2018-01-03 Golden Valley•Crystal•New Hope AGENDA JOINT WATER COMMISSION January 3, 2018—1:30 pm City Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Minutes—December 6, 2017 (Approved 3-0) 3. Resolution #18-01 Designating Depositories for Joint Water Fund. Handout at Meeting • (Virnig) (Approved 3-0) 4. Resolution #18-02 Making Annual Elections for the 2018-2019 Insurance Policy. Handout at Meeting(Virnig) (Approved 3-0) 5. Approve Contract with MMRK Certified Public Accountants to perform December 31, 2017 Audit. Handout at meeting (Virnig) (Approved 3-0) 6. Review and Approve Hourly Rates (Virnig) (Approved 3-0) 7. North Tower Repainting (Weber) 8. North Tower Bypass (Weber) 9. TAC Update (Kakach) 10. Other Business Next Schedule Meeting February 7, 2018 11. Adjournment (Approved 3-0) IRThis document is available in alternate formats upon a 72-hour request.Please call 7b3-593-800b(TTY: 7b3-593-3968)to make a request. Examples of alternate formats may include large print,electronic,Braille,audiocassette,etc. Resolution 18-01 January 3, 2018 Commissioner Cruikshank introduced the following resolution and moved its adoption: RESOLUTION DESIGNATING DEPOSITORIES FOR JOINT WATER FUNDS BE IT RESOLVED by the Joint Water Commission of the Cities of Golden Valley, Crystal, and New Hope that the following are named as depositories for funds on deposit as provided in the Laws of the State of Minnesota: Wells Fargo Golden Valley US Bank Golden Valley 4M Fund BE IT FURTHER RESOLVED that the following signatories or alternates are authorized to sign on checks drawn on funds deposited: General Checking: Joint Water Chair Anne Norris Alternate: Joint Water Vice Chair Kirk McDonald • BE IT FURTHER RESOLVED that the following shall be authorized to make investments of Joint Water Funds and shall be authorized to deposit the principal of said investments in the above named depositories and beneficial to the Joint Water Commission: Joint Water Chair, Golden Valley's Finance Director; Golden Valley Accounting Coordinator. Anne Norris, Chair ATTEST: Kirk McDonald, Vice Chair The motion for the adoption of the foregoing resolution was seconded by McDonald and upon a vote being taken thereon, the following voted in favor thereof: Norris, McDonald, Cruikshank and the following voted against the same:none; whereupon said resolution was declared duly passed and adopted, signed by the Chair and her signature attested by the • Commissioner. Resolution 18-02 January 3, 2018 . Commissioner Cruikshank introduced the following resolution and moved its adoption: RESOLUTION MAKING ANNUAL ELECTIONS FOR THE 2018-2019 INSURANCE POLICY WHEREAS, the Golden Valley-Crystal-New Hope Joint Water Commission must declare whether or not to waive the statutory limits on tort liability established by Minnesota Statutes 456.04, and WHEREAS, the Golden Valley-Crystal-New Hope Joint Water Commission insurance period begins August 1, 2017, through July 31, 2018. NOW, THEREFORE, BE IT RESOLVED by the Commissioners of the Golden Valley-Crystal-New Hope Joint Water Commission that it does not waive the statutory limits on tort liability established by Minnesota Statutes 466.04 for the 2016-2017 insurance policy. Anne Norris, Chair ATTEST: Kirk McDonald, Vice Chair The motion for the adoption of the foregoing resolution was seconded by Commissioner McDonald and upon a vote being taken thereon, the following voted in favor thereof: Norris, McDonald, Cruikshank and the following voted against the same: none; whereupon said resolution was declared duly passed and adopted, signed by the Chair and their signature attested by the Vice Chair. Stantec Consulting Services Inc. 2335 Highway 36 West . St,Paul 55113 c Tel: (651) 636-4600 Jta nteC Fax: (651) 636-1311 December 21, 2017 File: 193804153 Attention: Bernie Weber Director of Public Works City of New Hope 5500 International Parkway New Hope, MN 55428 Reference: 2018 North Water Tower Repaint-Authorize Preparation of Plans and Specifications City Project No. 1008 Dear Bernie, As discussed,we are requesting authorization to prepare plans and specifications for the 2018 North Water Tower Repainting Project. The project generally consists of repainting both the interior and exterior of the north water tower, located at the corner of Aquila Ave N and 47th Ave N. This tower was last painted in 1996, and repainting is recommended approximately every 20 years. The estimated total project cost for these improvements,including indirect, is approximately $750,000 as shown below. Note that approximately$75,000 of the estimated indirect costs would be for inspection of the repainting process by KLM, a local engineering firm that specializes in water tower rehabilitation. Joint Water Commission (JWC) funds will be used for this project. Improvement Estimated Costs Construction Costs $650,000 Indirect Costs-Stantec $25,000 Indirect Costs-KLM $75,000 Total Estimated Project Costs $750,000 If Council accepts the information presented and chooses to move forward with this project,we then recommend that the Council authorizes the preparation of plans and specifications at the January 8th meeting. Bids would be received in February 2018, and a contract considered at the March 12th Council Meeting. Repainting could be done in the summer or fall of 2018, after the completion of the bypass project. • Design with-oo mr unify it mirid December 21,2017 Mr. Bernie Weber Page 2 of 2 Reference: 2018 North Water Tower Repaint-Authorize Preparation of Plans and Specifications If you have any questions or require further information please call me at (651)604-4808. Sincerely, STANTEC Christopher W. Long, P.E. Attachments: Figure 1 -Location Map Cc: Kirk McDonald, Valerie Leone,Shawn Markham, Dave Lemke, Jim Muellner, Megan Albert- New Hope; Mark Rolfs, Kellie Schlegel, Adam Martinson, Ann Dienhart-Stantec Design with Community in mind sN 0 Y f� g R 4 4 a s, LOCATION PLAN NEW HOPE, MINNESOTA FIGURE: 1 Stantec 2018 NORTH WATER TOWER BYPASS 2.Highway 36 W St.PauL MN 55113 DATE: 12/20/2018 PROD.NO.:193804153 -tant-- Stantec Consulting Services Inc. 2335 Highway 36 West St.Paul 5513 Tel: (651) 636-4600 Stantec Fax: (651) 636-1311 December 21, 2017 File: 193804153 Attention: Bernie Weber Director of Public Works City of New Hope 5500 International Parkway New Hope, MN 55428 Reference: 2018 North Water Tower Bypass-Authorize Preparation of Plans and Specifications City Project No. 1009 Dear Bernie, As discussed,we are requesting authorization to prepare plans and specifications for the 2018 North Water Tower Bypass Project. The project generally consists of installing a bypass water main line between the existing emergency well/pump house to the existing 16"water main on the north side of the tower(see attached location map). This bypass line will allow the emergency well to remain connected to the distribution system while the tower is off-line this summer for the planned repainting project. The estimated total project cost for these improvements, including indirect, is approximately $100,000 as shown below. Joint Water Commission (JWC) funds will be used for this project. Improvement Estimated Costs Construction Costs $80,000 Indirect Costs $20,000 Total Estimated Project Costs $100,000 If Council accepts the information presented and chooses to move forward with this project,we then recommend that the Council authorizes the preparation of plans and specifications at the January 8rh meeting. Bids would be received in February 2018, and a contract considered at the March 12th Council Meeting. Construction could be completed in spring or early summer of 2018, prior to the repainting of the water tower. Design with community in rnind December21,2017 Mr. Bernie Weber Page 2 of 2 Reference: 2018 North Water Tower Bypass-Authorize Preparation of Plans and Specifications If you have any questions or require further information please call me at (651)604-4808. Sincerely, STANTEC W. Christopher W. Long, P.E. Attachments: Figure 1 -Location Map Cc: Kirk McDonald, Valerie Leone,Shawn Markham, Dave Lemke, Jim Muellner, Megan Albert- New Hope; Mark Rolfs, Kellie Schlegel, Adam Martinson, Ann Dienhart-Stantec • Design with community in mind z a( z as c c Q � c W C � � s T�M uv a3i z enuend elinbd Stantec Consulting Services Inc. 2335 Highway 36 West • It,Paul 5513 Tel: (651) 636-4600 Stantec Fax: (651) 636-1311 December 21,2017 File: 193804153 Attention: Bernie Weber Director of Public Works City of New Hope 5500 International Parkway New Hope, MN 55428 Reference: 2018 North Water Tower Repaint-Authorize Preparation of Plans and Specifications City Project No. 1008 Dear Bernie, As discussed,we are requesting authorization to prepare plans and specifications for the 2018 North Water Tower Repainting Project. The project generally consists of repainting both the interior and exterior of the north water tower, located at the corner of Aquila Ave N and 47th Ave N. This tower was last painted in 1996, and repainting is recommended approximately every 20 years. The estimated total project cost for these improvements, including indirect,is approximately $750,000 as shown below. Note that approximately$75,000 of the estimated indirect costs would be for inspection of the repainting process by KLM, a local engineering firm that specializes in water tower rehabilitation. Joint Water Commission (JWC) funds will be used for this project. Improvement Estimated Costs Construction Costs $650,000 Indirect Costs-Stantec $25,000 Indirect Costs-KLM $75,000 Total Estimated Project Costs $750,000 If Council accepts the information presented and chooses to move forward with this project,we then recommend that the Council authorizes the preparation of plans and specifications at the January 8th meeting. Bids would be received in February 2018, and a contract considered at the March 12th Council Meeting. Repainting could be done in the summer or fall of 2018, after the completion of the bypass project. Design with community'n mind • December 21,2017 Mr. Bernie Weber Page 2 of 2 Reference: 2018 North Water Tower Repaint-Authorize Preparation of Plans and Specifications If you have any questions or require further information please call me at (651)604-4808. Sincerely, STA�NTEC ,o l l�-400 - ao. Christopher W. Long, P.E. Attachments: Figure 1 -Location Map Cc: Kirk McDonald, Valerie Leone,Shawn Markham, Dave Lemke, Jim Muellner, Megan Albert- New Hope; Mark Rolfs, Kellie Schlegel, Adam Martinson, Ann Dienhart-Stantec • resign wit,community ire mini xos a�S >?3 oN 8 0 8 �R 4 LOCATION PLAN NEW HOPE, MINNESOTA FIGURE: 1 2018 NORTH WATER TOWER BYPASS Stantec 2335 Highway 36 W 51.Paul,MN 55113 DATE: 12/20/2018 PROD.NO.:193804153 www.stant—com Stantec Consulting Services Inc. 2335 Highway 36 West • St.Paul MN 55113 Tel: (651) 636-4600 S4}.an4}QC Fax: (651) 636-1311 December 21,2017 File: 193804153 Attention: Bernie Weber Director of Public Works City of New Hope 5500 International Parkway New Hope, MN 55428 Reference: 2018 North Water Tower Bypass-Authorize Preparation of Plans and Specifications City Project No. 1009 Dear Bernie, As discussed,we are requesting authorization to prepare plans and specifications for the 2018 North Water Tower Bypass Project. • The project generally consists of installing a bypass water main line between the existing emergency well/pump house to the existing 16"water main on the north side of the tower (see attached location map). This bypass line will allow the emergency well to remain connected to the distribution system while the tower is off-line this summer for the planned repainting project. The estimated total project cost for these improvements,including indirect,is approximately $100,000 as shown below. Joint Water Commission (JWC) funds will be used for this project. Improvement Estimated Costs Construction Costs $80,000 Indirect Costs $20,000 Total Estimated Project Costs $100,000 If Council accepts the information presented and chooses to move forward with this project,we then recommend that the Council authorizes the preparation of plans and specifications at the January 8th meeting. Bids would be received in February 2018, and a contract considered at the March 12th Council Meeting. Construction could be completed in spring or early summer of 2018, prior to the repainting of the water tower. Design with community in mina OL • December 21,2017 Mr. Bernie Weber Page 2 of 2 Reference: 2018 North Water Tower Bypass-Authorize Preparation of Plans and Specifications If you have any questions or require further information please call me at (651)604-4808. Sincerely, STANTEC Christopher W. Long, P.E. Attachments: Figure 1 -Location Map Cc: Kirk McDonald, Valerie Leone,Shawn Markham, Dave Lemke, Jim Muellner, Megan Albert- New Hope; Mark Rolfs, Kellie Schlegel, Adam Martinson, Ann Dienhart-Stantec • Design with c ommut#y in rrir-d Aquila Avenue z - am O co t�D � cr m x 'ow■ !�F