment inventory
database. Requests for fleet and equipment replacement will be addressed through
the normal budget process.
a. Fleet and equipment with a value in excess of$10,000 purchased for the first
time must be included in the CIP.
b. Fleet and equipment with a value less than $10,000 purchased for the first time
does not have to be included in the CIP, but must be included in the operating
budget.
2. Funding of Operational Expenses
a. Fuel Allocation
Fuel is allocated based on usage by each piece of equipment or vehicle and
billed monthly to the responsible department. Pricing for fuel is based on average
total cost of inventory and an overhead charge, as set by the Finance
Department.
3. Reassigned Equipment
a. Reassigned equipment may be used in lieu of new vehicles/equipment with
written approval by the City Manager. Reassignment duration will be as
determined annually by the Public Works Department Vehicle Maintenance
Division. Reassignments moved within or across departments/divisions will be
charged for conversion costs to the receiving department/division by internal
service charges. Reassignments with no conversion costs will not be charged.
131
The Finance Department will be notified of all reassignments for fixed assets and
insurance reports.
4. Equivalent Replacement/Upgrades
a. The CIP fund is structured to replace each vehicle or piece of equipment with an
equivalent unit, unless specified/justified, during the budget process.
b. Cost increases due to upgrades, changes in type of fleet or equipment, addition
of options, or other upgrades associated with vehicles scheduled for
replacement, shall be highlighted and clearly summarized as an element of the
CIP by the department requesting the upgrade or addition in options.
Responsibilities
1. Department Directors shall be responsible for:
a. Ensuring that all vehicles and equipment for replacement requests are of the
appropriate type and have only those items/options that are operationally
required.
b. Submitting requests for replacement with cost estimates to the Finance
Department and the Public Works Maintenance Manager prior to the CIP and
budget process.
2. The Public Works Department Vehicle Maintenance Division shall be
responsible for:
a. Submitting a 5-year Capital Improvement Program to the Finance Department
and City Manager during the budget process.
b. Reviewing replacement schedule annually with departments during the budget
process to ensure all vehicles and equipment are replaced as appropriate.
c. Establishing the Vehicle and Equipment Replacement Schedule.
d. Tracking fuel, labor and repair parts annually, and provide this information to
Finance and responsible departments.
e. Identifying the actual historical cost and variations in cost performance based on
lifetime-accumulated age and usage of the various vehicle and equipment types
(classifications).
132
3. The Finance Department shall be responsible for:
a. Completing an analysis and reconciliation of the vehicle replacement CIP on an
annual basis.
Purchasing and Disposal
1. Purchasing Procedures
a. New vehicles and equipment will be purchased by the Public Works Maintenance
Manager, as assigned by the Director of Public Works and in accordance with
Minnesota Statute 471.345. Acquisitions require the cooperation and assistance
of many departments.
b. When possible, purchases will be made from the State of Minnesota, Hennepin
County, or other Joint Purchasing Agreement contracts, as permitted by State
Statute. These purchases will also follow the City's purchasing policy.
c. Details for budgeting will be provided by the Finance Director when providing the
overall budget guidelines.
2. Equipment Disposal
a. Disposal of equipment shall be in accordance with the City's business standard
of disposing all vehicles and equipment by auction, trade-in, or other approved
methods.
b. When vehicles and equipment are replaced, there may be reassignment of
vehicles or equipment, but there will be no fleet or equipment hold over on the
fleet after a replacement is purchased. Adding fleet or equipment to the inventory
without City Manager authorization is not permitted.
c. In order to address the seasonal or short-term needs, fleet or equipment may be
retained temporarily for a period not to exceed nine months from the date the
replacement fleet or equipment is placed into service.
Request for Vehicles, Equipment, and Service
1. Requesting Vehicles or Equipment
a. New vehicles or equipment in excess of $10,000 must be made and approved
through the CIP budget process, and have a life of more than three (3) years.
The request shall be discussed with the Public Works Maintenance Manager and
Vehicle Maintenance Division to avoid duplication of equipment and to discuss
the appropriate type and size of vehicle or equipment requested.
133
b. Request for new vehicle or equipment less than $10,000 must be made and
approved through the normal budget process.
2. Repair and Maintenance of Vehicle or Equipment Requests
a. All repair and maintenance of vehicles and equipment will be made by
completing the Vehicle Maintenance Repair Slip, as provided by the Vehicle
Maintenance Division.
Acquisition Request(s)
The 5-year CIP will be reviewed and evaluated annually as part of the budget process.
In any given year, vehicle or equipment originally planned for replacement may be
adjusted as necessary to account for current needs.
134
��tyof
golden
V11
a eY
VEHICLE AND EQUIPMENT REPLACEMENT GUIDELINES
Public Works Department Vehicle Maintenance Division Management
Methodology
To manage the City's fleet in a manner that theoretically all of the City's motorized
equipment and vehicles are maintained and disposed of by the Public Works
Department Vehicle Maintenance Division. The Vehicle Maintenance Division has full
responsibility for vehicle and equipment maintenance and the equipment users are
charged an hourly repair rate for all service and repairs.
1. Expected Life
When new vehicles or equipment are purchased, it is given an expected life (years
in service) based on a variety of factors. Below are the estimated life expectancies
for some of the significant pieces of equipment:
a. Engine Pumpers 20+ years (refurbish half way through life cycle)
b. Tandem Dump Trucks 12 years
c. Single Axle Dump Trucks 12-14 years-some longer
d. Wheel Loaders 15-18 years
e. Backhoe/Excavators 10-12 years
f. Jet Truck 10 years
g. One-Ton Trucks 9-10 years
h. 3/ and '/2 Ton Pickups 10 years-some longer
i. Skid Steers 8-10 years
j. Street Sweeper 8 years
k. Tractors Varies (15 years average)
I. Vactor Truck 10 years
m. Mowers Varies (6-10 years)
n. Sport Utility Vehicle 10 years
o. Passenger Cars/Vans 10 years
p. Squad Cars 100,000 miles/4 years
q. Trailers 15 years
r. Sidewalk Machines 10-12 years
135
2. Replacement Factors
When a particular piece of vehicle or equipment achieves its expected life and
reaches its anticipated replacement year, it is analyzed to determine if it should be
replaced based on the following factors:
a. Critical nature of the equipment or vehicle and the availability of a backup or
alternative equipment or vehicle. For example, the Sewer Jet is a critical piece of
equipment for which there is no backup except to contract for those services. It is
important to have this equipment operational with minimal downtime.
b. Use of the equipment or vehicle (hours and/or miles). The duration and intensity
of use are also important factors. For example, squad cars typically achieve their
expected life of 100,000 miles and are retired in approximately 4 years while
other vehicles (cars and light trucks) may never achieve 100,000 miles and can
last for many years.
c. Appropriateness of the equipment or vehicle for the assigned tasks. Public Works
and the user examines whether the equipment or vehicle is still capable of doing
its intended work, whether it is the right equipment, and determine if the work
changed causing the equipment or vehicle to be obsolete.
d. Repair history, costs, and downtime. Mechanics provide critical input and
assessments of the overall condition of the equipment. Near the end of the
expected life of the equipment or vehicle, repair costs can exceed the value of
the equipment or vehicle and replacement is appropriate.
e. Suitability of the equipment or vehicle for other tasks. Other departments provide
input regarding the ability to reassign equipment and vehicles to other less
frequent or intense duties. For example, Public Works have re-assigned used
marked squad cars and light pickup trucks to other departments.
3. Life Cycle Costing
This accounting method is used as much as possible in managing the City's fleet
management. Life cycle costing includes the purchase cost of the equipment or
vehicle, lifetime maintenance and operation costs, and the residual value at the time
of disposal. This is the true cost of equipment or vehicle ownership. The goal is to
replace the equipment during its economic life. This is the period when the
maintenance costs are the lowest.
4. Fire Department Vehicle Replacement Practice
Fire apparatus is historically refurbished half way through its life cycle
(approximately 10-12 years) and replaced after 20 to 24 years of service, or a couple
of years longer depending on condition. This general rule applies to "major"
apparatus, engine, and ladder trucks. The replacement of a particular piece of
apparatus is based upon several factors including the general mechanical and
structural condition, required vehicle and safety upgrades, technological changes,
136
current and anticipated use, anticipation of future mission changes, and the current
mechanical history (including mileage).
The apparatus replacement schedule is revised to reflect a philosophy of validating
the replacement of a vehicle, as opposed to replacement based solely upon the age
of the vehicle. To this end, vehicles have been moved back in the replacement
schedule and not replaced at the time mark historically associated with replacement
schedules. Refurbishing pumpers and ladders to extend the "life" of fire apparatus is
a common practice. Refurbishing pumper and ladder fire vehicles extends vehicle
life.
137
City of Golden Valley, Minnesota
Capital Plan
2017 thru 2021
PROJECTS BY DEPARTMENT
Department Project# Priority 2017 2018 2019 2020 2021 Total
Brookview Community Center `
Brookview Community Center BC-001 nla 10,000,000 8,998,823 18,998,823
Brookview Community Center Total 10,000,000 8,998,823 18,998,823
'Buildings �
Carpet Replacement:City Buildings B-011 n/a 50,000 40,000 40,000 130,000
Installation of Building Security Systems 8-027 n/a 50,000 50,000 100,000
Public Buildings Roof Replacements B-041 n/a 270,000 150,000 150,000 150,000 720,000
City Hall Boiler Replacement 8-043 n/a 130,000 130,000
Vehicle Maintenance-Window Replacement 8-045 n/a 15,000 15,000
Buildings Total 115,000 360,000 190,000 280,000 150,000 1,095,000
_ --------- - -
'Cablecasting Improvements
Cable Equipment Replacement C-001 n/a 22,000 22,000 22,000 22,000 22,000 110,000
Cablecasting Improvements Total 22,000 22,000 22,000 22,000 22,000 110,000
IDouglas Drive Corridor `
Douglas Drive Improvements DD-001 n/a 3,000,000 3,000,000
Debt Service Payment DD-002 n/a 160,500 373,215 368,715 369,165 369,515 1,641,110
Douglas Drive Corridor Total 3,160,500 373,215 368,715 369,165 369,515 4,641,110
I,Golf Course �
GreenfTee Mowers GC-003 n/a 33,000 42,500 75,500
Golf Carts GC-009 nla 220,000 220,000
Rough Mowers GC-010 n/a 37,500 37,500
Grinders Reel and Bedknife GC-011 nla 55,000 55,000
Sand Trap Rake GC-013 nla 18,000 18,000
Five Plex Fairway Mower GC-014 n/a 39,000 39,000 78,000
Driving Range Nets GC-015 n/a 15,000 15,000 30,000
Topdresser GC-019 n/a 22,000 22,000
Bridge Improvements GC-023 n/a 30,000 30,000
Sprayer GC-031 nla 49,000 49,000
Core Harvester GC-032 n/a 16,000 16,000
Skid Loader GC-033 n/a 45,000 45,000
Passenger Shuttle Cart-Used GC-036 n/a 15,000 15,000
Driving Range Building-Siding GC-037 n/a 30,000 30,000
Par 3 and Lawn Bowling Building GC-038 n/a 65,000 65,000
Bunker Improvements GC-039 n/a 70,000 70,000
Golf Course Total 285,000 235,000 186,500 110,500 39,000 856,000
Parks `
BleacherReplacement P-001 n/a 25,000 30,000 20,000 75,000
Page 138
Department Project# Priority 2017 2018 2019 2020 2021 Total
Park Trail and Parking Lot Improvement P-002 nla 30,000 40,000 50,000 40,000 150,000 310,000
Play Structure Replacement P-003 nla 170,000 55,000 55,000 55,000 55,000 390,000
Ball field Lighting-Isaacson Park P-014 n/a 360,000 360,000
Outdoor Basketball and Hoop Replacement P-015 nla 28,000 28,000 28,000 28,000 25,000 137,000
Park Signage Rep�acement P-016 n/a 10,000 10,000 10,000 10,000 10,000 50,000
Sun Shelter Replacements and Additions P-017 nla 25,000 25,000 25,000 50,000 25,000 150,000
Tennis Court Resurfacing P-018 nla 32,000 32,000 10,000 24,000 12,000 110,000
Brookview Entrance Signage Replacement P-019 n/a 50,000 50,000
Wildwood Park Pickleball Courts P-020 n/a 120,000 120,000
Sidewalk Connection and Crosswalk Partnership P-021 nla 25,000 25,000
Ball Field Reconstruction P-022 n/a 25,000 25,000 25,000 25,000 100,000
Re-Lamp Athletic Field and Rink Lights P-023 n/a 15,000 15,000 15,000 15,000 60,000
Wildwood Park Athletic Field P-024 n/a 100,000 100,000
Community Gardens P-025 n/a 30,000 30,000
Parks Total 755,000 380,000 268,000 347,000 317,000 2,067,000
---- - _ ____
�Storm Sewers �
Residential Storm Sewer Improvements SS-01 n/a 600,000 750,000 750,000 750,000 750,000 3,600,000
Street Sweeper SS-05 nla 230,000 230,000
Brookview Goif Course-Buffer Zone Study SS-12 n/a 50,000 50,000 100,000
Storm Water Pond Dredging SS-23 n/a 150,000 300,000 450,000
V-Box Spreaderand Anti-Ice(tandem) SS-25 nla 67,000 67,000
V-Box Spreaderand Anti-ice(tandem) SS-26 n/a 67,000 67,000
Grounds Sweeper SS-27 n/a 40,000 40,000
Flood Mitigation SS-34 nla 500,000 250,000 250,000 250,000 1,250,000
BobcatToolcat SS-41 nla 55,000 55,000
V-Box Spreader SS-42 n/a 56,000 56,000
Bassett Creek Restoration Project SS-43 nla 110,000 110,000
Sandburg-Louisiana Pond SS-48 n/a 221,000 330,000 551,000
Medley Park Stormwater Treatment Facility SS-49 n/a 110,000 440,000 550,000
Sweeney Lake Watershed Water Quality Impr SS-50 nla 440,000 440,000
800 MHz Ratlios SS-51 n/a 40,000 40,000
10th Avenue North Culbert Rehabilitation SS-52 n/a 1,500,000 1,500,000
Mill&Overlay Storm Sewer Repairs SS-53 nla 25,000 75,000 50,000 50,000 50,000 250,000
Bassett Creek Water Quality Improvement SS-54 n/a 330,000 880,000 1,210,000
Asset Management Software SS-55 nla 30,000 30,000
Asset Management Equipment SS-56 n/a 20,000 20,000
Storm Sewers Total 3,011,000 975,000 1,691,000 2,765,000 2,174,000 10,616,000
_ _- - --- _- _.__ 1
IStreets
Pavement Management Program S-001 nla 2,840,000 3,330,000 3,870,000 4,200,000 4,450,000 18,690,000
Paveme�t Management Overlays S-013 n/a 200,000 300,000 500,000 500,000 1,500,000
TH 100 Pedestrian Bridge Walk Maintenance S-014 n/a 70,000 70,000
Municipal State Aid(MSA)Street Maintenance S-017 nla 125,000 125,000 125,000 125,000 125,000 625,000
Streetscape and Ciry Hall Complex Renovation S-018 n/a 100,000 50,000 150,000
MSA Debt Service S-019 n/a 196,175 196,385 196,385 196,175 189,000 974,120
Sidewalk and Trail System Upgrades S-030 nla 100,000 100,000 100,000 100,000 400,000
Xenia Avenue and Golden Hills Dr improvements S-031 n/a 1,200,000 1,200,000
Auto CAD Application S-032 nla 12,100 12,100 12,100 12,100 12,100 60,500
Cartegraph Street Management Software S-034 n/a 40,000 20,000 20,000 10,000 10,000 100,000
Comprehensive Plan Update S-035 n/a 195,000 195,000
Retaining Wall Repairs S-036 nla 100,000 100,000 100,000 100,000 100,000 500,000
Debt Service Payments(xenialGolden Hills) S-037 nla 120,000 120,000 120,000 120,000 480,000
Highway 55 West Redevelopment Project S-038 nla 1,615,000 1,615,000
TH 55 and Schaper Dr Flashing Yelloe Arrows S-039 nla 40,000 40,000
Page 139
Department Project# Priority 2017 2018 2019 2020 2021 Total
Streets Total 6,693,275 4,053,485 4,843,485 5,403,275 5,606,100 26,599,620
�'�Vehicles and Equipment �
Marked Squad Cars(Police) V&E-001 nla 80,000 120,000 80,000 80,000 80,000 440,000
Computers and Printers(Finance) V&E-002 nla 105,000 80,000 95,000 95,000 95,000 470,000
Pickup Truck(Engineering) V&E-008 n/a 40,000 40,000
Front End Loader(Street) V&E-009 n/a 260,000 260,000
Portable Computers(Police) V&E-020 n/a 50,000 50,000
Vibratory Asphalt Roller(Street) V&E-021 n/a 45,000 45,000
Sign Truck(Street) V&E-022 n/a 100,000 100,000
Pickup Truck(Park) V&E-026 nla 40,000 40,000
Dump Truck(Park) V&E-029 n/a 80,000 80,000
Asphalt Melter(Street) V&E-033 n/a 45,000 45,000
Crime Prevention Vehicle(Police) V&E-034 n/a 30,000 30,000
Aerial Ladder Truck(Fire) V&E-037 n/a 400,000 700,000 1,100,000
Streetscape Banners(Street) V&E-038 n/a 25,000 25,000
Utility Tractor(Park) V&E-039 n/a 75,000 75,000
RotaryMower(Park) V&E-048 n/a 25,000 25,000
Asphalt Cold Planer(Street) V&E-052 n/a 25,000 25,000
Fire Hose(Fire) V&E-058 nla 28,000 28,000
Rescue Vehicle(Fire) V&E-060 n/a 90,000 90,000
Pickup Truck(Street) V&E-063 n/a 35,000 35,000
Single Axle Dump Truck(Street) V&E-070 nla 225,000 225,000
Sidewalk Snowblower(Street) V&E-073 n/a 110,000 110,000
PassengerVehicle(Fire) V&E-083 nla 40,000 40,000
Marked Squad Digital Recording System(Police) V&E-092 n/a 120,000 120,000
Asphalt Hot Box(Street) V&E-099 n/a 45,000 45,000
Pickup Truck(Fire) V&E-102 n/a 40,000 40,000
Polaris 6 X 6(Fire) V&E-106 n/a 15,000 15,000
Bobcat Utility Truckster(Park) V&E-107 nla 55,000 55,000
Unmarked Police Vehicle(Police) V&E-108 n/a 40,000 40,000
Single Axle Dump Truck(Street) V&E-109 n/a 225,000 225,000
Dump Truck(Street) V&E-110 n/a 225,000 225,000
Bobcat Toolcat(Park) V&E-116 n/a 50,000 50,000
Field Line Painter(Park) V&E-120 n/a 20,000 20,000
Tasers(Police) V&E-121 n/a 16,000 16,000
Tack Sprayer(Street) V&E-126 nla 60,000 60,000
Utility Tractor(Park) V&E-128 n/a 105,000 105,000
Rotary Mower(Park) V&E-130 nla 25,000 25,000
800 MHz Radios(Public Works Maintenance) V&E-133 n/a 183,000 183,000
Body Cameras(Police) V&E-135 n/a 53,955 24,070 24,070 24,070 24,070 150,235
Outboartl Motor(Fire) V&E-137 n/a 5,500 5,500
PassengerVehicle(Fire) V&E-138 n/a 40,000 40,000
PassengerVehicle(Fire) V&E-139 n/a 40,000 40,000
Utility Trailer(Park) V&E-140 n/a 5,500 5,500
Pickup Truck(Park) V&E-141 n/a 35,000 35,000
Dump Truck(Park) V&E-142 n/a 80,000 80,000
Trash Compactor(Park) V&E-143 nla 65,000 65,000
Single Axle Dump Truck(Street) V&E-144 nla 230,000 230,000
Skid Steer Loader(Street) V&E-145 n/a 55,000 55,000
Dump Truck(Street) V&E-146 n/a 80,000 80,000
Marked Squad(Police) V&E-147 n/a 40,000 40,000
SWAT Van(Police) V&E-148 n/a 100,000 100,000
Water Truck(Street) V&E-149 n/a 215,000 215,000
Asset Management Software V&E-150 n/a 60,000 60,000
Fire Pumper Truck(Fire) V&E-151 nla 600,000 600,000
Page 140
Department Project# Priority 2017 2018 2019 2020 2021 Total
PassengerVehicle(Fire) V&E-152 nla 40,000 40,000
Equipment Trailer(Street) V&E-153 n/a 20,000 20,000
Vehicles and Equipment Total 1,494,955 2,179,070 1,095,070 795,070 899,070 6,463,235
_ _-__ ,
�IWater&Sewer Systems �
Sanitary Sewer&Water Line RepaidRecon. W&SS-001 n/a 870,000 500,000 500,000 500,000 500,000 2,870,000
Sewer Jet Truck W&SS-012 n/a 190,000 190,000
Multiquip Portable Generator W&SS-041 n/a 10,000 10,000
Mill and Oveday WaterlSewer Repairs W&SS-051 n/a 50,000 50,000
Portable Generator W&SS-052 n/a 10,000 10,000
Televising and Electroscan Equipment W&SS-053 nla 225,000 225,000
RubberTired Excavator W&SS-056 n/a 245,000 245,000
Step Van W&SS-060 n/a 80,000 80,000
RadioMeterReadingSystem W&SS-063 n/a 355,000 355,000 355,000 100,000 1,165,000
Utility Building Locker Room RepaidUpgrades W&SS-065 nla 100,000 100,000
Valve ReplacemenUWatermain Lining W&SS-O66 n/a 100,000 100,000
Tractor Loader Backhoe W&SS-070 n/a 150,000 150,000
I-394 Inflow/Infiltration Project W&SS-074 nla 300,000 300,000 600,000
Sewer Flow Meters W&SS-076 n/a 35,000 35,000
Asset Management Software W&SS-079 n/a 30,000 30,000
Asset Management Equipment W&SS-080 n/a 20,000 20,000
800 MHz Radios W&SS-081 n/a 40,000 40,000
Water&Sewer Systems Total 1,670,000 1,810,000 895,000 935,000 610,000 5,920,000
GRAND TOTAL 27,206,730 19,386,593 9,559,770 11,027,010 10,186,685 77,366,788
Page 141
����� �:�� �
�„� �,��' �
��,� � ���', o ��� ��, �� � � � 3 �y� ��
�
�� � � �"� 5 ::•i n• i.,, �:: � . : � ;: ef��,;, c'� i � i�Gi�
�; ,� ��'�;�* . . 6 aa �.,,.�� .� . ,, � , ��„• i/r ,,, ,;, %e�.
��m�
I�"l���i�a.�. I�evel+o�ment I�e�artment
as��s��-�o��t���-��.�-s�a�t����
Date: October 24, 2016
To: Golden Valley Planning Commission
From: Chloe McGuire Brigl, Planning Intern
Subject: Discussion of Zoning Code Text Amendments—Outdoor Storage for Automobile
Dealerships
Summary
Staff is seeking feedback from the Planning Commission regarding outdoor storage regulations and
screening requirements for automobile dealerships and inventory within the Zoning Code. Staff
brought this topic to Planning Commission on August 22, 2016, in order to gain thoughts and
feedback. This discussion will focus on solutions for automobile dealerships. The next discussion
will focus on solutions for residential and institutional districts. All changes recommended by staff
will be presented to the Planning Commission later this fall with an informal public hearing.
Careful reading of the Zoning Code reveals that the regulations surrounding outdoor storage on
non-residential properties are mixed at best. This makes it difficult to consistently apply
requirements to various properties around Golden Valley. Three areas that staff feels need
attention are the screening of materials from the view of those passing by on the street; the
screening of materials (or equipment) from the view of adjacent properties (both residential and
non-residential); and the permissibility of the storage in parking lots of vehicles or equipment not
associated with the principal use.
The Planning Commission feedback around dealership inventory from the August 22, 2016,
meeting was:
• Agreement on the need to screen outdoor storage that abuts residential properties to a
higher degree than non-residential properties
• Agreement on allowing automobile inventory storage in unused parking ramps
• Agreement on allowing automobile inventory storage on surface lots with screening in
compatible locations
• Agreement on the need for screening, preferably vegetative, for automobile inventory
Recommendations
After evaluating the issues and the range of solutions discussed at the previous meeting, staff is
offering the following regulations related to inventory storage and asking for feedback from the
Planning Commission.
location:
• With explicit consent from the owner, dealership inventory may be stored in unoccupied
parking ramp spaces. If the City Manager or his/her designee determines this interferes
with traffic flows or overall parking availability, inventory must be moved to another
permitted location
• Surface lots in non-residential districts may be used for excess storage of dealership
inventory only if accessory to principal use or only if as the principal use (not allowed if
unrelated to principal use)
• No storage of vehicles in front yard
Screening and Fencing Requirements:
• Where a parking area abuts a street right-of-way, vacant land, or any other development
(except another parking use area), perimeter landscaping and shall be provided and
maintained
• Lots next to residential or institutional properties will be subject to stricter fencing and
screening requirements, and must screen areas adjacent to residential or institutional
properties with vegetation of 90% opacity
o Less screening may be allowed on the portion of the property abutting the street
right-of-way for safety and visibility, through police decision
• All damaged and inoperable vehicles may be kept in an enclosed building or area
completely screened from public streets and adjacent property
• No display vehicles may be parked on grass, curb islands, sidewalks, other landscaped
areas or in the required customer parking
Administrative Review:
• Application for construction, redevelopment, or expansion of existing lots shall include a
site plan with dimensions, curb and gutter locations, and snow storage
• Given constraints on existing lots, staff will work administratively on applications to
ensure adequate screening given site-dependent situations
Attachments:
Comparison with Other Cities (3 pages)
2
Comparison with Other Cities
City Dealership(Inventory) Regulations
Golden Valley • Outdoor storage must be screened by a wall, fence, or vegetation at
least 6 feet in height and 90%opacity
• Light Industrial and Industrial Districts must be fenced or screened
from adjacent Residential or Institutional Districts
• Fences: 6 foot minimum, 8 foot maximum, 12 foot if for storage;
landscaping preferred for screening
• No specific dealership regulations
Roseville-Administrative • The majority of existing automobile dealerships needed conditional
use permits
• Within the regional business 1 or 2 district, dealerships are permitted
• Storage of dealership inventory is handled under'fleet vehicle'
storage
• Fleet vehicle storage regulation: design of new businesses is
handled with planning department administratively; have to meet
modern design standard regulations and site design—strict
regulations(This portion of Zoning Code was adopted in 2010, other
grandfathered in)
White Bear Lake • Special district for auto-oriented businesses (B-3)
• Outside services and sales connected with the principal use is limited
to 30%of the gross floor area of the principal use
• Outside sales areas are fenced or screened from view of neighboring
residential uses or an abutting"R" District
• Where any business or industrial use (i.e., structure, parking or
storage) abuts property zoned for residential use,that business or
industry shall provide screening along the boundary of the
residential property. Screening shall also be provided where a
business or industry is across the street from a residential zone, but
not on that side of a business or industry considered to be the front
• All the fencing and screening shall consist of either a fence or a
green belt planting strip as provided for below: 1) A green belt
planting strip shall consist of evergreen trees and/or deciduous trees
and plants and shall be of sufficient width and density to provide an
effective visual screen.This planting strip shall be designed to
provide complete visual screening to a minimum height of six feet.
Earth mounding or berms may be used, but shall not be used to
achieve more than three feet of the required screen.The planting
plan and type of plantings shall require the approval of the City
Council. 2)A required screening fence shall be constructed of
masonry, brick, wood or metal. Such fence shalf provide a solid
screening effect six feet in height.The design and materials used in
constructing a required screening fence shall be subject to the
approval of the City Council. Fences in excess of six feet in height
shall require approval of the Zoning Administrator and Building
Official.
• Definition: Exterior Storage:The storage of goods, materials,
equipment, manufactured products and similar items not fully
enclosed by a building
• All building material and construction equipment shall be stored in
an enclosed building. Lawn and garden equipment, snow blowers
and detached snow plows shall be stored within buildings or in the
rear or side yard (but not in a side yard abutting a street) if screened
so as not to be visible from adjoining properties as viewed from
ground level, except for the following allowable exceptions:
Firewood piles ... and building materials and construction equipment
stored outside in conjunction with a legally authorized construction
project
Minnetonka • Landscaping... must contain a wall, berm or other feature that is
constructed for long term durability when adjacent to residentially
zoned property to minimize to the greatest extent reasonably
possible, noise and visual impacts
• Surface parking lots must have submittal of a plan that adequately
screens 50%of the total parking spaces from public view
• Vehicles parked within a parking structure must be screened from
view from surrounding residential uses
• The customer parking spaces must be clearly signed and may not be
used at any time for inventory vehicle parking
• Dealerships must not be located within 100 feet of any low density
residential parcel or adjacent to medium or high density residential
parcels. The city may reduce separation requirements if the following
are provided:
1. Landscaping and berming to shield the auto service use;
2. Parking lots not located in proximity to residential uses; and
3. Lighting plans which are unobtrusive to surrounding
residential uses
• Conditional use permit needed unless in specific overlay areas
Brooklyn Park Summary: Regulate under parking and a special zoning district, B4, for
vehicle sales and showrooms, that says each lot needs a building (can't just
be parking) and that parking must take place on a paved surface
Specific district regulations (64):
• A 35 foot bermed and landscaped area must be included within the
required setback area from residential district property lines
• Each display vehicle parking space must meet the required size of a
parking space and must be striped accordingly
• No display vehicles may be parked on grass, curb islands, sidewalks,
other landscaped areas or in the required customer parking
• No vehicles may be displayed on elevated platforms,jacks, or berms
• No rows of display vehicles may be longer than 180 feet. Landscaped
areas with overstory deciduous trees are required to separate rows of
display vehicles. Required parking lot open space areas may be larger
than typically required in the district to accomplish this objective
• All areas on which motor vehicles are stored or displayed must be
paved with concrete or a bituminous surface. No display, sale or
storage of automobiles or other vehicles are permitted on
landscaped areas
• All damaged and inoperable vehicles may be kept in an enclosed
building or area completely screened from public streets and
adjacent property
Parking Regulations:
• Screening. Screening must be required for any off street parking or
loading area and may be any combination of landscaping, decorative
fencing, and berms, approved through the Site Plan Review process or
as required elsewhere in this chapter, unless further restricted
• Residential. All parking and loading areas over four spaces must be
screened from adjacent residential zoning districts. Screening must be
a minimum of six feet in height when installed as measured from the
parking area surface to the satisfaction of the City Manager. Fences
alone shall not meet this requirement.
� Street rights-of-way. All parking areas containing more than four stalls
and all loading areas must be screened from adjacent public rights-of-
way. Screening must be a minimum of three feet in height as
measured from the top of the adjacent parking area surface.
• Perimeter parking area/andscaping standards. Where a parking area
serving a use abuts a street right-of-way,vacant land, or any other
development (except another parking use area), perimeter
landscaping strips shall be provided and maintained between the
vehicle use areas and the abutting right-of-way or property line