13-Appendix city 0
golden
alley
Capital Improvement Program 2019-2023
Appendix Section
Exhibit A
Special Assessment Policy
for
The City of Golden Valley
January 17, 1995
Amended February 21, 1995
Amended June 7, 2005
Amended July 18, 2006
Amended January 20, 2009
General
Minnesota State Law, Chapters 429.010 to 429.11, provides municipalities the ability to
make public improvements such as installation of sanitary sewer, water, storm sewer,
sidewalks, and street improvements (including grading, curb and gutter, surfacing, and
lighting). The procedures that Cities must follow, including reports, notices, and public
hearings, are well defined within the laws.
The Statute allows municipalities to assess all or portions of the costs of any
improvements to property owners based on the benefits received from the project. The
Statute is not specific regarding the determination of benefits to a property, or how to
apportion the costs to the benefiting properties. Rather, the law makes the municipality
responsible for developing an equitable method of cost sharing among the benefiting
property owners.
The purpose of this special assessment policy is to provide a guide, to be used by City
Staff, for preparing assessment rolls for approval by the City Council. This policy is
meant to assure uniform and consistent treatment to all properties within the City as
improvements occur.
The special assessment policy will not cover all possible assessment situations. Special
cases and variations of standard cases that are not specifically discussed under this
policy will be evaluated during preliminary project studies, and assessments will be
determined that do not violate the benefit principles as required by Statute.
No special assessments will be levied against designated floodplains, municipal storm
water ponds or wetland areas on private property as determined by criteria in the
Wetland Conservation Act of 1991 and the Minnesota Department of Natural
Resources. The limits of wetlands will be determined by the City on a case-by-case
basis at the time of preliminary project design and feasibility report preparation.
No special assessments will be levied against railroad, county highway or state highway
rights-of-way. Properties fronting County Roads and County Highways will be subject to
special assessments for reconstruction projects based upon this policy.
Special assessments levied by the City will include an administrative fee, to be
established annually by ordinance, to finance indirect costs associated with the
assessment that are incurred by the City.
Sanitary Sewer and Water Main Assessments
Reconstruction and Repairs
No special assessments will be levied for repair and reconstruction of existing
sanitary sewer and water main systems, except for properties that have not been
previously assessed for these utilities.
For properties not previously assessed that are adjacent to sanitary sewer or
water main reconstruction projects, the amount of special assessments will be
calculated on a case-by-case basis at the time of preliminary design and
feasibility report preparation.
Property owners are responsible for maintenance, repair and replacement of
sanitary sewer services from, and including the connection to the main, and the
building being served. Pavement Management street reconstruction projects will
include an opportunity for property owners to reconstruct or repair their sanitary
sewer services. All costs, including construction, administration and other indirect
costs, will be specially assessed to the property being served by the sanitary
sewer service.
The City is responsible for maintenance, repair and replacement of water
services from the connection to the water main up to and including the curb stop
or valve on the service line. The property owner is responsible for maintenance,
repair and replacement of the water service from the connection of the service
pipe to the valve or curb stop, to the building being served.
New Construction
In instances where property is developing or redeveloping, public sanitary sewer
and water main may need to be installed. The construction of City sanitary
sewer, water mains and storm sewer to serve these properties will be
constructed as public improvement projects, unless the City opts to have the
developer design and construct the improvements. The developer of such
properties will be responsible for the entire cost of public utilities, including
construction, administration and other indirect costs, whether construction is
performed as a City Improvement Project or by the developer.
At the time such a development project is proposed, the Public Works
Department will determine if the project is to be constructed publicly or privately.
If the utility installation is to be constructed privately, the developer will be
responsible for preparing construction plans and specifications consistent with
City standards. These construction plans and specifications must be reviewed
and approved by the Public Works Department. The utility installation must also
be inspected by the Public Works Department during construction. The
developer will be responsible for 100% of the costs of City construction
observation and plan review, which will be billed directly to the developer. Any
unpaid costs incurred for these services will be assessed against the developing
properties. An irrevocable letter of credit must be posted by the developer in an
amount equal to 150% of the estimated construction costs to ensure timely
completion of the project.
If a public sanitary sewer or water main project is to be installed as a City
Improvement Project, the developer will be responsible for 100% of the direct
and indirect costs incurred by the City. These costs may include, but are not
limited to: feasibility report preparation, preliminary survey, preliminary design,
final design, construction staking, construction observation, as-built surveying
and drafting, and administrative and legal costs. The developer may elect to
have these costs assessed against the property being developed or pay the
costs directly to the City.
Storm Water Drainage
Street Storm Sewer
No special assessments will be levied for construction or reconstruction of storm
sewer systems within the City right-of-way as part of the Pavement Management
Programa However, in instances where storm sewer construction is incorporated
into Pavement Management Projects to resolve rear yard drainage issues, as
discussed in this policy, the costs associated with these improvements will be
specially assessed to the benefiting property owners.
In instances where storm sewer installation is required for development and
redevelopment projects, it shall be specially assessed to the property being
developed according to the Sanitary Sewer and Water Main Assessments
section of this policy.
Rear Yard Storm Sewer
In certain instances, storm sewer is necessary in rear yard areas to correct
existing drainage problems. City staff will visit such problem areas at the request
of a homeowner to evaluate the situation and provide engineering assistance to
encourage property owners to remedy the drainage problems without City
involvement.
If a property owner or owners cannot remedy the rear yard drainage problems,
they may petition the City for installation of storm sewer. Upon receiving a
request for petition for rear yard storm sewer, engineering staff will determine the
properties that contribute storm water runoff to the problem area. The petitioner
must then circulate the petition to the contributing property owners for signatures.
Each contributing property owner must be made aware that special assessments
will be levied against their property for the corrective storm sewer work. A
minimum of 35% of the contributing property owners must sign the petition for
the City Council to consider the project. Upon receipt of the petition and after a
public hearing, the City Council may either deny the request or order the storm
sewer improvements. If the improvements are ordered, the contributing property
owners will be assessed for 100% of the construction and indirect costs for the
storm sewer installation. The method of assessment and the pro-ration of costs
will be determined on a project-specific basis.
Affected property owners in rear yard drainage projects will also be required to
dedicate all drainage and utility easements for the installation of the storm sewer
at no cost to the City. If the City must purchase or condemn in order to obtain the
easements, the entire acquisition costs will be included in the project costs for
assessment or the City may decline to undertake the project.
Street Improvements
Development/Redevelopment Projects
When property is developed or redeveloped that has street frontage on
roadways that are scheduled for construction or reconstruction, the development
will be required to pay an escrow for the future street rehabilitation. The escrow
shall be based upon the assessment methods and land uses contained in this
policy, and shall be based on the assessment rates in effect at the time the
development is approved. The property or properties within the development will
not be specially assessed at the time street rehabilitation occurs.
Sidewalks
No special assessments will be levied for sidewalk construction that is in
accordance with the goals and recommendations of the City of Golden Valley
Sidewalk Committee. Requests for sidewalks that are not on the current
Sidewalk and Trail Plan will be forwarded to the Sidewalk Committee for
consideration. The Sidewalk Committee will forward its recommendations for the
requested sidewalks to the City Council, which will determine if the proposal
should be included in the Sidewalk Plan.
Street Lightinq
Street lighting is available to the residents of Golden Valley on a petition basis
according to the Street Lighting Policy.
New Street Construction
As property within the City develops or redevelops, it may be necessary to install
public streets. The Public Works Department will determine if the project is to be
installed publicly or privately. The procedures, policies, and requirements for
street construction will be the same as discussed for new sanitary sewer
installations.
Sealcoating
No special assessments will be levied for street sealcoating.
Bituminous Milling and Overlays
No special assessments will be levied for bituminous milling and overlays.
Street Reconstruction
Special assessments for street reconstruction projects will be in accordance with this
policy and Minnesota Statutes, Chapter 429. The total amount of the special
assessments will be a minimum of 20% of the street reconstruction costs not to exceed
the benefit received by each property. Special assessment rates for all land uses and
street classifications will be determined annually by ordinance.
Local Streets
1. Properties with residential and duplex residential land use, parks and other City-
owned properties subject to reconstruction will be assessed on a per-unit basis,
with one unit assessed to each property unless the property has the potential to
be further subdivided into two or more lots that each meets City subdivision
ordinance requirements. Such lots that may be so subdivided shall be assessed
for the number of units that equals the number of such lots that the property may
be subdivided into. However, residential properties that are subject to multiple
unit assessments will have all but one of such unit assessments deferred at the
time of the initial assessment. Such deferral will be made each year until such
time as the property is subdivided. At that time, the deferred unit assessments
shall be due.
2. Special assessments against properties with Multiple Dwelling land use will be
on a front-foot basis, with 100% of the frontage being improved subject to
assessment.
3. Properties with church, school and other tax exempt land uses will be assessed
on a front-foot basis, with 100% of the frontage being improved subject to
assessment.
4. All other land uses, including commercial, industrial, business and offices will be
assessed on a front-foot basis, with 100% of the frontage being improved subject
to assessment.
5. Residential properties adjacent to local streets being reconstructed may
participate in voluntary programs to have their driveways reconstructed and
sanitary sewer service repaired or reconstructed at contract unit prices.
Residents will be notified of these programs at informational meetings for each
street project. If a resident participates in these programs, staff will coordinate
construction with the contractor and will measure the quantities installed. The
construction costs, along with an administrative fee, established annually by
ordinance, will be assessed to the property owner.
6. When a corner residential lot has frontage on two local streets, it will be
assessed for one-half unit assessment for each street subject to reconstruction.
No more than one total unit assessment will be charged against a parcel for
street reconstruction. Corner properties adjacent to State Aid and local streets
will be charged one-half of the appropriate unit assessment at the time of
reconstruction of each street.
7. Corner residential properties adjacent to a local street and a state or county
roadway will not be subject to special assessments by the City for state highway
or county road reconstruction. However, these properties will be assessed the
appropriate number of unit assessments for the entire frontage along the local
streets when reconstruction occurs on the local street.
8. Residential properties adjacent to frontage roads of state highways will be
considered to be on local or Municipal State Aid streets and will be assessed
consistent with this policy.
9. Special Assessments for properties not specifically covered in any of the above
cases will be addressed on a parcel-specific basis at the time of the feasibility
report.
State Aid Streets
1. Properties with residential and duplex residential land uses that have frontage on
a Municipal State Aid Street will be assessed on a per-unit basis. The per-unit
assessment rate will be approximately 25% of the standard residential rate for
properties on local streets. Assessments for oversized parcels with the potential
for subdivision are to be consistent with the previously discussed policy for local
streets.
2. Properties with Multiple Dwelling land use that front on a Municipal State Aid
Street will be assessed on a front-foot basis for the frontage being improved.
Properties with church, school, and other tax-exempt land uses that front on a
Municipal State Aid Street will be assessed on a front-foot basis for the frontage
being improved.
All other land uses, including commercial, industrial, business and offices that
front on a Municipal State Aid Street will be assessed on a front-foot basis for the
frontage being improved.
3. Special assessments for properties not specifically covered in any of the above
cases will be addressed on a parcel-specific basis at the time of the feasibility
report.
4. Residential properties adjacent to State Aid streets being reconstructed will be
given the option of having their driveways and sanitary sewer services repaired
or reconstructed under the same terms discussed in the local street
reconstruction portion of this policy.
County Roads
1. Properties with residential and duplex residential land uses adjacent to county
roads will be assessed according to the previously discussed methods for local
streets, except for corner lots with local streets, which will be assessed in full at
the time the intersecting local street is reconstructed. Special assessments to
residential properties will be at State Aid street rates.
2. All other land uses, including commercial, industrial, business, and tax-exempt
uses will be assessed on a front-foot basis, with 100% of the frontage being
improved subject to assessment. The assessment rate shall be the rates used
for State Aid streets as established by ordinance.
Low Income Senior Citizen and Disability Deferments
As required by Minnesota Statute, the City has a special assessment deferral policy for
low income senior citizens and disabled persons meeting all of the following criteria:
1. The property upon which the assessment is deferred must be homesteaded;
2. The property is owned by a person at least 65 years of age on January 1 st of the
year in which payment of the first installment of the subject assessment is due; or is
owned by a person who is retired due to permanent and total disability.
3. The applicant must have a "financial hardship" defined as:
a) An annual income at or below a level established annually by ordinance and;
b) The aggregate total of all special assessments levies will exceed one and one-
half percent (1-1/2%) of the applicant's annual income.
More information is available at General Services Office (763.593.8020).
Street Reconstruction Special Assessment Rates
Special assessment rates as discussed in this policy will be established yearly with the
Annual Fee Resolution. The rates will be based on the percentages of construction and
indirect costs as discussed above. Indirect costs are estimated to be 30% of the
construction costs and include administration, engineering, construction observation,
and legal fees. These rates will be subject to revision each year based on the actual
construction costs in the City from the previous year and for inflation based upon the
ENR Index for construction costs.
city of
golden l•1\e�y1
Fleet Operation ,
Maintenance , and
Replacement Policy
Message from the Manager
Motor vehicles and equipment are vital to day-to-day operations and service delivery
activities of the City of Golden Valley. The Public Works Department Vehicle
Maintenance Division is responsible for the stewardship of the City's fleet and
equipment assets and for meeting the fleet and equipment service requirements of City
departments. The division also develops fleet and equipment utilization and
replacement policies and schedules. The Vehicle Maintenance Division is an internal
service division of the Public Works Department of which the costs are allocated to the
other City departments for services provided.
The main goal of the Public Works Department Vehicle Maintenance Division is to
provide vehicles that are dependable, flexible, efficient, and responsive so that City
departments and divisions can operate in a cost-effective manner, minimizing the City's
vehicle equipment budget. The division is also committed to maintaining the City's fleet
and equipment so that the equipment is readily available for performing City operations
and keeping downtime to a minimum. The Public Works staff works with all departments
to embrace a philosophy which emphasizes the value of the importance of vehicle and
equipment availability, safety, reliability, and efficiency as well as preserving the City of
Golden Valley's major capital investment in fleet and equipment.
The City has established a capital replacement schedule to replace aging vehicle and
equipment. The vehicle and equipment replacement schedule, in conjunction with the
5-year Capital Improvement Program (CIP) and operating budgets, is used to plan any
major capital investment (the CIP reflects only those investments that exceed $10,000).
New equipment or other items, which are not part of a replacement schedule, are
funded annually out of the originating or requesting department's operating budget.
Approved February 2010
Purpose
The purpose of this policy is to assign responsibility to the City of Golden Valley's Public
Works Department Vehicle Maintenance Division for the operation, maintenance,
acquisition, and replacement of vehicles and equipment owned and operated by the
City, with the exception of vehicles and equipment used by Brookview Golf Course,
which are acquired, operated, maintained, and replaced by Golf Maintenance.
Policy
This policy is intended to ensure the availability of funds for the operation, maintenance,
acquisition, and replacement of fleet and equipment. Adherence to this policy will
provide effective and efficient fleet and equipment services for operating
departments/divisions to provide the best services for the residents and businesses of
Golden Valley. This policy establishes a sound business approach associated with the
evaluation of vehicle and equipment cost and capabilities, purchasing and funding
methodology, and making decisions on acquisition and replacement considering the
level of usage and demonstrated needs. Departments are asked to review vehicle and
equipment needs with a goal of increasing fuel efficiency, consideration of alternative
and/or flexible fuels, reducing the number of vehicles, conversion of the diesel vehicle
and equipment to bio-diesel, and promoting the anti-idling policy.
1. Vehicle and Equipment Replacement
A vehicle and equipment replacement schedule is maintained by the Public Works
Department Vehicle Maintenance Division and Finance Department. Replacement of
vehicle and equipment will generally follow the attached Equipment and Vehicle
Replacement Guidelines and are summarized as follows and listed as Attachment A:
a. Description
b. Unit number
c. Classification
d. Year purchased
e. Purchase price
f. Expected service life
g. Projected replacement cost
h. Annual fuel, maintenance, and overhead costs by vehicle classification
2. Vehicle and Equipment Maintenance
Vehicle and equipment preventative maintenance schedules are maintained by the
Public Works Department Vehicle Maintenance Division with the goal of keeping
vehicles and equipment available 95% of the demand time.
a. Generally, maintenance standards and procedures are as recommended by the
vehicle/equipment manufacturer or other recognized authority, or utilizing the
Public Works Department Vehicle Maintenance Division Preventative
Maintenance Schedules.
L Daily maintenance inspections are performed by operators and
maintenance personnel using the Pre-operation Inspection Form.
ii. Scheduled maintenance is performed by the maintenance mechanics
considering the above-referenced Preventative Maintenance Schedules.
iii. Demand maintenance is generated by user activities and may require
outside services. The Service Request Form is used to request demand
maintenance.
iv. All maintenance done by the operator shall be coordinated with the
Vehicle Maintenance Division.
b. The Public Works Department Vehicle Maintenance Division may remove
equipment or vehicles from service based on the Commercial Vehicle Safety
Alliance (CVSA) Out-of—Service Criteria (OSC) or other recognized criteria.
3. Vehicle and Equipment Operation
The use of City vehicles or equipment is approved only for matters related to City job
responsibilities or for City business. Operation of City vehicles and equipment shall
be in accordance with the Employee Handbook, Section 5.0, Subd. 5.25, Vehicle
Use, January 1, 2006. Care and cleaning of vehicle and equipment is the
responsibility of the user.
The Public Works Department Vehicle Maintenance Division will manage and
maintain the central fuel system. This includes fuel system access assignments and
records management.
a. Dedicated department vehicles shall be assigned to departments whose job
duties require the immediate availability of a vehicle.
L Dedicated vehicle use shall be subject to the same limitations and
conditions as identified in the Vehicle Use Policy.
b. Shared vehicles should be considered for employees with similar job duties and
should be considered in lieu of a dedicated vehicle.
Funding
Vehicle and equipment replacement will be funded through the CIP. The Public Works
Department Vehicle Maintenance Division will maintain a current and complete
inventory of all vehicles and equipment in coordination with all users and the Finance
Department. These inventories will establish all divisions/department vehicle and
equipment replacement schedule. All vehicles and equipment maintained by the Vehicle
Maintenance Division will be reviewed on an annual basis for replacement. If a
department/division has requested replacement or an addition to the fleet, Vehicle
Maintenance will make a recommendation on the purchase for the CIP to the City
Manager. The CIP will be presented to the City Council for consideration and approval
during the budget process.
1. Funding New and Replacement Vehicles and Equipment
Fleet and equipment projected for replacement, or additional vehicles and
equipment, will be funded through the CIP process. Upon acquisition, all fleet and
equipment purchased shall be included in the vehicle and equipment inventory
database. Requests for fleet and equipment replacement will be addressed through
the normal budget process.
a. Fleet and equipment with a value in excess of$10,000 purchased for the first
time must be included in the CIP.
b. Fleet and equipment with a valueless than $10,000 purchased for the first time
does not have to be included in the CIP, but must be included in the operating
budget.
2. Funding of Operational Expenses
a. Fuel Allocation
Fuel is allocated based on usage by each piece of equipment or vehicle and
billed monthly to the responsible department. Pricing for fuel is based on average
total cost of inventory and an overhead charge, as set by the Finance
Department.
3. Reassigned Equipment
a. Reassigned equipment may be used in lieu of new vehicles/equipment with
written approval by the City Manager. Reassignment duration will be as
determined annually by the Public Works Department Vehicle Maintenance
Division. Reassignments moved within or across departments/divisions will be
charged for conversion costs to the receiving department/division by internal
service charges. Reassignments with no conversion costs will not be charged.
The Finance Department will be notified of all reassignments for fixed assets and
insurance reports.
4. Equivalent Replacement/Upgrades
a. The CIP fund is structured to replace each vehicle or piece of equipment with an
equivalent unit, unless specified/justified, during the budget process.
b. Cost increases due to upgrades, changes in type of fleet or equipment, addition
of options, or other upgrades associated with vehicles scheduled for
replacement, shall be highlighted and clearly summarized as an element of the
CIP by the department requesting the upgrade or addition in options.
Responsibilities
1. Department Directors shall be responsible for:
a. Ensuring that all vehicles and equipment for replacement requests are of the
appropriate type and have only those items/options that are operationally
required.
b. Submitting requests for replacement with cost estimates to the Finance
Department and the Public Works Maintenance Manager prior to the CIP and
budget process.
2. The Public Works Department Vehicle Maintenance Division shall be
responsible for:
a. Submitting a 5-year Capital Improvement Program to the Finance Department
and City Manager during the budget process.
b. Reviewing replacement schedule annually with departments during the budget
process to ensure all vehicles and equipment are replaced as appropriate.
c. Establishing the Vehicle and Equipment Replacement Schedule.
d. Tracking fuel, labor and repair parts annually, and provide this information to
Finance and responsible departments.
e. Identifying the actual historical cost and variations in cost performance based on
lifetime-accumulated age and usage of the various vehicle and equipment types
(classifications).
3. The Finance Department shall be responsible for:
a. Completing an analysis and reconciliation of the vehicle replacement CIP on an
annual basis.
Purchasing and Disposal
1. Purchasing Procedures
a. New vehicles and equipment will be purchased by the Public Works Maintenance
Manager, as assigned by the Director of Public Works and in accordance with
Minnesota Statute 471.345. Acquisitions require the cooperation and assistance
of many departments.
b. When possible, purchases will be made from the State of Minnesota, Hennepin
County, or other Joint Purchasing Agreement contracts, as permitted by State
Statute. These purchases will also follow the City's purchasing policy.
c. Details for budgeting will be provided by the Finance Director when providing the
overall budget guidelines.
2. Equipment Disposal
a. Disposal of equipment shall be in accordance with the City's business standard
of disposing all vehicles and equipment by auction, trade-in, or other approved
methods.
b. When vehicles and equipment are replaced, there may be reassignment of
vehicles or equipment, but there will be no fleet or equipment hold over on the
fleet after a replacement is purchased. Adding fleet or equipment to the inventory
without City Manager authorization is not permitted.
c. In order to address the seasonal or short-term needs, fleet or equipment may be
retained temporarily for a period not to exceed nine months from the date the
replacement fleet or equipment is placed into service.
Request for Vehicles, Equipment, and Service
1. Requesting Vehicles or Equipment
a. New vehicles or equipment in excess of$10,000 must be made and approved
through the CIP budget process, and have a life of more than three (3) years.
The request shall be discussed with the Public Works Maintenance Manager and
Vehicle Maintenance Division to avoid duplication of equipment and to discuss
the appropriate type and size of vehicle or equipment requested.
b. Request for new vehicle or equipment less than $10,000 must be made and
approved through the normal budget process.
2. Repair and Maintenance of Vehicle or Equipment Requests
a. All repair and maintenance of vehicles and equipment will be made by
completing the Vehicle Maintenance Repair Slip, as provided by the Vehicle
Maintenance Division.
Acquisition Request(s)
The 5-year CIP will be reviewed and evaluated annually as part of the budget process.
In any given year, vehicle or equipment originally planned for replacement may be
adjusted as necessary to account for current needs.
city 0
olden
valley
VEHICLE AND EQUIPMENT REPLACEMENT GUIDELINES
Public Works Department Vehicle Maintenance Division Management
Methodology
To manage the City's fleet in a manner that theoretically all of the City's motorized
equipment and vehicles are maintained and disposed of by the Public Works
Department Vehicle Maintenance Division. The Vehicle Maintenance Division has full
responsibility for vehicle and equipment maintenance and the equipment users are
charged an hourly repair rate for all service and repairs.
1. Expected Life
When new vehicles or equipment are purchased, it is given an expected life (years
in service) based on a variety of factors. Below are the estimated life expectancies
for some of the significant pieces of equipment:
a. Engine Pumpers 20+ years (refurbish half way through life cycle)
b. Tandem Dump Trucks 12 years
c. Single Axle Dump Trucks 12-14 years-some longer
d. Wheel Loaders 15-18 years
e. Backhoe/Excavators 10-12 years
f. Jet Truck 10 years
g. One-Ton Trucks 9-10 years
h. 3/ and Y2 Ton Pickups 10 years-some longer
i. Skid Steers 8-10 years
j. Street Sweeper 8 years
k. Tractors Varies (15 years average)
I. Vactor Truck 10 years
m. Mowers Varies (6-10 years)
n. Sport Utility Vehicle 10 years
o. Passenger Cars/Vans 10 years
p. Squad Cars 100,000 miles/4 years
q. Trailers 15 years
r. Sidewalk Machines 10-12 years
2. Replacement Factors
When a particular piece of vehicle or equipment achieves its expected life and
reaches its anticipated replacement year, it is analyzed to determine if it should be
replaced based on the following factors:
a. Critical nature of the equipment or vehicle and the availability of a backup or
alternative equipment or vehicle. For example, the Sewer Jet is a critical piece of
equipment for which there is no backup except to contract for those services. It is
important to have this equipment operational with minimal downtime.
b. Use of the equipment or vehicle (hours and/or miles). The duration and intensity
of use are also important factors. For example, squad cars typically achieve their
expected life of 100,000 miles and are retired in approximately 4 years while
other vehicles (cars and light trucks) may never achieve 100,000 miles and can
last for many years.
c. Appropriateness of the equipment or vehicle for the assigned tasks. Public Works
and the user examines whether the equipment or vehicle is still capable of doing
its intended work, whether it is the right equipment, and determine if the work
changed causing the equipment or vehicle to be obsolete.
d. Repair history, costs, and downtime. Mechanics provide critical input and
assessments of the overall condition of the equipment. Near the end of the
expected life of the equipment or vehicle, repair costs can exceed the value of
the equipment or vehicle and replacement is appropriate.
e. Suitability of the equipment or vehicle for other tasks. Other departments provide
input regarding the ability to reassign equipment and vehicles to other less
frequent or intense duties. For example, Public Works have re-assigned used
marked squad cars and light pickup trucks to other departments.
3. Life Cycle Costing
This accounting method is used as much as possible in managing the City's fleet
management. Life cycle costing includes the purchase cost of the equipment or
vehicle, lifetime maintenance and operation costs, and the residual value at the time
of disposal. This is the true cost of equipment or vehicle ownership. The goal is to
replace the equipment during its economic life. This is the period when the
maintenance costs are the lowest.
4. Fire Department Vehicle Replacement Practice
Fire apparatus is historically refurbished half way through its life cycle
(approximately 10-12 years) and replaced after 20 to 24 years of service, or a couple
of years longer depending on condition. This general rule applies to "major"
apparatus, engine, and ladder trucks. The replacement of a particular piece of
apparatus is based upon several factors including the general mechanical and
structural condition, required vehicle and safety upgrades, technological changes,
current and anticipated use, anticipation of future mission changes, and the current
mechanical history (including mileage).
The apparatus replacement schedule is revised to reflect a philosophy of validating
the replacement of a vehicle, as opposed to replacement based solely upon the age
of the vehicle. To this end, vehicles have been moved back in the replacement
schedule and not replaced at the time mark historically associated with replacement
schedules. Refurbishing pumpers and ladders to extend the "life" of fire apparatus is
a common practice. Refurbishing pumper and ladder fire vehicles extends vehicle
life.
City of Golden Valley, Minnesota
Capital Plan
2019 d ru 2023
PROJECTS BY DEPARTMENT
Department Project# 2019 2020 2021 2022 2023 Total
Buildings
Generators B-012 50,000 50,000
Air Compressors B-013 5,000 5,000
Replace CoRayVac Heating Systems B-018 175,000 175,000
Installation of Building Security Systems B-027 10,000 10,000 10,000 10,000 10,000 50,000
Council Chambers Remodeling B-036 300,000 300,000
Public Buildings Roof Replacements B-041 150,000 150,000 150,000 450,000
City Hall Boiler Replacement B-043 225,000 225,000
10th Avenue Storage Building-Insulate and Heat B-046 375,000 375,000
10th Ave South Side Storage Yard B-048 125,000 125,000 125,000 375,000
Park Shelters Buidling Improvements B-049 50,000 50,000 100,000
Brookview Shelter Sewer Service Repair B-050 50,000 50,000
10th Avenue Storage Yard Improvements B-051 100,000 100,000
Buildings Total 635,000 610,000 390,000 510,000 110,000 2,255,000
Cablecasting Improvements
Cable Equipment Replacement C-001 200,000 200,000
Cablecasting Improvements Total 200,000 200,000
Golf Course A
Green/Tee Mowers GC-003 45,000 45,000
Utility Cart GC-005 11,000 11,000 22,000
Point of Sale System GC-007 30,000 30,000
Rough Mowers GC-010 70,000 70,000 140,000
Fairway Mower GC-014 50,000 52,000 102,000
Bridge Improvements GC-023 40,000 40,000 80,000
Turf Sprayer GC-031 50,000 50,000
Beverage Cart GC-035 25,000 25,000
Hole 18 Tee Improvements GC-041 50,000 50,000
Range Nets GC-045 19,675 20,000 39,675
Aerator GC-046 25,000 25,000
Lightning Alarm System GC-047 22,000 22,000
Golf Course Total 102,675 106,000 162,000 120,000 140,000 630,675
arks
Bleacher,Soccer Goal,Team Bench&Picnic Tables P-001 25,000 15,000 25,000 25,000 25,000 115,000
Park Trail and Parking Lot Improvement P-002 90,000 40,000 50,000 75,000 75,000 330,000
Play Structure Replacement P-003 60,000 60,000 60,000 60,000 240,000
Outdoor Hard Surface Replacement P-015 23,000 20,000 25,000 25,000 25,000 118,000
Park Signage Replacement P-016 10,000 5,000 5,000 5,000 5,000 30,000
Sun Shelter Replacements and Additions P-017 25,000 50,000 75,000
Tennis&Pickle Ball Court Resurfacing P-018 15,000 15,000 15,000 15,000 15,000 75,000
Re-Lamp Athletic Field and Rink Lights(LED) P-023 25,000 18,000 18,000 18,000 18,000 97,000
Wildwood Park Athletic Field P-024 50,000 50,000
Department Project# 2019 2020 2021 2022 2023 Total
Community Gardens P-025 30,000 30,000 60,000
Off-Leash Pet Exercise Area P-026 60,000 60,000
Dugout,Fence and Felled Replacement P-027 55,000 35,000 55,000 55,000 55,000 255,000
Scoreboard Updats/Replacement P-028 25,000 25,000 25,000 75,000
Soft Fall Wood Fiber Replacement P-031 15,000 15,000 30,000
Sand Volleyball Courts P-032 15,000 15,000 30,000
Tennis Court Lights P-033 150,000 150,000
Parks Total 358,000 358,000 358,000 358,000 358,000 1,790,000
[Storm Water
Residential Storm Sewer Improvements SS-01 850,000 750,000 750,000 750,000 750,000 3,850,000
Brookview Golf Course-Buffer Zone Implementation SS-12 50,000 50,000 100,000
Pickup Truck(Stone Water Utility) SS-22 35,000 35,000
Storm Water Pond Dredging SS-23 300,000 300,000 600,000
V-Box Spreader and Anti-Ice(tandem) SS-25 67,000 67,000
V-Box Spreader and Anti-Ice(tandem) SS-26 67,000 67,000
Sidewalk Sweeper SS-27 20,000 20,000
Flood Mitigation SS-34 250,000 250,000 250,000 250,000 250,000 1,250,000
Bobcat Toolcat SS-41 55,000 55,000
Zane Avenue&Lindsay St Reconstruction SS-46 335,000 335,000
DeCola Ponds B and C SS-48 3,900,000 700,000 4,600,000
Medley Park Stormwater Treatment Facility SS-49 220,000 330,000 550,000
800 MHz Radios SS-51 40,000 40,000
Storm Sewer Repairs-MS4 and Overlay Program SS-53 150,000 150,000 150,000 150,000 150,000 750,000
Decola Pond F Diversion SS-54 1,600,000 620,000 3,480,000 5,700,000
Janalyn Pond Lift Station SS-58 125,000 125,000
Sidewalk Sweeper SS-59 20,000 20,000
Bassett Creek Regional Trail-Storm Sewer Repairs SS-60 50,000 50,000
Storm Water Total 5,365,000 2,287,000 2,800,000 2,680,000 5,082,000 18,214,000
Streets
Pavement Management Program S-001 3,870,000 3,350,000 3,400,000 3,400,000 3,400,000 17,420,000
Zane Ave.and Lindsay Street S-009 2,400,000 2,400,000
Pavement Management Overlays S-013 500,000 500,000 500,000 500,000 500,000 2,500,000
TH 100 Pedestrian Bridge Walk Maintenance S-014 200,000 200,000
Flashing Yellow Arrows S-016 45,000 45,000 90,000
Municipal State Aid(MSA)Street Maintenance S-017 125,000 125,000 125,000 125,000 125,000 625,000
Streetscape and City Hall Complex Renovation S-018 100,000 100,000 100,000 100,000 100,000 500,000
MSA Debt Service S-019 201,005 200,165 198,915 197,455 189,000 986,540
Sidewalks,Trails,&Bike Facility Upgrades S-030 325,000 150,000 150,000 150,000 150,000 925,000
Xenia Avenue and Golden Hills Dr Improvements S-031 1,350,000 1,350,000
Auto CAD Application S-032 12,100 12,100 12,100 12,100 12,100 60,500
Cartegraph Street Management Software S-034 20,000 20,000 20,000 20,000 80,000
Retaining Wall Repairs S-036 100,000 100,000 100,000 100,000 100,000 500,000
Highway 55 West Redevelopment Project S-038 63,500 182,310 179,900 182,450 179,950 788,110
Zenith Avenue Reconstruction S-041 1,500,000 1,500,000
Railroad Crossing Improvements S-042 250,000 250,000
Pavement Surface Treatments S-044 100,000 100,000
Streets Total 7,116,605 4,884,575 4,785,915 8,732,005 4,756,050 30,275,150
Vehicles and Equipment
Marked Squad Cars(Police) V&E-001 80,000 80,000 120,000 120,000 120,000 520,000
Computers and Printers(Finance) V&E-002 95,000 95,000 95,000 95,000 95,000 475,000
Chipper(Street) V&E-006 35,000 35,000
Department Project# 2019 2020 2021 2022 2023 Total
Pickup Truck(Engineering) V&E-008 35,000 35,000
Passenger Vehicle(Fire) V&E-011 40,000 40,000
Portable Computers(Police) V&E-020 50,000 50,000
Unmarked Police Vehicle(Police) V&E-024 40,000 40,000
Pickup Truck(Park) V&E-026 35,000 35,000
Dump Truck(Park) V&E-029 80,000 80,000
Rotary Mower(Park) V&E-030 110,000 110,000
Skylift Man Lift(Park&Street V&E-033 40,000 40,000
Crime Prevention Vehicle(Police) V&E-034 30,000 30,000
Utility Tractor(Park) V&E-039 75,000 75,000
Pickup Truck(Engineering) V&E-044 35,000 35,000
Rescue Vehicle(Fire) V&E-045 200,000 200,000
Pickup Truck(Park) V&E-047 65,000 65,000
Rotary Mower(Park) V&E-048 50,000 50,000
Dump Truck(Street) V&E-053 270,000 270,000
Pickup Truck(Vehicle Maintenance) V&E-054 100,000 100,000
Pickup Truck(Street) V&E-063 40,000 40,000
Tandem Axle Dump Truck(Street) V&E-066 270,000 270,000
Sidewalk/Maintenance Tractor(Street) V&E-089 55,000 55,000
Pickup Truck(Park) V&E-100 50,000 50,000
Pickup Truck(Fire) V&E-102 40,000 40,000
Polaris 6 X 6(Fire) V&E-106 15,000 15,000
Bobcat Utility Truckster(Park) V&E-107 55,000 4,500 4,500 4,500 4,500 73,000
Single Axle Dump Truck(Street) V&E-109 230,000 230,000
Dump Truck(Street) V&E-110 230,000 230,000
Portable Message Sign Trailer V&E-115 25,000 25,000
Bobcat Toolcat(Park) V&E-116 4,500 4,500 4,500 4,500 4,500 22,500
Sidwalk Tractor(Street) V&E-118 160,000 160,000
Tasers(Police) V&E-121 16,000 16,000
800 MHz Radios(Public Works Maintenance) V&E-133 100,000 100,000
Body Cameras(Police) V&E-135 24,070 24,070 24,070 24,070 24,070 120,350
Zodiac Boat(Fire) V&E-136 5,500 5,500
Outboard Motor(Fire) V&E-137 5,500 5,500
Passenger Vehicle(Fire) V&E-138 40,000 40,000
Passenger Vehicle(Fire) V&E-139 40,000 40,000
Utility Trailer(Park) V&E-140 5,500 5,500
Pickup Truck(Park) V&E-141 35,000 35,000
Dump Truck(Park) V&E-142 80,000 80,000
Trash Compactor(Park) V&E-143 65,000 65,000
Single Axle Dump Truck(Street) V&E-144 230,000 230,000
Skid Steer Loader(Street) V&E-145 5,000 5,000 5,000 5,000 5,000 25,000
Dump Truck(Street) V&E-146 80,000 80,000
Police Commander Vehicle(Police) V&E-147 50,000 50,000
SWAT Van(Police) V&E-148 100,000 100,000
Passenger Vehicle(Fire) V&E-152 40,000 40,000
Equipment Trailer(Street) V&E-153 20,000 20,000
Traffic Trailer(Police) V&E-154 30,000 30,000
Trailer(Street) V&E-155 5,000 5,000
Trailer(Fire) V&E-156 5,000 5,000
Passenger Car(Police) V&E-158 40,000 40,000
Vehicles and Equipment Total 728,570 978,570 864,070 849,070 1,213,070 4,633,350
ater&Sewer Systems
Sanitary Sewer&Water Line Repair/Recon. W&SS-001 1,400,000 1,200,000 1,200,000 1,200,000 1,200,000 6,200,000
Hook Dump Truck W&SS-004 80,000 80,000
Pickup Truck W&SS-011 40,000 40,000
Department Project# 2019 2020 2021 2022 2023 Total
Pickup Truck W&SS-014 100,000 100,000
Pickup Truck W&SS-015 75,000 75,000
Mill and Overlay Water/Sewer Repairs W&SS-051 150,000 150,000 150,000 150,000 150,000 750,000
Televising and Electroscan Equipment W&SS-053 150,000 150,000
Radio Meter Reading System W&SS-063 700,000 100,000 800,000
Valve Replacement/Watermain Lining W&SS-066 100,000 100,000 200,000
Tractor Loader Backhoe W&SS-070 160,000 160,000
1-394 Inflow/Infiltration Project W&SS-074 250,000 250,000 250,000 750,000
Sewer Flow Meters W&SS-076 35,000 35,000 70,000
Winnetka Ave Utility Rehabilitation W&SS-077 550,000 550,000
Sanitary Sewer Lining 1/1 Reduction W&SS-078 100,000 100,000 200,000
800 MHz Radios W&SS-081 40,000 40,000
T.H.55 Lift Station Relocation W&SS-083 500,000 500,000
Trenchless Request for Information W&SS-086 50,000 50,000
Complete Water Meter Replacement W&SS-087 100,000 100,000 100,000 300,000
Water&Sewer Systems Total 2,690,000 1,765,000 2,250,000 2,260,000 2,050,000 11,015,000
GRAND TOTAL 17,195,850 10,989,145 11,609,985 15,509,075 13,709,120 69,013,175
City of Golden Valley, Minnesota
Capital Plan
2019 thm 2023
PROJECTS BY YEAR
Project Name Department Project# Project Cost
2019
Replace CoRayVac Heating Systems Buildings B-018 175,000
Installation of Building Security Systems Buildings B-027 10,000
Council Chambers Remodeling Buildings B-036 300,000
Public Buildings Roof Replacements Buildings B-041 150,000
Cable Equipment Replacement Cablecasting Improvements C-001 200,000
Utility Cart Golf Course GC-005 11,000
Turf Sprayer Golf Course GC-031 50,000
Range Nets Golf Course GC-045 19,675
Lightning Alarm System Golf Course GC-047 22,000
Bleacher,Soccer Goal,Team Bench&Picnic Tables Parks P-001 25,000
Park Trail and Parking Lot Improvement Parks P-002 90,000
Play Structure Replacement Parks P-003 60,000
Outdoor Hard Surface Replacement Parks P-015 23,000
Park Signage Replacement Parks P-016 10,000
Tennis&Pickle Ball Court Resurfacing Parks P-018 15,000
Re-Lamp Athletic Field and Rink Lights(LED) Parks P-023 25,000
Community Gardens Parks P-025 30,000
Dugout,Fence and Failed Replacement Parks P-027 55,000
Scoreboard Updats/Replacement Parks P-028 25,000
Residential Storm Sewer Improvements Storm Water SS-01 850,000
Brookview Golf Course-Buffer Zone Implementation Storm Water SS-12 50,000
Flood Mitigation Storm Water SS-34 250,000
DeCola Ponds B and C Storm Water SS-48 3,900,000
800 MHz Radios Storm Water SS-51 40,000
Storm Sewer Repairs-MS4 and Overlay Program Storm Water SS-53 150,000
Janalyn Pond Lift Station Storm Water SS-58 125,000
Pavement Management Program Streets S-001 3,870,000
Pavement Management Overlays Streets S-013 500,000
TH 100 Pedestrian Bridge Walk Maintenance Streets S-014 200,000
Municipal State Aid(MSA)Street Maintenance Streets S-017 125,000
Streetscape and City Hall Complex Renovation Streets S-018 100,000
MSA Debt Service Streets S-019 201,005
Sidewalks,Trails,&Bike Facility Upgrades Streets S-030 325,000
Xenia Avenue and Golden Hills Dr Improvements Streets S-031 1,350,000
Auto CAD Application Streets S-032 12,100
Cartegraph Street Management Software Streets S-034 20,000
Retaining Wall Repairs Streets S-036 100,000
Highway 55 West Redevelopment Project Streets S-038 63,500
Railroad Crossing Improvements Streets S-042 250,000
Marked Squad Cars(Police) Vehicles and Equipment V&E-001 80,000
Computers and Printers(Finance) Vehicles and Equipment V&E-002 95,000
Skylift Man Lift(Park&Street Vehicles and Equipment V&E-033 40,000
Pickup Truck(Fire) Vehicles and Equipment V&E-102 40,000
Polaris 6 X 6(Fire) Vehicles and Equipment V&E-106 15,000
Project Name Department Project# Project Cost
Bobcat Utility Truckster(Park) Vehicles and Equipment V&E-107 55,000
Single Axle Dump Truck(Street) Vehicles and Equipment V&E-109 230,000
Bobcat Toolcat(Park) Vehicles and Equipment V&E-116 4,500
800 MHz Radios(Public Works Maintenance) Vehicles and Equipment V&E-133 100,000
Body Cameras(Police) Vehicles and Equipment V&E-135 24,070
Pickup Truck(Park) Vehicles and Equipment V&E-141 35,000
Skid Steer Loader(Street) Vehicles and Equipment V&E-145 5,000
Trailer(Fire) Vehicles and Equipment V&E-156 5,000
Sanitary Sewer&Water Line Repair/Recon. Water&Sewer Systems W&SS-001 1,400,000
Mill and Overlay Water/Sewer Repairs Water&Sewer Systems W&SS-051 150,000
Televising and Electroscan Equipment Water&Sewer Systems W&SS-053 150,000
Radio Meter Reading System Water&Sewer Systems W&SS-063 700,000
1-394 Inflow/Infiltration Project Water&Sewer Systems W&SS-074 250,000
800 MHz Radios Water&Sewer Systems W&SS-081 40,000
Total for 2019 17,195,850
2020
Installation of Building Security Systems Buildings B-027 10,000
Public Buildings Roof Replacements Buildings B-041 150,000
City Hall Boiler Replacement Buildings B-043 225,000
10th Ave South Side Storage Yard Buildings B-048 125,000
Park Shelters Buidling Improvements Buildings B-049 50,000
Brookview Shelter Sewer Service Repair Buildings B-050 50,000
Utility Cart Golf Course GC-005 11,000
Fairway Mower Golf Course GC-014 50,000
Range Nets Golf Course GC-045 20,000
Aerator Golf Course GC-046 25,000
Bleacher,Soccer Goal,Team Bench&Picnic Tables Parks P-001 15,000
Park Trail and Parking Lot Improvement Parks P-002 40,000
Outdoor Hard Surface Replacement Parks P-015 20,000
Park Signage Replacement Parks P-016 5,000
Tennis&Pickle Ball Court Resurfacing Parks P-018 15,000
Re-Lamp Athletic Field and Rink Lights(LED) Parks P-023 18,000
Off-Leash Pet Exercise Area Parks P-026 60,000
Dugout,Fence and Feiled Replacement Parks P-027 35,000
Tennis Court Lights Parks P-033 150,000
Residential Storm Sewer Improvements Storm Water SS-01 750,000
Storm Water Pond Dredging Storm Water SS-23 300,000
V-Box Spreader and Anti-Ice(tandem) Storm Water SS-25 67,000
Sidewalk Sweeper Storm Water SS-27 20,000
Flood Mitigation Storm Water SS-34 250,000
DeCola Ponds B and C Storm Water SS-48 700,000
Storm Sewer Repairs-MS4 and Overlay Program Storm Water SS-53 150,000
Bassett Creek Regional Trail-Storm Sewer Repairs Storm Water SS-60 50,000
Pavement Management Program Streets S-001 3,350,000
Pavement Management Overlays Streets S-013 500,000
Flashing Yellow Arrows Streets S-016 45,000
Municipal State Aid(MSA)Street Maintenance Streets S-017 125,000
Streetscape and City Hall Complex Renovation Streets S-018 100,000
MSA Debt Service Streets S-019 200,165
Sidewalks,Trails,&Bike Facility Upgrades Streets S-030 150,000
Auto CAD Application Streets S-032 12,100
Cartegraph Street Management Software Streets S-034 20,000
Retaining Wall Repairs Streets S-036 100,000
Highway 55 West Redevelopment Project Streets S-038 182,310
Project Name Department Project# Project Cost
Pavement Surface Treatments Streets S-044 100,000
Marked Squad Cars(Police) Vehicles and Equipment V&E-001 80,000
Computers and Printers(Finance) Vehicles and Equipment V&E-002 95,000
Pickup Truck(Engineering) Vehicles and Equipment V&E-008 35,000
Pickup Truck(Park) Vehicles and Equipment V&E-026 35,000
Crime Prevention Vehicle(Police) Vehicles and Equipment V&E-034 30,000
Pickup Truck(Street) Vehicles and Equipment V&E-063 40,000
Tandem Axle Dump Truck(Street) Vehicles and Equipment V&E-066 270,000
Bobcat Utility Truckster(Park) Vehicles and Equipment V&E-107 4,500
Bobcat Toolcat(Park) Vehicles and Equipment V&E-116 4,500
Body Cameras(Police) Vehicles and Equipment V&E-135 24,070
Passenger Vehicle(Fire) Vehicles and Equipment V&E-138 40,000
Utility Trailer(Park) Vehicles and Equipment V&E-140 5,500
Dump Truck(Park) Vehicles and Equipment V&E-142 80,000
Skid Steer Loader(Street) Vehicles and Equipment V&E-145 5,000
Dump Truck(Street) Vehicles and Equipment V&E-146 80,000
Police Commander Vehicle(Police) Vehicles and Equipment V&E-147 50,000
SWAT Van(Police) Vehicles and Equipment V&E-148 100,000
Sanitary Sewer&Water Line Repair/Recon. Water&Sewer Systems W&SS-001 1,200,000
Hook Dump Truck Water&Sewer Systems W&SS-004 80,000
Pickup Truck Water&Sewer Systems W&SS-011 40,000
Mill and Overlay Water/Sewer Repairs Water&Sewer Systems W&SS-051 150,000
Radio Meter Reading System Water&Sewer Systems W&SS-063 100,000
Tractor Loader Backhoe Water&Sewer Systems W&SS-070 160,000
Sewer Flow Meters Water&Sewer Systems W&SS-076 35,000
Total for 2020 10,989,145
2021
Generators Buildings B-012 50,000
Air Compressors Buildings B-013 5,000
Installation of Building Security Systems Buildings B-027 10,000
Public Buildings Roof Replacements Buildings B-041 150,000
10th Ave South Side Storage Yard Buildings B-048 125,000
Park Shelters Buidling Improvements Buildings B-049 50,000
Rough Mowers Golf Course GC-010 70,000
Fairway Mower Golf Course GC-014 52,000
Bridge Improvements Golf Course GC-023 40,000
Bleacher,Soccer Goal,Team Bench&Picnic Tables Parks P-001 25,000
Park Trail and Parking Lot Improvement Parks P-002 50,000
Play Structure Replacement Parks P-003 60,000
Outdoor Hard Surface Replacement Parks P-015 25,000
Park Signage Replacement Parks P-016 5,000
Tennis&Pickle Ball Court Resurfacing Parks P-018 15,000
Re-Lamp Athletic Field and Rink Lights(LED) Parks P-023 18,000
Wildwood Park Athletic Field Parks P-024 50,000
Community Gardens Parks P-025 30,000
Dugout,Fence and Feiled Replacement Parks P-027 55,000
Scoreboard Updats/Replacement Parks P-028 25,000
Residential Storm Sewer Improvements Storm Water SS-01 750,000
Brookview Golf Course-Buffer Zone Implementation Storm Water SS-12 50,000
Flood Mitigation Storm Water SS-34 250,000
Storm Sewer Repairs-MS4 and Overlay Program Storm Water SS-53 150,000
Decola Pond F Diversion Storm Water SS-54 1,600,000
Pavement Management Program Streets S-001 3,400,000
Pavement Management Overlays Streets S-013 500,000
Project Name Department Project# Project Cost
Municipal State Aid(MSA)Street Maintenance Streets S-017 125,000
Streetscape and City Hall Complex Renovation Streets S-018 100,000
MSA Debt Service Streets S-019 198,915
Sidewalks,Trails,&Bike Facility Upgrades Streets S-030 150,000
Auto CAD Application Streets S-032 12,100
Cartegraph Street Management Software Streets S-034 20,000
Retaining Wall Repairs Streets S-036 100,000
Highway 55 West Redevelopment Project Streets S-038 179,900
Marked Squad Cars(Police) Vehicles and Equipment V&E-001 120,000
Computers and Printers(Finance) Vehicles and Equipment V&E-002 95,000
Portable Computers(Police) Vehicles and Equipment V&E-020 50,000
Dump Truck(Park) Vehicles and Equipment V&E-029 80,000
Rotary Mower(Park) Vehicles and Equipment V&E-030 110,000
Bobcat Utility Truckster(Park) Vehicles and Equipment V&E-107 4,500
Dump Truck(Street) Vehicles and Equipment V&E-110 230,000
Bobcat Toolcat(Park) Vehicles and Equipment V&E-116 4,500
Tasers(Police) Vehicles and Equipment V&E-121 16,000
Body Cameras(Police) Vehicles and Equipment V&E-135 24,070
Passenger Vehicle(Fin;) Vehicles and Equipment V&E-139 40,000
Trash Compactor(Park) Vehicles and Equipment V&E-143 65,000
Skid Steer Loader(Street) Vehicles and Equipment V&E-145 5,000
Equipment Trailer(Street) Vehicles and Equipment V&E-153 20,000
Sanitary Sewer&Water Line Repair/Recon. Water&Sewer Systems W&SS-001 1,200,000
Mill and Overlay Water/Sewer Repairs Water&Sewer Systems W&SS-051 150,000
1-394 Inflow/Infiltration Project Water&Sewer Systems W&SS-074 250,000
Winnetka Ave Utility Rehabilitation Water&Sewer Systems W&SS-077 550,000
Complete Water Meter Replacement Water&Sewer Systems W&SS-081 100,000
Total for 2021 11,609,985
2022
Installation of Building Security Systems Buildings B-027 10,000
10th Avenue Storage Building-Insulate and Heat Buildings B-046 375,000
10th Ave South Side Storage Yard Buildings B-048 125,000
Point of Sale System Golf Course GC-007 30,000
Bridge Improvements Golf Course GC-023 40,000
Hole 18 Tee Improvements Golf Course GC-041 50,000
Bleacher,Soccer Goal,Team Bench&Picnic Tables Parks P-001 25,000
Park Trail and Parking Lot Improvement Parks P-002 75,000
Play Structure Replacement Parks P-003 60,000
Outdoor Hard Surface Replacement Parks P-015 25,000
Park Signage Replacement Parks P-016 5,000
Sun Shelter Replacements and Additions Parks P-017 25,000
Tennis&Pickle Ball Court Resurfacing Parks P-018 15,000
Re-Lamp Athletic Field and Rink Lights(LED) Parks P-023 18,000
Dugout,Fence and Felled Replacement Parks P-027 55,000
Scoreboard Updats/Replacement Parks P-028 25,000
Soft Fall Wood Fiber Replacement Parks P-031 15,000
Sand Volleyball Courts Parks P-032 15,000
Residential Storm Sewer Improvements Storm Water SS-01 750,000
Pickup Truck(Storrs Water Utility) Storm Water SS-22 35,000
Storm Water Pond Dredging Storm Water SS-23 300,000
Flood Mitigation Storm Water SS-34 250,000
Zane Avenue&Lindsay St Reconstruction Storm Water SS-46 335,000
Medley Park Stormwater Treatment Facility Storm Water SS-49 220,000
Storm Sewer Repairs-MS4 and Overlay Program Storm Water SS-53 150,000
Project Name Department Project# Project Cost
Decola Pond F Diversion Storm Water SS-54 620,000
Sidewalk Sweeper Storm Water SS-59 20,000
Pavement Management Program Streets S-001 3,400,000
Zane Ave.and Lindsay Street Streets S-009 2,400,000
Pavement Management Overlays Streets S-013 500,000
Flashing Yellow Arrows Streets S-016 45,000
Municipal State Aid(MSA)Street Maintenance Streets S-017 125,000
Streetscape and City Hall Complex Renovation Streets S-018 100,000
MSA Debt Service Streets S-019 197,455
Sidewalks,Trails,&Bike Facility Upgrades Streets S-030 150,000
Auto CAD Application Streets S-032 12,100
Cartegraph Street Management Software Streets S-034 20,000
Retaining Wall Repairs Streets S-036 100,000
Highway 55 West Redevelopment Project Streets S-038 182,450
Zenith Avenue Reconstruction Streets S-041 1,500,000
Marked Squad Cars(Police) Vehicles and Equipment V&E-001 120,000
Computers and Printers(Finance) Vehicles and Equipment V&E-002 95,000
Unmarked Police Vehicle(Police) Vehicles and Equipment V&E-024 40,000
Pickup Truck(Engineering) Vehicles and Equipment V&E-044 35,000
Pickup Truck(Park) Vehicles and Equipment V&E-100 50,000
Bobcat Utility Truckster(Park) Vehicles and Equipment V&E-107 4,500
Bobcat Toolcat(Park) Vehicles and Equipment V&E-116 4,500
Sidwalk Tractor(Street) Vehicles and Equipment V&E-118 160,000
Body Cameras(Police) Vehicles and Equipment V&E-135 24,070
Zodiac Boat(Fire) Vehicles and Equipment V&E-136 5,500
Outboard Motor(Fire) Vehicles and Equipment V&E-137 5,500
Single Axle Dump Truck(Street) Vehicles and Equipment V&E-144 230,000
Skid Steer Loader(Street) Vehicles and Equipment V&E-145 5,000
Passenger Vehicle(Fire) Vehicles and Equipment V&E-152 40,000
Traffic Trailer(Police) Vehicles and Equipment V&E-154 30,000
Sanitary Sewer&Water Line Repair/Recon. Water&Sewer Systems W&SS-001 1,200,000
Pickup Truck Water&Sewer Systems W&SS-015 75,000
Mill and Overlay Water/Sewer Repairs Water&Sewer Systems W&SS-051 150,000
Valve Replacement/Watermain Lining Water&Sewer Systems W&SS-066 100,000
Sewer Flow Meters Water&Sewer Systems W&SS-076 35,000
Sanitary Sewer Lining 1/1 Reduction Water&Sewer Systems W&SS-078 100,000
T.H.55 Lift Station Relocation Water&Sewer Systems W&SS-083 500,000
Complete Water Meter Replacement Water&Sewer Systems W&SS-087 100,000
Total for 2022 15,509,075
2023
Installation of Building Security Systems Buildings B-027 10,000
10th Avenue Storage Yard Improvements Buildings B-051 100,000
Green/Tee Mowers Golf Course GC-003 45,000
Rough Mowers Golf Course GC-010 70,000
Beverage Cart Golf Course GC-035 25,000
Bleacher,Soccer Goal,Team Bench&Picnic Tables Parks P-001 25,000
Park Trail and Parking Lot Improvement Parks P-002 75,000
Play Structure Replacement Parks P-003 60,000
Outdoor Hard Surface Replacement Parks P-015 25,000
Park Signage Replacement Parks P-016 5,000
Sun Shelter Replacements and Additions Parks P-017 50,000
Tennis&Pickle Ball Court Resurfacing Parks P-018 15,000
Re-Lamp Athletic Field and Rink Lights(LED) Parks P-023 18,000
Dugout,Fence and Failed Replacement Parks P-027 55,000
Project Name Department Project# Project Cost
Soft Fall Wood Fiber Replacement Parks P-031 15,000
Sand Volleyball Courts Parks P-032 15,000
Residential Storm Sewer Improvements Storm Water SS-01 750,000
V-Box Spreader and Anti-Ice(tandem) Storm Water SS-26 67,000
Flood Mitigation Storm Water SS-34 250,000
Bobcat Toolcat Storm Water SS-41 55,000
Medley Park Stormwater Treatment Facility Storm Water SS-49 330,000
Stone Sewer Repairs-MS4 and Overlay Program Storm Water SS-53 150,000
Decola Pond F Diversion Stone Water SS-54 3,480,000
Pavement Management Program Streets S-001 3,400,000
Pavement Management Overlays Streets S-013 500,000
Municipal State Aid(MSA)Street Maintenance Streets S-017 125,000
Streetscape and City Hall Complex Renovation Streets S-018 100,000
MSA Debt Service Streets S-019 189,000
Sidewalks,Trails,&Bike Facility Upgrades Streets S-030 150,000
Auto CAD Application Streets S-032 12,100
Retaining Wall Repairs Streets S-036 100,000
Highway 55 West Redevelopment Project Streets S-038 179,950
Marked Squad Cars(Police) Vehicles and Equipment V&E-001 120,000
Computers and Printers(Finance) Vehicles and Equipment V&E-002 95,000
Chipper(Street) Vehicles and Equipment V&E-006 35,000
Passenger Vehicle(Fire) Vehicles and Equipment V&E-011 40,000
Utility Tractor(Park) Vehicles and Equipment V&E-039 75,000
Rescue Vehicle(Fire) Vehicles and Equipment V&E-045 200,000
Pickup Truck(Park) Vehicles and Equipment V&E-047 65,000
Rotary Mower(Park) Vehicles and Equipment V&E-048 50,000
Dump Truck(Street) Vehicles and Equipment V&E-053 270,000
Pickup Truck(Vehicle Maintenance) Vehicles and Equipment V&E-054 100,000
Sidewalk/Maintenance Tractor(Street) Vehicles and Equipment V&E-089 55,000
Bobcat Utility Truckster(Park) Vehicles and Equipment V&E-107 4,500
Portable Message Sign Trailer Vehicles and Equipment V&E-115 25,000
Bobcat Toolcat(Park) Vehicles and Equipment V&E-116 4,500
Body Cameras(Police) Vehicles and Equipment V&E-135 24,070
Skid Steer Loader(Street) Vehicles and Equipment V&E-145 5,000
Trailer(Street) Vehicles and Equipment V&E-155 5,000
Passenger Car(Police) Vehicles and Equipment V&E-158 40,000
Sanitary Sewer&Water Line Repair/Recon. Water&Sewer Systems W&SS-001 1,200,000
Pickup Truck Water&Sewer Systems W&SS-014 100,000
Mill and Overlay Water/Sewer Repairs Water&Sewer Systems W&SS-051 150,000
Valve Replacement/Watermain Lining Water&Sewer Systems W&SS-066 100,000
1-394 Inflow/Infiltration Project Water&Sewer Systems W&SS-074 250,000
Sanitary Sewer Lining 1/1 Reduction Water&Sewer Systems W&SS-078 100,000
Trenchless Request for Information Water&Sewer Systems W&SS-086 50,000
Complete Water Meter Replacement Water&Sewer Systems W&SS-087 100,000
Total for 2023 13,709,120
GRAND TOTAL 69,013,175