Loading...
11-13-17 PC Agenda AGENDA Planning Commission Regular Meeting Golden Valley City Hall, 7800 Golden Valley Road Council Chambers Monday, November 13, 2017 7 pm 1. Approval of Minutes October 9, 2017, Special Planning Commission Meeting October 23, 2017, Regular Planning Commission Meeting 2. Presentation of Capital Improvement Program 2018-2022 — Sue Virnig, City Finance Director --Short Recess-- 3. Reports on Meetings of the Housing and Redevelopment Authority, City Council, Board of Zoning Appeals and other Meetings 4. Other Business • Council Liaison Report 5. Adjournment This dacun�ent is available in alternate formats upa�a 72-haur request. Please call ' 7b3-593-8006(TTY: 763-593-3968}#o make a request. Exampies of al't�rna�e forrnats m�y include large print,electronic,Braille,�udiUcassette,etc. Special Meeting of the Golden Valley Planning Commission October 9, 2017 A special meeting of the Planning Commission was held at the Golden Valley City Hall, Council Chambers, 7800 Golden Valley Road, Golden Valley, Minnesota, on Monday, October 9, 2017. Chair Baker called the meeting to order at 7 pm. Those present were Planning Commissioners Baker, Black, Blenker, Blum, Johnson, Segelbaum, and Waldhauser. Also present were Planning Manager Jason Zimmerman and Associate Planner/Grant Writer Emily Goellner. 1. Comp Plan Work Session — Land Use Zimmerman introduced the revised land use categories and highlighted ways in which they were different from the current categories, including using "intensity" instead of "density" for the residential land uses. The Commissioners discussed how the zoning districts might be revised to align more closely with the new land use categories and some potential changes to the lists of permitted and conditional uses. Baker pointed out some parts of Theodore Wirth Park shown as Active Use and indicated they really should be classified as Passive Use. In addition, the proposed Park and Ride area near Golden Valley Road should be guided for Railroad use. Goellner commented on the Institutional categories and talked about how the new break down would better reflect impacts to surrounding properties. Zimmerman and Goellner described the Flexible Use category and talked about the possibility of creating two different scales of mixed use nodes: one for neighborhoods and one for regional attractions. Goellner said she would work to update the description of this category. Zimmerman reviewed the four Planning Districts that were being proposed for the Comprehensive Plan to help guide redevelopment. The Commissioners discussed the future of the Optum site. Baker indicated he would like to see future uses of the property include restaurants and commercial spaces. Segelbaum asked about assigning percentages of various uses to areas guided for Flexible Use and if that could be a way to prevent too much land converting to multi-family housing. Black asked if zoning designations could be specific under a Flexible Use scenario. Waldhauser said she supported more neighborhood scale nades of mixed use and would like to see it incorporated into the land use plan where appropriate. Baker indicated he would not be supportive of reguiding parcels along Glenwood Ave south of Breck School to a new use until Breck was able to come to the City with a proposal for the entire area. The Commissioners discussed the opportunities to encourage commercial uses along Golden Valtey Road near the new Hello apartment building. Special Meeting of the Golden Valley Planning Commission October 9, 2017 Page 2 The meeting was adjourned at 8:35 pm. Ron Blum, Secretary Lisa Wittman, Administrative Assistant Regular Meeting of the Golden Valley Planning Commission October 23, 2017 A regular meeting of the Planning Commission was held at the Golden Valley City Hall, Council Chambers, 7800 Golden Valley Road, Golden Valley, Minnesota, on Monday, October 23, 2017. Chair Baker called the meeting to order at 7:03 pm. Those present were Planning Commissioners Baker, Black, Blenker, Johnson, and Waldhauser. Also present were Physical Development Director Marc Nevinski, Planning Manager Jason Zimmerman, Associate Planner/Grant Writer Emily G'oellner, and Administrative Assistant Lisa Wittman. Commissioners Blum and �egelbaum were' absent. 1. Approval of Minutes September 11, 2017, Special Planning Commission Meeting MOVED by Waldhauser, seconded by Johnson and motion carried`unanimously to approve the September 11, 2017, special meeting minutes as submitted. September 11, 2017, Regular Planning Commission Meeting MOVED by Blenker, seconded by Waldhauser and motion carried unanimously to approve the September 11, 2017, regular meeting minutes as submitted. 2. Informal Public Hearing —Major PUD Amendment— PU-114, Tennant Company, Amendment#2 Applicant: Oppidan, Inc. Address: 701 Lilac Drive North Purpose: To allow for an expansion of the PUD and the construction of a six story office building and a three story parking ramp. 3. Informal Publ'ic Hearing — Property Rezoning — PU-114 Tennant Company Applicant:` Oppidan, Inc. Address: Various properties within amended PUD #114 Purpose: To rezone all the properties within the PUD to Industrial The Informal Public Hearings and discussion for Items 2 and 3 were combined. Zimmerman referred to a location map and gave an overview and some background information regarding Tennant Companies proposal to expand their campus by Minutes of the Golden Valley Planning Commission October 23, 2017 Page 2 constructing a new six story office tower and a three story parking ramp. Tennant is also proposing to relocate the existing Damascus Way facility, preparing an outlot, and vacating their Corporate Woods office building for future redevelopment. Tennant is also asking for a TIF package from the City to help cover certain eligible costs. Zimmerman discussed the various zoning designations of the parcels located within the PUD and stated that staff is recommending that they all be rezoned to Industrial which allows office, warehouse, and manufacturing uses. Rezoning the properties to Industrial will also make them consistent with the General Land Use Map. Zimmerman discussed some of the key elements of the proposal including: acquisition of additional parcels in the northwest quadrant, demolition of seven structures, construction of a six story office tower near Highway 100, construction of a three story parking ramp internal to the site, a new main access drive connecting Zane Avenue with Lilac Drive, new pedestrian connections, a new stormwater management plan, significant tree removal and replacement, changes to the west loading dock area, and creation of an outlot for future development. Zimmerman referred to the building height requirements a`nd stated that the Industrial zoning district allows buildings to be 45 feet tall. Tennant is proposing that the office building be approximately 107 feet tall and the parking ramp 34 feet tall. Zimmerman discussed the parking requirements and stated that based on the proposed uses Tennant is required to have 1,145 vehicle parking spaces and 58 bicycle parking spaces. Tennant is proposing to have 820 vehicle parking spaces and 42 bicycle parking spaces. Zimmerman stated that staff is requiring that the parking ramp be constructed to allow for future decks to be added in the future if necessary. Staff is also requiring proof of bicycle parking for 16 bicycle parking spaces. Zimmerman referred to a map of the site and discussed the site access for vehicles and pedestrians. He added that staff is interested in having further discussion about creating a connection to the Luce Line in the northeast corner of the sit� and a connection from the new Damascus Way to Zane Avenue. Zimmerman referred to the stormwater management plan and stated that there is minimal stormwater treatment on the site now. He explained that the applicant is proposing two ponds with piping to bring water to these ponds. He added that there is an infiltration area under the parking lot and that the bulk of the water would flow out to the northeast corner of the site. Zimmerman referred to the landscaping plan and explained that there are 711 trees on the site and that 463 of them are significant trees. The applicant is proposing to remove 504 trees; 323 of these are significant trees. The applicant is proposing to plant 502 new trees, 1,018 shrubs, and 7.3 acres of ground cover. Zimmerman stated that the floor plans, elevations, and materials are not yet available, but they will be reviewed by the Planning Commission and the City Council at future meetings. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 3 Zimmerman stated that staff is recommending approval of the Major PUD Amendment and the rezoning of the properties within the PUD subject to the findings and conditions listed in the staff report. Johnson asked why Industrial is being proposed for the rezoning rather than another zoning district. Zimmerman stated that the 2020 and 2030 Comp Plans have these properties guided for Industrial uses. Also, Tennant's vision for these properties is for manufacturing and office use which is consistent with the General Land Use Map. Zimmerman added that keeping Industrial uses in the City is also important because they hard to get back once they are gone. Waldhauser asked if the entire property needs to be zoned the same. Zimmerman>said it does not and noted that there are other PUDs in the City that have different'zoning designations within them. Black asked if a separate PUD amendment would be required if the applicant wanted to exceed the maximum height allowed for the parking ramp. Zimmerman stated that if the applicant needs to come back to add additional levels to the parking ramp a PUD amendment will be required. Baker asked why the applicant is proposing to split the PUD into three parcels instead of one. Zimmerman stated that the City is considering recommending that the property be split into four parcels. He stated that it has to do with,the Tax Increment Financing (TIF) and capturing the existing value and what value is being added. He added that Outlot A is a separate parcel because the applicant may choose to develop it themselves or sell it to someone else. Waldhauser referred to the pedestrian access and asked about the connection from Zane Avenue to Lilac Drive. Zimmerman stated that staff is encouraging that connection to be made. Johnson asked if there is bicycle`access to the Luce Line from Zane Avenue. Zimmerman said yes, there is an at-grade access in the northwest corner of the site and that staff is recommending a connection to the Luce Line trail in the northeast corner of the site as welL Baker said he understands that the applicant will be coming back to the City with elevations, floor plans, and materials and he hopes the applicant will consider the general aesthetics of the building, the type of lighting used, and if it will be bird friendly with non- reflective glass because this is a landmark for the City. He added that he knows the applicant is proposing silver LEED certification and he is wondering what it would take to make that a higher certification. Blenker stated that the applicant's narrative states that they aren't going to be getting LEED certification, but they will be doing the equivalent of it. Baker reiterated that he is interested in the applicant doing better than the bare minimum of LEED certification. Goellner stated that the proposal is an efficient use of the land and that there would be opportunities to gain points in the LEED system with building efficiency and stormwater management. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 4 Blenker asked what approvals would still be coming before the City. She noted that some of the conditions are worded somewhat weakly especially the ones that say the City is requiring further discussion because that isn't really requiring anything. Zimmerman stated that staff anticipates that building materials and the final building design will be submitted before the next Planning Commission meeting. He added that there are other approvals that will go before the City Council as well. Baker stated that the Planning Commission could change the conditions to state what they would like the City Council to require rather than saying items require further discussion. Johnson said he agrees with the comments made about LEED certification especially since one of the overwhelming comments they've heard from the pubfic during the Comp Plan update process has been that people want the City to "be green" and environmentally friendly. He added that because TIF is involved in this proposal there is more of a public interest to consider. Blenker referred to the access and circulation plans and asked about the nearest transit stop. Zimmerman stated that there is a gap in the system right now and` noted that there is a sidewalk on the west side of Zane Ave. and bus stop on Douglas Drive at Highway 55. Baker asked if there are other examples in the City where companies provide a shuttle service or connectors to public transportation. Zimmerman said there are none that he is aware of. He added that part of the light railproject is to explore circulators from the transit stations. Waldhauser said there must be some opportunity for communities and businesses to lobby transit agencies for service. Waldhauser asked if the City has seen any dernonstration of shift overlaps and how that works with parking. Zimmerman stated that the applicant's narrative explains how their shift overlapping affects parking. Waldhauser asked if there is parking allowed on Zane Avenue or on the frontage road. Zimmerman said he doesn't believe parking is allowed on Zane Avenue or on the frontage road. Baker asked what would trigger the need to require the applicant to construet additional parking levels. Zimmerman said complaints from employees, visitors, and the Fire Department could trigger the need for additional parking. Baker said he would like to encourage public transit and the use of alternative transportation especially since PUDs are supposed to be a benefit to the City. Black asked how accurate the parking calculations would be if the method was applied to the applicant's current facility. Zimmerman said it is hard to tell and added that Tennant knows better than the City about how many employees come and go which is why staff is requ'iring a backup plan. Blenker asked if it is common to require the parking ramp be constructed to accommodate additional levels. Zimmerman said the City has required this in other projects and stated that it is cheaper to plan for additional levels up front rather than trying to retrofit the parking ramp in the future. Waldhauser referred to the landscaping plan and asked for a summary of what is being planted. Zimmerman stated that the applicant's landscape team can provide a summary. He added that the City Forester will also review the landscape plan. Baker asked why the trees are proposed to be removed on Outlot A now if it is being used for future development. Zimmerman said his understanding is that removing the trees on Outlot A has do with the stormwater flow, ponding, grading, and the topography of the lot. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 5 Waldhauser asked if the Planning Commission will review any future proposals on Outlot A. Zimmerman said yes, the future development of Outlot A will require a PUD amendment. Blenker noted that the Engineering staff report has several conditions listed and several recommendations listed asked if those conditions and recommendations are part of the Planning staff report's conditions. Zimmerman stated that there are some conditions in the Engineering staff report that they are requiring and other items are things they are recommending or suggesting further conversation. Baker asked how the remaining single family home retains access. Zirr�merman said that an easement will be required for utilities and access to that house. Baker asked who owns the existing Damascus Way property and who will own and construct the new facility. Zimmerman explained that Damas�us Way is independently owned now and that Tennant is working to construct their new building. New ownership would take over Damascus Way and Tennant would take ownership of the parcel they are vacating. Baker asked if access through the site is a public road and if public access would be limited. Zimmerman said it is a private road. Drew Johnson, Oppidan, Inc., referred to comments regarding LEED certification and stated that LEED is one many programs. He said they look more at the end result of what they are achieving and less so of the administrator they pay to follow their rules. He stated that they build to the standards set forth in the LEED program, but they don't want to pay the administrative fees for the official certification. Baker asked how the standards are evaluated if there isn't an objective standard to use. Chris Fischer, BWBR, added that LEED is just one way to get people down the path to saving energy and being more sustainable. He said ultimately Tennant is a company that dedicates itself to sustainability. He explained LEED standards have changed over the years and he would argue that a LEEQ Silver building built 10 years ago wouldn't even be LEED certified today. He said they are looking at strategies for this building to be as thoughtful and energy conseience as possible. Baker asked the applicants if they have given any thought to passive solar use on the roof. Fischer said they are working on getting the energy footprint down for the whole building first and then they will look further at ways to use renewable energy strategies. Waldhauser asked if they are any opportunities for the manufacturing facility even though it isn't being rebuilt. Drew Johnson said that is not a part of what they've been hired to do. Carlos Fernandez, Aune Fernandez Landscape Architects, stated that the biggest sustainability move Tennant has made to date is electing to build a parking ramp. He said the proposal calls for 40% open space which is a slight increase over what is there today and they are removing a lot of buildings that aren't energy efficient. He stated that they can't forget that this is a manufacturing and industrial use which isn't necessarily a safe environment with a lot of trucks and equipment coming in and out. He stated that they are not proposing limiting access but there are safety and privacy issues and a lot of the Minutes of the Golden Valley Planning Commission October 23, 2017 Page 6 changes Tennant is making are addressing the safety of pedestrians, employees, and visitors to the site. Drew Johnson stated that they are still working through the Luce Line trail connection issues. He said he would like clarification on the condition regarding the additional levels on the parking ramp if needed in the future. He said the condition is vague about whether the City could make Tennant build the additional levels or if Tennant can decide if and when the additional levels are needed. Fernandez added that Tennant is fully committed and aware of their parking needs. Fernandez reviewed the grading and topography of the site and said they will have to move a significant amount of earth to Outlot A in order to be efficient and minimize export of dirt. Baker said he is concerned about removing a huge nurnber of trees on Outlot A just for the convenience of not having to haul fill off site. Fernantlez stated that most of the tree removals are happening in places where the building and ramp will be built. Waldhauser asked if Outlot A will have to be cut down later when it is developed. Fernandez said yes. Waldhauser asked where the manufacturing facility would be expanded if needed. Fernandez said there are no plans to do that. Drew Johnson said the administration employees in the plant could move to the new office building so there is some flexibility. Ben Ford, Rehder Associates, referred to the stormwater plan and said the goal is to reduce impacts to the site. He said there will be infiltration under the proposed parking lot and they are also proposing a pipe to take stormwater around the building to the east and off to the northeast corner of the site. Baker asked if water will be retained on site. Ford said they are providing a significant stormwater management system that doesn't exist now. He explained that they are providing pre-treatment in the two ponds they are proposing and infiltration that reduces the volume of water leaving the site. Andy Johnson asked what he should say to people when they ask why all the trees are being removed on Outlot A when nothing is being built there. Ford stated that it is really because of the grading and topography of the site and explained that there will also be a retention pond on 0utlat A. Waldhauser asked how the water retention under the parking lot will work. Ford stated that there will be tank with a permeable bottom under the parking lot that infiltrates water into the ground. Baker opened the public hearing. Stacy Hoschka, 6848 Knoll Street North, said she works as a water resource engineer and is a commissioner on the Bassett Creek Watershed Commission. She stated that she knows there are rate, quality, and volume standards that are required. She said because Golden Valley is a developed community, there is limited opportunity to address water quality issues and flooding issues so any time there is redevelopment it is important to go above and beyond what is required. She asked if there is contamination on the site and Minutes of the Golden Valley Planning Commission October 23, 2017 Page 7 what studies have been done to look at the soils on the site. She referred to the proposed pond on Outlot A and asked if the design includes any portion of the proposed development in terms of rate control and water quality and what types of easements will be placed on Outlot A. She said a big issue in the metro area is chloride contamination and that is something the Bassett Creek Watershed Commission considers when reviewing proposals. She said when infiltration basins are beneath parking areas that is a source for chloride contamination into the groundwater and she is concerned about tasting salt in the drinking water so she would like to see a winter maintenance plan and a chloride management plan. She said another concern is that a level three sex offender moved into Damascus Way several years ago and she is curious about the security and connecting Damascus Way Tennant and Damascus Way to bike trails and sidewaJks. She asked if there will be more people moving into Damascus Way. Seeing and hearing no one else wishing to comment, Baker closed the public hearing. Waldhauser stated that it would be nice to hear from the applicant about chloride contamination. Baker noted that a snow removal plan is required: Drew Johnson stated that they have perFormed a Phase I environmental assessment limited to the area of work and the soil borings did not have any elevated levels of anything that would require treatment. Waldhauser asked if testing for chloride is required. Drew Johnson said he didn't know if chloride was one of things tested or not. Baker asked if the Bassett Creek Watershed Commission will review this proposal. Ford said yes, their proposal will go to the watershed commission. He added that the water from the parking lot will be taken to the pond first for pre-treatment. Black asked about the net impact in water quality with this proposal. Ford said there will be a net increase in the water quality. Baker said he would like to add Ianguage to condition number four about the Luce Line trail connection in the northeast corner of the site. Waldhauser noted that Tennant may not want the Luce Line connected directly to their site and suggested connecting the Luce Line to the frontage road instead. Black stated that the Luce Line connection would almost entirely benefit Tennant so he is not sure if the City should focus on something that doesn't benefit the City as a whole. Andy Johnson stated there is public money going into this proposal. $aker also reiterated that PUDs are supposed to provide a benefit to the City. Zimmerman stated that language regarding the sidewalk connection to Zane Avenue from page seven of the Engineering staff report could be added to the conditions of approva'I. Baker said he would also like a condition added that encourages public transit use and he would like to hear specifics on how the applicant is achieving sustainability. Waldhauser stated that language regarding efforts to achieve or maximize sustainability could be added to condition number three. Andy Johnson said he would like it to be clear how the proposal is deviating from LEED requirements. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 8 Blenker referred to language on page 13 of the Engineering staff report regarding preserving, enhancing and re-establishing woodland area and suggested that be added as a condition because there would be an opportunity to preserve and enhance the southwest part of the property. MOVED by Johnson, seconded by Blenker and motion carried unanimously to recommend approval of the Major PUD Amendment plan for Tennant Companies PUD No. 114, subject to the following findings and conditions: Findinas: 1. The PUD amendment is tailored to the specific characteristics of the site in that it utilizes a prominent location for a high profile office tower, creates an internal main drive that provides access to parking for employees and visitors, and reorganizes uses on the site to maximize both functionality and redevelopment opportunities. In addition, the appearance of the area would be enhanced through modem site design and with quality materials and architecture. 2. Although the PUD amendment would result in the remo�al of a number of existing trees, it attempts to mitigate these removals through tree replacement, high quality landscaping, and the demolition of existing structures that would be replaced with open space. Stormwater treatment would be added to an area in which it is currently lacking, thereby improving water quality in the Sweeney Lake sub-watershed. 3. The proposed amendment would utilize land efficiently by consolidating operations onto one campus and removing blighted or underutilized properties. Additional future redevelopment opportunities would be created as a result of these efforts, allowing for continued growth of the City's tax base. 4. The uses being proposed are consistent with the current uses on the site and others in the surrounding industrial area; consistent with the City's Comprehensive Plan which calls for the preservation and expansion of facilities housing major employers; consistent with other redevelopment goals of the City such as the revitalization of the Douglas Drive Corridor; and would help bring order to an area that is currently a mix of uses and zoning designations and that lacks cohesion. 5. The PUD amendment would improve general health by providing water quality improvements to the Sweeney Lake sub-watershed, would improve safety by reducing the number of access points and improving the flow of truck movements on Zane Avenue, and would improve the general welfare by removing blighted properties and providing opportunities for tax base growth, and is therefore consistent with preserving and improving the general health, safety, and general welfare of the people of the City. 6. The creativity and flexibility provided under the PUD section of the Zoning Code allows for the assembly and development of land to form larger parcels, quality site planning, greater compatibility between land uses, and better coordination between the various elements of the site. The PUD amendment meets the Intent and Purpose provision of the City Code. Conditions 1. The plans for the Tennant Headquarters Project submitted October 9, 2017, shall become a part of this approval. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 9 2. The recommendations and requirements outlined in the memo from the Engineering Division, dated October 17, 2017, shall become a part of this approval. 3. Prior to the issuance of a Building Permit, the applicant shall provide the Planning Commission and the City Council with final plans for review and approval showing revised floor plans, elevations, and materials for both the office building and the parking ramp, including elements of energy efficiency and sustainability, as well as any proposed signage. 4. As noted in the memo from the Engineering Division, a new sidewalk connection shall be required between Zane Avenue and the relocated Damascus Way facility along the north side of the Highway 55 frontage road. 5. A connection shall be required to the Luce Line Regional Trail in the northeast portion of the Tennant campus, as described in the memo from the Engineering Division, in order to serve Tennant employees, the public, and City maintenance staff that'need to access, inspect, and maintain the retaining wall and utilities in the;area. 6. As noted in the memo from the Engineering Division, an e�ctension of the`proposed sidewalk along the new campus roadway to the west to Zane Avenue shall be added to connect to the future bike and pedestrian facilities on Zane. 7. Modifications to the pedestrian routes throughout the parking lot shall be made in consultation with staff in order to improve pedestrian connections prior to the issuance of a Building Permit. 8. Clarification regarding the intended redesign of Plant One's sprinkler system and the water mains feeding it shall be provided to the Fire De'partment for review and approval prior to the issuance of a Building Permit., 9. An additional hydrant shall be added on the southwest side of the new office tower in order to serve the needs of both the office building and the parking structure. 10. Adjustments to the lighting plan in order to bring the parking lot and parking ramp into conformance with the standards of the Zoning Code shall be submitted for review and approval by staff prior to the issuance of a Building Permit. 11. The parking ramp shall be designed and built to accommodate the construction of future additional levels of parking if persistent parking shortages are found to be a concern by the City Manager or his/her designee and/or if needed to accommodate parking spaces required by future phases of development on Outlot A. 12. Public bicycle racks or similar facilities for the parking/storage of a minimum of 42 bicycles shall''be provided with proof of parking for an additional 16 bicycles, based on a calculation of 5%0 of the 1,145 parking spaces required for the site. The applicant shail work with staff to appropriately locate the bicycle facilities. 13. As noted in the memo from the Engineering Division, woodland areas that are planned to remain, including those in the southwest and west central portions of the site, shali be preserved, enhanced, and re-stablished through the addition of new trees to promote forest regeneration. 14. A snow storage/removal plan shall be submitted to and approved by staff prior to issuance of a Building Permit. 15. Modifications to the Preliminary Plat, as noted in the memo from the Engineering Division and mentioned above, shall be made and resubmitted to the City before approval of the Final Plat. 16. An easement establishing access to 5806 Olson Memorial Highway shall be drafted and recorded with the Final Plat as noted in the memo from the Engineering Division. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 10 17. A park dedication fee of 6% of the estimated land value shall be paid before release of the Final Plat. 18. An additional PUD Amendment shall be submitted to and approved by the City prior to any additional phase of development on Outlot A. 19. All signage must meet the requirements of the City's Sign Code. 20. This approval is subject to all other state, federal, and local ordinances, regulations, or laws with authority over this development. MOVED by Blenker, seconded Johnson and motion carried unanimously to recommend approval of rezoning the properties within Tennant Companies PUD #114 from �arious zoning districts to Industrial 4. Informal Public Hearing — General Land Use Plan Map Amendment— Damascus Way — 5808 Olson Memorial Highway— CPAM-67 Applicant: Oppidan, Inc. Address: 5508 Olson Memorial Highway Purpose: To change the designation on the General Land Use Plan Map from Industrial to Medium-High Density 5. Informal Public Hearing — Property Rezoning = 5808 Olson Memorial Highway — Damascus Way —Z012-23 Applicant: Oppidan,' Inc. Address: 5808 Olson Memorial Highway Purpose: To rezone the property from R-1 Single Family Residential to R-3 Medium 'Density Residential 6. Informal Pubfic.Hearing — Conditional Use Permit— 5808 Olson Memorial Highway— Damascus Way — CU-159 - Applicant: Oppidan, Inc. Address: 5808 Olson Memorial Highway Purpose: To allow for a Residential Facility serving up to 30 clients The Informal Public Hearings and discussion for Items 4, 5 and 6 were combined. Goellner referred to a site plan and explained the applicant's request to move the existing Damascus Way facility to a new location approximately 200 feet to the west. She stated that the existing Damascus Way facility has been at the same location since 1977. Currently, the 2030 Comp Plan guides both the existing property and the new property Industrial and the Minutes of the Golden Valley Planning Commission October 23, 2017 Page 11 zoning designations on the existing properties are Institutional and R-1 Single Family Residential. The proposed new Comp Plan designation for the existing property is Industrial and for the new location Medium-High Density. The proposed zoning designation for the existing property is Industrial and for the new property it is R-3 Medium Density Residential. Goellner discussed the site characteristics of the proposed new location and stated that the property will be 32,240 square feet in size and will be accessible from Olson Memorial Highway. The new location is also near the proposed Zane Avenue bike lanes and sidewalks, the Luce Line trail, and bus routes on Highway 55, Douglas Driwe, and Golden Valley Road. Goellner explained that the existing location doesn't have a Conditional Use Perm:it because one wasn't required by Code when Damascus Way first opened. She stated-that the new facility requires a Conditional Use Permit to operate a 24-hour residential facility serving up to 30 individuals. Goellner explained that the facility will be licensed by Hennepin County and the State of Minnesota and will have a shared kitchen and dining facilities, a group activity room, and offices for staff. There will be one employee on site at all times and three to five employees on site during regular business hours. Goellner stated that the Zoning Code requires six parking spaces and that the applicant is proposing to have 15 parking spaces. Goellner referred to the comment regarding sex offenders and noted that the police and the courts don't have authority to decide where an off�nder can live but they do have to register their home address. She added that Damascus Way doesn't focus on this type of clientele, but rather on individuals who have been released from corrections in general. Goellner stated that staff is recornmending approval of the Conditional Use Permit. Staff is also recommending approval of amending the General Land Use Plan Map to guide the new property Medium-High Density Residential use and rezoning the property to Medium Density. Baker asked if there have been any complaints about the existing Damascus Way facility. Goellner said no. Blenker asked if a Cond`'itional Use Permit would be required if the facility moved but retained the same number of clients. Goellner said a Conditional Use Permit is required only if this facifity is serving more than 25 individuals on a property zoned R-3. Baker asked how the size of this facility compares with other similar facilities elsewhere in the state. Goellner said she doesn't know how it compares to others in the state but that there are other residential facilities in Golden Valley that are larger than this. Craig Fruen, Executive Director, Damascus Way, stated that they are the smallest facility of this type in the Twin Cities area. Baker asked about the proportion of level three sex offenders. Fruen stated that a level three sex offender lived at their facility for approximately nine months in 2013 and that he Minutes of the Golden Valley Planning Commission October 23, 2017 Page 12 doesn't live there anymore. He stated that their facility no longer accepts level three sex offenders. Johnson referred to the staff report where it states that the new Damascus Way building will be a safer and more secure building designed with institutional safeguards and asked what that means. Carl Nelson, President of Damascus Way, stated that their facility is staffed 24 hours a day, seven days a week and that the building has video monitoring and alarrns. He stated that part of the programming is accountability and that they know when residents are on site and their activities. He explained that a resident's transition plan includes obtaining a job and locating his next housing. Fruen added that Damascus Way is a halfway house and is designed to be a buffer to the community and to help keep the community safe by providing the residents a place to live. Blenker asked about the typical amount of time someone stays at the facility. Fruen said 2 to 8 months depending on the client. Baker opened the public hearing. Seeing and hearing no one wishing to comment, Baker closed the public hearing. Blenker questioned if changing the Comp Plan designation and zoning would be considered if this facility weren't already there. She noted that if Damascus Way wasn't located where it is the City would proba'bly zone the property Industrial. She asked about the implications of rezoning the property to R-3` Residential. Goellner stated that this is a unique situation and circumstance and that the proximity of the existing facility is a big factor in this case. Blenker asked if the use would be allowed in the fndustrial Zoning District. Goellner said no. Waldhauser stated that keeping this facility in this area has a stronger case than a new and different facility coming into an industrial area. Blenker stated that society produces these types of individuals and that there has to be a way to help people get back into society and this seems like a non-threatening way to do that. Baker agreed and stated that by encouraging this facility in this location the City is doing its part to help these individuals. MOVED by Blenker, seconded by Johnson and motion carried unanimously to recommend approval of changing the designation of 5808 Olson Memorial Highway on the General Land Use Map from Industrial to Medium-High Residential. MOVED by Blenker, seconded by Waldhauser and motion carried unanimously to recommend approval of rezoning the property at 5808 Olson Memorial Highway from R-1 Single Family Residential to R-3 Medium Density Residential. MOVED by Blenker, seconded by Waldhauser and motion carried unanimously to recommend approval of Conditional Use Permit #159 subject to the following findings and conditions: Minutes of the Golden Valley Planning Commission October 23, 2017 Page 13 Findinqs: 1. This facility is a unique housing type in the City and there is demonstrated need for this type of facility. The applicant has indicated that there is more demand than capacity at the existing facility, which serves up to 18 individuals. The proposed facility would serve up to 30 individuals. 2. The proposed residential facility use is consistent with the General Land Use Plan Map and the Comprehensive Plan. The Housing Chapter of the Comprehensive Plan states that a variety of housing types and designs should be provided in order to allow for greater housing choices for Golden Valley residents. 3. There is no evidence to support an argument that property values would be either positively or negatively affected by the presence of a residential faciiity in this' location. Assessing staff anticipates that there will be no effect as long as the property is well maintained. 4. The number of trips associated with the proposed use will not generate any negative traffic impacts to the surrounding areas. However, deliveries to the property should be made off-street whenever possible to mitigate short-term congestion. 5. The proposal will increase the population at the location as compared to the previous use. This is not expected to have a n�gative impact: ' 6. This use is expected to generate the same level of noise as any medium density residential building occupied by residents. 7. The proposed use is not anticipated to cause an increase in dust, odor, or vibrations. 8. The proposed use is not anticipated to attract pests. 9. The proposed building and parking area would have minimal visual impact and would be consistent with other properties'in the area. 10. Staff does not anticipate any other negative effects of the proposed use. The use is expected to make a positive impact on new residents of the facility. These residents are re-entering the community afterJife-changing events and will receive 24-hour care. Conditions: 1. The facility may serve up to 30 persons and must maintain required licensure from the State of Minnesota and Hennepin County at all times. 2. Site plans and building plans must meet all requirements in the Golden Valley City Code, including but not limited to building height and setbacks, building coverage, impervious surface, outdoor lighting, fencing, signage, and screening. Requirements must be met at all times and all final site and building plans must be approved prior to the issuance of a Building Permit and a Certificate of Occupancy. 3. A Conditional Use Permit Amendment application must be filed by the applicant if any sign'ificant changes are made to this proposal, or if any of the conditions of this approval can no longer be met, or if the City Manager or his/her designee identifies changes to the plan or building that impact the findings and recommendations made in this memorandum. 4. A sidewalk design acceptable to the City Manager or his/her designee must be included in final approved site plans and the applicant or property owner must construct the sidewalk. 5. Trash and recycling receptacles as well as rooftop equipment must be screened from view. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 14 6. This approval is subject to all other state, federal, and local ordinances, regulations, or laws with authority over this development. 7. Informal Public Hearing — General Land Use Plan Map Amendment— Corporate Woods — PUD #22 — 1111 Douglas Drive — CPAM-64 Applicant: Oppidan, Inc. Address: 1111 Douglas Drive Purpose: To change the designation on the General Land Use Plan Map from Commercial-Office to Mixed Use Zimmerman referred to a site plan and explained that upon completion of the Tennant World Headquarters this property will be vacated. The property is surrounded by higher density residential, office, and industrial uses along with single family residential north of Golden Valley Road. Zimmerman referred to the Douglas Drive Corridor study and stated that it calls for Mixed Use nodes along Douglas Drive as redevelopment occurs, a:nd the draft 2040 Comp Plan anticipates mixed use so staff is recommending reguiding this property from Commercial- Office to Mixed Use. He added that the property also needs to be reguided now in order to be in conformance with the proposed TIF Rlan. Zimmerman explained that the property is currently zoned Business and Professional Offices and that would need to be modified in the future to be consistent with the new land use. Also, the existing PUD would need to be rescinded once Tennant has vacated the site. Baker asked if this proposal would constrain what is done with the Optum site and questioned combining this site and the Optum site. Zimmerman said it shouldn't conflict with the Optum site. Waldhauser asked how T(F on this site affects the other Tennant site. Zimmerman stated that the increase in value on both sites will be utilized in the TIF plan. Blenker asked'how changing the land use impacts the current PUD. Zimmerman said it doesn't have an impact yet, it is taking steps toward when the site is vacated and guiding the land use plan toward mixed use. Johnson questioned why the proposal is to reguide the property to Mixed Use because the TIF plan says the property will be used for multi-family residential development. Zimmerman said some multi-family residential development is anticipated along with other uses. Baker opened the public hearing. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 15 Patricia Burrets, 6414 Golden Valley Road, asked what mixed use means and what would be allowed on this property. She said a new driveway was installed on this property directly across from her driveway and asked if that was built at the expense of Golden Valley or Hennepin County. She said she would like to know if a gas station and convenience store could be built and what the City visualizes for this property. She asked how large a footprint there could be for a new development compared to what is there now, what kind of buffer will there be, and what type of lighting there will be. She said she can't imagine after spending millions of dollars in this corridor that there will be anything like a gas station or convenience store in this location because it is simply not appropriate. She referred to the staff report where it states potential changes have been considered and asked why. She asked how the Douglas Drive Corridor Study done in 2009 is applicable today. She stated that senior housing would be appropriate and that the property should be medium or high density residential, not mixed use. ` Seeing and hearing no one else wishing to comment, Baker clased the public hearing. Zimmerman stated that mixed use is a mix of uses including residential, commercial, institutional, and office and is intended to be along"corridors where there is a level of density to support transit. He stated that the Douglas Drive Corridor Study was done in anticipation of redevelopment of Douglas Drive and the City planned for land uses that would be supportive of the investment being made in the roadway. He explained that the Study pointed out areas where mixed use nodes could be`used and the 2040 Comp Plan update will look at places along this corridor where mixed use makes sense. He agreed that a gas station or convenience store probably won't work at this site, but that some sort of senior housing and other uses would most Iikely work. He stated that there are no proposals submitted yet for this sit�;. At this point the City is just saying it envisions some sort of mixed use here in the futurre. Baker explained that this property among others that have the potential to be redeveloped will be considered during the Comp Plan update process and encouraged people to participate in the process. Baker questioned who paid for the driveway that Ms. Burrets spoke about. Zimmerman said he is not sure if it was part of the Douglas Drive reconstruction, but that he would find out. ' MOVED by Blenker, seconded by Johnson and motion carried unanimously to recomrnend approval of changing the designation of 1111 Douglas Drive North on the General Land Use Map from Commercial-Office to Mixed Use. 7. Consideration of Resolution 17-01 Finding that Modifications to the Redevelopment Plan for the Douglas Drive Corridor Redevelopment Project Area and the Tax Increment Financing Plan for Tax Increment Financing District Tennant World Headquarters Conform to the General Plan for the Development and Redevelopment of the City, as Amended (Amended 2008 Comprehensive Plan Update) Minutes of the Golden Valley Planning Commission October 23, 2017 Page 16 Nevinski stated that the resolution before the Planning Commission does two things. It modifies the Douglas Drive Corridor Redevelopment Project Area and approves the TIF plan for the Tennant World Headquarters. Nevinski explained that the project area locations that have been designated are where the HRA can invoke their powers including: planning, programs like Section 8, real estate activities like assembling land or contamination clean-up, and financing. He explained the project area in this case was established approximately 10 years ago and it established goals for redevelopment and reinvestment in the Douglas Drive Corridor. He stated that as the City began discussions with Tennant there was talk about the need to include Tennant in a redevelopment area so it made sense to modify the Douglas Drive redevelopment area to include the Tennant properties and the area#o the west of Tennant and Douglas Drive. Nevinski stated that the goals for area A-4 include opportunities for housing`and commercial uses, and preserving industrial uses and employment in manufacturing, research and development, and office. The goals for area A-5 retain and enhance industrial and commercial activities including employment, office, and services/amenities. Johnson asked when the redevelopment plan was created. Nevinski stated it was created in 2009. Waldhauser asked how much discussion there'has been on the Optum site. Nevinski said staff has talked with several developers about that site. Some want to reuse the site, and some want to redevelop the site so there has been some interest. Baker asked if there has been interest in creating a mixed use development, or if there is opportunity to influence the type of development on this site. Nevinski said there have been some inquiries about mixed use developments and that the City can try to influence development on this site with thoughtful planning. Johnson asked if the existing redevelopment plan has been brought up during discussions about the 2040 Comp Plan update. He said this is an important part of planning and he is wondering how to make this successful because he doesn't remember this plan being a part of any discussions about the Comp Plan so far. Baker asked if there is an opportunity to revise the Douglas Drive Area Redevelopment Plan. Nevinski stated that the existing land use section of the Comp Plan calls out the Douglas Drive Corridor as one of the Gity's redevelopment areas. He said the Douglas Drive Redevelopment Plan is more of visionary, high level document that is specific to the HRA and the HRA's powers and is a process that needs to be followed by the HRA so it can act in its capacity. Waldhauser noted that the redevelopment plan calls out incorporating some retail uses in this area. She said she would strongly encourage amenities for employees and the community. Nevinski stated that Tennant has requested TIF to assist with redevelopment of their corporate campus. He explained that TIF is the increase in tax value between the existing Minutes of the Golden Valley Planning Commission October 23, 2017 Page 17 and new use. The increased value can be used for eligible costs which can include funds for site assembly, demolition, soil correction, and utilities. Nevinski explained that the TIF district is proposed to be a 25 year pay-as-you-go, redevelopment district and that the City has agreed to $6.8 million to help fund Tennant's site improvements. The City will be using $1.6 million to fund Zane Avenue reconstruction, and $1 million for use at the Corporate Woods site. Blenker asked how the sale of the Corporate Woods site would the impact TIF plan. Nevinski said the ownership does not impact the TIF district. Nevinski stated that the role of the Planning Commission is to consider whether the Project Area Plan and the TIF District Plan conform to the general (Comprehensive) plan of the City as a whole, they are compatible with the City's regulations, and they encourage efficient use of infrastructure. Baker said he always thought TIF was designed to accomplish things the City could not otherwise accomplish. He questioned why TIF is being brought to the table and what the incentive is to the City if Tennant wants to create their corporate headquarters here. Nevinski said ultimately the decision lies with the City Couneil, but Tennant has options to locate in other areas where it might be easier to de��lop, but they'd like to be in Golden Valley and the site has some challenges. `He stated that many times the City won't use TIF, but it is an appropriate tool in this situation. Johnson noted that the TIF plan states that Area 4 will be used for multi-family development, but the request is to guide it for mixed use. Nevinski stated that there have been discussions about having a residential use on the Corporate Woods site and that there are also opportunities to do a unique mix of uses on that site as well. Johnson questioned if the City needs more housing. Zimmerman stated that the City does need additional senior housing. MOVED by Blenker, seconded by Waldhauser and motion carried 3 to 1 to adopt resolution 17-01 Finding that Modifications to the Redevelopment Plan for the Douglas Drive Corridor Redevelopment Project Area and the Tax Increment Financing Plan for Tax Increment Financing District Tennant World Headquarters Conform to the General Plan for the Development and Redevelopment of the City, as Amended (Amended 2008 Comprehensive Plan Update). Commissioner Johnson voted no. --Short Recess-- 9. Reports on Meetings of the Housing and Redevelopment Authority, City Council, Board of Zoning Appeals and other Meetings Zimmerman gave an update on the Bottineau Light Rail project. Minutes of the Golden Valley Planning Commission October 23, 2017 Page 18 10. Other Business • Council Liaison Report No report was given. 11. Adjournment The meeting was adjourned at 10:59 pm. Ron Blum, Secretary Lisa Wittman, Administrative Assistant �`�L�1 ��� '� ��a -� �. '� � .� �� �,� �� , ' ; � �� ,� �q�,, �,�5 � � ���s��� ,:�. �`��' � � � ���z� Ph�si�al �+�velc�prne�t T)ep�rfirn�n�t 763-593-8095!763-593-81 U9{f�x) Date: November 13, 2017 To: Golden Valley Planning Commission From: Sue Virnig, Finance Director Jason Zimmerman, Planning Manager Subject: 2018-2022 Capital Improvement Program Finance Director Sue Virnig will present the 2018-2022 Capital Improvement Program (CIP). Chapter 11 of the Comprehensive Plan is the CIP which is amended annually. As stated in the by- laws of the Planning Commission, it is the duty of the Commission to review major capital improvement plans against the goals and policies incorporated into the Comprehensive Plan and to determine if they are consistent. The new five-year CIP was discussed at the Council/Manager meeting on August 8, 2017. Key initiatives in this plan include: • Isaacson Park ball field lighting (2018) • DeCola Ponds B & C project (2019-20) • Winnetka Avenue utility rehabilitation (2020) • Pavement Management Program (2018-2022) Many of the dollars in the proposed CIP will fund projects that further the goals of the Comprehensive Plan, including: Providing Recreation Opportunities for All Age Groups and Ability Levels, Regulating Storm Water to Minimize Flood Problems, Maintaining and Rehabilitating Infrastructure, and Preserving and Enhancing the Transportation System. The following CIP initiatives were completed in 2017: • Brookview Community Center construction • Douglas Drive reconstruction Recommended Action Staff recommends approval of the 2018-2022 Capital Improvement Program as it is consistent with the goals and policies of Golden Valley's Comprehensive Plan. Attachments: 2018-2022 Capital Improvement Program (135 pages) city of o en va e 2018-2022 Capital Improvement Program Proposed December 5, 2017 Reviewed by Council August 8, 2017 Reviewed by Planning Commission October Mayor Shepard M. Harris Council Joanie Clausen, Larry Fonnest, Steve Schmidgall, Andy Snope Management Team Tim Cruikshank City Manager Rick Birno Director of Parks and Recreation John Crelly Fire Chief Marc Nevinski Physical Development Director Kirsten Santelices Human Resources Director Jason Sturgis Police Chief Sue Virnig Director of Finance Cheryl Weiler Communications Manager CITY OF GOLDEN VALLEY, MINNESOTA 2018-2022 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Page Introduction � Financing Exhibit I - General Fund Projects � Exhibit II - Water& Sewer Utility Fund Projects $ Exhibit III - Brookview Golf Course Fund Projects and Working Capital Projection 9 Exhibit IV - Equipment Replacement Fund Projects and Cash Balance Projection 10 Exhibit V - Building Funds—Buildings, Cablecasting 11 Exhibit VI - Park Improvement Fund Projects and Cash Balance Projection 12 Exhibit VII - Storm Sewer Utility Fund Projects and Cash Balance Projection 13 Exhibit VIII - City Municipal State Aid Street Fund Projects and Cash Balance Projection 14 Exhibit IX - Capital Improvement Fund Projects and Cash Balance Projection 15 Exhibit XI - General Obligation Bonded Debt Tax �evy Projections 16 Exhibit XII - Summary of Capital Improvement Expenditures by Category by Year 17 Exhibit XIII - Financing Summary by Source by Year �8 Vehicles & Equipment (V&E) �9 Parks (P) 49 Golf (GC) 60 Buildings (B) 70 Buildings 7� Cablecasting (C) �$ Storm Sewers (SS) $� Water& Sanitary Sewer Utility (W&SS) 9� Streets (S) 102 Appendix 113 Special Assessment Policy 114 Fleet Operation, Maintenance, and Replacement Policy 121 Projects & Funding Sources by Department Summary 132 August 4, 2017 The Honorable Shepard Harris, Mayor Members of the City Council Dear Mayor Harris and City Council Members: The Proposed Capital Improvement Program (CIP) for years FY 2018-2022 is presented with this transmittal. The Capital Improvement Program is a five-year fiscal planning instrument that is used to identify needed capital projects and to delineate the financing and timing of the associated projects. Generally these projects exceed $10,000 in cost and require long-term financing. An annual capital improvement budget, encompassing the projects outlined for the first year of the CIP, is presented to the Council with the City budget. The capital improvement also identifies bond issues necessary to fund the year's improvements. Each project is brought forth in the upcoming year for final approval by Council. The adoption of a CIP is a requirement for each city in the metropolitan area. As part of the Metropolitan Land Planning Act passed by the State legislature in 1976, each city is required to adopt a Comprehensive Plan. In 2009, the City's Comprehensive Plan was approved and accomplished: • Updated zoning and subdivision codes; • Housing implementation programs; • Capital Improvement Program related to transportation, sewers, parks and open space facilities Starting this year, staff will be working on an update to the current comprehensive plan and will make revisions and approval by 2018. Many citizens have had input through various contacts. Because of its relationship to the Comprehensive Plan, the CIP is reviewed by the Planning Commission. The CIP should be viewed as a vehicle to accomplish the goals outlined in the City's Comprehensive Plan. The goals in the plan cover housing, sanitary and storm sewers, public facilities, transportation and parks and open spaces. An orderly expenditure of funds on capital items is a means of accomplishing the Plan. A complete CIP is an indispensable tool for the City Council and the City staff as they manage and control the timing and financing of capital improvements needed to maintain the current high level of City services. A CIP is also used by the bond rating agencies to not only evaluate the current and future financial condition of a city, but also to evaluate the quality of a city's management. Adoption of this comprehensive CIP for 2018-2022 will enhance the City's ability to maintain its current Aa1 bond rating. Finally, a CIP is a valuable document for commission members and citizens to use to gain an understanding of how their City works and the means to accomplish its overall plan. Page 1 The process for completing the 2018-2022 CIP was much the same as the process for the 2018-2019 Budget. Project requests were submitted by all the divisions and reviewed by the Management Team and appropriate supervisors to establish the feasibility and priority of the projects and match with available financing. The CIP is a planning document or guide for the future capital improvements in the City which in no way constitutes formal approval of the various projects. All of the projects will be formally approved through the City's purchasing or public improvement process. Each section lists the upcoming projects, project overview, and an estimated cost of the project. The Financing section includes a narrative analysis of financing sources involved in the program along with exhibits analyzing some of these sources, with special emphasis on the City's Capital Project Funds. Also included is an exhibit which provides an analysis of the estimated future tax levies needed to finance the City's current general obligation debt and the future general obligation debt identified in the program. There are also two exhibits which summarize projects by year, source of financing by year and the category for each project. The sections are: Financing Vehicles and Equipment Parks Golf Course Buildings Cablecasting Storm Sewers Water 8� Sanitary Sewer Utility Streets The New Brookview Center financing was added to the 2017-2021 Capital Improvement Program along with the Douglas Drive Corridor. Both will be complete by the time this document is adopted. I look forward to completing these important projects in the coming fiscal year. As we move forward with this FY 2018-2022, I hope that this CIP meets your approval and provides a useful tool for the Council as it makes decisions regarding these projects. Timothy Cruikshank City Manager Page 2 CITY OF GOLDEN VALLEY, MINNESOTA 2018 - 2022 CAPITAL IMPROVEMENT PROGRAM FINANCING The 2018-2022 Capital Improvement Program (CIP), which is detailed on the following pages, is financed from a variety of sources. The purpose of this section is to describe and analyze these sources, in as much detail as possible, so that the users of this CIP can be certain that the program as outlined can be financed from available financing sources. General Fund The General Fund is the main operating fund of the City, and as such contains most of the City's operating divisions. The main revenue source for this fund is real estate taxes. Large, non-recurring capital outlay expenditures are usually made from one of the City's capital project funds. Level annual transfers from the General Fund to these funds help to even out the annual budgeting process. The General Fund fund balana as of December 31, 2016 was $10,10,973,076. Exhibit I lists the General Fund transfers to Funds for projects in the CIP. Water 8� Sewer Utilitv Fund The Water & Sewer Utility Fund is an enterprise fund, which is involved in the operation and renewal & replacement of the City's water and sanitary sewer systems. The main sources of revenue for this fund are the user charges to those residential and commercial/industrial customers connected to the systems and franchise fees to help with infrastructure improvements. Per City policy, new lateral water and sewer system projects are assessed at 100% of cost unless there are unusual circumstances involved, in which case the City would pay for the difference from the reserve account. Since the City is essentially fully developed, therE should be fewer and fewer of these projects in future years. These late�al water and sewer system projects are usually requested by property owners, so it is very hard to project when they might occur and the total cost. The trunk water system is owned and operated under a joint powers agreement with the cities of Golden Valley, New Hope and Crystal. This organization is known as the Joint Water Commission. The operating and capital improvement expenditures of the trunk water system are shared by the three cities. In 2014, an Emergency Water Supply was approved. Financing was through an interfund loan with an additional fee on water consumption. In 2015, another interfund loan was used to finance the break on the water main that carries water from Minneapolis to Crystal through Robbinsdale. The trunk sanitary sewer system is owned by Metropolitan Council Environmental Services to which the City makes monthly payments for the operation of and the capital improvements to the trunk system. The fund balance or net position that is unrestricted at 12/31/16 was $6,889,720. The financial position of this fund is extremely important because the City is facing large expenditures in future years for the renewal and replacement of aging water and sewer lines. Exhibit II is a list of projects in the program financed by the Water& Sewer Utility Fund. Brookview Golf Course Fund The Brookview Golf Course Fund is an enterprise fund, which is involved in the operation and improvement of the City's golf course and newly developed Lawn Bowling Course in 2014. The main revenue source is green fees paid by the golfers. The golf course consists of an 18 hole regulation course, a 9 hole par 3 course and a driving range. Other revenue sources come from the lawn bowling course, pro shop and grill. Many of the improvements to the course are part of regular course maintenance, but where specific projects Page 3 can be defined and costs estimated, they are included in the program. Major pieces of equipment used by the golf course are also included in the program. In December 2017, the new Brookview Center will open a new facility for the golf pro shop and restaurant. The net position in this fund as of December 31, 2016 was $1,134,257. This was slightly higher than the previous year due to the great weather and activity from the course. Exhibit III is a list of the major course improvements and equipment included in the program and the projected working capital balances of this fund. Storm Sewer Utilitv Fund The Storm Sewer Utility Fund is an enterprise fund, which is involved in the maintenance and improvement of the City's storm water system including storm sewers and holding ponds. The fund is financed from charges to all the property in the City based on the level of estimated storm water runoff from a given class of property. Projects funded are those related to the Pavement Management Program, the City's adopted Storm Water Management Plan and projects constructed in conjunction with the other cities that are members of the Bassett Creek Water Management Commission. Exhibit VII is an analysis of the projected revenue, expenditures and cash balances in this fund. In 2016, bonds were sold and wilt be paid back with tax increment received from The Liberty development. The net position in this fund as of December 31, 2016 was $10,025,218. Equipment Replacement Fund This capital project fund is used to finance major vehicle and equipment purchases for General Fund divisions. One of the revenue sources of this fund is the proceeds of the sale of Certificates of Indebtedness. Exhibit IV is an analysis of the projected revenue, expenditures and cash balances in this fund. The estimated future annual tax levies that will be needed to repay the debt service on current and future certificates of indebtedness issues are detailed in Exhibit XI. Buildina Fund This capital project fund is used to finance major improvements to buildings used by the General Fund divisions. Wold Architects completed a city facility analysis in 2006. This plan has been incorporated into the Building Fund and the 2018 General Fund Buildings Budget as funding permits. A major source of financing in this fund is transfers from the General Fund. Exhibit V is an analysis of the projected revenue, expenditures and cash balances of this fund. Cablecastina Fund This capital project fund was separately designated in 2014 to account for the franchise fees collected for cablecasting. These monies are designated for any future improvements for the council chambers to provide cablecasting of public meetings. Northwest Cable Television (NWCT) provides service and programing for the city. Park Improvement Fund This capital project fund is used to finance major park and open space improvements. One of the revenue sources in this fund is an annual transfer from the General Fund along with park dedication fees. Exhibit VI is an analysis of the projected revenue, expenditures and cash balances of this fund. Municipal State Aid (MSA) Fund This fund is used to account for moneys held in account both by the City and the State of Minnesota for use in the maintenance and improvement of municipaf state aid streets located in the City. Streets are Page 4 designated as municipal state aid based on criteria established by the State. Each city is allowed a maximurr number of miles of these designated streets. Every improvement project involving these streets must first be approved by the State. If approved, a certain portion of the projected cost is advanced to the City from its MSA account at the State, with the balance being paid upon completion. The monies that finance the City's MSA account at the State come from the State gasoline tax. The City's MSA account at the State is essentially the City's money, and the amount in the account at any one time is included as an asset of this fund. The State also participates directly in various street and storm sewer improvement projects with the City, when the particular project benefits or involves State highways and rights of way. On the worksheets for street and storm sewer projects, the designation under the financing analysis of MSA refers to the City's MSA account at the State, and State of Minnesota refers to direct State participation. Exhibit VII is an analysis of the projected revenue, expenditures and cash balances of the Municipal State Aid Fund. Caaital Improvement Fund Revenues for this fund will primarily come from a portion of the franchise fees that are not designated for payment of debt services from the Douglas Drive project. Monies in this fund finance infrastructure improvements. Exhibit VIII is an analysis of the projected revenue, expenditures and cash balances of this fund. General Oblis�ation Bonds To finance certain projects the City must borrow funds externally by issuing general obligation municipal bonds. The method(s) of financing the repayment of these bonds differentiates the various types of bonds used in the program. Tax Increment Bonds The proceeds of these bond issues are used to pay for public improvements in specially designated tax increment districts. The debt service on the bonds is repaid from property taxes on the increased value in the district over a base year's value. The property taxes on the increased value (increment) are not distributed to the various taxing jurisdictions, but are retained by the City to pay off the debt service on the bonds. The increased value in the district comes from the increased commercial/industrial development made possible by the public improvements financed by the bonds. The City has four tax increment districts. , Special Assessment Bonds Per State Statute, if at least 20% of the bond principal for a public improvement is financed by special assessments against benefited properties, the balance can be financed from tax levies against all the property in the City without the need of a bond referendum. On the project worksheets, if special assessment bond financing is involved, we have indicated the amount of bonds to be repaid from special assessments and tax levies. The pavement management program uses special assessment bonds for financing along with assessments from benefiting properties. These street projects will extend over a longer period than is included in the 2018-2022 CIP and will be financed by annual special assessment bond issues. On the project worksheet for the pavement management program, the method of financing is indicated as just Special Assessment Bonds. Page 5 Certificates of Indebtedness Certificates of Indebtedness are used to help finance capital equipment that is outlined in the Equipment Replacement Fund. These are short-term general obligation debt instruments issued for a term of four years and repaid from annual tax levies. Current legislation has allowed cities to extend the term of these certificates up to ten years if the life of the asset is that in length. We may extend the term for those certificates that will finance fire pumper replacements. Municipal State Aid (MSA) Revenue Bonds MSA bonds were sold in 2007 for the first time for the City of Golden Valley. The project was Golden Valley Road and Bridge replacement. The debt service payments will be repaid over twenty years with State Aid Allotments used to improve and maintain Municipal State Aid roads. Tax Abatement Bonds These bonds will be repaid from the abated City taxes on the General Mills' headquarters expansion, which has been completed. The abatement agreement was signed between the City and General Mills in 2001 and the bonds were sold in 2004. The City taxes generated by the expansion will not be used to finance general City operations, but will be used to pay the debt service on the bonds. The term of the abatement agreement is fifteen (15)years and will end in 2019. Exhibit XI is an analysis of the projected tax levies needed to finance the current general obligation bonded debt of the City of Golden Valley. Page 6 CITY OF GOLDEN VALLEY 2018 - 2022 CIP GENERAL FUND (FUND 1000) EXHIBIT I EXPENDITURES PROJECT (1) 2018 2019 2020 2021 2022 Transfer to Building Fund $350,000 $400,000 $450,000 $500,000 $500,000 Transfer to Park Improvement Fund 300,000 325,000 350,000 375,000 400,000 Transfer to Street Reconstruction 400,000 500,000 500,000 500,000 500,000 for Overlays Totals $1,050,000 $1,225,000 $1,300,000 $1,375,000 $1,400,000 Notes• (1) The individual building and park projects funded by these transfers are included in the Building and Parks Sections of the CIP. All transfers are included and approved with the General Fund budget. � CITY OF GOLDEN VALLEY 2018-2022 C I P WATER AND SEWER UTILITY FUND (FUND 7120) EXHIBIT II 2018 2019 2020 2021 2022 Net Position @ 1!1 $5,450,805 $4,392,250 $3,559,965 $2,162,046 $2,272,820 Revenue: Franchise Fees 400,000 400,000 400,000 400,000 400,000 600,000 1,100,000 1,100,000 1,100,000 1,100,000 Grant 300,000 Project Reimbursement(TIF) Operating Revenue 8,672,660 8,915,195 9,182,651 9,458,130 9,741,874 Total Revenue for Operations 9,672,660 10,415,195 10,682,651 10,958,130 11,541,874 Total Available 15,123,465 14,807,445 14,242,616 13,120,177 13,814,694 Expenditures: Operating Expenditures: Administration (600,400) (581,000) (595,525) (610,413) (625,673) Sewer Maintenance (3,088,750) (3,164,990) (3,259,940) (3,357,738) {3,458,470) Water Maintenance (4,712,065) (4,861,490) (4,910,105) (4,959,206) (5,008,798) Sub-TotalOperations (8,401,215) (8,607,480) (8,765,570) (8,927,357) (9,092,941) Capital Outlay: 2018 (2,330,000) 201 g (2,640,000) 2020 (3,315,000) 2021 - (1,920,000) 2022 (2,191,000) Sub-Total Capital Expenses (2,330,000) (2,640,000) (3,315,000) (1,920,000) (2,191,000J Total Expenses (10 731 215) (11 247 480) (12 080 570) (10,847,357) (11,283,941; Net Position @ 12/31 $4,392,250 $3,559,965 $2,162,046 $2,272,820 $2,530,752 � CITY OF GOLDEN VALLEY 2018-2022 CIP BROOKVIEW GOLF COURSE FUND (FUND 7150) EXHIBIT III 2018 2019 2020 2021 2022 Net Position @ 1/1 $940,327 $749,977 $800,632 $916,392 $994,264 Revenue: Totai Course Revenue 2,648,450 2,671,450 2,724,879 2,779,377 2,834,964 Total Available 3,588,777 3,421,427 3,525,511 3,695,769 3,829,228 Expenses: Operating Expenses: (2,370,800) (2,464,795) (2,477,119) (2,489,505) (2,501,952) Capital Outlay 2018 (468,000) 2019 (156,000) 2020 (132,000) -2021 (212,000) 2p22 (120,000) al Expenses (2,838,800) (2,620,795) (2,609,119) (2,701,505) (2,621,952) Net Position @ 12/31 $749,977 $800,632 $916,392 $994,264 $1,207,276 —1 CITY OF GOLDEN VALLEY 2018-2022 CIP EQUIPMENT REPLACEMENT FUND(FUND 5700) EXHIBIT IV 2018 2019 2020 � 2021 2022 Fund Balance @ 1/1 2,353,761 1,673,229 1,482,891 1,268,150 1,140,762 Revenue: Proceeds-Certificates of Indebtedness 800,000 800,000 800,000 800,000 800,000 Proceeds-Certificates of Indebtedness 400,000 Sale of Assets(Auction proceeds): 35,000 35,000 35,000 35,000 35,000 Transfer from DUI Fund 40,000 Fire Truck Trade-in 50,000 Interest Earnings(Beginning Balance) 23,538 16,732 14,829 12,682 11,408 Total Available 3,702,299 2,524,961 2,332,720 2,115,832 1,987,169 Expenditures: Capital Outlay 2018 (2,029,070) 2019 (1,042,070) 2020 (1,064,570) 2021 (975,070) 2022 (895,070) Total Expenditures (2,029,070} (1,042,070) (1,064,570) (975,070) (895,070) Fund Balance @12/31 1,673,229 1,482,891 1,268,150 1,140,762 1,092,099 � � CITY OF GOLDEN VALLEY 2018-2022 CIP � BUILDING FUND(FUND 5200) EXHIBIT V 2018 2019 2020 2021 2022 Fund Balance @ 1/1 $1,029,012 $946,730 $903,830 $830,609 $1,006,838 Revenue: Transfer From General Fund 350,000 400,000 450,000 500,000 500,000 Interest Earnings 7,718 7,100 6,779 6,230 7,551 Total Available 1,386,730 1,353,830 1,360,609 1,336,838 1,514,390 Exaenditures: 2016 (440,000) 2017 (450,000) 2018 (530,000) 2019 (330,000) 2020 (150,000) Total Expenditures (440,000) (450,000) (530,000) (330,000) (150,000) Fund Balance @ 12/31 $946,730 $903,830 $830,609 $1,006,838 $1,364,390 CITY OF GOLDEN VALLEY 2018-2022 CIP CABLECASTING FUND(FUND 5500) EXHIBIT V 2018 2019 2020 2021 2022 Fund Balance @ 1/1 $240,687 $278,230 $115,962 $152,881 $189,986 Revenue: Franchise Fees 36,340 36,340 36,340 36,340 36,340 Interest Earnings 1,203 1,391 580 764 950 Total Available 278,230 315,962 152,881 189,986 227,276 Exqenditures: 2018 0 2019 (200,000) � 2020 0 2021 � 0 2022 � Total Expenditures 0 (200,000) 0 0 0 Fund Balance @ 12/31 $278,230 $115,962 $152,881 $189,986 $227,276 j � CITY OF GOLDEN VALLEY 2018-2022 CIP PARK IMPROVEMENT FUND (FUND 5600) EXHIBIT VI 2018 2019 2020 2021 2022 Cash Balance @ 1/1 $655,387 $347,302 $321,907 $316,321 $290,694 Revenue: Transfer From General Fund 300,000 325,000 350,000 375,000 400,000 MN Twins Fund Little League Payment 15,000 Hennepin County Youth Sports Grant 150,000 MN/W isc Playground Paul's Pals Three Riviers Park Disctrict Park Dedication Fee ISD#281 (SEA School) 12,500 Golden Valley Youth Associations 12,500 Interest Earnings 4,915 2,605 2,414 2,372 2,180 Total Available 1,125,302 674,907 674,321 718,694 692,874 Expenditures: 2018 2019 (778,000) 2020 (353,000) 2021 (358,000) 2022 (428,000) (303,000) Total Expenditures (778,000) (353,000) (358,000) (428,000) (303,000) Estimated Net Assets @ 12/31 $347,302 $321,907 $316,321 $290,694 $389,874 12 CITY OF GOLDEN VALLEY 2018-2022 CIP STORM SEWER UTILITY FUND (FUND 7300) EXHIBIT VII 2018 2019 2020 2021 2022 Net Position @ 1/1 $3,147,218 $2,747,683 $3,346,808 $3,362,490 $3,773,198 Revenue: Storm Sewer Charges 2,475,000 2,475,000 2,475,000 2,475,000 2,475,000 Bassett Creek Watershed Management Commission 500,000 1,100,000 300,000 300,000 Hennepin County 670,000 State of MN (Bridge Bonds/DNR) 2,206,000 50,000 Other Interfund Loan-Water/Sewer 203,300 198,830 194,360 189,875 189,875 Interfund Loan-Liberty Crossing 110,000 110,000 110,000 110,000 110,000 Interest Earnings 50,000 50,000 33,468 33,625 37,732 Total Revenue 2,838,300 6,209,830 3,912,828 3,108,500 3,162,607 Total Available 5,985,518 8,957,513 7,259,636 6,470,990 6,935,805 Exaenditures: Operating Expenditures: Storm Sewer Maintenance (525,450) (532,685) (548,666) (565,126) (582,079) Street Cleaning (128,595) (129,380) (133,261) (137,259) (141,377) Environmental Services (336,790) (342,640) (352,919) (363,507) (374,412) Debt Service-Revenue Bonds(2037) (65,000) (65,000) (182,300) (179,900) (182,450) Sub-Total of Operations (1,055,835) (1,069,705) (1,217,146) (1,245,792) (1,280,318) Capital Outlay: 2016 2017 2018 (2,182,000) 2019 (4,541,000) 2020 (2,680,000) 2021 (1,452,000) (1,925,000) Sub-Total of Capital Expenditures (2,182,000) (4,541,000) (2,680,000) (1,452,000) (1,925,000) Total Expenditures (3,237,835) (5,610,705) (3,897,146) {2,697,792) (3,205,318) Net Position @ 12/31 $2,747,683 $3,346,808 $3,362,490 $3,773,198 $3,730,487 �3 CITY OF GOLDEN VALLEY 2018-2022 CIP CITY STATE AID CAPITAL PROJECT FUND(FUND 5100) EXHIBIT VIII 2018 2019 2020 2021 2022 Fund Balance @ 1!1 2,928,630 1,404,105 1,838,680 669,475 1,181,662 Revenue: State Aid Bond Payments 125,000 130,000 135,000 145,000 150,000 Annual Maintenance Ailotment From State 363,095 363,095 363,095 363,095 363,095 Special Assessments-State-Aid Bonds; Golden Hilis/Xenia Avenue 150,000 150,000 150,000 150,000 Haroid Avenue Reconstruction 1,800 1,800 Hwy 55 West Special Assessments 82,752 79,993 77,235 74,476 TIF reimbursement(Hwy 55 West) 44,848 154,783 152,253 154,993 Zenith State Aid 1,250,000 Piymouth State Aid 1,530,000 170,000 Zane/Lindsay State Aid 2,160,000 240,000 MN DOT Grant Interest Earnings (°/a of Beg.Bal.) 21,965 10,531 13,790 5,021 8,862 Totai Availabie 4,970,490 2,357,131 4,895,341 1,802,079 3,333,088 Exoenditures: Maintenance 125,000 125,000 125,000 125,000 125,000 MSA Debt Service(ends 2027) 196,385 201,005 200,165 198,916 197,455 Golden Hil�s/Xenia Avenue 1,500,000 Hwy 55 Bond Payments 147,446 255,701 251,501 252,551 Flashing Arrows 45,000 45,000 45,000 45,000 45,000 Plymouth Ave Rehabilitation 1,700,000 Zane/Lindsay Reconstruction 3,600,000 Zenith Avenue Reconstruction 1,500,000 Total Expenditures 3,566,385 518,451 4,225,866 620,417 2,120,006 Fund Balance @ 12/31 $1,404,105 $1,838,680 $669,475 $1,181,662 $1,213,082 � � CITY OF GOLDEN VALLEY 2018-2022 CIP CAPITAL IMPROVEMENT FUND (FUND 6100) EXHIBIT IX 2018 2019 2020 2021 2022 Fund Balance @ 1/1 $733,875 $756,554 $864,779 $869,407 $969,401 Revenue: Charge to Street Reconstruction Projects to Finance CAD &Pavement Management SystE 20,000 20,000 20,000 20,000 20,000 Franchise Fees (CenterpoinUXcei) 110,000 200,000 200,000 200,000 200,000 Interfund Loan from Utility Fund 217,440 212,760 208,080 203,400 203,400 City of Crystal 100,000 Interest Earnings (1% of Beg. Bal.) 7,339 7,566 8,648 8,694 9,694 Total Available 1,088,654 1,196,879 1,401,507 1,301,501 1,402,495 Expenditures: 2018 (332,100) 2019 (332,100) 2020 (532,100) 2021 (332,100) _ 2022 (332,100) {332,100) (332,100) (532,100) (332,100) (332,100) Fund Balance @ 12/31 $756,554 $864,779 $869,407 $969,401 $1,070,395 ' J CITY OF GOLDEN VALLEY 2018-2022 CIP GENERAL OBLIGATION-CURRENT DEBT PAYMENTS EXHIBIT XI-(does note include issues that are in escrow) � �D CITY OF GOLDEN VALLEY 2018-2022 CIP CAPITAL IMPROVEMENT EXPENDITURES BY CATE60RY BY YEAR EXHIBIT X11 I � � CITY OF GOLDEN VALLEY 2018-2022 CIP FINANCING SUMMARY BY SOURCE BY YEAR EXHIBIT XIII IV city of � �lden � va e Capital Improvement Program 2018-2022 Vehicles and Equipment Replacement Section This section includes all capital equipment and vehicles that help employees have the tools to fulfill their job requirements. The Vehicle Maintenance department maintains all equipment and vehicles except for the Enterprise Funds (Water and Sewer, Storm Sewer, and Golf). The City's Information Technology Coordinator maintains the computers, printers and phone system. Each year each piece of equipment is reviewed before replacement. This schedule allows the City to finance upcoming purchases for the next five years. Financing for this fund comes from selling Equipment Certificates. Certificates are paid back in four years by a debt levy. � � City of Golden Valley, Minnesota Capital Plan 2018 thru 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Vehicies and Equipment � Marked Squad Cars(Police) V&E-001 100,000 100,000 100,000 100,000 100,000 500,000 Computers and Printers(Finance) V&E-002 80,000 95,000 95,000 95,000 95,000 460,000 Front End Loader(Street) V&E-009 260,000 260,000 Asphalt Paver(Street) V&E-012 150,000 150,000 Portable Computers(Police) V&E-020 50,000 50,000 Sign Truck(Street) V8E-022 120,000 120,000 Unmarked Police Vehicle(Police) V&E-024 40,000 40,000 Dump Truck(Park) V&E-029 80,000 80,000 Rotary Mower(Park) V&E-030 110,000 110,000 Skylift Man Lift(Park&Street V&E-033 40,000 40,000 Crime Prevention Vehicle(Police) V&E-034 30,000 30,000 Aerial Ladder Truck(Fire) V&E-037 575,000 575,000 Utility Tractor(Park) V&E-039 75,000 15,000 Rotary Mower(Park) V&E-048 25,000 25,000 Asphalt Coid Planer(Street) V&E-052 25,000 25,000 Rescue Vehicle(Fire) V&E-060 90,000 90,000 Pickup Truck(Street) V8E-063 40,000 40,000 Tandem Axle Dump Truck(Street) V&E-066 270,000 270,000 SidewalklMaintenanceTractor(Park) V8E-089 50,000 50,000 Pickup Truck(Police) V8E-095 40,000 40,000 Pickup Truck(Park) V&E-100 50,000 50,000 Pickup Truck(Fire) V&E-102 40,000 40,000 Concrete Saw(Street) V&E-103 30,000 30,000 Polaris 6 X 6(Fire) V&E-106 15,000 15,000 Bobcat Utility Truckster(Park) V&E-f07 55,000 55,000 Single Axle Dump Truck(Street) V&E-109 230,000 230,000 Dump Truck(Street) V&E-110 230,000 230,000 Portabie Message Sign Trailer V&E-115 25,000 25,000 Bobcat Toolcat(Park) V&E-116 50,000 50,000 Sidwalk Tractor(Street) V&E-118 160,000 160,000 Tasers(Police) V&E-121 16,000 16,000 Rotary Mower(Park) V&E-130 25,000 25,000 800 MHz Radios(Public Works Maintenance) V&E-133 183,000 183,000 Body Cameras(Police) V&E-135 24,070 24,070 24,070 24,070 24,070 120,350 Zodiac Boat(Fire) V&E-136 5,500 5,500 Outboard Motor(Fire) V&E-137 5,500 5,500 Passenger Vehicle(Fire) V&E-138 40,000 40,000 Passenger Vehicle(Fire) V&E-139 40,000 40,000 Utility Trailer(Park) V8E-140 5,500 5,500 Pickup Truck(Park) V&E-141 35,000 35,000 Dump Truck(Park) V&E-142 80,000 80,000 Trash Compactor(Park) V&E-143 65,000 65,000 Single Axle Dump Truck(Street) V&E-144 230,000 ?30,000 Skid Steer Loader(Street) V&E-145 55,000 55,000 Dump Truck(Street) V&E-146 80,000 80,000 Piice Commander Vehicle(Police) V&E-147 50,000 50,000 �� Department Project# 201$ 2019 2020 2021 2022 Total SWAT Van(Police) V&E-148 100,000 100,000 Water Truck(Street) V&E-149 215,000 215,000 Fire Pumper Truck(Fire) V&E-151 600,000 600,000 Passenger Vehicle(Fire) V&E-152 40,000 40,000 Equipment Trailer(Street) V&E-153 20,000 20,000 Tra�c Trailer(Police) V&E-154 30,000 30,000 Vehicles and Equipment Total 2,019,070 1,032,070 1,054,570 965,070 885,070 5,955,850 GRAND TOTAL 2,019,070 1,032,070 1,054,570 965,070 885,070 5,955,850 2 � Project# V&E-001 Uepartment Vehicles and Equipment Contact Project Name Marked Squad Cars (Police) 1'y pe Equipment l�seful I.ife ('ategor� Vehicles i Description _ _ __ -- Marked squad cars for the Police Department per replacement schedule for tbe City's ten squads. � i � __ -------__...-- _. -- ------ � i _ Jusdfication �--_____ __ . �Each year all ten squads are looked at based on the number of miles,accidents and overall safety.The number replaced may vary based on these factors. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 100,000 100,000 EquipNehicles/Furnishings 100,000 100,000 100,000 100,000 400,000 Total 100,000 100,000 100,000 100,000 100,000 500,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund ` 100,000 100,000 100,000 100,000 100,000 500,000 Total 100,000 100,000 � 100,000� 100,000 100,000 500,000 Project# VBtE-��2 Depar[ment Vehicles and Equipment Contact Project Name Computers and Printers Finance � � 7'��pe Equipmeut Usetul l.ife Categor� Equipment:Computers i Description � - _ _ . IReplacement of computers siwitches and printers in the City. Most computers are scheduled to be replaced every four to five years and printers every eight. The j City has a total of 150 computers and printers. Also includes upgrades to the City's computer network system,which includes switches,hubs and fiber connection hardware. ' _ ___ _ __ ' Justification - ,. Technology changes make personal computers obsolete afier five years for business purposes. The computers wi11 be replaced on the basis of need. � _ _. , Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings�___ 80,000 _95,000 95,000 95,000� 95,000 460,000 ----___-.__._...__._�_.�___ 'rotal 80,000 95,000 95,000 95,000 95,000 460,000 Funding Sources 2018 2019 2020 2021 2022 Total - _.__ Equipment Replacement Fund 80,000 95,000 95,000 95,000 95,000 460,000 -- ___-_ _ -._.------.. _._�_ Total 80,000 95,000 95,000 95,000 95,000 460,000 22 Projecf# V&E-009 Uepartment Vehicles and Equipment Contact Project Name Front End Loader Street � � 7'ype Equipment Useful I.ifc Categor� Vehicles '� Description _ __.-— --- — ---- 3-4 cubic yard front end loader for the Street Uepartment to replace Unit 766(2003 Caterpillar 950G Front End Lnader). ------ - _- ---...� �Justi�cation i � ._ _ , _ Increased repair and maintenance expenditures on Unit 766,which will be fiftcxn years old. -'' __ _ -- Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Fumishings 260,000 260,000 Total 260,000 260,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund A 260,000 _ , ___ � �_ __ � �_—.__._��_ 260,000 'ra� 260,000 260,000 Projeci# VBLE-�IZ Department Vehicles and Equipment Contact Project Namc Asphalt Paver(Street) �r.Pe Equipment Useful Lifc Category Fquipment Heavy Equip. _ ', Description _--- _ _. ---_ Asphalt paver for in house paving projects for the Street Division to replace Unit 700,2014 Maudon asphalt paver. -- — ------_.� I Jusdficadon �Inereased repair and maintrnance expenditures on Unit#700 which will be seven years old. _ _ ___ --� Expenditures 2018 2019 2020 2021 2022 'Total --- EquipNehicles/Furnishings 150,000 150,000 Total 150,000 � 150,000 Funding Sources 2018 2019 2020 2021 2022 Total —. _-- Equipment Repiacement Fund 150,000 150,000 —. _...._ __..________._—._ Total 150,000 150,000 23 Projec�# V&E-020 Uepartment Vehicles and Equipment ('ontact Project Name portable Com uters Police P � � 1'ype f:yuiptnent Usefui I,ife Categor� Equipment Computers `Description _._ _ __ �Replacement of poriable computers in squad cars. There are currenUy ten Toughbook PC's with docking stations. -- -------.J I Justification �computers a e r placed every four y�ears?017. Increased repair and maintenance ocwrs as machines age. New Technology requires wrrent hardware.These portabie , Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Repiacement Fund 50,000 v� 50,000 Total 50,000 50,000 Project# VBGE-�22 Department Vehicles and Equipment Contact Project Name Sign Truck(Street) T)�pe Equipment llseful Life CateRor� Vehic)es ! Description ' . ----- ---- �Sign wck for the Street Division to replace Unit#776(2008 Ford F-450)Wck with flat bed,tool boxes and sign removal crane. _ _�__ �_---.� �Justification _- - _ j Increased repair and maintenance expenditures on Unit#776 which will be trn years old. � Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Fumishings 120,000 120,000 T'otal 120,000 120,000 Funding Sources 2018 2019 2020 2021 2022 "1'otal Equipment Replacement Fund 120,000 � � 120,000 Total 120,000 � �120,000 2� Project# V&E-024 Uepartment Vehicles and Equipment Contact Project Name Unmarked Police Vehicle Police � � I ppe Equipment Useful Life Celegor� Vehicles Description --_. _ , _ _ _ _ w___ ___ --- --- -..__ IOne new nnmarked police vehicle to replace Unit#$l9(201 I Dodge C'harger). 1 ----- ---_ _ - - — ----- --- — --- --.__J �Jusdf7ca6on �[ncreased repair and maintenance expenditures on Unit#819. _ __ _ _ __ _. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 34,000 34,000 __----- v_____ —_----- Tota) 34,000 34,000 Project# V�C�'-�29 Uepartment Vehicles and Equipment ('ontact Project Name Dump Truek(Park) 1'�•pe Equipment Useful t,ife Categor� Vehicles ' Descrip6on Ford F-550 truck with swaploader hook system for the Park Department to replace Unit 48Q a 201 1 Ford F-550 diump truck with Swaploader hook system. � Jus6ficadon Increased repair and maintenance expenditures on Unit#480,which will be ten years old. _-- � Expenditures 2018 2019 2020 2021 2022 Totai Equip/Vehicles/Fumishings 80,000 80,000 _ - __._.__--- --------- Total 80,000 80,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 80,000 80,000 ------------..___ _---- ..__.____.____._�__.___-------.._._... Total 80,000 80,000 2S Project# V&E-030 Department Vehicles and Equipment Contacl Project Name Rotar Mower Park �' � � l ype Equipment Useful Lifc Categor} Fquipment:Heavy Gyuip. ' Descriptlon ' _ __ __ -- _.._— 16'hydrostalic tractor mower for the Yark Department to replace Unit#484(2013 Toro Groundsmaster 5910D). � _ __._ __ _— ____, ' JusNficadon . Increased repair and maintenance expenditures on Unit#484,which will be eight years old. large mowers of this type are the most cost-effective approach to imowing large open areas such as park land. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 110,000 110,000 Total 110,000 110,000 Funding Sources 2018 2019 2020 2021 2022 Totai Equipment Repiacement Fund 110,000 110,000 Total 110,000 110,000 Project tt V&E-033 Department Vehicles and Equipment Contact Project Name Sk lift Man Lift Park& Street Y � �fype Equipment UseTul I.ife Cste�on Equipment:Heavy Equip. � Descripdon ---- — - -- _ _----- _--- --- �Skylift man lift for the Park and SVeet Divisions to repiace Unit#405,a 2009 Skylift man lift. , _ _ _ --- --- -- -- --– ---� ' Justification , ___ --�____ ------------- -- - ;Increased repair and maintenance expenditures on Unit#405,which will be ten years old. i Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicies/Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Equipment Replacement Fund � 40,000 40,000 �ro�i ao,000 ao,000 2 Co Project tt V&E-034 Depnrtment Vehicles and Equipment Contacl P''o�eC�N�"1e Crime Prevention Vehicle Police � � T'ype Equipment Useful I.ife C'ategon Vehicles ' Description l_ _. _ New crime prevention vehicle for the Police Depariment to replace Unit#804(2008 Dodge Caravan). _ __ _-----_ � -- - ------ - -- Justification , Increased repair and maintenance expenditures on Unit#804,which will be eleven years old. I Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 30,000 30,000 Total 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Equipment Replacement Fund 30,000 30,000 . .___-----_ _ _ -- _.. Total 30,000 30,000 Project# V&E-037 Uepartment Vehicles and Equipment ('ontact P''°�e�'Ne"'� Aerial Ladder Truck(Fire) ryPe Equipment Useful Lifc ('ategor� Vehicles Description ', _ _ _ - --- Replace aerial ladder fire pumper Unit#334 that was originally purchased in 1993 and refurbished in 2009. 1 ---J ! Justification .__ This aerial pumper will be twenty rve years old. ---_� Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 575,000 i 575,000 s_____---_ _.______.�------_.__��----------_..___ Total 575,000 575,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal ' ---- Equipment Replacement Fund 575,000 575,000 —_—__ .._ ___----._________ __ --.....__—__ _�._._ Total 575,000 575,000 27 �roject� V&E-039 Uepartment Vehicles and Equipment Cbntact Project Name Utilit Traetor Park �' � � I ype Equipment Usetul I.ife Categon Vehicles Description Utility tractor with broom for the Park Department to replace Unit 473,a 2008 lohn Deere utility tractor. This unit is used to mow right-of-way,maintain skating �rinks and general maintenance. _ , ',.IUS[If1C8UOD f _ _--------- ilncreased repair and maintenance expenditures on Unit#473,which will be twelve years old. 1 Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 75,000 75,000 Total 75,000 75,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Equipment Replacement Fund 75,000 75,000 Total 75,000 75,000 Project tt V&E-048 Uepartment Vehicles and Equipment Contact Project Name Rotar Mower Park y � � '1'ype Equipment Useful Life Category Equipment:Heavy Equip. � — _ ._ ' Description ' ___ _ --- — — ---------- — ZTR mower for mowing City Hall Complex,Fire Stations and Neighborhood Padcs. ` ._- _ __-- _ ---- _ ____. -- --------- I.�USCI�C&h011 _ _ __ . _ _..--_-- __— __ _----_--_ _ --- � 'Increased repair and maintenance expendrtures on Unit#485. � Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 25,000 25,000 7'otal 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Equipment Repiacement Fund � � 25,000 � 25,000 Tota) 25,000 25,000 28 Project� V&E-052 Uepartmenl Vehicles and Equipment Contact Project Name Asphalt Cold Planer(Street) �� e P Fquipment l�setul I.ife (ategory Equipment Heary Fquip. ! Uescription ___ --_ ___---- Cold planer atiachmem for Bobcat T-190 skid streer loader for Street Department to replace Unit#784(MT trackless implement). -- _ ----_� , Justification ' ;� __ _ __.____ ._� Increased repair and maintenance expenditures on Unit#784,which will be twelve years old. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 25,000 25,000 Total 25,000 25,000 Project# V&E-060 Department Vehicles and Equipment Contact P�o�e�'Ne"'� Rescue Vehicle Fire � � 7�ype Equipment Useful I.ife Categor� Vehicles j Descriptlon � __ __._ ---- - _ _ __- --_ __--_— --, �New Rescue Vehicle to replace Unit 339,a 2001 Ford Exwrsion. ; _ _ _ --__.. Jusdficalion - _ _ � �Increased repair and maintenance expenditures on Unit 339. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 90,000 Y 90,000 � __ ._ _ __..�___---_.. _---- _----__ 7'otal 90,000 90,000-- Funding Sources 2018 2019 2020 2021 2022 'I'otal ------_ _ Equipment Replacement Fund 90,000 90,000 -- _.. ___- ------ -- Total 90,000 90,000 2q Project# V&E-063 Uepartment Vehides and Equipment C'ontact Project Namc pickup Truck(Street) r.P� Equipment Useful I.ife ('ategon Vehicles I Description ' __ _ - — - _. -- —. __ One half ton pickup truck for the street department lo replace unit�1790,a 2011 Fnrd F-250 pickup. � -- _._. _ .._ � __. _- - -- ..__� �USL1f1C 8h0 tl _.._ _ _ __ _ f Increased repair and maintenance expenditures on Unit#790,which will be seven years old. ��II Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 40,000 40,000 Tota) 40,000 ` 40,000 Funding Sources 2018 2019 2020 2021 2022 Total --_. qwpment Replacement Fund 40,000 40,000 __________ ------------ Total 40,000 40,000 Project tt V&E-066 Department Vehicles and Equipment ('ontact P''o�e�'N$"'e Tandem Axle Dump Truck(Street) r,Pe Equipment us�t�i�.�re Category Vehicles ,__ �Descrip6on _ ----- --._ �Tandem axle dump truck for the Street Department to replace unit#779,a 2009 Intemational 1'andem Axie dump truck with hook system. --- --� �Jasti6ca6on ' Increased repair and maintenance expenditures on tJnit 779. I Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings ----A-_�_"---`----------V -- ,`- -- 270,000 --v-270,000 Total 270,000 270,000 Funding Sources 2018 2019 2020 2021 2022 T'otat Equipment Repiacement Fund 270,000 270,000 _ _.___.___ _ __.. _�__--------_.__. Total 270,000 270,000 30 Project# V&E-089 Uepar[menl Vehicles and Equipment ('ontact Project Namc Sidewalk/Maintenance Tractor Park � � T�pe Equrpment Useful Life Category Equipment:Miscellaneous � Descriptlon ---.__ Sidewalkhnaintenance tractor 1'or clearing walks on the city hall complex for the Park Division tu replace unit 493,a 2014 John Deere. – -- ---� �Justifica6on � _ _. __ ----_ _._ _ �lncreased repair and maintenance expenditures on Unit 4933. I ; Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 50,000 50,000 Tow �o,000 �o,000 Funding Sources 2018 2019 2020 2021 2022 Totat Equipment Replacement Fund 50,000 50,000 Total iv 50,000 50,000 Project�s V&E-095 Department Vehicles and Equipment Contact Projecl Name p�cku Truck Police p � � Type Equipment Useful Life f'ategor� Vehicles �Description _ _ _ __ ----,__ _- — --- Half ton crew cab pickup truck for the Police Depanment to replace unit 820,0 2012 crew cab pickup. _ — ..__ _----- --- --� Justi6cation ���! [Increased repair and maintenance expenditures on Unit 820,which will be six years old. ! Expenditures 2018 2019 2020 2021 2022 7'otal EquipNehicleslFurnishings 40,000 40,000 -----------------__ __..--.._�_--- _ __ ---- Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 40,000 40,000 ------ -___.___..__.— - __ __--------_ Total 40,000 40,000 31 Project t! V&E-100 Department Vehicles and Equipmenl Contacl Project Name picku Truck Park p � � l ype Equipment Useful I.ife Categor� Park Equipment Descrip6on ---- - ---- -— __. _ PF-350 Pickup/Utility 7"ruck for the Park Division to replace unit 483,a 2012 F-350 pickup/utility tn�ck. _— — --- -- -- ----_� 'i JusNficadon - :- _. ----- ---- - ---- Increase rc�air and maintenance expenditures on unit 483,which will be ten years old. � __ ; Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 50,000 50,000 To[al 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Equipment Replacement Fund � 50,000 50,000 Total 50,000 � 50,000 Project N V�tE-��2 Department Vehicles and Equipment Contact Project Name p�ckup Truek(Fire) •ryPe Equipment Useful I,ife ('ategory Vehicles i Descrip6on � __ _ ___ __._ _ _ _ -- ------ �Four door pickup truck with storage box for Fire Department. ` _ -— _ __ _ _.._ _ -----� ' Jus6fication Vehicle to transport firefighters to emergency calls and training.Currently they are taking a fire engine out of service to these types of calls and training. J Expenditures 2018 2019 2020 2021 2022 'I'otal EquipNehicles/Furnishings 40,000 40,000 _._ -----___ _ __ ___ ---- Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'Total _s_ Equipment Repiacement Fund 40,000 40,000 --- --.�---__,._______A _ Total 40,000 40,000 32 Project# V&E-103 Departmenf Vehicles and Equipme�it ('ontact Project Name Concrete Saw Street � � I�pe Equipment l Iseful I.ife C'ategor� Unassigned , Description ' --__ --- __ __-- --__- � A concrete,�asphalt saw to replace unit#792.The saw is used for cutting out street repairs. — -- _— -- ---- --- --- �Jusbfication �'� _ _ __ _ _ _ _ __ _ _ _ - Increased repair and maintenance on unit#792,which is eleven years old. ' _ Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings ^ 30,000 30,000 Total 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Equipment Repiacement Fund � 30,000 30,000 —___.._�— ----____ _---_ _ Total 30,000 30,000 Project tJ V&E-106 Department Vehicles and Equipment con���� Project Name polaris 6 X 6(Fire) rype Equipment l�seful I.ife Categon Equipment:Miscellaneous '',Description _ — _ _ _ . _ . Utility Vehicle utilized for off road resue and transpoR. _ _---- - - -- - - -,-- ___ .� "Jusdficadon ; ____.___l Increased repair and maintenance expenditures on Unit#341,which will be twelve years olf. Expenditures 2018 2019 2020 2021 2022 7'otal -- --- ---.e_ EquipNehicles/Fumishings 15,000 15,000 ---._..__ _____--,----_._.---.--__—��`_----_ Total 15,000 15,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Equipment Replacement Fund 15,000 � � 15,000 ---------------- -- _ _____..._--- Tota! 15,000 15,000 33 Projecl# V&E-107 1)cparlmenl Vehicles and Lquipment (bntaN Projecl Namc Bobcat Utility Truckster (Park) T�pe Equipment Useful l.ifc Categor�� Vehicles II Description ____ __ __ __ ----- _____ __� New utility trucksir.v to replace unit#469(2005 Bobcat). --- _- --__ -- __ _ _ _- �Justitication _ —_ ---- _ _ _ _– ----- --_ ____ . _. Increased repair and maintenance expenditures on Unit#469. "- ; Expenditures 2018 2019 2020 2021 2022 Totat EquipNehicles/Furnishings 55,000 55,000 7'otal 55,000 55,000 Funding Sources 2018 2019 2020 2021 2022 Total v__ _ Equipment Replacement Fund 55,000 55,000 __.__.._---------.__.._----...__—___.--- Total 55,000 55,000 Projecl t1 V&E-109 Department Vehicles and Equipment Contact Project Name Single Axle Dump Truck(Street) 7'ypc Equipment Useful I.ife Categor� Equipmrnt:Heavy Equip. ', Descrip6on ' Single axle dump iruck for the Street Division to replace Unit 768,a 2005 Sterling 7500 dump truck. -- - -- _ ___ --J .____ _-- ---- -- ---- I Justification : _ __. �,Increased repair and maintenance expenditures on Unit#768 which will be thrirteen years old.. � Expenditures 2018 2019 2020 2021 2022 7'otal -- ---__— EquipNehicles/Fumishings 230,000 230,000 Total 230,000 ----vY ------__---230,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 230,000 230,000 — _�._----_-- —_._ _---.. -----________.__� _ Total 230,000 230,000 3� Project# vt�CE-11� Department Vehicles and Equipme��t C'ontact Project Name Dum Truck Street p � � "1'ppe Equipment ('seful Lite ('ategon Vehicles Description 'Single-axle dump wck for the Street Department to replace Unit Ji772(2007 Sterling Dump 7'ruck).new single axle dump truck will be equipped with swaploader ' 'ihook system,plows,wind and controls. ' ;Justification ; _ : _ , ----- �Increased repair and maintenance expenditures on lJnit#1772,which will be thirteen years old. � Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings i 230,000 230,000 Total 230,000 230,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 230,000 230,000 Total 230,000 230,000 Project# V&E-115 Uepartment Vehicies and Equipment ('ontact Project Namc portable Message Sign Trailer r,�P� Unassigned t isefu 1 I.ife ('ategory Unassigned �' Descripfion ----- -- - _ --------- -__ -- --_ _---- -- �Programmable message sign for traflic conaol,maintenance work and events. - -- _. - -- --- __ ---- ------.. �Justification ' _._. _ __ -- ___ __ � iIn house programmable message sign for street maintenance activities and city evrnts. , Expenditures 2018 2019 2020 2021 2022 Total EquipNehicleslFumishings 25,000 25,000 7'otal 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Equipment Replacement Fund 25,000 25,000 7'otal 25,000 25,000 3.S Project�l V&E-116 Ucpartmen� Vehicles and Lquipment ('ontact Project Name gobeat Tooleat (Park) 1`1pe Equipment tlseful I.ifc Categor�' Unassigned ' Description Bobcat Toolcat for the Street Division to replace unit#478,a 201 1 Bobcat 7oolcat. _ _ _ _ ___ _ --- ----__ _ _ _ _.� - --- —._ _ .. _---------- _---- _, 'Jusdfication . _ ___ ___ __- �Increase repair and maintenance expenditures on lJnit 478 which will be seven years old.. j 1 Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 50,000 � 50,000 -- ------ Total 50�000 ____-----------__� 50,000 Project# V&E-118 Department Vehicies and Equipment Contact Project Name Sidwalk Tractor(Street) 1'�pe Equipment Useful Life Category Unassigned Description ' _ ___ -- -- . _ ---- - �Sidewalk machine for the Street Division to replace Unit#1796(2013 MT Trackless). I i, — - -_---- ___—_� ___--J Jusd�cadon , ilncreased repair,maintenance and parts availability on Unit#796. --� Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Furnishings 160,000 160,000 --.__ __ __ _--- --- ^.�_— Ta�1 160,000 160,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 160,000 160,000 ._.___�__.______------ --------,i Totai 160,000 160,000 3� � ProjeM fl V&E-121 Urpartment Vehicles and Fyuipment ('ontact Project Name TaSCCS (POIICC� I�pc Equipment Useful Life Categor� Fquipment:Miscellaneous Descrip6on ',30 Tasers were originally pu��chased in 20U5.Thes warrenty runs three years. 19 were purchased in 2013.7he remaining will be Purchased in 2017.In 2021,another i 13 will be replaced. - JUSt1}IC8tio0 Maintenance on each taxer runs around$800 per time after the wa�ranty expires.This will allow new units to be rurchased and less maintenance costs due to the I warranty period.The police department believes that the use of the Taser both through deployment and threatened deployment continues to reduce the incidence of ' I�injuries to both oflicers and suspects. ' Expenditures 2018 2019 2020 2021 2022 Total - _ __. quipNehicles/Fumishings t6,000 16,000 _. __ _-- _. __ . ___.._.e__ TotR) 16,000 16,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 16,000 16,000 Total 16,000 16,000 Project#t V&E-130 Department Vehicles and Equipment C'ontact Project Name Rotary Mower(Park) 1'ype Equipment Useful I.ife Categon Unassign� � Description I _ ___ _--_ ____ --__ ___- --- ____-- Rotary mower for mowing Ciry Hall Complex,Fire Stations and Neighborhood Parks. –––– ---- - ..___ —_-- – --- i ––---- �Justification � �Replace current wa&behind mower that was purchased in 2011. � Expenditures 2018 2019 2020 2021 2022 T'otal EquipNehicles/Furnishings 25,000 � J 25,000 Total 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 25,000 25,000 -----_______�_ ___._ -----._.._ --- _ _ -----�__ �__-- 7'otal 25,000 25,000 3 '7 Project# V&E-133 Ucparlment Vehicles and Equipment ('ontact Project Name g00 MHz Radios (Public Works Maintenance � I'ype Equipment llseful I.ifc ('ate�or} Unassigned ; Description 37-800 Mhx portable radios and accessories for communication in the field. � _---- ---. _ _---- -- __--- _ _ _-- 'Justification Replace current radios purchased in 2008.Manufacturer and Hrnnepin County will no longer support radios with parts due to age.In-service life is 10-12 years.New' radios P25 Phase U modification compliant. , Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 183,000 183,000 -----__.._------------_________.------------ Total 183,000 183,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund' 183,000 183,000 Total 183,000 183,000 Project N V&E-135 Department Vehicles and Equipment C'ontact Project Name Body Cameras(Police) I'ype Equipment Usefui I.ife Category Unassigned i Descripdon Acquisition of body camecas,maintenance agreement and server storage for officers. ---- � ---� ��Usnr,�ebaR �The Police Department will need to add body cameras(maintenance and video storage)to the array of technology tools for ofiicers to wear while on-duty.The �estimate is far the purchase of I S body cameras,assessories and storage.This was delayed in 2016 for the state legislature to set up guidelines. ' Expenditures 2018 2019 2020 2021 2022 'fotal EquipNehicles/Furnishings 24,070 24,070 24,070 24,070 24,070 120,350 --_..- -----_._..___- ---. ---- Total 24,070 24,070 24,070 24,070 24,070 ' 120,350 Funding Sources 2018 2019 2020 2021 2022 '1'otal Equipment Replacement Fund � 24,070 24,070 � 24,070 24,070 24,070 120,350 Total 24,070 24,070 24,070 24,070 24,070 120,350 3 � Projec�# V&E-136 Dcpartrocnt Vehicles and L'yuipment Contacl Project Name �diac Boat(Fire) � T�pe Equipment Useful I.ife Categor� Equipmenu Miscellaneous Description _ -- ____ __ -- _ ------ Zodiac Boat fpor the Fire Depariment Unit 329,a 2008 Zodiac boat utilized for water rescue. —� __ . __. _.._ __ -----� Justification _ _ _ ,Replace lJnit 320,a 2008 Zodiac inflatable boat. 1 Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 5,500 5,500 T'otal 5,500 5,500 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund � '� 5,500 5,500 __..__—__------- __-----.__---- Tota! 5,500 5,500 Project# V&E-137 Department Vehicles and Equipment Contact Project Name Outboard Motor (Fire) T��pe Equipment Useful Life Category Equipmenu Miscellaneous ' Descripdon ._ _ --- Zodiac water rescue boat outboard motor utilized by the Fire Department for water rescues to replace Unit Si352 a 2010 Yamaha outboard motor. ---� Jusdfica6on Increased repair and maintenance expenditures on Unit#352. --------) ._. . . .. . ...__ __.i Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings � _ __ 5,500 5,500 --_.._....__-- _ - _ -__---__ 7'otal 5,500 5,500 Funding Sources 2018 2019 2020 2021 2022 Total --- ----- qwpment Replacement Fund 5,500 5,500 .__--`_.._._----.---- .__.. -_ _ ___. ------.._-- Total 5,500 5,500 3q Project# V&E-138 Depar►ment Vehicles and Equipment co��ca�� Project Name passenger Vehicle(Fire) r,Pe Equipment us�rUi t.�t� � C'ateRor� Vehicles Description Passenger vehicle for the Fire Department to replace Unit t1354,a 2013 Ford k�xplorer. _._ _ _ __ _ ---------( --— __ _._ _ _ _ . �IUShfICAtl011 Increased repair and maintenance on Unit#354 on an emergency response vehicle which will be ssix years old.7'his vehicle will be�eassigned to the Inspections i Department. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 40,000 40,000 ___—.v.._.-----__�_�_._.___._.._----_.____ Total 40,000 40 000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 40,000 40,000 Total 40,000 40,000 Project N V&E-139 Uepartment Vehicles and Equipment Contact Project Nxmc passenger Vehicle(Fire) "1'ype Equipment Useful l.ife Categon Vehicles ' Description i, _ - ----__ __ _ _ _. -- Passenger vehicle for the Fire Depariment to replace Unit#355,a Ford Explorer. � ___� �Justification I __ __ , _ 7ncreased repair and maintenance on Unit#355 on an emergency response vehicie which will be six years old.This vehicle will be re-assigned to the Inspections ' Depariment. , Expenditures 2018 2019 2020 2021 2022 Total Equip/VehicleslFumishings _ 40,000 40,000 Total 40,000 -------------- —40,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund � 40,000 � v �0 40,000 Total 40,000 40,000 � � Project# V&E-140 Depariment Vehicles and Equipmrnt Contacl Project Name Utility Trailer(Park) I�pe Equipment Useful I.ife Category Park Equipment Descripdon Utility trailer for the I'ark Uivision to replace l.lnit#468,a 2005 utility trailer. � ---- _.---- --_---- -- ---- -------—--� ;Justifica6on : _- __.__ Age,wear and tear on utility trailer Unit#468,which wiU be fifieen years old. Expenditures 2018 2019 2020 2021 2022 T'otal EquipNehicles/Fumishings 5,500 _ _ 5,500 Total 5,500 `s 5,500 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 5,500 5,500 — -- -----___ ,..__...__. Total 5,500 ` 5,500 Project k V&E-141 Uepartment Vehicles and Equipmenl C'ontacl Project Name p�ekup Truck(Park) 7 ype Equipment Usefu!Life Category Vehicles ' Descripdon Half Ton pickup wck for the Park Division to replace Unit#475,a 2009 Ford Ranger. ---- --- - -------, _. --- — --- -- , Justification — _--J �Inereased repair and maintenance expendiwres on Unit#475. -- ----� Expenditures 2018 2019 2020 2021 2022 1'otal EquipNehicles/Furnishings 35,000 35,000 Total —— -��35,000 �----------35,000_ Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 35,000 � 35,000 ---------.__.._ _____. ___:-- ---__--------_____.---- Total 35,000 35,000 � ( Project# V&E-142 Department Vehides and Equipment ('ontaci Project Name Dump Truek(Park) 7'}pc Equipment lisetul Life ('ategor�� Vehicles Description Ford F-550 Dump Truck with Swaploader hook system for the Park Division to replace Unit#477,a 2010 Ford F-550 Uump Truck with Swaploader hook system. ' Justification ' '_ _ _ __ - --- . Mcreased repair and maintenance expenditures on Unit#477. ' Expenditures 201$ 2019 2020 2021 2022 Total Equip/VehicleslFumishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 80,000 80,000 -- -----_ __--- Total 80,000 80,000 Project# V&E-143 Department Vehicles and Equipment ('ontact , Project Namc Trash Compactor (Park) Type Equipment Useful Life Categor� Equipment:Miscellaneous � Description �___ _ _ Trash compactor for the Park Division to replace Unit#479,a 2011 Wayne trash compactor with hook frame to be used with F-550 dump trucks with Swaploader ; hook syste�n. , Jusdfica6on _____-----__ _------ --_ __ _—------ _: �Increased reoair and maintenance expenditures on Unit#479. � Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 65,000 65,000 ____._ __._.____ . _----_._ _.------ Total 65,000 65,000 Funding Sources 2018 2019 2020 2021 2022 'Total Equipment Replacement Fund � ' �� 65,000 65,000 Total 65,000 65,000 "1 � Project# VBt�'-144 Drpartment Vehicles and Equipment Contact Project Name Single Axle Dump Truck(Street) r.Pe Equipment l�seful Life C'alegur� Vehicles Description --- __ _ Single axle dump truck 1'or the Street Division to replace lJnit#778,a 2008 Sterling 7500 dump truck with hook system. -- - -- --- ---1 ' Justification , _ _ __ _ __ _-- - Increased repair and maintenance expenditures on Unit#778. l!' Expenditures 2018 2019 2020 2021 2022 Totai EquipNehicles/Furnishings 230,000 230,000 Total 230,000 230,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Equipment Replacement Fund 230,000 230,000 ----- ----- __...__...---- _ - -----.v__ _-- -- Total 230,000 230,000 Project# V&E-145 Department Vehicles and Equipmenl ('ontact Project Namc Skid Steer Loader(Street) r��P� L'quipment ' Useful Life C'stegory Vehicles Descrip6on ' l _____ Skid steer loader for the Street Division to replace Unit#797,a 2013 Bobcat T650 skid steer loader. 1 Justification ' �Increaseel repair and maintenance expenditures on Unit#797. Expenditures 2018 2019 2020 2021 2022 T'otal EquipNehicles/Furnishings 55,000 55,000 - -. ____._._ ___._._..._____�_._.__.._ . _. 'I'otal 55,000 55,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Repiacement Fund 55,000 55,000 -- -------- Total � 55�000 __ - - --- - - 55�000 �3 Project fi V&E-146 Department Vehicic�s and Equipment ('ontact Project Name Dump Truek(Street) r�Pe Equipment l�seful I ifc ('ategor� Vehicles � Descrip6on Ford F-550 dump truck with Swaploader hook system for the Street Division to replace Unit#791,a 2010 Fnrd F-550 dwnp truck with Swaploader hook system. ' Justification �ilncreased repair and maintenance expenditures on Unit#791. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicleslFumishings _ 80,000 80,000 Total 80,000 v� 80,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 80,000 80,OQ0 Total 80,000 -�__�__—.__.____ 80,000 Project# V&E-147 Department Vehicles and Equipment Contact Project Name police Commander Vehicle Police � � � 'i�ype Equipment Useful Life Category Vehicles ' Description - _ __ �Police commander vehicle for the Police Department to replace Unit#821,a 2012 Ford police interceptor sedan. � _ -- — �Jusrificadon � Increased repair and maintenance expenditures on LJnit#821. i Expenditures 2018 2019 2020 2021 2022 Total EquipNehicleslFumishings 50,000 � 50,000 _..�---____._____---___.____.---- Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 T'otal ___ quipment Replacement Fund 50,000 50,000 _ .---_._ .-__ ___ .___----_ ___ - ------- Total 50,000 50,000 � � Project q V&E-148 Uepartment Vehicles and Equipment ('ontact Project Nance SWAT Van PO�1CC � � I�pc Equipment Usefui I.ite Categor} Vehicles ; Descciption �_ _--_ — -— --- - -- - Replace SWAT Vehicle for Police DepanmenY to replace Unit#812,a 1988 Ford L7000. -- - --- _ --.. ---- _ _ _._� Justifica6on _ ____ ,lncreased repair and maintenance expenditures and unavailable parts on Unit 812. I Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 100,000 100,000 Total 700,000 100,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund 100,000 100,000 -- ----------- -_----_____ - Total 100,000 100,000 Project# V&E-149 Uepartment Vehicles and Equipment Contact Project Name �y$ter Truek(Street) T',ype Unassigned Useful Lite Categor� Unassigned ; Descriptlon Water Wck for the Street Department to replace Unit#770(2006 Sterling L7500 Tanker).This Wck is utilized frx street sweeping,skating rink flooding and � watering landscaping. Jus6ficabon � _._ -- - ______ ___ __ _ — lncreasad repair and maintenance expenditures on Unit#770,which will be sixtern years old. � Expenditures 2018 2019 2020 2021 2022 Totat EquipNehicles/Fumishings 215,000 215,000 _-------------__--- Total 215,000 215,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Equipment Replacement Fund �� � � 215,000 � 215,000 7'otal 275,000 215,000 �� Projcct# V&E-151 Uepartment Vehicles and Equipment ('ontact Projecl Name Fire Pumper Truck(Fire) 1'ipe Equiproent l�seful I.ife Category Vehicles � Description rire Pumper truck to replace L7nit#337(1995 Peterbuilt). --- _ � _ _._.. _ _ �Jusdtication . `[ncreased repair and maintenance expenditures on Unit#337,which will be twenty-three years old.C'amply with NFPA standards.Repurpose can and chassis as ' ISWAT vehicle. ' Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 600,000 600,000 ------_._.___...___.____.---------___-----____ Total s00,000 600,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Equipment Replacement Fund 600,000 600,000 Totai 600,000 600,000 Projecf# V&E-152 Department Vehicles and Equipment Contact Project Name p$ssenger Vehicle(Fire) T�pc Fquipment Useful Life Categor� Vehicles I Description � �_ _ � �Passenger vehicle for the Fire Depariment to replace Unit#356(2015 Ford Crown Victoria). l ;Jus6fication � �---__ �Increased repair and maintrnace on Unit 356 on an emergency response vehicle,which will be six years old.This passenger vehicle will be re-assigned to the ' !Inspection Uivision. ' Expenditures 2018 2019 2020 2021 2022 1'otal Equip/Vehicles/Fumishings __ __` ___� 40,000 ` _ 40,000 Totat 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal _---- -.� ---- quipment Replacement Fund 40,000 40,000 Total 40,000 40,000 � w Project# V&E-153 Depariment Vehicles and Equipment ('ontact Project Name E ui ment Trailer Street 9 P � � I�pc Equipment Useful I.ifc Categon F.quipment:Miscellaneous Description _ _- _— --_ __ -- --- _ � Gyuipment Trailer for the Street Division to replace Unit 774,a 2007 Felling eyuipment trailc,v. _ Justification ; _ _ __ _. __ _— Increase repair and maintenance expenditures on Unit 774. ' Expenditures 2018 2019 2020 2021 2022 'I'otal EquipNehicles/Fumishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2018 2019 2020 2021 2022 Total Equipment Replacement Fund � 20,000 20,000 Total 20,000 `s 20,000 Project ts V&E-154 Department Vehicles and Equipment Contact Project Name Traffic Trailer Police � � l�pe Unassigned Useful Lifc Categon Unassigned Description _._ __ __. Traffic control/radar trailer for the Police Department to replace Unit 817,a 2012 message,'raclar trailer. I _. __ _ —_J �Justificatlon Increased repair and maintenance expenditures on unit 817,which will be ten years old. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings � 30,000 30,000 Total 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Equipment Replacement Fund 30,000 30,000 Total 30,000 30,000 � � city of � olden � va e Capital Improvement Program 2018-2022 Park Improvement Section The City Council reviews the submissions from the Open Space and Recreation Commission, Park & Recreation, and Public Works staff for the development and improvement of the City's park system. The commission consists of nine members that are appointed by the City Council and serve as an advisory board to the City Council. In 2006, as part of the City's parks planning initiative on park facilities, the City Council focused this year on developing a vision for Golden Valley parks and recreation facilities. The City solicited citizen input via information meetings in parks, a survey of youth athletic association leaders and a citizen survey was created with the help of the Open Space and Recreation Commission. All information will be gathered to help plan the future of the park improvements for the next five years. The City will also use the results from the building survey and ADA consultant. �9 City of Golden Valley, Minnesota Capital Plan 2018 thn► 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Parks � Bleacher,Soccer Goal,Team Bench&Picnic Tables P-001 25,000 25,000 25,000 25,000 25,000 125,000 Park Trail and Parking lot Improvement P-002 40,000 50,000 50,000 50,000 50,000 240,000 Play Structure Replacement P-003 55,000 55,000 55,000 55,000 55,000 275,000 Ball Field L'ghting-Isaacson Park P-014 250,000 250,000 Outdoor Basketball and Hoop Replacement P-015 28,000 28,000 28,000 28,000 28,000 140,000 Park Sgnage Replacement P-016 10,000 10,000 10,000 10,000 40,000 Sun Shelter Replacements and Additions P-017 50,000 50,000 Tennis Court Resurfacing P-018 30,000 25,000 25,000 25,000 15,000 120,000 Wildwood Park Pickleball Courts P-020 60,000 60,000 Re-Lamp Athletic Field and Rink L'ghts(LED) P-023 25,000 25,000 25,000 50,000 50,000 175,000 Wildwood Park Athletic Field P-024 100,000 100,000 Community Ga�dens P-025 30,000 30,000 60,000 Off-Leash Pet Exeroise Area P-026 60,000 60,000 Dugout,Fence and Feiled Replacement P-027 55,000 55,000 55,000 55,000 55,000 275,000 Ballfield Scoreboard UpdatslReplacement P-028 25,000 25,000 25,000 75,000 Tennis Court Reconstruction P-029 150,000 150,000 Wesley Ball field#3 Drain Tile P-030 25,000 25,000 Parks Total 778,000 353,000 358,000 428,000 303,000 2,220,000 GRAND TOTAL 778,000 353,000 358,000 428,000 303,000 2,220,000 50 Project�l P-001 Ueparfinenl Parks Contact Project Name g�eacher, Soccer Goal, 'Team Bench& Picnic Tables I�pe Improvement Useful(.i(e ('ategor� Park lmprovements Descrip6on Replacement ofbleachers at I.ions fields#1&#2(2018j,Lions fields#3&#W(2019),Scheid#I&#2 and Hampshire Fields#1&#2(2020),Natchez Park field#1 '. &Gearty Park field#I (2021).Begin replacement of picnic tables at Brookview Park beginning 2021 and 2022.Team benches and soccer g�als replaced as needed. � Jusdfica6on The City of Golden Valley has 36 sets of bleachers which need to meet the ADA and safety guidelines.Picnic tables,team benches and soccer goals are deteriorating throughout the park system and need to be systematically replaced. Expenditures 2018 2019 2020 2021 2022 Total ConstructionlMaintenance _ 25,000 , `25,000 ^ 25,000 �_ 25,000 v 25,000 � 125,000 ']'��� 25,000 25,000 25,000 25,000 25,000 125,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 25,000 25,000 25,000 25,000 25,000 125,000 (5600) Tota! 25,000 25,000 25,000 25,000 25,000 125,000 Project# P-002 Department Parks Contact Project Name park Trail and Parkin Lot Im rovement g P Type Lnprovement U sefu I I.ifc Categor� Park lmprovemenls Descripdon i IReconstruct intemal park trails and patch/sealcoat parking areas located throughout the park system.7'he Scheid Park Parking Lot addition is scheduled for 202L � Justification Maintain quality,safety and usability of City parks for a lifetime active spon and meet ADA accessibility standards.Paved trails are deteriorating,with certain segments subjec:t to serious erosion. Trails and parking areas will be evaluated to determine priorities. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 40,000 50,000 50,000 50,000 50,000 240,000 -._--- - ---____ ----___-__.__ Total 40,000 50,000 50,000 50,000 50,000 240,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund � 40,000 ' S0,000 � 50,000 50,000 50,000 240,000 (5600) __ _ _._____----_ _ __ ------________ _____.______--- Total 40,000 50,000 50,000 50,000 50,000 240,000 51 Project# P-003 Dcpartmcnt Parks ('ontact Project Name p�ay Structure Replacement r�Pe Improvement Useful i,ife ('ategor� Park F.quipment Descripdon New playground equipme�it and area curbing on an"as-needeci"basis in the C'ity's parks. , 2017-Medley Park;St('roix Park;Schaper 2018-Wesley Park '2019-Scheild Park 2020-Yosemite Park 2021-Soth Tyrol Park 2022-Natchez Park _ __ 'Jusdfica6on _ _ _ ''Play sVuctures are used freyuendy and need repairs and periodic replacements dye to wearing out and will eventually become unsafe. The('iry is required to meet iiConsumer Product Safety Commission(CPSC)guidelines,as well as the requirements ofthe Americans With Disabilities Act(ADA). Expenditures 2018 2019 2020 2021 2022 'Total EquipNehicies/Fumishings 55,000 55,000 55,000 55,000 55,000 275,000 Total 55,000 55,000 55,000 55,000 55,000 275,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 55,000 55,000 55,000 55,000 55,000 275,000 (5600) "['otal 55,000 55,000 55,000 55,000 55,000 275,000 Project# P-014 Department Parks Contact Project Name Ball Field Lighting-Isaaeson Park •ryPe Improvement l:seful I.itc Categor� Park(mprovements � Description Replace field light Gxtures on Isaacson field#I,add new field lights and poles to lsaacson fields#2 and#3.This is a partnership project with the Golden Valley i 'Little I.eague and will be providing funding to support and apply for a Hennepin County Yourh Sports Grant fall of 2016.Without the grant,the project will not be ,done. JusGfica6on ; _ _. , _ _ _ , 'The baseball field lights at Isaacson Park are becoming problematic for consistent use due to their age and require new fixtures.Adding lights to Issacson fields#2 I and#3 will a11ow other fields within the park system to open up for community and youth athletic associations use.By combining fiscal resources the potential to be '�, successful with a grant application for the facility improvements increases exponentially. ' GV Little I,eague would contrbute 510,000. Expenditures 2018 2019 2020 2021 2022 T'otal EquipNehicles/Furnishings 250,000 250,000 Total 250,000 250,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal GV Little League 15,000 15,000 Hennepin County SpoRs Grant 150,000 150,000 Park Improvement Fund 85,000 85,000 (5600) Total 250,000 250,000 52 �rojcct st P-015 Ucpartmeni I'arks ('ontact Project Namc Outdoor Basketball and Hoo Re lacement P P 7�pe Maintenance l�seful I,ife ('ategon Park Improvements Descripdon Replace old and deteriorating autd��r basketball courts and hoops.Replacemait schedule is the 1'ollowing: ,2017-Hampshire,lakeview;Stockman ; �i2018-Wesley;Brookview � 2019-Lions;Seeman I 2020-Sheid,Natchez � 2021-N Tyrol,S Tyrol Jus6fica6on Outdoor basketbal courts are deteriorating quickly and need to be systematically replaced.Most of our basketball hoops are 1970's vintage and need updating.All � new hoops will be replaced with adjustable units which will make then accessible for family use and younger park patrons. Expenditures 2018 2019 2020 2021 2022 7'otal Infrastructure Improvements 28,000 28,000 28,000 28,000 28,000 140,000 Total 28,000 +28,000 �i28,0o0 ' 28,000 28,000 140,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 28,000 28,000 28,000 28,000 28,000 140,000 (5600) Total Z8,000 28,000 28,000 28,000 28,000 140,000 Project#1 P-016 Uepartment Parks Contact Project Namc park Si na e Re lacement g � P 7'�pe Maintenance l�seful Life CateRor} Park Improvements ', Descrip6on Replace deteriorating and aging park signs at all community parks,neighborhood parks,na(�re areas and open spaces.Park Maintenance staff will utilize a worst i first scenerio as to a replacement schedule. , 'Justification Current park signs are deteriorating and need to be replaced. New signs will be added to loc:ations which currenUy do not have park signage.Replacement schedule ii will be to adcUreplace five park signs annually. ; Expenditures 2018 2019 2020 2021 2022 'Ibtal Other 10,000 10,000 10,000 10,000 40,000 T'a� 10,000 10,000 10,000 10,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'Ibtat _________._._.__ __--_._�._A_ _ _____ Park Improvement Fund 10,000 10,000 10,000 10,000 40,000 (5600) __-----_._.�-.__�_�_.. '1'otal 10,000 10,000 10,000 10,000 40,000 53 Project# P-�l7 Ucpartmenl Parks C'ontact Projcct Namc Sun Shelter Re lacements and Additions p t�pe Improvement liseful Life Categor� Park Gnprovements ' Description Replace Sun Shelters in various parks: 201?-Stockman Park ' 2018-Yosemite Park ' 2019-Seeman Park 2020-North Tyrol,South 7'yrol �2021-Glenview Terrace Park i '�Jusdfication ' Various summer mobile park playgraund programs are being offered and do not have any cover for the program.New sun shelters will allow cover from the sun and rain and provide a slaging area with picnic tables for supplies and the program. ' Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 50,000 50,000 -----___ _.�-----____--_------------___--- Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 50,000 50,000 (5600j Total 50,000 50,000 Project# p-01g Department Parks ('ontact Projecl Name Tennis Court Resurfacin g 7'�pe Mainteaance liseful Litc C'ategor� Park Improvements �, Descripfion ' __ _ Fili cracks and birthbaths,resurface and paint tennis courts.Add Pickleball and Quick Start Tennis I.ines were appropriate. ! 2017-Brookview,Lions Park ; 2018-Scheid,Medley>Wesley 2019-Gearty Park I2020-Wesley,Medley 2021-Sch ied Tennis courts will be evaluated in 2016 on number,use and need.The Open Space and Rec('ommisison will also be involved. Wildwood and Glenview Tercace are complete reconstivctions. Jusdfica6on -- Many of Golden Valley's Tennis courts arc in need of rec:onstruction alon�with fencing and lighting replacement.Generally a tennis court resurfacing needs to be done every 5-7 years. Expenditures 2018 2019 2020 2021 2022 1'otal -- Construction/Maintenance 30,000 25,000 25,000 25,000 15,000 120,000 _-_..,___.---.^__._ _____.__.__ --------- - ']'p� 30,000 25,000 25,000 25,000 15,000 120,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal �_..__. ,. ___- _.__ _�_ - Park Improvement Fund 30,000 25,000 25,000 25,000 15,000 120,000 (5600) _ ___ _ __ _ --- __ ______ __. _ __ _ _.. - - - -- - __ Total 30,000 25,000 25,000 25,000 15,000 120,000 �� Project# P-O2� Uepartment Parks ('ontact Project Name Wildwood Park Piekleball Courts �r�P� Unassigned Useful I.ife ('ategon Park Improvements ' Descripfion Replace the two deteriorated tennis courts at Wildwood Park with a six court Pickleball facility. ---- _ _ -- -_ ___ __1 Justification : Pickleball has exploded in popularity and Golden Valley currently does not have any outdoor exclusive courts for the activity.Six new Pickleball Courts will Gt in i� �the same area as the two tennis courts.The new facility will provide a specific location fi�r Pickleball,open up cuirent tennis court areas and replace a tennis court !that is no longer able to be repaired. Expenditures 2018 2019 2020 2021 2022 1'otal Infrastructure Improvements _ 60,000 60,000 __�_.___.___._______.._------ Total 60,000 ----------- 6Q000 _ Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 60,000 60,000 (5600) '['a� 60,000 60,000 Project tt P-023 Uepartment Parks Contact Project Name Re-Lamp Athletie Field and Rink Lights(LED) r,Pe Maintenance l�seful Life C'ate�ory Park Equipmeni Descripdon --_- -- --, Replace athletic f eld and outdoor ice rink lamps and fixtures.When monies are available the city will change to LED when possible. -- ----� Justi�cation Outdoor athletic field and rink light systems require regular maintenance and replacement to operate prope�•ly.LED will be used when possible. � Expenditures 2018 2019 2020 2021 2022 7'otal Infrastructure Improvements 25,000 25,000 25,000 50,000 50,000 175,000 Total 25,000 25,000 25,000 50,000 50,000 175,000 Funding Sources 2018 2019 2020 2021 2022 T'otal Park Improvement Fund 25,000 25,000 25,000 50,000 50,000 175,000 (5600) Total 25,000 25,000 25,000 50,000 50,000 175,000 5.5 Projcct# P-024 Ucpartment Parks ('ontacl Projecl Namc Wildwood Park Athletic Field 7�pe Maintenance Gseful I,i(c Categor� Park lmprovements llescription ,Construct new soccer,football,lacrosse field at Wildwood Park and the ISll 28I properiy forcommunity and school use.Vrojec;t would include regrading field area, '', addition of irrigation,turf improvement and new goals. ; Justifica6on ',Community youth athle[ic groups and school district are in need of additional green field space for youth rec;reation,physical dducation classes and athletics.This I ',project would be a joint partnership project with the City of Golden Valley,lSD#281 and(iolden Valley Youth Athletic Associations. Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 100,000 100,000 ____------._...------ Total 100,000 100,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Golden Valley Youth 12,500 12,500 Associations ISD#281 12,500 12,500 Park Improvement Fund 75,000 75,000 (5600) Total 25,000 15,000 100,000 Project M P-�25 Deparlment Parks C'ontacl Project Name Communit Gardens �' 7�pe Unassigned Useful I.ifc Categor� Park Improve�nents '�Description ____ ._— __-- -----_ _----- - _ __--...------_ —) �Add 1-2 Communily Garden areas in the Golden Valley Park system. — _.__. _.. Justification Community Gardens are required frequently by residents as an addition to the services offered through the Vark&Recreation Department.Staff will work with residents and the Open Space and Recreation Commission to identify potential locations and make reocmmendations to the City CounciL ' Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 30,000 30,000 60,000 Total 30,000 30,000 60,000 Funding Sources 2018 2019 2020 2021 2022 7bta1 Park Improvement Fund � '��i 30,000 � 30,000 60,000 (5600) _.._-------_---_ ____----___._._------- Total 30,000 30,000 60,000 5� Projecl# P-�Z6 Ucparlment 1'arks ('ontact Project Name Off-Leash Pet Exercise Area Tppe Unassigned tlsefal I,ite C'ategor� Unassigned Descripfion Add an off-leash pet exercise area in the Golden Valley Park sSystem. � JuShfiCa6on O4T I,eash Pet I:xercise areas rrquested frequently by residents as an addition to the services o13�ered thraugh the Parks&Recreation Department This is also a key ' amenity which has been identified in the community survey as we11 as a goal in the comprehensive park plan.Staff'will work with the Qpen Space and Recreation Commission to identify a potential location and make a recommendation to the Ciry CounciL Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 60,000 60,000 -----__.._.__�__._.___.___----- Total 60,000 60,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 60,000 60,000 (5600) Total 60,000 60,000 Project tJ P-�27 Department Parks ('ontact Projcct Name DUgOUt� Fence and Feiled Repl�cement r�P� Unassigned Useful I.ife � C'ategor� lJnassigned , Descrip6on Staff is proposing to begin reconsWcting ballfields,repairing fence/backstops and adding shade structure over dugouts each season beginning in 2018.Sofiball field '' dugouts nced updates to meet use and ssafety needs and ballfields reyuire ongoing maintenance to keep them available for use.Stafl'is recommending improvements ', begin at Lions Park and then shift to a worst first replacement scheduled which will be detenninc�d by staff annually. ' Justifica6on All ballfields are activie daily with city sponsored programs and Golden Valley youth athletic assoc;iation use.Without field improvements staff will not be able to i ;maintain the cument level of use. Expenditures 2018 2019 2020 2021 2022 'I'otal Construction/Maintenance 55,000 55,000 � 55,000 55,000 55,000 275,000 Total 55,000 55,000 55,000 55,000 55,000 275,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 55,000 W 55,000 � 55,000 55,000 55,000 275,000 (5600) Tp� 55,000 55,000 55,000 55,000 55,000 275,000 5 '1 Pruject# P-028 Ucpartment Parks Projecl Name C'ontact Ballfield Scoreboard Updats/Replacement 7 ype l)nassigned Useful I.ife ('ategor� Unassigned Description Update and/or replace scoreboards cun�endy in place on Golden Valley fields.lmprovement schedule will be based on a worst first update/replacement on staff recommendation. Justificadon All scoreboards on Golden Valley athletic fields are in need of significant maintenance and upkeep to keep them functional.Staff'will look to fiscaliy partner with community athletic associations and seek grants whenever appropriate or possible. Expenditures 2018 2019 2020 2021 2022 Total Infrastructure tmprovements 25,000 25,000 25,000 75,000 ---- ___...___.._. �____------------.. . Total 25,000 25,000 25,000 75,000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 25,000 25,000 25,000 75,000 (5600) Total 25,000 25,000 25,000 75,000 ( Project# P-029 Uepartment Parks Project Name ('ontact Tennis Court Reconstruction "T�pe Unassigned Useful Lifc Cate�or� Unassigned '' Description Kee;onstruct tennis courts at Wesley Park expanding the current deteriorating three courts to four/five couris.If budget allows with bid process,up to four Pickle Ball couris may also be addad.This improvement includes new courts,lights and fencing. Justificatlon _ __ Because Wesley and Medley Vark tennis courts need to be fully reconstrvcted,staff'is recommending to eliminate the tennis courts at Medley Park due to the very pcwr soil conditions as well as the soUm water drainage issues and reconstruct/expand the number of tennis/Picle Ball courts,at South Wesley Park.Medley Park tennis couns will remain open until the Wesley court improvement project is completc and open for public use. Expenditures 2018 2019 2020 2021 2022 Total ConstructionlMaintenance 150,000 � 150,000 Total 150,000 150,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Park Improvement Fund 150,000 � �� 150,000 (5600) Total 150,000 150,000 58 Project# P-030 Departmcni Parks Projcct Name (�ontact Wesley Ball field#3 Drain Tile �;�Pe u�dss;�„ea us�r�i t.�r� Categor� Unassigned Description Due to the lc�cation and soils of ball field#3 at Wesley Park,drain thc needs to be added to help remove sionn waler and improve general drainage to use the athletic �� amenity. Jusafication ___ Without drain tile this ball field will cantinue to be a 1'acilty that cannot be relied on for use.The improvement will allow regular use similar to other fields in Golden�', Valley. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 25,000 25,000 ------_.__ � --- ---_--------__---- _ Total 25,000 25 000 Funding Sources 2018 2019 2020 2021 2022 Total Park Improvement Fund 25,000 25,000 (5600) Total 25,000 25,000 5q ��tyof� olden � va e Capital Improvement Program 2018-2022 Brookview Golf Course Section Brookview Golf Course is owned and operated by the City of Golden Valley under the auspices of the Park and Recreation Department. The Brookview golf facility consists of an 18 —Hole Regulation Course, 9-Hole Par 3, Driving Range and teaching area, Golf Shop, Grill and Lawn Bowling. Brookview's Regulation Course is a challenging, mature course with some tree-lined fairways, 28 moderate bunkers, fairly small greens, and an abundance of water hazards. A maintenance building at 100 Brookview Parkway and Clubhouse are rented from the City. User fees are the main source of revenue. History: Brookview Golf Course was a private country club until the late 1960s, when the City of Golden Valley purchased the facility to operate as a municipal golf course. In 1976-77, the course underwent major renovations with the addition of the Par 3 nine-hole course and Driving Range. In 1984-85, extensive work was done to bridge the fairways and enlarge the ponds to alleviate flooding. The Regulation Course was closed in 1990 to redesign and rebuild the greens. That same year, the clubhouse was enlarged and remodeled. In 2014, a Lawn Bowling Course was added. In 2017, the Pro Shop and Grill will be located in the new Brookview Community Center. �OV City of Golden Valley, Minnesota Capital Plan 2018 thru 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Golf Course � Green/Tee Mowers GC-003 35,000 37,000 42,000 114,000 Trucksters GC-004 19,000 19,000 38,000 Point of Sale System �C-007 30,000 30,000 Golf CaRs GC-009 308,000 308,000 Rough Mowers GC-010 70,000 10,000 Five Plex Fairway Mower GC-014 50,000 52,000 102,000 Bridge Improvements GC-023 40,000 40,000 40,000 120,000 Hole#14 Floating Walkway GC-024 50,000 50,000 Verticuts for Fairvvay Mower GC-025 9,000 9.�� Turt Sprayer GC-031 50,000 50,000 Wood Chipper �C-040 20,000 20,000 Hole 18 Tee Improvements GC-041 50,000 50,000 Storm Shelter GC-042 50,000 50,000 Irrigation System GC-043 50,000 50,000 Conversion for Sprayer GC-044 18,000 18,000 Range Nets GC-045 9,000 9,0� Golf Course Total 468,000 156,000 132,000 212,000 120,000 1,088,000 GRAND TOTAL 468,000 156,000 132,000 212,000 120,000 1,088,000 (o f Projec!# GC-003 Uepar[meiit Golf C'ourse Project Naroe Contact Green/7'ee Mowers r,P� Equipment llseful I.ife C'ategor� Gquipment:Heavy Equip. Description Green/Tee mowers to replace current unit. One unit to be replaced in each year shown. l - -- - — --- —-- - _.I Jus6fica6on __ _ Increased repair and maintenance expenditures on current units. ' Expenditures 2018 2019 2020 2021 2022 T'otal EquipNehicles/Fumishings 35,000 37,000 42,000 114,000 Total 35,000 37,000 42,000 114,000 Funding Sources 2018 2019 2020 2021 2022 Totai Brookview Golf Course Fund _�35,000 37,000 `_ 42,000 _ ��_ _ `__ 114,000 Total 35,000 37,000 42,000 114,000 Project 1l GC-004 Uepartment Golf Course Contact Projcct Name Trucksters 1'�pe Equipment Useful I.ife Ca[e�or� Equipment:Heavy Equip. i Description , _ ____ Four wheel Trucksters 1'or the Golf Course to replace current units. These units are us�for the hauling of maintenance materials and equipment to various locations on the course. The course cwrently has four trucksters in its fleet. Justi�cation lncreased repair and maintenance expenditures on current units. i Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 19,000 19,000 _ 38,000 -------- _ .�__----- Total 19,000 19,000 - -�------ 38,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Brookview Golf Course Fund 19,000 19,000 � gg,ppp T'otal 19,000 19,000 38,000 Co 2 Project# (�iC-�0� Uepartment Golf('aurse Contact Project Name p011lt Of Sa1C S Stem Y 7 ype Equipment Useful Life ('ategor� Equipment:Miscellaneous Description --- --- Purchase a new POS/Cash Kegister system for golf,lawn bowling,banyuet,and food and beverage opentions. __. ____� Justifica6on Upgrade in technology,current system needs replacement. Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Furnishings 30,000 30,000 7'otal 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Brookview Golf Course Fund 30,000 30,000 T'otal 30,000 30,000 Projcct# �iC-��9 Department GolfCourse Contacl Project Name Golf CaCts I�pe Equipment ll�eful I.ite ('ategor� Equipment:Heavy Equip. Descripdon 60 carts were purchased in 2010 for rental income while playing gol£Carts will be traded in to offset the purchase and is included in this estimate.In 2018,electric carts will be purchaed for the first time.Golf carts are quieter and cleaner for the environment. "Ihe conversion to the storage space is$33,000. ' ' Justification Golf carts are a needed commodiry at any golf course.Ownership of golf caAs has turned out to be much more profitable than leasing.The previous cans lasted eight years. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 33,000 33,000 EquipNehicles/Furnishings 275,000 275,000 Total 308,000 308,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Golf Course Fund 275,000 33,000 308,000 -- ------- __- -- --- --- _---- - Totai 275,000 33,000 308,000 Co3 Projcct# (�iC-�]� Uepartmenl GolfCourse Contact Project Name Rough Mowers l�ype Equipment Useful I.ife ('ategon Equipmenr Heavy C•yuip. Description _—i _ __ ___ _ _. --- _ __ __ __ ----- Rough Mower to replace units. ._ ._ _ . _ _ _ - -- -- _-- --------� ' Justification Increased repair and maintenance expenditures on current units. - _ _, Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 70,000 70,000 'I'otal 70,000 70,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Golf Course Fund 70,000 70,000 Total 70,000 70,000 Project# GC-014 Uepartment GolfC'ourse ('ontact Project Name Five Plex Fairway Mower 7)pe Unassigned Uscful I.ifc Categor� Equipment:Miscellaneous ' Descripdon ' Mows the Golf Course Fainvays five times a week during the golf season. l __ __— _ I Jusdfica6on Increased repair and maintenance expenditures on current unit __----� Expenditures 2018 2019 2020 2021 2022 'I'ota! EquipNehicles/Furnishings 50,000 52,000 �� 102,000 Total 50,000 -----v -__.__ 52,000 y-_�—�_'�---102,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Golf Course Fund � 50,000 52,000 102,000 --____----_._._.. . ._._.__.__ __. . ____-- ----- -- 1'otal 50,000 52,000 102,000 � T Projccl# GC-023 Ucparimenl GolfCourse C'ontact Project Name Bridge Improvements 1'�pe Unassigned t!tcful l.ifc ('ategor� Unassigned Description ln 2013,one side of the supFwrt abutment was repairul and tested for settlement.In 2014 and 201 S,more concrete approaches will be replaced. � Justi�cabon 'Improvement to the structure and safety of bridges. Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 40,000 40,000 40,000 120,000 Tota) 40,000 40,000 � 40,000 120,000 Funding Sources 2018 2019 2020 2021 2022 Tbtal Brookview Golf Course Fund_� __ 40,000 40,000 � 40,000 120,000 Total 40,000 '40,000 40,000 120,000 Projecl# �iC-�24 Department Golf('ourse ('ontact Project Namc Hole#14 Floating Walkway 1'ypc Unassigned Useful Lifc ('ategor� Unassigned � Description Improve Ffole#14 flooding issues have eroded the turE 1 J ' Jus6�ca6on ___) Renovation to Hole#14 flooding issues that will help continuaus play. Expenditures 2018 2019 2020 2021 2022 1'otal Construction/Maintenance 50,000 50,000 -----.__.._.—_____-- _ ._--____--- Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 Total — —_.____._ rookview Golf Course Fund 50,000 50,000 --- _�_._�,._._— ---------- ___ _ . _ _ _ ,-- -- Total 50,000 50,000 C�5 Pro�ect u GC-025 Dcpartment Golf Course ('ontact Project Namc yerticuts for Fairwa Mower 3' 7'�pe llnassigned Uscful Life ('ate�or� Unassigned Description _ _. _ _ __ __._ -- -_ 1 'Verticut attachment for the Fairway Mowers[o allow thatching of the fairways. � _ ___ __--------_ __.� Jus6ficadon ' Fairways need to be groom«i to help assist with play. . ' Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 9,000 ' 9,000 Total 9�000 --_.___ ---- 9,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview_Golf Course Fund 6,000 ~ 6,000 �-----�._------_--..-------------- Total 6,000 6,000 Projcct# GC-031 Department Golf Course C'ontact Project Name Turf S ra CY p y l�pe Unassigned Useful Life Categor�� Unassigned ' Description __ Maintenance equipment that sprays fungicide and herbicide. --- — _. __ ___ ____ __ -_ --__.--� .IUShfIC8hOI1 Replacement of sprayer previously purohased in 2004. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 50,000 50,000 _ ----_ _..__..__...__ Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Brookview Golf Course Fund 50,000 50,000 __ - -----_ - --�.. 7'otal 50,000 50,000 �� Projcct� GC-040 Departmcnt GolfCourse tbntact Project Namc �7�100t� Cbl er PP r�P� Unassigned t��eful Lite ('ate�or� Unassigned Descripdou The cun•ent wood('hippe,7 is extremely old.The course has need throughout ihe yrar to chip wood. ; __._�.____—___ ------- _ � Justification _ __ The need to replace the chiipper that no longer is safe to operate. ' Expenditures 2018 2019 2020 2021 2022 'Total EquipNehicles/Furnishings 20,000 20,000 'j'p� 20,000 ' 20,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Goif Course Fund 20,000 20,000 _.__._ _.._-_----____----.__.____...._------.._._--- Z'o� 20,000 20,000 - Project# GC-041 Department Golf Course Contact Project Name Hole 18 Tee Improvements r,P� Unassigned Useful I.ife Categor� Unassigned llescrip6on Improvements to}iole#18 tee l _ _ __ ___ .l Justi�ca6on Maintenance work to improve the$18 tee which is deteriorating. ' Expenditures 2018 2019 2020 2021 2022 T'otal Construction/Maintenance 50,000 � 50,000 --------__.__ _ --�,�--- Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 1'otal �.--- rookview Golf Course Fund 50,000 50,000 ----._._._._ . _ . . ______.__.-----_— Total 50,000 50,000 W � ProjeN# GC-042 Uepartment GolfC'ourse Project Name Storm Shelter (�ontacl "I ppc Unassigned l�seful Life Categor� Unassignecl Description Construction oTa stonn shelter on the northwest comer of Brookview Gnlf Course. Justification - The current shelter is completely deteriorated and in need of repiacement. Expenditures 2018 2019 2020 2021 2022 Total Other � - 50,000 50,000 Total 50,000 50,000 Project N GC-043 Uepartment Golf Course Project Name Irrigation System c°"`a" tppc Unassigned Useful I.itc Categorp Unassigned Description Start on the replacement of a very large irrigationsystem. Project to be completed over a few years. _— —-- , Justificadon -- --- ----� Imigation system is failing and over 30 years old. System is mandatoty to continue operation of a golf course. - ----' --� I Expenditures 2018 2019 2020 2021 2022 7bta1 EquipNehicles/Fumishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Brookview Golf Course Fund --.__.________-------- ------_ ____.�-------- 50,000 50A00 ----_...----. __._._.._..-------__- ----- Total 50,000 50,000 �8 Project# GC-044 Depariroent GolfCourse Project Name C'ontact Conversion for Sprayer ,��P� unaSS�gn�i t�seful I.ife Cate�on Unassigned Uescripdon Upgrade electronic com�nents far sprayer. Justification Sprayer electric components need upgrading to keep current equipment fully functioning. Expenditures 2018 2019 2020 2021 2022 7'otal EquipNehicles/Fumishings 18,000 18,000 7'otal 18,000 � 18,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Golf Course Fund 1$000 18,000 -------- --------________ __--------- T'otal 18,000 18,000 Project# GC-045 Uepariment GolfCourse Project Name ('ontact RBllge NCtS 7�ype Unassigned llseful I,ife Category Unassigned Description Nets along the Driving Range need to be repairecl and replaced. - --- -.. __ - -- —__,_.� Justifica6on Nets have lo be repairad and replaced for the Driving Range for security of the drive�s on neer by roads and other golfers. � Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance � 9,000 9,000 _.— ___��_ _____------._�_.__ Total 9,000 9,000 Funding Sources 2018 2019 2020 2021 2022 Total Brookview Golf Course Fund 9,000 � 9,000 �—___....____------- _ _ __ ___ --------- Totai 9,000 9,000 c�q city of olden g va e Capitai Improvement Program 2018-2022 Building Improvement Section The City owns and or/maintains the following facilities for the purpose of carrying out its mission of providing needed services to the community and bringing people together by fostering inviting public spaces where people work and play, encounter their fellow citizens and discover common interests. This has incorpo�ated the Wold Architects and Engineers city-wide comprehensive facility assessment building anatysis that was completed late 2006. Golden Valley Buildings Total S uare Feet Cit Hall 26,350 Public Safet Police and Fire Station #1 28,000 Streets and Park Maintenance 29,100 Utilities Maintenance 12,950 Vehicles Maintenance 12,500 Warehouse & Animal Impound 11,490 Golf Maintenance 12,050 Fire Station No. 2 5,785 Fire Station No. 3 6,030 Brookview Center/Golf Operations 37,000 A transfer from the General Fund is the main source of revenue. 70 City of Golden Valley, Minnesota Capital Plan 2018 th,1, 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Buildings � Carpet Replacement:Ciry Buildings 8-011 30,000 Generators 30,000 B-012 35,000 50,000 85,000 Air Compressor:Station#2 8-013 10,000 Installation of Building Security Systems g_Op� 5,000 15,000 30,000 30,000 Council Chambers Chambers Remodeling 8-036 125,000 Public Buildings Roof Replacements 125,000 B-041 270,000 150,000 150,000 150,000 720,000 City Hall Boiler Replacement 8-043 205,000 Vehicle Maintenance-Window Replacement B-045 205,000 25,000 25,000 10th Avenue Storage Building-Insulate and Heat B-046 Employee Work Stations 150,000 150,000 B-047 40,000 40,000 10th Ave South Side Storage Yard B-048 125,000 125,000 125,000 Park Shelters-Windows 375,000 8-�9 50,000 50,000 100,000 Buildings Total 440,000 450,000 530,000 330,000 150,000 f,900,000 GRAND TOTAL 440,000 450,000 53Q000 33Q0o0 150,000 1,90Qo00 � � Project# 8-011 Departmenl Buildings Contact Project Nnmc Car et Re lacement: Cit Buildin s P P Y g 'i)pe Improvement u,�r�i i.�r� ('ateRon Buildings Description On-going program to replace worn out carpet in City buildings. Dec;ision as to which carpet to replace in a given year will be based on an annual inspection of the condition of the carpets in the various buildings. '2018-Llpstairs ofCity Hall:General Services i Jus6fication Carpet is worn beyond its useful life.It is difficult to clean and in some areas is wam and frayecl resulting in tripping hazards.Some areas have been delayed since I 2006. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 30,000_ 30,000 1'p�j 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 Total Building Fund(5200) 500,000 500,000 _—__------- ----- --------..__.__ __----- _ ']'p� 500,000 500,000 Project# 8-0�2 Department Buildings ('ontact Project Name Generators r�Pe Improvement Useful I.ifc ('ategor� Buildings � Descripdon Remove and replacelupgrade existing building emergency standby generators.2018 replace Vehicle Maintenance generator.2019 replace Publie Safety generator. ', 'Justificadon _ Vehicle Maintenance building emergency standy generator is over 40 years old;the generator was the original Public Safety Generator before it was re-installed at ,the vehicle maintenance building in 1990.The vehicle maintenance building generator is cruicial to public works operations during power outages. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnlshings _ 35,000 50,000 85,000 —---- — --------- ____ ______. -- --_--- Total 35,000 50,000 85,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Building Fund(5200) 35,000 35,000 70,000 Total 35,000 35,000 --�---�--______..�_—._�— ----70,000 72 Project# 8-�13 Uepartment Bui►dings ('ontact Projecl Name Air Com ressor: Stat1011 #2 p I�pc lmprovement Useful Lifc Categan Buildings Description __ __.__ ___ ___, Replace air compressor in the Vehicle Maintenance Building and Park/Street Maintenance Building. � Justif cadon 7'he existing air compressors are over 20 years and in need of replacement I 2018-two air compressors for Vehvile Maintenance Building � 2021-one air compressor ParklStreet Maintenance Building Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 10,000 5,000 15,000 - ---- --__---- ___ _____._ .---____.-- Total 10,000 5,000 15,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Building Fund(5200) 10,000 5,000 t5,000 Total 10,000 5,000 15,000 Project# 8-�27 Department Buildings Cbntact Project Name Installation of Buildin Securit S stems g y �' Type hnprove�nent Useful I,ifc Categon Buildings Descrip6on _--- -- ___ _ -- --- -__ ______- - _1 Installation of building sec:uriry systems in all Ciry owned facilities. --- __ _ _ __ - _-- _ _.__., Jus66cadon ____ _ _ _ The Ciry has installed a security system for primarily the City Hall Campus.2017 security projects include installation of video suveillance.2018 projects include I !security systems in other buildings. Expenditures 2018 2019 2020 2021 2022 Total Other � 30,000 30,000 _____ _ ..______ _.__ __. _... .--_-- ------- T�p�� 30,000 30,000 Funding Sources 2018 2019 2020 2021 2022 T'otal Building Fund(5200) 30,000 � v 30,000 '1'otal 30,000 30,000 �3 Project ft B-036 Departmeni k3uildings Contact Project Name Council Chambers Chambers Remodeling ryP� [mprovement l�seful Lifc Cate�or� Buildings Description __. _ _ -- --- -. . __ ._ � Complete Remodel of Council('hambers Jus6fication _ _ _- _ � The('ouncil Chambers has not been updated in over 30 years.Remodel to more accurately match the Ciry's current brand. Expenditures 2018 2019 2020 2021 2022 7'otal Equip/Vehicles/Fumishings 125,000 125,000 7'otal 125,000 125,000 Funding Sources 2018 2019 2020 2021 2022 Total Building Fund(5200) 125,000 125,000 ---_ __.�--- —__--- ---- _ .__.�_ Total 125,000 125,000 Project# 8-�41 Department Buildings Contact Project Namc public Buildings Roof Replacements �r�Pe Unassigned L'uful I,ifc Categon Unassigned Descripdon Replace roofs on buildings that are thirty-years old or greater. ( _.__ .IUSCIfIC8t1011 The follawing roofs will be at least 40 years old or greater and are leaking and in need of replacement.Replacements are scheduled for the following: 2018-Wesley Park; IOth Avenue Cold Storage Building ' ';2019-LGeartyPark 2020-Scheid Park 2021-Location TF3D Expenditures 2018 2019 2020 2021 2022 "Total Infrastructure Improvements 270,000 150,000 150,000 150,000 720,000 _�_. —. _ __�_—___---._.--- ——__ Total 270,000 150,000 150,000 150,000 T20,000 Funding Sources 2018 2019 2020 2021 2022 'fotal Building Fund(5200) 270,000 150,000 150,000 150,000 720,000 �_ ----_.______ ------___._____-----_____ ------------__----------- Total 270,000 150,000 150,000 150,000 720,000 � / Project# B-043 Dcpartment Buildings Project Name C'ontact City Hall Boiler Replacement r�P� Unassigned Useful I.ifc Categor} Unassigned Description Keplace the City Hall Boiler System and conUol system.. Jus6fication The existing boiler syste�n for City Hall is over 40 years old and is noi efficient according to today's standard.T'he system would require total replacement Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings s 205,000 205,000 Total 205,000 205,000 Funding Sources = 2018 2019 2020 2021 2022 Total Building Fund(5200) 205,000 205,000 Tota) ------— 205,000 --'..------------205,000` Project tf $-OQ$ Uepartment Buildings Project Name Contact Vehicle Maintenance-Window Replacement r�P� Improvement Usetul I.ife Categor} Buildings i Descripdon Replace otfce windows in the Vehicle Maintenance building and a new window in IT. - ----) _ -- — - - .—. _____.J JustiCcatlon Vehicle Maintenance building ol7ice windows are in need of replacement and an oflice area that needs a window in IT. � Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 25,000 25,000 --____------ '_.._--_-----------_----- Total 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Building Fund(5200) 25,000 25,000 _�_.__------ ____�---_____--____ _---.__---._---- "Total 25,000 25,000 f '7 5 Project# B-046 Ucpartment Buildings Cmuact Projecl Name lOth Avenue Storage Building-Insulate and Heat l�pe Unassigned l�seful I.ifc ('ategon Unassigned ' Description [nstall insulation and heat at the existing l Oth Avenue storage building - -- -- "-- -- ' -- � __- -._ _ _ � Justi�ca6on Installation of insulation and heat for the lOth Avenue storage building gives public works storage space for equipment that needs to be protected from freezing street sweepers,water truck,Vactor and 1et truck,etc. Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Fumishings v��_V__ _ 150,000 150,000 Total 150,000 150,000 Funding Sources 2018 2019 2020 2021 2022 Total Building Fund(5200) 150,000 150,000 Total 150,000 150,000 Project# 8-�47 Department Buildings Contact Pr°�e�'Na"'e Employee Work Stations 7�pc Unassigned Useful I.ifc Cate�or� Unassigned Description Ongoing program lo replace old work stations in City HaIL 2018-General Services , Jusdfication :Work stations are coming to an end of their useful lfe and are in nieed of'replace�nent. Expenditures 2018 2019 2020 2021 2022 'I'otal EquipNehicles/Furnishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 Total Building Fund(5200) 40,000 40,000 —______.. ___�� ___-----_,—__— _ - -- --- --. Total 40,000 4Q000 ��iJ Project# $-�Q$ Departmenl E3uildings Project Name �Oth Ave South Side Storage Yard �bntact 1'�'pc Unassigned t!seful I,ifc Categor} Unassigned Descripdon install a sectional concrete wall around the south side outdoor storage year for securiry and visual screening of storage yard. JusNfication -_--__------ � __ —_.__� The diri berms araound the site are an eyesor and do not offer any security. ----__i Expenditures 2018 2019 2020 2021 � infrastructure Improvements 2022 Total 125,000 125,000 125,000 375,000 Total 125,000 125,000 125,000 375,000 Funding Sources 2018 2019 2020 2021 2022 Total Building Fund(5200) 125,000 125,000 125,000 --�-- _--- 375,000 ._________�_�__----- __._-- Total 125,000 125,000 125,000--- .✓_____-._--_�__---� 375,000 P��ie��# B-049 Department Buildings Project Name park Shelters -Windows (onlact 7}pe Unassigned Uscful Lifc ('ategor� Unassigned Descripbon Add windows to park shelters(7). __ ___. — ---- __— _ _ ----- .__ ___ _-- � ___---_ _--_ __.__._. Jusdfication -_ -- --- Add windows to park shelters for better use of the facilities. _..----__� Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements ___.______..____._----_.._-----------50,000 50,000 100,000 _---.—�_____�____. _.`�_____._ �otal 50,000 50,000 100,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Building Fund(5200) � 50,000 ---------- 50,000 10Q000 _.--.__ --._______._.._. _.__.. __._�._---.._� Total _ -----.__ __ 50,000 50,000 100,000 � � cityo�f olden g va e Capital Improvement Program 2018-2022 Cablecasting Improvement Section The City of Golden Valley partners with Northwest Community Television (NWCT) to bring you a wide variety of city video programming featuring information about your local government as well as activities and events in the community. This capital project fund plans for major improvements to provide access for city meetings. History NWCT started in 1982 and is funded by a joint powers agreement that supports public access and local programming activities through local Franchise and Community Television fees. Nine adjacent cities are part of the franchise agreement between Comcast and the Northwest Suburbs Cable Communications Commission (NWSCCC). They include Brooklyn Center, Brooklyn Park, Crystal, Golden Valley, Maple Grove, New Hope Osseo, Plymouth, and Robbinsdale. Franchise fees is the main source of revenue. .� �� City of Golden Valley, Minnesota Capital Plan 2018 thru 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total , Cablecasring Improvements � Cable Equipment Replacement C-001 200,000 200,000 Cablecasting Improvements Total 200,000 200,000 GRAND TOTAL 200,000 200,000 79 Project N C-QQj Ueparinienf Cablecasting improvements Project Name Cable Equipment Replacement ��antact 7;vpe Improvement l�seful I.ife Category Cablecasting Improvements Uescripdon Replace aging eyuiptnent in cable TV control room with updated equipment employing digita]technology. ____ - -I JustiGcation --_ _--------- As eyuipment ages,the use for compatible software and hardware changes over time which requires new equipment. Expenditures 2018 2019 . I 2020 2021 2022 Tota! EquipNehicles/Fumishings 200,000 __ 200,000 Total 200,000 200,000 Funding Sources 2018 2019 2020 2021 2022 Total Cablecasting Improvements 200,000 __------- --_---____ ----- 200,000 Total 200,000 - _______. _._.-------- 200,000 �� ��tyof olden � �a e Capital improvement Program 2018-2022 Storm Sewer Section This section includes the storm water infrastructure improvements and the flood damage reduction program for the next five years. Most of these improvements, which include both rate control and water quality projects, coincide with the Pavement Management Program (see section on Streets). Improvements will be funded either through the use of current reserves or the issuance of revenue bonds. The goal is to have enough reserves to account for 50% of the current revenues. 8 � City of Golden Valley, Minnesota Capital Plan 2018 chru 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Storm Sewers � Residential Storm Sewer Improvements SS-Ol 900,000 750,000 750,000 750,000 750,000 3,900,000 Brookview Golf Course-Buffer Zone Impiementation SS-12 50,000 50,000 100,000 Storm Water Pond Dredging SS-23 300,000 300,000 300,000 900,000 V-Box Spreader and Anti-Ice(tandem) SS-25 67,000 67,000 V-Box Spreaderand Anti-Ice(tandem) SS-26 67,000 67,000 Grounds Sweeper SS-27 40,000 40,000 Flood Mitigation SS-34 250,000 250,000 250,000 250,000 250,000 1,250,000 Bobcat Toolcat SS-41 55,000 55,000 Zane Avenue 8 Lyndsay St Reconstruclion SS-46 60,000 60,000 DeCola Ponds B and C SS-08 500,000 3,426,000 1,210,000 5,136,000 Medley Park Stortnwater Treatment Facility SS-49 220,000 220,000 S00 MHz Radios SS-51 40,000 40,000 Mill&Oveday Stonn Sewer Repairs SS-53 75,000 75,000 75,000 75,000 75,000 375,000 Decola Pond F Diversion SS-54 330,000 330,000 Rotating Grapple SS-57 40,000 40,000 Janalyn Pond Lift Station SS-58 200,000 200,000 Storm Sewers Total 2,182,000 4,541,000 2,680,000 1,452,000 1,925,000 12,780,000 GRAND TOTAL z,182,000 4,541,000 2,680,000 1,452,000 1,925,000 12,780,000 82 Project k SS-�1 Depariment Stonn Sewers Contact Project Namc Residential Storm Sewer Im rovements P I'ype 6nprovement Useful I.ife Categon Stonn Sewer ' Description ___ _.___________.--- Construction and repair of storm sewer drainage systero in conjunction with the Pa��ement Management Program(see S#1).. � _ ____ _ ___. Justi6caUon Provide an improve storm water drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff,minimize local drainage i and flooding issues protect pavement and facilitate sump drainage from the private property. ; Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 900,000 __ 750,000 750,000 750,000 750,000 3,900,000 ']'p�� 900,000 750,000 750,000 750,000 750,000 3,900,000 Funding Sources 2018 2019 2020 2021 2022 Totat Storm Sewer Utility Fund 900,000 750,000 750,000 750,000 750,000 3,900,000 (7300) �—._______^__--------________�_____----__.a Total 900,000 750,000 750,000 750,000 750,000 3,900,000 Project# SS-]Z Uepartment Stonn Sewers Contact Project Name Brookview Golf Course-Buffer Zone Implementation 7'ype Impmvement Useful Life Categorv Stonn Sewer Description Perfonn a study in 2013 to identify Iceations for the development of native vegetation buffer areas in Brookview Golf Course.Conswction of the buffer areas after � 2013. ; i Jusdfication _ , _- _ _- - iRemoval of nutrients and sediment from stormwater runoff entering golf course ponds and Bassett Creek. �'' Expenditures 2018 2019 2020 2021 2022 Total Infrastnicture Improvements 50,000 50,000 100,000 - ------ --- -___---- ---_—..__-- 'roca� ��oao so,000 ,00,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Storm Sewer Utility Fund 50,000 50,000 100,000 (7300) Total 50,000 50,000 100,000 V� Project# SS-23 ��epartment Stonn Sewers ('ontact Project Namc Storm Water Pond Dredging I'cpe Maintenance t seful I.ifc ('ategor� Storm Sewer Description , Pond Dredging program to remove accumulated sediment and hazardous materials such as Polycyclic Aromatic Hydrocarb�ns(PAIl),including the proper disposal o}'dredged materials. Justification Significant sedimentation reduces the water quality volume in ponds and contributes to degradation of downstream waters.Periodic dredging removes accumulated ' sediment and hazardoas materials and restores nutrient and sediment removal efticiencies. Expenditures 2018 2019 2020 2021 2022 1'otal Other 300,000 300,000 300,000 900,000 _�— __.__..�______��_-__�_--..___ Total 300,000 300,000 300,000 900,000 Funding Sources 2018 2019 2020 2021 2022 Total Storm Sewer Utility Fund 300,000 300,000 300,000 900,000 (7300) TotAI 300,000 300,000 300,000 900,000 Project# SS-25 Department Stortn Sewers ('ontaM Project Name V-Box Spreader and Anti-Ice(tandem) T�pe Equipment Usefui I.ifc Categor� Stonn Sewer Descripdon _ --- -_ __ � V-Boz sander with liquid application for pre-wet and anti-icing for tamdem axle dump truck.This unit is 508. -- --._. -— -- —- , Jusdfication V-Box sanders are the most e�cient and cost effective way to apply de-icing chemicals for winte�•operations.V-Box sanders wiil reduce the impacts of de-icing ,chemicals on locallakes and streams. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 67,000 67,000 —_.._.__.--__�_ Total 67,000 _ _--------____._------- 67,000 Funding Sources 2018 2019 2020 2021 2022 T'otal Storm Sewer Utility Fund �i 67,000 �"� 67,000 (7300) —__._____..----_-------�._.__ ---- ____--_.`__ Total 67,000 67,000 �� Project# SS-26 Departmcnt Stonn Sewers Project Name ('ontact V-Box Spreader and Anti-Ice(tandem) ryP� Equipment Useful I.ifc Cate�or� Stonn Sewer Description V-Boz sande��with liquid application for pre-wet and anti-icing for tamdem axle dump truck.7'his unit is 511. - -� Justification _ _ _ _ ; V-Box sanders are the most efficient and cost effective way to apply the de-icing chemicals for winrer operations.V-Box sanders will reduce the impacts of de-icing i chemicals on local lakes and streams. Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Furnishings �,A _� _ � � 67,000 67,000 ------____..__�_ Total 67,000 67,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Storm Sewer Utility Fund 67,000 67,000 (7300) --- ------------__ _—_----_.�--------- Total 67,000 67,000 Project# SS-27 Uepartment Storm Sewers Project Name ('ontact Grounds Sweeper r�Pe Equipment Useful I.ife . Categor�� Storm Sewer ', Description �Grounds sweeper to replace Unit#506,a 2011 Smithco grounds sweeper. - -- _ _ _- -- .— _ _ —-- _ - -- --� Justification �Increased repair and maintenance on Unit#506,which will be nine years old. --"--� I Expenditures 2018 2019 2020 2021 2022 Tutal EquipNehicles/Fumishings 40,000 40,000 Total 40,000 � � 40,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Storm Sewer Utility Fund � � � � 40,000 40,000 (7300) Total 40,000 40,000 85 Projecl# SS-34 Departmenl Stonn Sewers ('ontact Project Namc Flood Miti ation g I ype lmprovement t�setul I.ifc ('ategor� Storm Sewer Uescrip6on Dedication of funds to damage Irom flooding on Qassett Creek and its tributaries,including('ity stann water ponds. '' __J Jus6fication Plood mitigation may include working with homeowners and the Basseri Creek Wate�•shed Commission on a program. ''i Expenditures 2018 2019 2020 2021 2022 T'otai Construction/Maintenance 250,000 250,000 250,000 250,000 250,000 1,250,000 Total 250,000 250,000 250,000 250,000 250,000 1,250,000 Funding Sources 2018 2019 2020 2021 2022 7btal Storm Sewer Utility Fund 250,000 250,000 250,000 250,000 250,000 1,250,000 (7300) Total 250,000 250,000 250,000 250,000� 250,000 1,250,000 Project# SS-41 Uepartment Storm Sewers <bntact Project Name Bobcat Toolcat r,Pe E,quipment Usefui l,ife Categor� Stonn Sewer Descrip6on Bobcat Toolcat will be purchased with snow blower and sweeper attachments. This is a multipurpose loader that can also be used as a stump grinder,post hole auger,trencher etc.This unit was purchased in 2013 and is unit 510. Justification - _ --__ � Increased repair and maintenance on Unit 510. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicleslFumishings 55,000 55,000 Total 55,000 55,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Storm Sewer Utility Fund 55,000 � 55,000 (7300) — --___. ..____--...______._-----_.. To tal 55,000 55,000 �W Uepariment Storm Sewers Project# SS-46 ('ontact Project Namc Zane Avenue& L ndsa � St Reconstruction Y y f�pe Improvement l�xeful Life CaleRon Storni Sewer Descripdon _ ____ _ ____ _ Constiuction and/or repair of storm sewer drainage system in conjunction with Pavement Management Program. __— --- - -- --__� �USh�C8h011 Provide and improve stonn water drainage system in conjunction with the Pavement Management Program to facilitate surface water�vnoff,minimize Iceal drainage and 17ooding issues,protect pavement and facilitate sump drainage from private property. ' Expenditures 2018 2019 2020 2021 2022 7btal Infrastructure Improvements 60,000 60,000 7'��� 60,000 60,000 Funding Sources 2018 2019 2020 2021 2022 7'otal Storm Sewer Utility Fund 60,000 60,000 (7300) Total 60,000 60,000 Projcct# ss-4$ Departmcnl 5tom�5ewers Contact Project Name DeCola Ponds B and C �r,Pe Unassigned liseful I.ite Calegon Stonn Sewer Description Construct a new pond in ur near Isaacson Park with native vegetation buffer,and install storm sewer to divert runof3�from adjacent areas to the pond. � ' Justificatlon The Medicine l,ake Road and Winnetka Avenue Area Flood Mitigation Study identified several projects that are needecl to reduce the effect of repeat flooking on the ,roadway and adjacent properties.Projects will refuce the depth of flooing on the roadway and will lower flood elevations to help protect stnctures from flood damage.7'he Bassett Creek Wate�shed Management Commission Capital lmprovement Program includes constnaction of this projecL Expenditures 2018 2019 2020 2021 2022 lbtal Infrastructure Improvements 500,000 3,426,000 1,210,000 5,136,000 Total 500,000 3,426,000 1,210,000 5,136,000 Funding Sources 2018 2019 2020 2021 2022 Total Bassett Creek Watershed ^ 500,000 1,100,000 V vA 1,600,000 Mgmt Comm Hennepin County 670,000 670,000 MN DNR 2,206,000 2,206,000 Storm Sewer Utility Fund 500,000 50,000 110,000 660,000 (7300) ---__�- --_______------._____._____------_. T'o�� 500,000 3,426,000 1,210,000 5,136,000 �� Pruject tl SS-49 Departmenl Stonn Sewers Contact Project Name Medley Park Stormwater Treatment Facilit y f�pe Improvement Useful I.ifc CatcRon Storm S��ver Description Construction of a water quality treatment pond or similar facility to help remove sediment and nutrient loads within the Medicine lzke sub-watershed of the Bassett } Creek watershed. I _l Jusfi}ica6on __ __ The Bassett C'reek Watershad Management Commission Capital Improvement Program includes the construction of this project and provides funding to maximize Ithe rate control and water quality within this area of the watershed.Medicine Lake is impaired for the nutrients(phosphorus)and this project will help to meet water 1 ,quality goals for the lake. Expenditures 2018 2019 2020 2021 2022 'Total Infrastructure Improvements 220,000 220,000 __---- -- .._ Total 220,000 220,000 Funding Sources 2018 2019 2020 2021 2022 Total Bassett Creek Watershed 200,000 200,000 Mgmt Comm Storm Sewer Utility Fund 20,000 20,000 (7300) --�..__ --._...__—------ __ _ Total 220,000 220,000 Project# SS-SI Ueparlment Storm Sewers ('ontact Project Name $OO MHZ RSdI'OS 1'�pe Unassigned liscful Life C'ategon Stonn Sewer Description ' _ __ __ _ __ __.. . 8-800 MHz portable radios and accessories to be purchased in 2019. Justifica6on Replace current raidos purchased in 2008.Hennepiin County will no longer support the current 800 Mhz radios past December 31,2019.New radios P25 Phase II modulation compliant. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Storm Sewer Utility Fund 40,000 40,000 (7300) _-______ ----._ _.---- ------- 7'otal 40,000 40,000 �� Project t! SS-53 UcparUnenl Storm Sewers Projecf Name Mill & Overlay Storm Se�ver Repairs ��ontaci lppe Maintenance Useful I.ife Cate�on Sto�m Sewer Description Storn�sewer and repaiis in conjunction with the annual asphah overlay program.Repairs include but are not limited to manhole adjustments,manhole sealing and ! pipe replacement. JUStI}ICdh011 To maintain the C'ity's stonn water and drainage system in conjunction with the asphalt overlays. --""- Expenditures 2018 2019 2020 2021 EquipNehicles/Fumishin s - 2�22 Total 9 75,000 75,000 75,000 75,000 75,000 375,000 Total 75,000 75,000 75,000 75,000 �5,000 375,000 Funding Sources 2018 2019 2020 2021 2022 T'otal Storm Sewer Utility Fund 75,000 75,000 75,000 75,000 75,000 375,000 (7300) �_._._.�- - __-_.._.__-_ 7'otal 75,000 75,000 75,000 75,000 75,000 375,000 Project# SS-54 Uepartment Storm Sewers Project Namc Decola Pond F Diversion ('ontact l ype Improvement Uscful I,ife Categon Storm Sewer ; Descrip6on Construction of flood storage ponds and stonn sewer pipes to diveri stormwater and lower the depth of flooding in the DeCola Ponds area.BC WMO has an additional$I,OOQ000 programmed far 2023.MnDNR flood damage reduction grant funding to contribute�2,780,000 in 2023. Jus6fica6on _ The Medicine Lake Road and Winnetka Avenue Area Flood Mitigation Study identified several projects that are needed to reduce the effect of repeat flooking on the roadway and adjacent properties.Projects will refuce the depth of flooing on the roadway and will lower flood elevations to help protect structures from tlood damage.The Bassett Creek Watershed Manage�nent Commission Capital Improvement Program includes construction of this projec Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements � --_---____.__.----_________.__�____�--- 33Q000 330,000 Total 330,000 � 330,000 Funding Sources 2018 2019 2020 2021 2022 Total Bassett Creek Watershed ��- � Mgmt Comm 300,000 300,000 Storm Sewer Utility Fund (7300) 30,000 30,000 Tota) "� 330,000 330,000 �q Project# SS-5'] Department Stonn Sewers Project Name Rotating Grapple co��a�� Type l)nassigned Useful I.ifc Cafe�ory Unassigned Description Rotating grapple for Cat M320 Excavator,g�apple utilized for tree and b�vsh loading. _ I ushfica6on ---- _ . _..---- ----___-- ---- ___� Increased maintenance and repair expenditures on existing rotating grapple with will be 18 years old. I Expenditures 2018 2019 2020 2021 2022 Total ' EquipNehicles/Furnishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'Total Storm Sewer Utility Fund 40,000 - (7300) 40,000 Total 40>000 40,000 Project N SS-$$ Department Storm Sewers Project Name �analyn Pond Lift Station cooca�� 7'�pc Unassigned Useful I.ifc Categon Unassigned ; Description Install a lift station at 220 Janalyn Circle to pump water from the pond into the storm swec - -- ---- ---- -- � •jUShftC8hOt1 - _ _ Janalyn pond is a land loced storm water pond.There is no outlet to the pond.During imense rain events properties adjacent to the pond are at risk for flooding. Currently staff must manually set up and monitor a pump.The lifi station would be set to automatically turn on when needed to pump the water. Expenditures 2018 2019 2020 2021 2022 'Ibtal Infrastructure Improvements 200,000 — �—_.___._ ----------v_ 200,000 -- _�---___��—_ Total 200,000 200,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Storm Sewer Utility Fund i � 200,000 (7300) 200,000 ���� 200,000 200,000 �O �ttyof olden g va e Capital Improvement Program 2018-2022 Water and Sanitary Sewer Utility Section A five-year projection of the Water and Sanitary Sewer Fund reveals some potential financial challenges the City may have to address. The contract pricing with the City of Minneapolis and Golden Valley-Crystal-New Hope Joint Water Commission was renewed in 2013. The Metropolitan Council Environmental Services (MCES) surcharge program related to inflow and infiltration will have a direct affect on rates as it requires the City to make improvements to the sanitary system that will reduce the rate of inflow and infiltration into the system. Fees from the City's utility bill are the main source of revenue. q � City of Golden Valley, Minnesota Capital Plan 2018 thr►, 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Water&Sewer Systems 1 Sanitary Sewer&Water Line RepaidRecon. WBSS-001 1,200,000 1,400,000 1,200,000 1,300,000 1,200,000 6,300,000 W6SS-004 80,000 80,000 Hook Dump Truck 40,000 W&SS-011 40,000 Pickup Truck 235,000 Sewer Jet Truck W&SS-012 235,000 W&SS-014 100,000 10Q000 Pickup Truck 75,000 75,000 Pickup TNck W&SS-015 10� Multiquip Portable Generator W&SS-041 10,000 Mill and Oveday WatedSewer Repairs W&SS-051 150,000 100,000 100,000 100,000 100,000 550,000 25,000 25,000 SVucture and Pipe Inspecfron Pole Camera W&SS-055 80,000 Step Van W&SS-060 80,000 W&SS-063 600,000 600,000 200,000 1,400,000 Radio Meter Reading System 160,000 Tractor Loader Backhoe W&SS-070 160,000 W&SS-074 500,000 500,000 1,000,000 I-394 Inflowllnfiltratan Project 35,000 Sewer Flow Meters W&SS-076 35A�0 W&SS-077 1,500,000 1,500,000 Winnetka Ave Utility Rehabilitation 40,000 800 MHz Radios W&SS-081 40,000 WdSS-082 65,000 65,000 Greenview Lane Watermain Repair 650,000 650,000 T.H.55 Lift Station Relocation W&SS-083 Water&Sewer Systems Total 2,330,000 2,640,000 3,315,000 1,910,000 2,150,000 1Y,345,000 GRAND TOTAL 2,330,000 2,640,000 3,315,000 1,910,000 2,150,000 12,345,000 Project t� w&SS-QQj Uepartment Water&Sewer Systems Project Name C'ontact Sanitary Sewer & Water Line Repair/Recon. 1'ppe Unassigned Useful Life Categor� Water and Sewer Description Major repairs and reconsWction on the City's sanitaty sewer and water systems as needed. Repairs will be done in conjunction with the City's Pavement � Management Program(See S#1), � ,Jusdficabon ' To maintain City's water mains and sanitary sewer mains. ""----- -- --- __— � Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 1,200,000 1,400,000 1,200,000 1,300,000 1,200,000 6,300,000 Total 1,200,000 1,400,000 1,200,000 1,300,000 1,200,000 6,300,000 Funding Sources 2018 2019 2020 2021 2022 Total Vehicle Maintenance Fund 1,200,000 1,200,000 Water&Sewer Utility Fund 1,200,000 1,400,000 1,200,000 1,300,000 5,100,000 Total 1,200,000 1,400,000 1,200,000 1,300,000 1,200,000 6,300,000 Project# w&SS-QQQ 1)epartment Water&Sewer Systems Project Name ('o�dact Hook Dump Truck 'I�pe Unassigned Useful Life Categon Water and Sewer Description Utiliry truck to replace Unit#690,a 2010 F550 Hook dump truck. - - -- __ __-- - --- -- —--- --- ___ . Jusd�cadon -- —— -- _� Increased repair and maintenance expenditures on Unit#691,which will be ten years old. - ---____ .___._--_ i Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 80,000 80,000 �.� ---__. __--- —_--- Total 80,000 80,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Water 8 Sewer Utility Fund 80,000 80,000 To�al ------- - -- eo,000 ------------ ao,000 _ �3 Projecl ti w&ss-�]j Department Water&Sewe�•Systems ('ontact Project Namc p�ckup Truck I�ype Unassigned Useful I.ife Category Wate�•and 5ewer Description ----- -- _. —- Pickup truck to replace t)nit#688,a 2010 F150 pickup truck. -j -- — — _ -- -- —__—_ 1 Justifica6on Inereased repair and maintenance expenditures on Unit 688,which will be tten(10)years old. Expenditures 2018 2019 2020 2021 2022 1'otal Equip/Vehicles/Furnishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 Total Water 8�Sewer Utility Fund 40,000 40,000 Total �.----40,000 _------ ------ --- 40,000 Project# W&SS-��2 Ucpartment Water&Sewer Systems Contact Project Name Sewer Jet Truck T�pe LJnassigned Usefui Llfe ('ategorp Water and Sewer ; Description High pressure sewer jet(roclder truck for the Utility Division,Unit 678 is an essential piece of equipment for mainline sewer cleaning. — _.__ __. --� Justification Increased repair and maintenance expenditures on Unit 648,which will be 1 I yqrs old. ----� Expenditures 2018 2019 2020 2021 2022 '1'otal EquipNehicles/Furnishings� 235,000 _ _ __�_� _ � _ _ 235,000 Total 235,000 235,000 Funding Sources 2018 2019 2020 2021 2022 7'olal Water&Sewer Utility Fund 2,350,000 --- — 2,350,000 __.__. _._ .------------------- __ Z'o� 2,350,000 -- --'— 2,350,000 1 � Department Water&Sewer Systems Project# w&SS-�14 ('mdact Project Name PjCkUP TCUCk l�pc Unassignecl Useful Lifc , Categor} Water and Sewer Descripdon . _-- - --- � Pickup/Utility truck for the Utility Uepa�tment to replace Unit 604 a 2013 Ford F-550 4X4 with crane. ____ ^ __ __—_— JusN�caGon _ ----__� lncreased repair and maintenance expenditures on Unit 604,which will be nine years old. ; Expenditures 2018 2019 2020 2021 2022 'I'otal EquipNehicles/Fumishings 100,000 100,000 7btal 100,000 100,000 Funding Sources 2018 2019 2020 2021 2022 'Total Water 8 Sewer Utility Fund 100,000 100,000 _____—_ —�_.____�._--------�.---- Totai 100,000 100,000 Department Water&Sewer Systems Project# W&SS-015 Contact Project Name PICkU(/Tl'UCk 'I'}pe Unassigned Useful Life Categor� Wafer and Sewer Descrip6on Pickup/Utility truck for the Utility Department to replace Unit 600,a Ford 2012 F350 __ ____________ ___,..___ �—___�—_____i ' Justification _. ___ — -__—_ _____-, �Increased repair and maintenance expenditures on Unit 600,which will be ten years old. � Expenditures 2018 2019 2020 2021 2022 1'otal EquipNehicles/Furnishings 75,000 75,000 -------— ---------_-----------_ _.�_..-----__---- __ _, Total 75,000 75,000 Funding Sources 2018 2019 2020 2021 2022 Total Water&Sewer Utility Fund 75,000 75,000 ^___—._____.__._._----____..__ � -------- -- Total 75,000 75,000 q5 � Project# W&SS-041 Ucpartmenl Water&Sewer Syste�ns ('mftact Project Name Multiquip Portable Generator rype Unassigned l!ticful I.ifc ('ate�or� Water and Sewer Description __ __ -_ ___ � A Multiquip poriable generator Unit 692,a 2010 portable generator. Justificadon __ __ -_ __ . _-- _ . __. __ __ ------- __ ______ , Ilncreased repair and maintenance expenditures on Unit 692. ' � Expenditures 2018 2019 2020 2021 2022 Total EquipNehicieslFurnishings 10,000 10,000 Total � 10,000 10,000 Funding Sources 2018 2019 2020 2021 2022 "1'otal Water&Sewer Utility Fund 10,000 10,000 �_�___w�.------__�___._ ,._.__---- -_.___-_ Total 10,000 10,000 Project# w8iss-�51 Department Water&Sewer Systems ('ontact Project Namc Mill and Overlay Water/Sewer Repairs �r.Pe Improvement Use(ul Life Categon Water and Sewer Descriprion Water and Sanitary Sewer repairs willl be made in conjuction with the annual Asphalt Overlay program.Repairs include but not limited to valve and hydrant ; replacement,manhole adjustments,manhole sealing,and pipe replaceme�it. , _ ' 'Justification ___----- --____ --- -_ ___ __-. __ _ � ITo maintain the City's sanitary sewer and water systems. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 150,000 100,000 100,000 100,000 100,000 550,000 --------__ -___---__ -- ----_---- _. _ �� 7'otal 150,000 100,000 100,000 100,000 100,000 550,000 Funding Sources 2018 2019 2020 2021 2022 'Total Water&Sewer Utility Fund � 150,000 v 100,000 100,000 100,000 100,000 550,000 Total 150�000 100,000 100,000 100,000 100,000 550,000 I �/ Project q W&SS-O55 Ucpartmcnt Water&Sewer Syste�ns Contact Projcct Name Structure and Pipe Inspection Pole Camera 7�'pc Unassigneci Uscful i.ifc C'ateRor� Wate��and Sewer Descripbon Structure and pipe inspection,portable pole came��a televising equipment.Camera is mounted on a pole for yuick and eflicient televised inspeciton of manhole I sUuctures.Recorded inspection infonnation is then downloaded into the mainline televising software for electronic filing of data. ' Justification -. ----- Increased efficiencies on structure inspections and structure infonnation docwnentation.7 he current polce camera will be eleven years old. � Expenditures 2018 2019 2020 2021 2022 'I'otal EquipNehicles/Furnishings 25,000 s 25,000 Total 25,000 25,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Water&Sewer Utility Fund 25,000 25,000 T'otul 25,000 25,000 Project# W�Css-�(0 Department Water&Sewer Systems C'ontacl Project Name Step Van l�pc Unassigned Uutul I,ife Categor� Unassigned Description , ---- --_ --- —-----__ Step Van for the lliility Department to replace Unit�t674,a 2002 Work Horse Step Van. _ __) _— _-- -_ —--- —-----------_---- �'Justification Increased repair and maintenance expenditures on Unit#674. Expenditures 2018 2019 2020 2021 2022 Total Equip/Vehicles/Fumishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2018 2019 2020 2021 2022 Total Water&Sewer Utility Fund 80,000 80,000 T'otal 50,000 80,000 I � Ucpartment Waier&Sewer Systems Project#i W&SS-063 C'ontact Project Namc Radio Meter Reading System r.Pe Equipment l�xcfui I.ifc ('ateqon Water and Sewer Description . __ ___ _ ----- Pixed base radio metering reading system for utility billing.. ---- Justification ------� Existing P('C radio frequency�tilized for reading city water meters has been banneci by the FCC and city is forced to comply with the rule changes. Expenditures 2018 2019 2020 2021 2022 `I'otai EquipNehicles/Fumishings 600,000 600,000 200,000 1,400,000 Total 600,000 600,000 200,000 1,400,000 Funding Sources 2018 2019 2020 2021 2022 Total Water 8�Sewer Utility- 200,000 200,000 Operating Water&Sewer Utility Fund 600,000 600,000 1,200,000 Total 600,000 600,000 200,000 1,400,000 t)epartment Water&Sewer Syst�ns Project t� w�Css-�7� ('ontact Project Name Tractor Loader Baekhoe r.Pe Unassigneci Useful i.ife Categor}' Unassigned Uescription ___ _ _ _ � Tractor loader backhoe to replace Unit 675,a 2004 Cat tractor loader backhoe. __ ___ ____ ___ __ _-- ___— Jus6fica6on Increased repair and maintenance expenditures on Unit 675,which will be 14 years old. Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Furnishings 160,000 160,000 -ra�� 160,000 _ 160,000 Funding Sources 2018 2019 2020 2021 J 2022 Total ----- 16Q000 Water&Sewer Utility Fund 160,000 ----- -------------__--________—_�_s------. ---- ---__ ___ . - --_--- Total 160,000 160,000 1 � Project# w�Css-074 Department Water&Sewer Syste�ns ('ontact PiO�ec1�a"1e I-394 Inflow/Infiltration Project ��.pe u„ass;gnea Useful I.ifc Cate�or� Unassigned Descripdon Reduce inflow/infiltration in the 1-394 sewer shed district. 1 _ . Justifcation 7�he sanitary sewer in the 1-394 sewer shed is cuirenily near capacity following large stonn events.7'he reduction of UI in the sewer shed is necessary in order to continue to allow future redevelopment af the corridoc Expenditures 2018 2019 2020 2021 2022 1'otai Construction/Maintenance _^ �_ 500,000 500,000 1,000,000 Tota) 500,000 �500,000 ' ' 1,000,000 Funding Sources 2018 2019 2020 2021 2022 Total Water&Sewer Utility Fund 500,000 500,000 1,000,000 Tota) 500,000 500,000 1,000,000 Project# WaQCss-�7( Uepartment Water&Sewer Systems ('ontact Projcct Namc Sewer Flow Meters �r.P� Unassigned Useful I.ifc Catc�or� Unassigned Description Porlable sewer flow meters for monitoring inflow and infiltration in sanitary sewer system. __ _— --. -- _--__. _ _ _- -- -- __J Justitication _ _ ___ . —__._. __ __ _ _ ._ , Replace older portabl�sewer flow meters to accurately monitor sewer flows. ! Expenditures 2018 2019 2020 2021 2022 Total EquipNehicles/Fumishings 35,000 35,000 "To tal 35,000 35,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Water&Sewer Utility Fund 35,000 35,000 'Ibtal 35,000 � 35,000 Iq Project# weQC.Ss-077 Ueparlmenl Water&Sewer Systems ('ontacl Projcct Name �y�nnetka Ave Utility Rehabilitation r,P� Unassigned liscfui I.ifc Cate�or� Unassigned Description Rept�cement and Rehabilitation of all sanitary sewer and watennain along Winnetka Avenue between Golden Valley Road and Medicine Iake Road. JUStI fIC 8t1 O il ,Watennain and Sanitary sewer along Winnetka Avenue should be rehabilitated/replaced in conjunction with the future CenterPoint Energy Beldine Replacement. Expenditures 2018 2019 2020 2021 2022 'Total Construction/Maintenance 1,500,000 1,500,000 '['��d� 1,500,000 1,500,000 Funding Sources 2018 2019 2020 2021 2022 Total Water 8 Sewer Utility Fund � � 1,500,000 1,500,000 Total 1,500,000 1,500,000 Project# WBLss-�gl Ucpartment Water&Sewer Systems Contact Project Name g00 MHz Radios 1�pc Equipment Useful i.ife Cate�ory Water and Sewer ' Descrip6on 8-800 MHz}wrtable radios and accessories to be purchased in 2019. I Justi�cation Replace current raidos purchased in 2008.Hennepiin County will no longer support the cun•ent 800 Mhz radios past December 31,2019.New radios P25 Phase 11 modulation compliant. Expenditures 2018 2019 2020 2021 2022 1'otal Equip/Vehicles/Fumishings 40,000 s� 40,000 "I'otal 40,000 40,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Water&Sewer Utility Fund 40,000 � 40,000 Total 40,000 40,000 '00 Project il wa�Css-�g2 Departmcnt Water&Sewer Systems ('ontact Projecf Namc Greenview Lane Watermain Repair r.P� Unassigned Useful I,ifr Categor� Unassigned Descrip6on � __ -- -- _ _... ---- __ . ___-- _ — --.. _ — -- - - — -- - -- ____. _ _ __- - -� _ ___ _� Jusdfication _--� - - ___ - -___ _ _ __ _ _ ___ _ ___-- -___------------- Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 65,000 65,000 ` Tota) ' 65,000 � 65,000 Funding Sources 2018 2019 2020 2021 2022 'fotal Water&Sewer Utility Fund 65,000 65,000 �._-------- -- ---.._�_..----- ---- Total 65,000 65,000 Project# w�Css-�g3 Departmenl Water&5ewer Systems Contact Project Name 'j'.j�. 55 Lift Station Reloeation r.Pe Unassigned Useful Life Category Unassigned ' Description ___- -_---- -- _.. _-- _ __ __- --__ __ ___ ---_ Relcxate T.H.55 sanitary sewer lift statio�stnicture. Jusrificadon _ _ Uesign and construction to relocate T.H.55 lift station to remove the lift station from the flood plain. ' Expenditures 2018 2019 2020 2021 2022 'I'otal ConstructionlMaintenance 650,000 650,000 Total � sso,000 s�o,000 Funding Sources 2018 2019 2020 2021 2022 Total Water&Sewer Utility Fund 650,000 650,000 -------------------------- Total 650,000 650,000 iol city of � olden � va � Capital Improvement Program 2018-2022 Streets Section The City of Golden Valley has over 120 miles of streets. The city is responsible for 90 miles of local streets. Municipal State Aid streets account for the remainder or 30 miles. As streets deteriorate, roads need to be reconstructed or repaired. The City's Pavement Management Program has outlined all roads to be reconstructed by the year 2023. The bond payments on the debt will go until 2044. This plan has been included in the five year program. The revenue sources are city-wide street reconstruction debt levy, state aid debt, benefiting property owner assessments and Municipal State Aid Allotments. � U� City of Golden Valley, Minnesota Capital Plan 2018 thru 2022 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Streets 1 Pavement Management Program S-001 3,330,000 3,870,000 2,100,000 2,100,000 2,225,000 13,625,000 Zane Ave.and Lindsay Street S-009 3,600,000 3,600,000 Pavement Management Ovedays 5-013 500,000 500,000 500,000 500,000 500,000 2,500,000 TH 100 Pedestrian Bridge Walk Maintenance S-014 200,000 200,000 Flashing Yellow Artows S-016 45,000 45,000 45,000 45,000 45,000 225,000 Municipal State Aid(MSA)Street Maintenance S-017 125,000 125,000 125,000 125,000 125,000 625,000 Streetscape and City Hali Complex Renovation S-018 100,000 100,000 100,000 100,000 100,000 500,000 MSA Debt Service S-019 196,385 201,005 200,165 198,916 197,455 993,926 Sidewalk and Trail System Upgrades S-030 100,000 100,000 100,000 100,000 100,000 500,000 Xenia Avenue and Golden Hilis Dr Improvements S-031 1,500,000 1,500,000 Auto CAD Application S-032 12,100 12,100 12,100 12,100 12,100 60,500 Cartegraph Street Management Software S-034 20,000 20,000 20,000 20,000 20,000 100,000 Retaining Wall Repairs S-036 100,000 100,000 100,000 100,000 100,000 500,000 Debt Service Payments(xenialGolden Hills) S-037 1,500,000 1,500,000 Highway 55 West Redevelopment Project S-038 147,446 255,701 251,501 252,551 907,199 Plymouth Avenue Pavement Rrehabilitaiton S-040 1,700,000 1,700,000 Zenith Avenue Reconstruction S-041 1,500,000 1,500,000 Streets Total 9,428,485 5,220,551 7,157,966 3,552,517 5,177,106 30,536,625 GRAND TOTAL 9,428,485 5,220,551 7,157,966 3,552,577 5,177,106 30,536,615 103 Project# 5-0�1 Deparlmenl Streets ('ontact Project Name pavement Mana ement Pro ram g g r>p� Improvement liscful Lifc Categorp Street Construction Description On-going pmgram to manage tbe City's street system in a long term cost effective manner by reconstructing deficient roadways to Ciry standards. � ---_ _ 'Jus6ficadon Reconstrvction of sub-standard roadways to City standards followed by proper and effective maintenance wili reduce the long range costs of street maintenance. ; 2018-1.30 miles 2019-1.51 miles ; 2020-L30 miles � 2021-130 miles ' I 2022-1.25 miles ' Expenditures 2018 2019 2020 2021 2022 7'otai Construction/Maintenance 3,330,000 3,870,000 2,100,000� 2,100,000 2,225,000 13,625,000 Total 3,330,000 3,870,000 � 2,100,000 2,100,000 2,225,000 � 13,625,000 Funding Sources 2018 2019 2020 2021 2022 Total Special Assessment Bonds `33,300,000 3,780,000 2,100,000 2,100,000 2,225,000 43,505,000 Total 33,300,000 3,780,000 2,100,000 2,100,000 2,225,000 43,505,000 Project N S-��9 Department Streets Contact Project Name Zane Ave.and Lindsay Street t�PC Unassigned Useful I.ife Categor� Street Reconstruction � Descrip6on _ _ ReconsUuction of Zane Avenue and Lindsay Street to Municipal State Aid standards. _ -— — -----� Justifica6on Upgrade deficient roadways to current MSA standards. _—.___1 Expenditures 2018 2019 2020 2021 2022 Totat Construction/Maintenance 3,600,000 3,600,000 Total 3,600,000 N 3,600,000 Funding Sources 2018 2019 2020 2021 2022 'I'otal Municipal State Aid(MSA- 2,160,000 240,000 2,400,000 5100) ---._—__-----_—`_�_..__ — ---__-- Total 2,160,000 240,000 2,400,000 1 � � Project# 5-013 Uepartment Streets (bntact Project Name pavement Mana ement Overla s g �' 7��•pe Unassigned l�sefui Life Categor} Street Construction Description ' Pavement overlays for streets constructed to City standards to maximize the lifespan in a long term cost effective manner. Future projects detennined annually based u�wn needs. Justifica6on Provides high quality street system in a long tefm cost effective manner in accordance with the Payement Management Policy. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 500,000 500,000 500,000 500,000 500,000 2,500,000 Total 500,000 500,000 500,000 500,000 `500,000 � 2,500,000 Funding Sources 2018 2019 2020 2021 2022 Total Street Improvement Fund 500,000 500,000 500,000 500,000 500,000 2,500,000 Total 500,000 500,000 500,000 � 500,000 500,000 2,500,000 Project# 5-014 Department Streets Coutact Project Name TH 100 Pedestrian Bridge Walk Maintenance 7ypc Unassigned l)seful I.ife ('ategor� Streei Constniction ' Descrip6on ---_—I Replace appmach sidewalk on the Golden Valley side of the Trunk Highway 100 Pedestrian Bridge;and repaint and seal hand railings on entire bridge. Justi�cation The existing concrete sidewalk on the approach to the TH 100 Pedestrian Bridge has settled and created a large gap between concrete panels,resulting in a hazardous' Icondition for bicyclists using the bridge.Replacement walk will not have a center joint and will be reinforced to minimize settlement.The railings have been subject to repeated graffiti and must be repainted and sealed. Expenditures 2018 2019 2020 2021 2022 T'otal Construction/Maintenance 200,000 � 200,000 --__._..__..__..__ . _._.._._____---,-------- _ Total 200,000 200,000 Funding Sources 2018 2019 2020 2021 2022 `I'otal Capital Improvement Fund 100,000 �v� 100,000 (6100) City of Crystal 100,000 100,000 'I'otul 200,000 `� ' 200,000 105 Project# S-�If) Uepartment Streets Contact Project Name Flashing Yellow Arrows r�pe Unassigned l�sefui I.ifc ('ategor� Sueet Construction ' Description Installation of tlashing yellow arrows fi�r Icft turns at eligible signalized intersections. Justificadon _ _ ___ . ,Flashing yellow arrows will reduce delay for lefi tuming vehicles and increase the level of service of the intersection during non-peak hours. � Expenditures 2018 2019 2020 2021 2022 Total Infrastructure Improvements 45,000 45,000 45,000 45,000 45,000 225,000 Total 45,000 45,000 45,000 45,000 45,000 225,000 Funding Sources 2018 2019 2020 2021 2022 Total Municipal State Aid(MSA- 45,000 45,000 45,000 45,000 45,000 225,000 5100) � Tp�� �45,000 45,000 45,000 W45,000 45,000 225,000 Project k 5-�17 Department Streets Contact Project Namc Municipal State Aid(MSA) Street Maintenance �r>Pe Unassigned Useful Life Categor� Unassigned �, Description _ 'Allotment of a poriion of the City's annual Municipal State Aid construction funds to be used for maintenance of designated State Aid routes,including materials and salaries. Jus6fication _ __-- _ _ _ _ _. ------ _ _ ___ _. Maintenance of Municipal State Aid street system. � Expenditures 2018 2019 2020 2021 2022 Total Other 125,000 125,000 125,000 125,000 125,000 625,000 � Totat 125,000 125,000 + 125,000 125,000 125,000 625,000 Funding Sources 2018 2019 2020 2021 2022 Total Municipal State Aid(MSA- 125,000 125,000 125,000 125,000 125,000 625,000 5100) � 7'otal 125,000 125,000 125,000 125,000 125,000 625,000 10� Project It S-��$ Departmeni Streets Project Naroe Contacf Streetscape and City Hall Complex Renovation �r�p� Uaassigned Useful I.ife Category Street Conshvetion Description Comprehensive rehabilitation of the Winnetka Avenue Streetscape and City Hall Complex streetscape,landscape and peciestrian facilities based upon the j recommendation in the 2012 Streetscape Asset Management Plan. i Justificadon ' _._ . _ ____ - ___ _ _ --------------.___-_----------_-_--, 2017-Rehab retaining wall planters 2018-Rehab bcillards Expenditures 2018 2019 2020 2021 2022 1'otal ConstructionlMaintenance 100,000 , 100,000 � 100,000 100,000 100,000 500,000 Toral �oo,000 �oo,000 �oo,000 �oo,000 �oo,000 soo,000 Funding Sources 2018 2019 2020 2021 2022 Total Capital Improvement Fund 100,000 100,OOQ 100,000 100,000 100,000 500,000 (6100) Total 100,000 100,000 100,000 100,000 100,000 500,000 Project t1 5-�19 Uepartment Streets Project Name MSA Debt Service �'ontact I ypc Unassigned Useful I.ife Cateqor� Unassigned Description Debt Service payment on Municipal State Aid Bonds ending in 2027. i --.. ___ ___ --- -_ ---- --- 1 Justificadon - --- _- --- Necessary funding for State Aid roads to construct projects needed for safety. Expenditures 2018 2019 2020 2021 2022 Totat Other , 196,385 201,005 i 200,165 198,916 197,455 993,926 Total 196,385 201,005 200,165 198,916 197,455 993,926 Funding Sources 2018 2019 2020 2021 2022 7'otal Municipal State Aid(MSA- 196,385 201,005 200,165 198,916 197,455 993,926 5100) Tota) 196,385 201,005 200,165 198,916 197,455 993,926 ' O � Projecl# 5-�30 Uepartment Streets Contact Project Name Sidewalk and Trail System Upgrades r�Pe Unassigned U�cful I.ife Categon Street Construction Uescripdon ,Upgrading thc deficient portions of the City's sidewal and trail systems to current standards including compliance with accessibility standards.This project also 'includes construction of new sidewalks and trails throughout the City consistent with the Comprehensive Transporiation plan. � Justificadon Completion of the City's sidewalk and trail system as identified in the C'omprehensive Transportation Plan will provide greater mobility for non-motorized transportation within the City that is fully accessible for users of all physical abilities. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 100,000 100,000 100,000 100,000 100,000 500,000 ----- -- -_----_.__ . __- - - -- Total 100,000 100,000 100,000 100,000 100,000 500,000 Funding Sources 2018 2019 2020 2021 2022 Total Capital Improvement Fund 100,0�0 100,000 100,000 100,000 100,000 500,000 (6100) Total 100,000 100,000 100,000 100,000 100,000 500,000 Project# 5-031 Departmenf Streets C'ontact Project Name Xenia Avenue and Golden Hills Dr Improvements r�P� Improvement Uscful I.ife Categor� SVeet Reconstruetion Description Modification to streets,traffic signals and pedestrian system at and near the intersection of Xenia Avenue and Golden Hills Drive. , , ' Jusdfica6on ',ModiGcation to the traffic signals,street system and pedestrian system in the vicinity of Golden Hills Drive and Xenia Avenue to accommodate redevelopment in the ' area.77�e proposed improvements include the railroad crossing improvements,installation of sidewalk on the north side of Golden Hills Drive betwcen the railroad tracks and Colorado Avenue,completing the sidewalk on the south side of Golden Hills Drive at the railroad crassing and a pave�nent overlay of portions of Xenia Avenue,Laurel Avenue and Golden Hi11s rDrive. Expenditures 2018 2019 2020 2021 2022 "Ibtal Other 1,500,000 1,500,000 Total 1,500,000 1,500,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Special Assessments � 150,000 150,000 � 150,000 � 150,000 150,000 750,000 Total 750,000 150,000 150,000 150,000 150,000 750,000 ' O� Project# 5-�32 Uepartment Streets ('ontaci Projcct Name Auto CAD Application l�pc UnassigneJ lisefid Lifc Categor� Unassigned Descripdon AutoCAD is a CAD dcsign,drafiing,modeling,architectural d�awing,and engineering sofrware that helps with design and as-built drawings of infrastructure. ! Jusbrca6on __ _ _ _ This sofiware is thc maintenance and upgrades for sofiware to manage our street and utility systems. ; Expenditures 2018 2019 2020 2021 2022 Total Other 12,100 12,100 12,100 12,100 12,100 60,500 Total 12,100 12,100 12,100 12,100 12,100 60,500 Funding Sources 2018 2019 2020 2021 2022 Total Capitai improvement Fund 12,100 12,100 12,100 12,100 12,100 60,500 (6100) Total 12,100 12,100 12,100 12,100 12,100 60,500 Project# S-�3� Department Streets C'ontact Project Name Cartegraph Street Management Software fcpe Unassigned Useful Life Categor� Unassigned Description ilmplementation of Cartegraph Asset Managemrnt software applications to manage public utilities,roadways,bridges,sidealks,trails and utilities. �ln 2017,a new version was purchased. , Justificadon lnfrastructure management sofiware to maintain data on all spublic infraswcture including capiital and maintenance costs.In 2018,sofrware update and hardware are included.Future appiications include bridges,sidewalks and trails,call tracking,and others. Expenditures 2018 2019 2020 2021 2022 Total Other 20,000 20,000 20,000 20,000 20,000 100,000 ---_.. ___ .._. _ -- _ _ __ - ----- Total 20,000 20,000 20,000 20,000 20,000 100,000 Funding Sources 2018 2019 2020 2021 2022 Total Capitai Improvement Fund 20,000 20,000 20,000 20,000 20,000 100,000 (6100) Total 20,000 20,000 20,000 20,000 20,000 100,000 � � { Projcct tl 5-036 Ucparlment Streets (`ontact Project Name Retaining Wall Repairs 7'ipe Maintenance l�seful Life CateKor� Unassigned Uescription -.________---- . Repair and replacement of retaining walls and ather assets within the city right-of-way. ( ----- ----J Jusfification Retaining�valls need to be repaired within the city right-of way. __. ___ __ Expenditures 2018 2019 2020 2021 2022 Totai Construction/Maintenance 100,000 100,000 100,000 100,000 100,000 500,000 Total 100,000 100,000 100,000 � 100,000 100,000 500,000 Funding Sources 2018 2019 2020 2021 2022 1'otal Capital Improvement Fund 100,000 100,000 100,000 100,000 100,000 500,000 (6100) Total 100,000 100,000 100,000 100,000 100,000 500,000 Project N 5-�37 Uepartment Streets C'ontact Project Namc Debt Service Payments (xenia/Golden Hills � I'ype t)nassigned l�seful I.ife ('ate�ory Unassigned Descrip6on Modifications to street,traflic signals and pedestrian system at and near the intersection of Xenia Avenue and Golden}�ills Drive. I Jusdfiration _ Modifications to the traf�ic signals,street system and pedestiran system in the vicinity of Golde�i Hills Drive and Xenia Avenue to accommodate redevelopment in the area.The propsed improvements include the railroad crossing imrppvements,installation of sidewal on the north side o1'Golden Hills Drive between the railroad crossing imtpvoements,installation of sidewalk on the north side of Golden Hills Drive betwc�n the railroad tracks and Colorado Avenue,completing the sidewalk of the south side of Golden fiills Drive at the railroad crossing and pavement overlay of portions of Xrnia Avenue,Laurel Avenue and Golden Ilills Drive. Expenditures 2018 2019 2020 2021 2022 Total -__ Infrastructure Improvements 1,500,000 1,500,000 _ _ _ _. _ _ _. - _ ___ __ .___. 'rp�� 1,500,000 1,500,000 Funding Sources 2018 2019 2020 2021 2022 Tota! Special Assessments 150,000 900,000 150,000 150,000 150,000 1,500,000 Total 150,000 900,000 150,000� 150,000 150,000 1,500,000 � � O Projcct# 5-038 Uepar�men� Streets Coutact Project Name HighWay SS West RedeVelOPmerit PCO,jeCt 7'ppe lmprovement Useful Life ('atc�or� Street Conswetion Description ___ , Rehabilitation and realignment of Golden Valley Road and Decatw�Avenue,installation of pedestrian amenities and burial of overhead utilities. Justificadon ,Due to a development projec:t in the viciniry of this intersection and establishment of a Tax Increment District,infrastructure upgrades are praposed on Golden Valley Road,Decatur Avenue,and 7th Avenue.New development will bring increased traffic and pedestrians to the area.The praject aims to maintain safety and establish lan aeshetic and pedestrian friendly corriJor. Expenditures 2018 2019 2020 2021 2022 Total Debt Service Payments 147,446 255,701 251,501 252,551 907,199 7'��� 147,446 255,701 251,501 252,551 907,199 � Funding Sources 2018 2019 2020 2021 2022 Total Tax Increment 147,446 154,783 152,253 154,993 609,475 Total 147,446 154,783 152,253 154,993 609,475 Project# S-�4� Departmeut Streets Coutact Project Name p�ymouth Avenue Pavement Rrehabilitaiton �r�Pe Unassigned Usetul I.ife Categor} Unassigned ', Description 'Pavement rehabilitation along Plymouth Avenue fi�om Winnetka Avenue North to Mendelssohn Avenue Northincluding pedestrian facility upgrades. � .IUtitl f C Nll OIl To maintain an acceptable pavement condition consistent with the City's Pavement Management Program. Expenditures 2018 2019 2020 2021 2022 Total Construction/Maintenance 1,700,000 1,700,000 ��o� 1,100,000 1,700,000 Funding Sources 2018 2019 2020 2021 2022 "I'otal Municipal State Aid(MSA- 1,530,000 170,000 1,700,000 5100) "I�otal 1,530,000 170,000 1,700,000 � � � Project# �-�41 Uepartmenf Streets ('ontact Project Name Zenith Avenue Reconstruction 1'�pe Unassigned Useful I,ife ('ategon Unassignecl Descrip6on Rec;onsUuct"Lenith Avenue to State Aid standards along Theo Wirth Parkway to 36th.. � Jusdfica6on _ __ _._ __ -- 7he road is in need of repair and will complete construction on the State Aid road system in Golden Valley. i Expenditures 2018 2019 2020 2021 2022 T'otal Construction/Maintenance 1,500,000 1,500,000 Total 1,500,000 1,500,000 Funding Sources 2018 2019 Z020 2021 2022 Total Municipal State Aid(MSA- 1,350,000 1,350,000 5100) Total 1,350,000 1,350,000 112 ��tyo� olden � va e Capital Improvement Program 2018-2022 Appendix Section 1 �.� Exhibit A Special Assessment Policy for The City of Golden Valley January 17, 1995 Amended February 21, 1995 Amended June 7, 2005 Amended July 18, 2006 Amended January 20, 2009 General Minnesota State Law, Chapters 429.010 to 429.11, provides municipalities the ability to make public improvements such as installation of sanitary sewer, water, storm sewer, � sidewalks, and street improvements (including grading, curb and gutter, surFacing, and lighting). The procedures that Cities must follow, including reports, notices, and public hearings, are well defined within the laws. The Statute allows municipalities to assess all or portions of the costs of any improvements to property owners based on the benefits received from the project. The Statute is not specific regarding the determination of benefits to a property, or how to apportion the costs to the benefiting properties. Rather, the law makes the municipality responsible for developing an equitable method of cost sharing among the benefiting property owners. The purpose of this special assessment policy is to provide a guide, to be used by City Staff, for preparing assessment rolls for approval by the City Council. This policy is meant to assure uniform and consistent treatment to all properties within the City as improvements occur. The special assessment policy will not cover all possible assessment situations. Special cases and variations of standard cases that are not specifically discussed under this policy will be evaluated during preliminary project studies, and assessments will be determined that do not violate the benefit principles as required by Statute. No special assessments will be levied against designated floodplains, municipal storm water ponds or wetland areas on private property as determined by criteria in the Wetland Conservation Act of 1991 and the Minnesota Department of Natural Resources. The limits of wetlands will be determined by the City on a case-by-case basis at the time of preliminary project design and feasibility report preparation. No special assessments will be levied against railroad, county highway or state highway rights-of-way. Properties fronting County Roads and County Highways will be subject to special assessments for reconstruction projects based upon this policy. 1 I �-! Special assessments levied by the City will include an administrative fee, to be established annually by ordinance, to finance indirect costs associated with the assessment that are incurred by the City. Sanitary Sewer and Water Main Assessments Reconstruction and Repairs No special assessments will be levied for repair and reconstruction of existing sanitary sewer and water main systems, except for properties that have not been previously assessed for these utilities. For properties not previously assessed that are adjacent to sanitary sewer or water main reconstruction projects, the amount of special assessments will be calculated on a case-by-case basis at the time of preliminary design and feasibility report preparation. Property owners are responsible for maintenance, repair and replacement of sanitary sewer services from, and including the connection to the main, and the building being served. Pavement Management street reconstruction projects will include an opportunity for property owners to reconstruct or repair their sanitary sewer services. All costs, including construction, administration and other indirect costs, will be specially assessed to the property being served by the sanitary sewer service. The City is responsible for maintenance, repair and replacement of water services from the connection to the water main up to and including the curb stop or valve on the service line. The property owner is responsible for maintenance, repair and replacement of the water service from the connection of the service pipe to the valve or curb stop, to the building being served. New Construction In instances where property is developing or redeveloping, public sanitary sewer and water main may need to be installed. The construction of City sanitary sewer, water mains and storm sewer to serve these properties will be constructed as public improvement projects, unless the City opts to have the developer design and construct the improvements. The developer of such properties will be responsible for the entire cost of public utilities, including construction, administration and other indirect costs, whether construction is perFormed as a City Improvement Project or by the developer. At the time such a development project is proposed, the Public Works Department will determine if the project is to be constructed publicly or privately. If the utility installation is to be constructed privately, the developer will be responsible for preparing construction plans and specifications consistent with City standards. These construction plans and specifications must be reviewed and approved by the Public Works Department. The utility installation must also be inspected by the Public Works Department during construction. The developer will be responsible for 100% of the costs of City construction � IJ ° observation and plan review, which will be billed directly to the developer. Any unpaid costs incurred for these services will be assessed against the developing properties. An irrevocable letter of credit must be posted by the developer in an amount equal to 150% of the estimated construction costs to ensure timely completion of the project. If a public sanitary sewer or water main project is to be installed as a City Improvement Project, the developer will be responsible for 100% of the direct and indirect costs incurred by the City. These costs may include, but are not limited to: feasibility report preparation, preliminary survey, preliminary design, final design, construction staking, construction observation, as-built surveying and drafting, and administrative and legal costs. The developer may elect to have these costs assessed against the property being developed or pay the costs directly to the City. Storm Water Drainage Street Storm Sewer No special assessments will be levied for construction or reconstruction of storm sewer systems within the City right-of-way as part of the Pavement Management Program. However, in instances where storm sewer construction is incorporated into Pavement Management Projects to resolve rear yard drainage issues, as discussed in this policy, the costs associated with these improvements will be specially assessed to the benefiting property owners. In instances where storm sewer installation is required for development and redevelopment projects, it shall be specially assessed to the property being developed according to the Sanitary Sewer and Water Main Assessments section of this policy. Rear Yard Storm Sewer In certain instances, storm sewer is necessary in rear yard areas to correct existing drainage problems. City staff will visit such problem areas at the request of a homeowner to evaluate the situation and provide engineering assistance to encourage property owners to remedy the drainage problems without City involvement. If a property owner or owners cannot remedy the rear yard drainage problems, they may petition the City for installation of storm sewer. Upon receiving a request for petition for rear yard storm sewer, engineering staff will determine the properties that contribute storm water runoff to the problem area. The petitioner must then circulate the petition to the contributing property owners for signatures. Each contributing property owner must be made aware that special assessments will be levied against their property for the corrective storm sewer work. A minimum of 35% of the contributing property owners must sign the petition for the City Council to consider the project. Upon receipt of the petition and after a public hearing, the City Council may either deny the request or order the storm sewer improvements. If the improvements are ordered, the contributing property � � � owners will be assessed for 100% of the construction and indirect costs for the storm sewer installation. The method of assessment and the pro-ration of costs will be determined on a project-specific basis. Affected property owners in rear yard drainage projects will also be required to dedicate all drainage and utility easements for the installation of the storm sewer at no cost to the City. If the City must purchase or condemn in order to obtain the easements, the entire acquisition costs will be included in the project costs for assessment or the City may decline to undertake the project. Street Improvements Development/Redevelopment Proiects When property is developed or redeveloped that has street frontage on roadways that are scheduled for construction or reconstruction, the development will be required to pay an escrow for the future street rehabilitation. The escrow shall be based upon the assessment methods and land uses contained in this policy, and shall be based on the assessment rates in effect at the time the development is approved. The property or properties within the development will not be specially assessed at the time street rehabilitation occurs. Sidewalks No special assessments will be levied for sidewalk construction that is in accordance with the goals and recommendations of the City of Golden Valley Sidewalk Committee. Requests for sidewalks that are not on the current Sidewalk and Trail Plan will be forwarded to the Sidewalk Committee for consideration. The Sidewalk Committee will forward its recommendations for the requested sidewalks to the City Council, which will determine if the proposal should be included in the Sidewalk Plan. Street Liqhtinq Street lighting is available to the residents of Golden Valley on a petition basis according to the Street Lighting Policy. New Street Construction As property within the City develops or redevelops, it may be necessary to install public streets. The Public Works Department will determine if the project is to be installed publicly or privately. The procedures, policies, and requirements for street construction will be the same as discussed for new sanitary sewer installations. Sealcoating No special assessments will be levied for street sealcoating. Bituminous Millinq and Overlavs No special assessments will be levied for bituminous milling and overlays. 11 '1 Street Reconstruction Special assessments for street reconstruction projects will be in accordance with this policy and Minnesota Statutes, Chapter 429. The total amount of the special assessments will be a minimum of 20% of the street reconstruction costs not to exceed the benefit received by each property. Special assessment rates for all land uses and street classifications will be determined annually by ordinance. Local Streets 1. Properties with residential and duplex residential land use, parks and other City- owned properties subject to reconstruction will be assessed on a per-unit basis, with one unit assessed to each property unless the property has the potential to be further subdivided into two or more lots that each meets City subdivision ordinance requirements. Such lots that may be so subdivided shall be assessed for the number of units that equals the number of such lots that the property may be subdivided into. However, residential properties that are subject to multiple unit assessments will have all but one of such unit assessments deferred at the time of the initial assessment. Such deferral will be made each year until such time as the property is subdivided. At that time, the deferred unit assessments shall be due. 2. Special assessments against properties with Multiple Dwelling land use will be on a front-foot basis, with 100% of the frontage being improved subject to assessment. 3. Properties with church, school and other tax exempt land uses will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. 4. All other land uses, including commercial, industrial, business and offices will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. 5. Residential properties adjacent to local streets being reconstructed may participate in voluntary programs to have their driveways reconstructed and sanitary sewer service repaired or reconstructed at contract unit prices. Residents will be notified of these programs at informational meetings for each street project. If a resident participates in these programs, staff will coordinate construction with the contractor and will measure the quantities installed. The construction costs, along with an administrative fee, established annually by ordinance, will be assessed to the property owner. 6. When a corner residential lot has frontage on two local streets, it will be assessed for one-half unit assessment for each street subject to reconstruction. No more than one total unit assessment will be charged against a parcel for street reconstruction. Corner properties adjacent to State Aid and local streets will be charged one-half of the appropriate unit assessment at the time of reconstruction of each street. � � � 7. Corner residential properties adjacent to a local street and a state or county roadway will not be subject to special assessments by the City for state highway or county road reconstruction. However, these properties will be assessed the appropriate number of unit assessments for the entire frontage along the local streets when reconstruction occurs on the local street. 8. Residential properties adjacent to frontage roads of state highways will be considered to be on local or Municipal State Aid streets and will be assessed consistent with this policy. 9. Special Assessments for properties not specifically covered in any of the above cases will be addressed on a parcel-specific basis at the time of the feasibility report. State Aid Streets 1. Properties with residential and duplex residential land uses that have frontage on a Municipal State Aid Street will be assessed on a per-unit basis. The per-unit assessment rate will be approximately 25% of the standard residential rate for properties on local streets. Assessments for oversized parcels with the potential for subdivision are to be consistent with the previously discussed policy for local streets. 2. Properties with Multiple Dwelling land use that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. Properties with church, school, and other tax-exempt land uses that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. All other land uses, including commercial, industrial, business and offices that front on a Municipal State Aid Street will be assessed on a front-foot basis for the frontage being improved. 3. Special assessments for properties not specifically covered in any of the above cases will be addressed on a parcel-specific basis at the time of the feasibility report. 4. Residential properties adjacent to State Aid streets being reconstructed will be given the option of having their driveways and sanitary sewer services repaired or reconstructed under the same terms discussed in the local street reconstruction portion of this policy. Countv Roads 1. Properties with residential and duplex residential land uses adjacent to county roads will be assessed according to the previously discussed methods for local streets, except for corner lots with local streets, which will be assessed in full at � � � the time the intersecting locai street is reconstructed. Special assessments to residential properties will be at State Aid street rates. 2. All other land uses, including commercial, industrial, business, and tax-exempt uses will be assessed on a front-foot basis, with 100% of the frontage being improved subject to assessment. The assessment rate shall be the rates used for State Aid streets as established by ordinance. Low Income Senior Citizen and Disability Deferments As required by Minnesota Statute, the City has a special assessment deferral policy for low income senior citizens and disabled persons meeting all of the following criteria: 1. The property upon which the assessment is deferred must be homesteaded; 2. The property is owned by a person at least 65 years of age on January 1 st of the year in which payment of the first installment of the subject assessment is due; or is owned by a person who is retired due to permanent and total disability. 3. The applicant must have a "financial hardship" defined as: a) An annual income at or below a �evel established annually by ordinance and; b) The aggregate total of all special assessments levies will exceed one and one- half percent (1-1/2%) of the applicant's annual income. More information is available at General Services Office (763.593.8020). Street Reconstruction Special Assessment Rates Special assess.ment rates as discussed in this policy will be established yearly with the Annual Fee Resolution. The rates will be based on the percentages of construction and indirect costs as discussed above. Indirect costs are estimated to be 30% of the construction costs and include administration, engineering, construction observation, and legal fees. These rates will be subject to revision each year based on the actual construction costs in the City from the previous year and for inflation based upon the ENR Index for construction costs. � Zd city of o en va e eet ' eration � . ai ntenan ce , an e acement ' a � c 121 Message from the Manager Motor vehicles and equipment are vital to day-to-day operations and service delivery activities of the City of Golden Valley. The Public Works Department Vehicle Maintenance Division is responsible for the stewardship of the City's fleet and equipment assets and for meeting the fleet and equipment service requirements of City departments. The division also develops fleet and equipment utilization and replacement policies and schedules. The Vehicle Maintenance Division is an internal service division of the Public Works Department of which the costs are allocated to the other City departments for services provided. The main goal of the Public Works Department Vehicle Maintenance Division is to provide vehicles that are dependable, flexible, efficient, and responsive so that City departments and divisions can operate in a cost-effective manner, minimizing the City's vehicle equipment budget. The division is also committed to maintaining the City's fleet and equipment so that the equipment is readily available for performing City operations and keeping downtime to a minimum. The Public Works staff works with all departments to embrace a philosophy which emphasizes the value of the importance of vehicle and equipment availability, safety, reliability, and efficiency as well as preserving the City of Golden Valley's major capital investment in fleet and equipment. The City has established a capital replacement schedule to replace aging vehicle and equipment. The vehicle and equipment replacement schedule, in conjunction with the 5-year Capital Improvement Program (CIP) and operating budgets, is used to plan any major capital investment (the CIP reflects only those investments that exceed $10,000). New equipment or other items, which are not part of a replacement schedule, are funded annually out of the originating or requesting department's operating budget. Approved February 2010 � � � Purpose The purpose of this policy is to assign responsibility to the City of Golden Valley's Public Works Department Vehicle Maintenance Division for the operation, maintenance, acquisition, and replacement of vehicles and equipment owned and operated by the City, with the exception of vehicles and equipment used by Brookview Golf Course, which are acquired, operated, maintained, and replaced by Golf Maintenance. Policy This policy is intended to ensure the availability of funds for the operation, maintenance, acquisition, and replacement of fleet and equipment. Adherence to this policy will provide effective and efficient fleet and equipment services for operating departments/divisions to provide the best services for the residents and businesses of Golden Valley. This policy establishes a sound business approach associated with the evaluation of vehicle and equipment cost and capabilities, purchasing and funding methodology, and making decisions on acquisition and replacement considering the level of usage and demonstrated needs. Departments are asked to review vehicle and equipment needs with a goal of increasing fuel efficiency, consideration of alternative and/or flexible fuels, reducing the number of vehicles, conversion of the diesel vehicle and equipment to bio-diesel, and promoting the anti-idling policy. 1. Vehicle and Equipment Replacement A vehicle and equipment replacement schedule is maintained by the Public Works Department Vehicle Maintenance Division and Finance Department. Replacement of vehicle and equipment will generally follow the attached Equipment and Vehicle Replacement Guidelines and are summarized as follows and listed as Attachment A: a. Description b. Unit number c. Classification d. Year purchased e. Purchase price f. Expected service life g. Projected replacement cost h. Annual fuel, maintenance, and overhead costs by vehicle classification 2. Vehicle and Equipment Maintenance Vehicle and equipment preventative maintenance schedufes are maintained by the Public Works Department Vehicle Maintenance Division with the goal of keeping vehicles and equipment available 95% of the demand time. 1 �3 a. Generaify, maintenance standards and procedures are as recommended by the vehicle/equipment manufacturer or other recognized authority, or utilizing the Public Works Department Vehicle Maintenance Division Preventative Maintenance Schedules. i. Daily maintenance inspections are performed by operators and maintenance personnel using the Pre-operation Inspection Form. ii. Scheduled maintenance is performed by the maintenance mechanics considering the above-referenced Preventative Maintenance Schedules. iii. Demand maintenance is generated by user activities and may require outside services. The Service Request Form is used to request demand maintenance. iv. All maintenance done by the operator shall be coordinated with the Vehicle Maintenance Division. b. The Public Works Department Vehicle Maintenance Division may remove equipment or vehicles from service based on the Commercial Vehicle Safety Alliance (CVSA) Out-of—Service Criteria (OSC) or other recognized criteria. 3. Vehicle and Equipment Operation The use of City vehicles or equipment is approved only for matters related to City job responsibilities or for City business. Operation of City vehicles and equipment shall be in accordance with the Employee Handbook, Section 5.0, Subd. 5.25, Vehicle Use, January 1, 2006. Care and cleaning of vehicle and equipment is the responsibility of the user. The Public Works Department Vehicle Maintenance Division will manage and maintain the central fuel system. This includes fuel system access assignments and records management. a. Dedicated department vehicles shall be assigned to departments whose job duties require the immediate availability of a vehicle. i. Dedicated vehicle use shall be subject to the same limitations and conditions as identified in the Vehicle Use Policy. b. Shared vehicles should be considered for employees with similar job duties and should be considered in lieu of a dedicated vehicle. � �� Funding Vehicle and equipment replacement will be funded through the CIP. The Public Works Department Vehicle Maintenance Division will maintain a current and complete inventory of all vehicles and equipment in coordination with all users and the Finance Department. These inventories will establish all divisions/department vehicle and equipment replacement schedule. All vehicles and equipment maintained by the Vehicle Maintenance Division will be reviewed on an annual basis for replacement. If a department/division has requested replacement or an addition to the fleet, Vehicle Maintenance will make a recommendation on the purchase for the CIP to the City Manager. The CIP will be presented to the City Council for consideration and approval during the budget process. 1. Funding New and Replacement Vehicles and Equipment Fleet and equipment projected for replacement, or additional vehicles and equipment, will be funded through the CIP process. Upon acquisition, all fleet and equipment purchased shall be included in the vehicle and equipment inventory database. Requests for fleet and equipment replacement will be addressed through the normal budget process. a. Fleet and equipment with a value in excess of$10,000 purchased for the first time must be included in the CIP. b. Fleet and equipment with a value less than $10,000 purchased for the first time does not have to be included in the CIP, but must be included in the operating budget. 2. Funding of Operational Expenses a. Fuel Allocation Fuel is allocated based on usage by each piece of equipment or vehicle and billed monthly to the responsible department. Pricing for fuel is based on average total cost of inventory and an overhead charge, as set by the Finance Department. 3. Reassigned Equipment a. Reassigned equipment may be used in lieu of new vehicleslequipment with written approval by the City Manager. Reassignment duration will be as determined annually by the Public Works Department Vehicle Maintenance Division. Reassignments moved within or across departments/divisions will be charged for conversion costs to the receiving departmenUdivision by internal service charges. Reassignments with no conversion costs will not be charged. ! �� The Finance Department will be notified of all reassignments for fixed assets and insurance reports. 4. Equivalent Replacement/Upgrades a. The CIP fund is structured to replace each vehicle or piece of equipment with an equivalent unit, unless specified/justified, during the budget process. b. Cost increases due to upgrades, changes in type of fleet or equipment, addition of options, or other upgrades associated with vehicles scheduled for replacement, shall be highlighted and clearly summarized as an element of the CIP by the department requesting the upgrade or addition in options. Responsibilities 1. Department Directors shall be responsible for: a. Ensuring that all vehicles and equipment for replacement requests are of the appropriate type and have only those items/options that are operationally required. b. Submitting requests for replacement with cost estimates to the Finance Department and the Public Works Maintenance Manager prior to the CIP and budget process. 2. The Public Works Department Vehicle Maintenance Division shall be responsible for: a. Submitting a 5-year Capital Improvement Program to the Finance Department and City Manager during the budget process. b. Reviewing replacement schedule annually with departments during the budget process to ensure all vehicles and equipment are replaced as appropriate. c. Establishing the Vehicle and Equipment Replacement Schedule. d. Tracking fuel, labor and repair parts annually, and provide this information to Finance and responsible departments. e. Identifying the actual historical cost and variations in cost performance based on lifetime-accumulated age and usage of the various vehicle and equipment types (classifications). I �,t0 � 3. The Finance Department shall be responsible for: a. Completing an analysis and reconciliation of the vehicle replacement CIP on an annual basis. Purchasing and Disposal 1. Purchasing Procedures a. New vehicles and equipment will be purchased by the Public Works Maintenance Manager, as assigned by the Director of Public Works and in accordance with Minnesota Statute 471.345. Acquisitions require the cooperation and assistance of many departments. b. When possible, purchases will be made from the State of Minnesota, Hennepin County, or other Joint Purchasing Agreement contracts, as permitted by State Statute. These purchases will also follow the City's purchasing policy. c. Details for budgeting will be provided by the Finance Director when providing the overall budget guidelines. 2. Equipment Disposal a. Disposal of equipment shall be in accordance with the City's business standard of disposing all vehicles and equipment by auction, trade-in, or other approved methods. b. When vehicles and equipment are replaced, there may be reassignment of vehicles or equipment, but there will be no fleet or equipment hold over on the fleet after a replacement is purchased. Adding fleet or equipment to the inventory without City Manager authorization is not permitted. c. In order to address the seasonal or short-term needs, fleet or equipment may be retained temporarily for a period not to exceed nine months from the date the replacement fleet or equipment is placed into service. Request for Vehicles, Equipment, and Service 1. Requesting Vehicles or Equipment a. New vehicles or equipment in excess of$10,000 must be made and approved through the CIP budget process, and have a life of more than three (3) years. The request shall be discussed with the Public Works Maintenance Manager and Vehicle Maintenance Division to avoid duplication of equipment and to discuss the appropriate type and size of vehicle or equipment requested. � � � b. Request for new vehicle or equipment less than $10,000 must be made and ' approved through the normal budget process. 2. Repair and Maintenance of Vehicle or Equipment Requests a. All repair and maintenance of vehicles and equipment will be made by completing the Vehicle Maintenance Repair Slip, as provided by the Vehicle Maintenance Division. Acquisition Request(s) The 5-year CIP will be reviewed and evaluated annually as part of the budget process. In any given year, vehicle or equipment originally planned for replacement may be adjusted as necessary to account for current needs. 1 �� ��tyaf olden � 11 va ey VEHICLE AND EQUIPMENT REPLACEMENT GUIDELINES Public Works Department Vehicle Maintenance Division Management Methodology To manage the City's fleet in a manner that theoretically all of the City's motorized equipment and vehicles are maintained and disposed of by the Public Works Department Vehicle Maintenance Division. The Vehicle Maintenance Division has full responsibility for vehicle and equipment maintenance and the equipment users are charged an hourly repair rate for all service and repairs. 1. Expected Life When new vehicles or equipment are purchased, it is given an expected life (years in service) based on a variety of factors. Below are the estimated life expectancies for some of the significant pieces of equipment: a. Engine Pumpers 20+ years (refurbish half way through life cycle) b. Tandem Dump Trucks 12 years c. Single Axle Dump Trucks 12-14 years-some longer d. Wheel Loaders 15-18 years e. Backhoe/Excavators 10-12 years f. Jet Truck 10 years g. One-Ton Trucks 9-10 years h. 3/ and '/2 Ton Pickups 10 years-some longer i. Skid Steers 8-10 years j. Street Sweeper 8 years k. Tractors Varies (15 years average) I. Vactor Truck 10 years m. Mowers Varies (6-10 years) n. Sport Utility Vehicle 10 years o. Passenger CarsNans 10 years p. Squad Cars 100,000 miles/4 years q. Trailers 15 years r. Sidewalk Machines 10-12 years 1 �� 2. Replacement Factors When a particular piece of vehicle or equipment achieves its expected life and reaches its anticipated replacement year, it is analyzed to determine if it should be replaced based on the following factors: a. Critical nature of the equipment or vehicle and the availability of a backup or alternative equipment or vehicle. For example, the Sewer Jet is a critical piece of equipment for which there is no backup except to contract for those services. It is important to have this equipment operational with minimal downtime. b. Use of the equipment or vehicle (hours and/or miles). The duration and intensity of use are also important factors. For example, squad cars typically achieve their expected life of 100,000 miles and are retired in approximately 4 years while other vehicles (cars and light trucks) may never achieve 100,000 miles and can last for many years. c. Appropriateness of the equipment or vehicle for the assigned tasks. Public Works and the user examines whether the equipment or vehicle is still capable of doing its intended work, whether it is the right equipment, and determine if the work changed causing the equipment or vehicle to be obsolete. d. Repair history, costs, and downtime. Mechanics provide critical input and assessments of the overall condition of the equipment. Near the end of the expected life of the equipment or vehicle, repair costs can exceed the value of the equipment or vehicle and replacement is appropriate. e. Suitability of the equipment or vehicle for other tasks. Other departments provide input regarding the ability to reassign equipment and vehicles to other less frequent or intense duties. For example, Public Works have re-assigned used marked squad cars and light pickup trucks to other departments. 3. Life Cycle Costing This accounting method is used as much as possible in managing the City's fleet management. Life cycle costing includes the purchase cost of the equipment or vehicle, lifetime maintenance and operation costs, and the residual value at the time of disposal. This is the true cost of equipment or vehicle ownership. The goal is to replace the equipment during its economic life. This is the period when the maintenance costs are the lowest. 4. Fire Department Vehicle Replacement Practice Fire apparatus is historically refurbished half way through its life cycle (approximately 10-12 years) and replaced after 20 to 24 years of service, or a couple of years longer depending on condition. This general rule applies to "major" apparatus, engine, and ladder trucks. The replacement of a particular piece of apparatus is based upon several factors including the general mechanical and structural condition, required vehicle and safety upgrades, technological changes, ! j� current and anticipated use, anticipation of future mission changes, and the current mechanical history (including mileage). The apparatus replacement schedule is revised to reflect a philosophy of validating the replacement of a vehicle, as opposed to replacement based solely upon the age of the vehicle. To this end, vehicles have been moved back in the replacement schedule and not replaced at the time mark historically associated with replacement schedules. Refurbishing pumpers and ladders to extend the "life" of fire apparatus is a common practice. Refurbishing pumper and ladder fire vehicles extends vehicle life. � �� City of Golden Valley, Minnesota Capital Plan 2018 thru 2�22 PROJECTS BY DEPARTMENT Department Project# 2018 2019 2020 2021 2022 Total Buildings � Carpet Replacement:Ciry Buildings B-011 30,000 30,000 �enerators B-012 35,000 50,000 85,000 Air Compressor:Station#2 8-013 10,000 5,000 15,000 Installation of Building Security Systems B-027 30,000 30,000 Council Chambers Chambers Remodeling 8-036 125,000 125,000 Public Buildings Roof Replacements B-041 270,000 150,000 150,000 150,000 720,000 City Hall Boiler Replacement B-043 205,000 205,000 Vehicle Maintenance-Window Replacement B-045 25,000 25,000 10th Avenue Storage Building-Insulate and Heat 8-046 150,000 150,000 Employee Work Stations 8-047 40,000 40,000 10th Ave South Side Storage Yard B-048 125,000 125,000 125,000 375,000 Park Shelter Remodel 8-049 50,000 50,000 100,000 Buildings Total 440,000 450,000 530,000 330,000 150,000 1,900,000 'Cablecasting Improvements � Cable Equipment Replacement C-OOi 200,000 200,000 Cablecasting Improvements Total 200,000 200,000 Golf Course � GreeNTee Mowers GC-003 35,000 37,000 42,000 114,000 Trucksters GC-004 19,000 19,000 38,D00 Point of Sale System GC-007 30,000 30,000 Golf Carts GC-009 308,000 308,000 Rough Mowers GC-010 10,000 70,000 Five Plex Fairway Mower �C-014 50,000 52,000 102,000 Bridge Improvements GC-023 40,000 40,000 40,000 120,000 Hole#14 Floating Walkway GC-024 50,000 50,000 Vedicuts for Fairway Mower GC-025 9,000 9�0� Turf Sprayer GC-031 50,000 50,000 Wood Chipper GC-040 20,000 20,000 Hole 18 Tee Improvements GC-041 50,000 50,000 Storm Shelter �C-042 50,000 50,000 Irrigation System GC-043 50,000 50,000 Conversion for Sprayer GC-044 18,000 18,000 Range Nets GC-045 9,000 9.�� Golf Course Total 468,000 156,000 132,000 212,000 120,000 1,088,000 �Parks � Bleacher,Soccer Goal,Team Bench&Picnic Tables P-001 25,000 25,000 25,000 25,000 25,000 125,000 Park Trail and Parking Lot Improvement P-002 40,000 50,000 50,000 50,000 50,000 240,000 Play Struclure Replacement P-003 55,000 55,000 55,000 55,000 55,000 275,000 Ball Field Lighting-Isaacson Park P-014 250,000 250,000 Outdoor Basketball and Hoop Replacement P-015 28,000 28,000 28,000 28,000 28,000 140,000 ! 32 Department Project# 2018 2019 2020 2021 2022 Total Park Signage Replacement P-Ol6 10,000 10,000 10,000 10,000 40,000 Sun Shelter Replacements and Additions P-Oi7 50,000 50,000 Tennis Court Resurfacing P-018 30,000 25,000 25,000 25,000 15,000 120,000 Wiidwood Park Pickleball Courts P-020 60,000 60,000 Re-Lamp Athletic Field and Rink L'ghts(LED) P-023 25,000 25,000 25,000 50,000 50,000 175,000 Wildwood Park Athletic Field P-024 100,000 100,000 Community Gardens P-025 30,000 30,000 60,000 Off-Leash Pet Exercise Area P-026 60,000 60,000 Dugout,Fence and Feiled Replacement P-027 55,000 55,000 55,000 55,000 55,000 275,000 Ballfield Scoreboard Updats/Replacement P-028 25,000 25,000 25,000 75,000 Tennis CouK Reconstruction P-029 150,000 150,000 Wesley Ball field#3 Drain Tile P-030 25,000 25,000 Parks Total 778,000 353,000 358,000 428,000 303,000 2,220,000 Storm Sewers � Residential Storm Sewer Improvements SS-Ol 900,000 750,000 750,000 750,000 750,000 3,900,040 Brookview�olf Course-Buffer Zone Implementation SS-12 50,000 50,000 100,000 Storm Water Pond Dredging SS-23 300,000 300,000 300,000 900,000 V-Box Spreader and Anti-Ice(tandem) SS-25 67,000 67,000 V-Box Spreader and Anti-Ice(tandem) SS-26 67,000 67,000 Grounds Sweeper SS-27 40,000 40,000 Flood Mftigation SS-34 250,000 250,000 250,000 250,000 250,000 1,250,000 Bobcat Toolcat SS-41 55,000 55,000 Zane Avenue&Lyndsay St Reconstruction SS-46 60,000 60,000 DeCola Ponds B and C SS-48 500,000 3,426,000 1,210,000 5,136,000 Medley Park Stormwater Treatment Facility SS-49 220,000 220,000 800 MHz Radios SS-51 40,000 40,000 Mill&Overlay Storm Sewer Repairs SS-53 75,000 75,000 75,000 75,000 75,000 375,000 Decola Pond F Diversion SS-54 330,000 330,000 Rotating Grapple SS-51 40,000 40,000 Janalyn Pond Lift Station SS-58 200,000 200,000 Storm Sewers Total 2,182,000 4,541,000 2,680,000 1,452,000 1,925,000 11,780,000 Streets � PavementMan�ementProgram S-001 3,330,000 3,870,000 2,100,000 2,100,000 2,225,000 13,625,000 Zane Ave.and Lindsay Street S-009 3,600,000 3,600,000 Pavement Management Ovedays S-013 500,000 500,000 500,000 500,000 500,000 2,500,0�0 TH 100 Pedestrian Bridge Walk Maintenance S-014 200,000 200,000 Flashing Yellow Artows S-016 45,000 45,000 45,000 45,000 45,000 225,000 Municipal State Aid(MSA)Street Maintenance S-017 125,000 125,000 125,000 125,000 125,000 625,000 Streetscape and Ciry Hall Complex Renovation S-018 100,000 100,000 100,000 100,000 100,000 500,000 MSA Debt Service S-019 196,385 201,005 200,165 198,916 197,455 993,926 Sidewalk and Trail System Upgrades S-030 100,000 100,000 100,000 100,000 100,000 500,000 Xenia Avenue and Goiden Hilis Dr Improvements S-031 1,500,000 1,500,000 Auto CAD Application S-032 12,100 12,100 12,100 12,100 12,100 60,500 Cartegraph Street Management Software S-034 20,000 20,000 20,000 20,000 20,000 100,000 Retaining Wall Repairs S-036 100,000 100,000 100,000 100,000 100,000 500,000 Debt Service Payments(xenia/Golden Hills) S-037 1,500,000 1,500,000 Highway 55 West Redevelopment Project S-038 147,446 255,701 251,501 252,551 907,199 Plymouth Avenue Pavement Rrehabilitaiton S-040 1,700,000 1,700,000 Zenith Avenue Reconstruction S-041 1,5fl0,000 1,500,000 Streets Total 9,428,485 5,220,551 7,157,966 3,552,517 5,177,106 30,536,625 Vehicles and Equipment � I �3 Department Project# 2018 2019 2020 2021 2022 Total Marked Squad Cars(Police) V&E-001 100,000 100,000 100,000 100,000 100,000 500,000 Computers and Printers(Finance) V&E-002 80,000 95,000 95,000 95,000 95,000 460,000 Front End Loader(Street) V&E-009 260,000 260,000 Asphait Paver(Sheet) V&E-012 150,000 150,000 Portable Computers(Police) V8E-020 50,000 50,000 Sign TNck(Street) V8E-022 120,000 120,000 Unmarked Police Vehicle(Police) V&E-024 40,000 40,000 Dump Truck(Park) V&E-029 80,000 80,000 Rotary Mower(Park) V&E-030 110,000 110,000 Skylift Man Lik(Park&Street V&E-033 40,000 40,000 Crime Prevention Vehicle(Police) V&E-034 30,000 30,000 Aeriat Ladder Truck(Fire) V&E-037 575,000 515,000 Utility Tractor(Park) V&E-039 75,000 75,000 Rotary Mower(Parki V&E-048 25,000 25,000 Asphalt Cold Planer(Street) V&E-052 25,000 25,000 Rescue Vehicle(Fire) V8E-O60 90,000 90,000 Pickup Truck(Street) V&E-063 40,000 40,000 Tandem Axle Dump Truck(Street) V&E-066 270,000 270,000 SidewalklMaintenance Tractor(Park) V&E-089 50,000 50,000 Pickup Truck(Police) V8E-095 40,000 40,000 Pickup Truck(Park) V&E-100 50,000 50,000 Pickup Truck(Fire) V&E-102 40,000 40,000 Concrete Saw(Street) V&E-103 30,000 30,000 Polaris 6 X 6(Fire) V&E-106 15,000 15,000 Bobcat Utiliry Truckster(Park) V&E-107 55,000 55,000 Single Axle Dump Truck(Street) V&E-109 230,000 230,000 Dump Truck(Street) V&E-110 230,000 230,000 PoRable Message Sign Trailer V&E-115 25,000 25,000 Bobcat Toolcat(Park) V&E-116 50,000 50,000 Sidwalk Tractor(Street) V&E-118 160,000 160,000 Tasers(Police) V&E-121 16,000 16,000 Rotary Mower(Park) V8E-130 25,000 25,000 800 MHz Radios(Public Works Maintenance) V&E-133 183,000 183,000 Body Cameras(Police) V&E-135 24,070 24,070 24,070 24,070 24,070 120,350 Zodiac Boat(Fire) V&E-136 5,500 5,500 Outboard Motor(Fire) V8E-137 5,500 5,500 Passenger Vehicle(Fire) V&E-138 40,000 40,000 Passenger Vehicle(Fire) V8E-139 40,000 40,000 Utility Trailer(Park) V8E-140 5,500 5,500 Pickup Truck(Park) ' V&E-141 35,000 35,000 Dump Truck(Park) V8E-142 80,000 80,000 Trash Compactor(Park) V&E-143 65,000 65,000 Single Axle Dump Truck(Street) V&E-144 230,000 230,000 Skid Steer Loader(Street) V8E-145 55,000 55,000 Dump Truck(Street) V8E-i46 80,000 80,000 Plice Commander Vehicle(Police) V&E-147 50,000 50,000 SWAT Van(Police) V8E-148 100,000 100,000 Water Truck(Street) V&E-149 215,000 215,000 Fire Pumper Truck(Fire) V6E-151 600,000 600,000 Passenger Vehicle(Fire) V&E-152 40,000 40,000 Equipment Trailer(Street) V8E-153 20,000 20,000 Traffic Traiier(Police) V&E-154 30,000 30,000 Vehicles and Equipment Total 2,019,070 1,032,070 1,054,570 965,070 885,070 5,955,850 Water&Sewer Systems � Sanitary Sewer&Water Line RepaidRecon. W&SS-001 1,200,000 1,400,000 1,200,000 1,300,000 1,200,000 6,300,000 13�f Department Project# 2018 2019 2020 2021 2U22 Total Hook Dump Truck WBSS-004 80,000 80,000 Pickup Truck W&SS-Oi i 40,000 40,000 Sewer Jet Truck W&SS-012 235,000 235,000 Pickup Truck WBSS-014 100,000 100,000 Pickup Truck W&SS-015 75,000 75,000 Multiquip Portable Generator W&SS-041 10,000 10,000 Mill and Oveday WatedSewer Repairs WBSS-051 150,000 100,000 100,000 100,000 100,000 550,000 Structure and Pipe Inspection Pole Camera W6SS-055 25,000 25,000 Step Van W&SS-060 80,000 80,000 Radio Meter Reading System W&SS-063 600,000 600,000 200,000 1,400,000 Tractor Loader Backhoe W&SS-070 160,000 160,000 I-394 Inflow/lnfiltration Project W&SS-074 500,000 500,000 1,000,000 Sewer Flow Meters W&SS-076 35,000 35,000 Winnetka Ave Utility Rehabilitation W&SS-077 1,500,000 1,500,000 800 MHz Radios W&SS-081 40,000 40,000 Greenview Lane Watermain Repair W&SS-082 65,000 65,000 T.N.55 lift Station Relocation W&SS-083 650,000 650,000 Water& Sewer Systems Total 2,330,000 2,640,000 3,315,000 1,910,000 2,150,000 11,345,000 GRAND TOTAL 17,645,555 14,592,621 15,227,536 8,849,587 10,710,176 67,025,475 13S