08-Building Improvement (B) cityof
golden
alley
Capital Improvement Program 2019-2023
Building Improvement Section
The City owns and or/maintains the following facilities for the purpose of carrying out its mission of
providing needed services to the community and bringing people together by fostering inviting public
spaces where people work and play, encounter their fellow citizens and discover common interests.
This has incorporated the Wold Architects and Engineers city-wide comprehensive facility
assessment building analysis that was completed late 2006.
Golden Valley Buildings
Total Square Feet
-City Hall 26,350
Public Safety Police and Fire Station #1 28,000
Streets and Park Maintenance 29,100
Utilities Maintenance 12,950
Vehicles Maintenance 12,500
Warehouse &Animal Impound 11,490
Golf Maintenance 12,050
Fire Station No. 2 5,785
Fire Station No. 3 6,030
Brookview Center/Golf Operations 37,000
A transfer from the General Fund is the main source of revenue.
City of Golden Valley, Minnesota
Capital Plan
2019 thm 2023
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# 2019 2020 2021 2022 2023 Total
Buildings y
Generators B-012 50,000 50,000
Air Compressors B-013 5,000 5,000
Replace CoRayVac Heating Systems B-018 175,000 175,000
Installation of Building Security Systems B-027 10,000 10,000 10,000 10,000 10,000 50,000
Council Chambers Remodeling B-036 300,000 300,000
Public Buildings Roof Replacements B-041 150,000 150,000 150,000 450,000
City Hall Boiler Replacement B-043 225,000 225,000
10th Avenue Storage Building-Insulate and Heat 8-046 375,000 375,000
10th Ave South Side Storage Yard B-048 125,000 125,000 125,000 375,000
Park Shelters Buidling Improvements B-049 50,000 50,000 100,000
Brookview Shelter Sewer Service Repair B-050 50,000 50,000
10th Avenue Storage Yard Improvements B-051 100,000 100,000
Buildings Total 635,000 610,000 390,000 510,000 110,000 2,255,000
Building Fund(5200) 635,000 610,000 390,000 510,000 110,000 2,255,000
Buildings Total 635,000 610,000 390,000 510,000 110,000 2,255,000
Grand Total 635,000 610,000 390,000 510,000 110,000 2,255,000
Project# B-012 Department Buildings
Contact
Project Name Generators Type Improvement
Useful Life
Category Buildings
D�tion
Remove and replace/upgrade existing building emergency standby generators.
Justification
Generators are used to keep buildings ready to operate 24 hours a day.The generator replacement in 2021 is for the public safety building.
Expenditures 2019 2020 2021 2022 2023 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 50,000 50,000
Total 50,000 50,000
Project# B-013 Department Buildings
Contact
Project Name Air Compressors Type Improvement
Useful Life
Category Buildings
Descnption
Replace air compressor in the Park/Street Maintenance Building.
(Justification
The existing air compressors are over 20 years and in need of replacement.
2021-one air compressor Park/Street Maintenance Building
Expenditures 2019 2020 2021 2022 2023 Total
EquipNehicles/Furnishings 5,000 5,000
Total 5,000 5,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 5,000 5,000
Tom 5,000 5,000
Project# B-018
Department Buildings
Contact
Project Name Replace CoRayVac Heating Systems Type Improvement
Useful Life
Category Buildings
Description
Replace CoRayVac heaters in Vehicle Maintenance and Park Maintenance buildings.
Justification
Increased repair and maintenance costs.The systems are increasingly in need of periodic repairs and are susceptible to failure resulting in no heat in the buildings.
Expenditures 2019 2020 2021 2022 2023 Total
Equip/Vehicles/Furnishings 175,000 175,000
Total 175,000 175,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 175,000 175,000
Total 175,000 175,000
Project# B-027 Department Buildings
Contact
Project Name Installation of Building Security Systems Type Improvement
Useful Life
Category Buildings
Description
Installation of building security systems in all City owned facilities.
Justtfication
The City has installed a security system for primarily the City Hall Campus.Video suveillance was installed in 2017.On-going repaus and camera replacements are
scheduled each year as needed.
Expenditures 2019 2020 2021 2022 2023 Total
Other 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Project# B-036 Department Buildings
Contact
Project Name Council Chambers Remodeling Type Improvement
Useful Life
Category Buildings
Description
Complete remodel of Council Chambers
Justification
The Council Chambers has not been updated in over 28 years.Remodel to more accurately match the City's current need of the room.The equipment will be
replaced with cable franchise fees in the cablecasting improvement fund
Expenditures 2019 2020 2021 2022 2023 Total
EquipNehicles/Furnishings 300,000 300,000
Total 300,000 300,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 300,000 300,000
Total 300,000 300,000
Project# B-041 Department Buildings
Contact
Project Name Public Buildings Roof Replacements Type Unassigned
Useful Life
Category Unassigned
[Description
Replace roofs on buildings that are thirty-years old or greater.
Justification
(Roof replacements are scheduled to be replaced on various public buildings.
Expenditures 2019 2020 2021 2022 2023 Total
Infrastructure Improvements 150,000 150,000 150,000 450,000
Total 150,000 150,000 150,000 450,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 150,000 150,000 150,000 450,000
Total 150,000 150,000 150,000 450,000
Department Buildings
Project# B-043 Contact
Project Name Ci Hall Boiler Replacement
�' p Type Unassigned
Useful Life
Category Unassigned
- -
Description
Replace the City Hall Boiler System and control system..
Justification
The existing boiler system for City Hall is over 40 years old and is not efficient according to today's standard.The system would require total replacement.
Expenditures 2019 2020 2021 2022 2023 Total
EquipNehicles/Furnishings 225,000 225,000
Total 225,000 225,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 225,000 225,000
Total 225,000 225,000
Project# B-046 Department Buildings
Contact
Project Name 10th Avenue Storage Building-Insulate and Heat Type Unassigned
Useful Life
Category Unassigned
Description
Install insulation and heat at the existing 10th Avenue storage building
Justification -
Installation of insulation and heat for the 10th Avenue storage building gives public works storage space for equipment that needs to be protected from freezing street
sweepers,water truck,Vactor and Jet truck,etc.
Expenditures 2019 2020 2021 2022 2023 Total
EquipNehicles/Furnishings 375,000 375,000
Total 375,000 375,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 375,000 375,000
Total 375,000 375,000
Project# B-048
Department Buildings
Contact
Project Name 10th Ave South Side Storage Yard Type Unassigned
Useful Life
Category Unassigned
Description J
Install a sectional concrete wall around the south side outdoor storage yearly-for-security and visual screening of storage yard.
Justification
The dirt berms araound the site are an eyesore and do not offer any secunty.
Expenditures 2019 2020 2021 2022 2023 Total
Infrastructure Improvements 125,000 125,000 125,000 375,000
Total 125,000 125,000 125,000 375,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 125,000 125,000 125,000 375,000
Total 125,000 125,000 125,000 375,000
Project# B-049 Department Buildings
Contact
Project Name Park Shelters Buidlin Improvements g 1� Type Unassigned
Useful Life
Category Unassigned
Description
Park Shelter buildings are in need of new mechanicals relating to heat and lighting.Windows will be added to some shelters.
Justification
The park shelter building mechinaical equipment is in need of replacement.As each shelter is reviewed,mechanicals and potential installation of windows will occur.l
Expenditures 2019 2020 2021 2022 2023 Total
Infrastructure Improvements 50,000 50,000 100,000
Total 50,000 50,000 100,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 50,000 50,000 100,000
Total 50,000 50,000 100,000
Project# 8-050 Department Buildings
Contact
Project Name Brookview Shelter Sewer Service Repair Type Unassigned
Useful Life
Category Unassigned
Description
Repair Brookview Shelter 8"sewer service with 4"HDPE pipe.
Justification
The existing 8"is oversized for the building reulting in frequent backups.
Expenditures 2019 2020 2021 2022 2023 Total
Infrastructure Improvements 50,000 50,000
Total 50,000 50,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 50,000 50,000
Total 50,000 50,000
Project# 8-051 Department Buildings
Contact
Project Name 10th Avenue Storage Yard Improvements Type Unassigned
Useful Life
Category Unassigned
Description
Installation of a water service to the yard on the south side of the road and sanitary sewer service to the building on the north side of the road.
Justification
Water is needed on the souuth side of the road to wash equipment.The runoff would drain into a retention pond.Washing equipment at 10th Avenue instead o
behind the Utility building would improve storm water quality.Sanitary sewer is needed before the concrete floor with floor drains is installed.
Expenditures 2019 2020 2021 2022 2023 Total
Infrastructure Improvements 100,000 100,000
Total 100,000 100,000
Funding Sources 2019 2020 2021 2022 2023 Total
Building Fund(5200) 100,000 1009000
Total 100,000 100,000