2018-10-03 Golden Valley•Crystal•New Hope AGENDA JOINT WATER COMMISSION October 3, 2018— 1:30 pm Council Conference Room Golden Valley City Hall 1. Call to Order 2. Approval of Revised Minutes—May 2, 2018 (Approved 3-0) (June 2, 2018,July 4, 2018, August 1, 2018, and September 5, 2018 Meetings Cancelled) 3. Approve Replacement of the original altitude valve and butterfly valve in the pit at the North Water Tower (Lemke) (Approved 3-0) 4. TAC Update 5. Other Business Next Scheduled Meeting November 7, 2018 6. Adjournment (Approved 3-0) This document is available in alternate formats upon a 72-hour request. Please call 763-593-8006(TTY: 763-593-3968)to make a request. Examples of alternate formats may include large print,electronic, Braille,audiocassette,etc. JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of May 2, 2018 The Golden Valley—Crystal—New Hope Joint Water Commission (JWC) meeting was called to order at 1:00 pm in the City of Golden Valley Council Chambers. Commissioners Present Anne Norris, City Manager,Crystal Kirk McDonald, City Manager, New Hope Tim Cruikshank, City Manager, Golden Valley Staff Present Joe Hansen, Utilities Supervisor, Golden Valley Randy Kloepper, Utilities Superintendent, Crystal Dave Lemke, Operations Manager, New Hope Jim Muellner, Utilities Maintenance Supervisor, New Hope Marc Nevinski, Physical Development Director, Golden Valley Jeff Oliver, City Engineer, Golden Valley Mark Ray, Director of Public Works/City Engineer, Crystal Sue Virnig, Finance Director, Golden Valley Bernie Weber, Public Works Director, New Hope Approval of Revised Minutes—April 4,2018 Moved by McDonald seconded by Cruikshank to approve the revised minutes of the April 4, 2018 Joint Water Commission Meeting. Motion carried. Approve Repairs to Gate Valve Manhole Staff reported on the repairs to the gate valve manhole.Valley Rich is doing the repairs. Staff has not received all the invoices from Valley Rich but expected this to be in the$3,000 to$4,000 range. Staff explained the Joint Water Commission has budgeted for this type of work as per the Joint Water Commission bylaws,The Commission has the authority to approve$20,000 per occurrence for repairs. This is an operation repair and does not require action. Receive and File 2017 Financial Report and Management Letter Staff report on the 2017 Financial Report indicating the numbers are basically the same as last year and is requesting the Commission to accept, receive, and file the 2017 Financial Report and Management Letter. Staff provided a spreadsheet to the Commission running from 2017 through 2048. Moved by McDonald seconded by Norris to accept, receive, and file the 2017 Financial Report and Management Letter as submitted. Motion carried. Joint Water Commission May 2, 2018 Page 2 of 3 Approve Resolution#18-03 Adopting the 2019-2023 Capital Projects for the Golden Valley-Crystal- New Hope Joint Water Commission Staff reported on the 2019 through 2023 Capital Projects.The Commission stated they were approving of the capital plan. Commissioner Cruikshank introduced the following resolution and moved its adoption: RESOLUTION 18-03 RESOLUTION APPROVING THE ADOPTION OF THE 2019-2023 CAPITAL PROJECTS FOR THE GOLDEN VALLEY—CRYSTAL—NEW HOPE JOINT WATER COMMISSION The motion for the adoption of the foregoing resolution was seconded by Commissioner McDonald and upon a vote being taken thereon,the following voted in favor thereof: Norris, McDonald,and Cruikshank; and the following voted against the same; none; whereupon said resolution was declared duly passed and adopted; signed by the Chair and their signature attested by the Vice Chair. Approve Resolution#18-04 2019 General Fund Budget Staff reported a total overall budget increase of 3.96%.The percentage increases for each city varies based on usage.City of Golden Valley's increase is 1.90%. City of Crystal is 5.07%.City of New Hope is 2.30%.The Commission stated they were accepting of the increase. Commissioner Cruikshank introduced the following resolution and moved its adoption: RESOLUTION 18-04 RESOLUTION APPROVING THE 2019 GENERAL FUND BUDGET The motion for the adoption of the foregoing resolution was seconded by Commissioner McDonald and upon a vote being taken thereon,the following voted in favor thereof: Norris, McDonald,and Cruikshank; and the following voted against the same; none;whereupon said resolution was declared duly passed and adopted; signed by the Chair and their signature attested by the Vice Chair. TAC Update Staff reported on the following projects: • Water Supply Plan. Met with SEH to finalize draft of plan for JWC. Draft should be completed by mid-June. • Elevated Towers Bypass work is complete. • Reservoir Work. Crack sealing is recommended inside the GV reservoir. Working with Bolton and Menk to replace high series pump#3 at Golden Valley pump house and adding an effluent meter with the project. Working with MPLS to install 48-inch valve at Golden Valley Reservoir. • Tower Security Total Control will provide options • Crystal Valve Replacement Should begin in fall of 2018. • SCADA Updates Staff working with Total Control Joint Water Commission May 2, 2018 Page 3 of 3 Other Business Staff provided the Commission with an update on the DeCola Ponds Project. Next Meeting May 2, 2018. Adiournment Moved by Cruikshank seconded by McDonald to adjourn meeting. Motion carried. Chair Norris adjourned the meeting at 2:30 pm. Chai rAnne Norri ATTEST: Sue Schwalbe, Recording Secretary Schwalbe, Sue From: Lemke David <dlemke@newhopemn.gov> Sent: Thursday, September 27, 2018 10:07 AM To: Schwalbe, Sue Cc: McDonald Kirk;Weber Bernie Subject: FW: Message from KM_C454e Attachments: SKM_C454el8092709590.pdf Hi Sue, Please see the attached updated quotes for discussion at next week's JWC meeting. This is for the replacement of the old original altitude valve and butterfly valve in the pit at the North Water Tower. Thanks, Dave From: pwcopier@ci.new-hope.mn.us<pwcopier@ci.new-hope.mn.us> Sent:Thursday, September 27, 2018 10:00 AM To: Lemke David<dlemke@newhopemn.gov> Subject: Message from KM_C454e 1 Total Control Systems,Inc tots kI ,) It,r -` 38841 Nyman Drive NE SYSTEMS , INC PO Box40 Stanchfield,MN 55080 Phone 320-396-4442/Fax 320-3964443 September 18th, 2018 To: Dave Lemke Re: New Hope, MN: North Tower Valve Control Modifications Total Control Systems, Inc. (TCS)proposes to connect&configure monitoring&control for the new City supplied altitude valve at the North Water Tower.TCS will modify SCADA system to operate as discussed with customer. Our proposal includes the following items: Connection of new valve to existing SCADA equipment at site - SCADA control modifications for valve operation and monitoring Setup,calibrating and testing Startup&training Price Both Sites: $ 1,847.22 (NO Tax Included) Does not include - Any additional RTU functions - Any additional SCADA screens - Any other RTU equipment - Documentation modifications We acknowledge receipt of Addendum#. Terms are Net 30 days from invoice date. No retainage allowed. A 1.5% charge per month added to any past due balance. Price may be dependent on past credit history. This quote/proposal valid for 60 days. Work to commence after receipt of an acceptable written purchase order acknowledging acceptance of our terms. - F.O.B.job-site. - TCSI does not accept any liquidated damages. - Bid bond is NOT included. If you have any questions regarding our proposal, please contact our office. We look forward to working with you on this project. Sincerely, Total Control Systems, Inc. Kraig LaFreniere Date: 9/14/18 Bid: #18442 P Project: New Hope Valve Pit Location: New Hope, MN Site Utilities Valley-Rich Co., Inc. will provide labor and a crane truck needed to replace (1) 12" gate valve and (1) altitude valve. All materials are provided by the City. Base Bid: $10,000 Time and Material Not to Exceed Note: This proposal is good for 30 days from the bid date in order to lock in our material prices with our vendors. Maximum depth of trenches and structures is assumed to be 10 feet when information is not provided. A 3% service charge will be added to all payments made via credit card. Respectfully, Pete Nasvik Exclusions: Land/Lane use permits, SAC and/or other connection charges, water meters, water bypass, dewatering, soil correction and/or replacement, pipe support,removal of buried obstructions,jacking, frost charges, rock excavation, construction staking, restoration(other than listed above), compaction tests, hauling of excess soils, erosion control/inlet protection, hazardous material handling, wall sleeves, utility cut-offs and/or removals, cut and patch floors, culverts, irrigation,trench drains, perimeter drain tile, tree removal and/or replacement, grubbing,sheeting, shoring, bracing, and private utility locates. 147 Jonathan Blvd. N., Ste.4 Chaska, Minnesota 55318 Office: (952)448-3002 Fax: (952)448-3362 VESSCO 8217 Upland Circle, Chanhassen,MN 55317 • Phone: (952)941-2678 Fax: (952)941-0796 FLOW CONTROL DIVISION QUOTATION QUOTE#: 083118JTM.1.Rev2 Date: 9/27/2018 #of pa es 1 OF 1 TO: Dave Lemke QUOTED BY: City of New Hope,MN Joel Morgan morRE: 12"Altitude valve replacement I Cel�7 3-276-4262 TERMS: Phone#: 763.592-6777 Net 30 Days E-Mail. dlemke@newhopemn.Aov F.O.B.: Factory FREIGHT: Allowed Item# She Description Price Ea. W.Price 1 1 12" 12"Delurjk Butterfly Valve Package to replace existing 12"C/a-Val altitude $12,128.00 $12,128.00 valve. Price Includes: 1-12'DeZurik Model BA flanged(Class 150B)AWWA butterfly valve with Rotork IQT electric actuator(12011160)for modulating service. Rotork IQT to include a Type 2(intemaily powered)battery back-up option. 1-12'DeZurik Model BAW flanged(150B)AWWA butterfly valve w/handwheel 1-12'x 45-112'flanged pipe spool 4 sets of 12'flange gaskets and zinc plated flange bolts&nuts Lead Time: Approx.8 weeks Total Price = $12,128.00 Shipment: See above Pricing is firm for 30 days from date of quote.Subject to Vessco Standard Terms d Conditions; Quote does NOT include any taxes unless specifically stated; Credit Card orders subject to 3.5%processing fee. Thank you for giving us the opportunity to provide this quote! Joint Water Commission TAC Meeting Thursday May 31st, 2018 2:00 PM 1 . Water Supply Plan a. Finalizing reports • Met with SEH to go through final draft of plan for JWC. • Final draft should be complete by mid-June. 2. Project Updates a. Elevated Towers • Bypass work is complete • Waiting on updated schedule for painting -will take approximately 2-3 months. b. Reservoir Work • Crack sealing recommended inside GV reservoir in next 1-3 years, Crystal next 5-7 years. • Working with Bolton and Menk to replace high service pump#3 at Golden Valley pump house and adding an effluent meter with the project (replacing piping from new pump to distribution tee). • Will look into type of starter with design (VFD vs. soft start). • Working with Minneapolis to install 48-inch valve at Golden Valley reservoir. c. Tower Security jTotal Control looking into options for JWC. d. rystal Valve Replacement • Most likely will be fall work. e. SCADA Updates • Joe and Randy working with Total Control. G:\JWC\JWC_TAC\Minutes\JWC TAC Meeting Minutes_5.31.18.docx Joint Water Commission TAC Meeting Thursday July 261h, 2018 2:00 PM 1 . Water Supply Plan • Plan has been completed. 2. Project Updates a. Elevated Towers • Bypass work is complete. • Waiting on updated schedule for painting-will take approximately 2-3 months. b. Reservoir Work • TAC working with Bolton and Menk to replace high service pump#3 at Golden Valley pump house and adding an effluent meter with the project (also replacing piping from new pump to distribution tee). • Will look into type of starter with design (VFD vs. soft start). • Looking to use old meter pit to install new meters. • Still working with Minneapolis to install 48-inch valve at Golden Valley reservoir later this year. c. Tower Security • Total Control looking into options for JWC. d. Crystal Valve Replacement • Trying to isolate the valves near 42"d, if this cannot be done without additional repairs, will replace smaller valves over on Douglas (in Crystal). e. SCADA Updates • Joe and Randy working with Total Control. f. Maintenance Items • A/C unit repairs at GV pump house. • Fence repair at GV pump house. G:WWC\JWC_TAC\Minutes\JWC TAC Meeting Minutes_7.26.18.docx