2018-11-07 Golden Valley•Crystal•New Hope AGENDA JOINT WATER COMMISSION November 7, 2018—1:30 pm City Council Conference room Golden Valley City Hall 1. Call to Order 2. Approval of Revised Minutes—October 3, 2018 (Approved 3-0) 3. Approve Total Control Quote to Update Two Computer Systems, 2018 SCADA Upgrades (Approved 3-0) 4. Update Capital Improvement Projects-Virnig 5. TAC Update 6. Other Business Next Scheduled Meeting December 5, 2018 7. Adjournment This document is available in alternate formats upon a 72-hour request. Please call 763-593-8006(TTY: 763-593-3968)to make a request. Examples of alternate formats may include large print,electronic, Braille,audiocassette,etc. JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of October 3, 2018 The Golden Valley—Crystal—New Hope Joint Water Commission (JWC) meeting was called to order at 1:00 pm in the City of Golden Valley Council Chambers. Commissioners Present Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Tim Cruikshank, City Manager, Golden Valley Staff Present Joe Hansen, Utilities Supervisor, Golden Valley Randy Kloepper, Utilities Superintendent, Crystal Dave Lemke,Operations Manager, New Hope Jim Muellner, Utilities Maintenance Supervisor, New Hope Marc Nevinski, Physical Development Director, Golden Valley Jeff Oliver, City Engineer, Golden Valley Sue Virnig, Finance Director, Golden Valley Bernie Weber, Public Works Director, New Hope Approval of Revised Minutes—May 2,2018 Moved by McDonald seconded by Norris to approve the revised minutes of the May 2, 2018 Joint Water Commission Meeting. Motion carried. Approve Replacement of the Original Altitude Valve and butterfly Valve in the Pit at the North Water Tower Staff reviewed the quotes from Total Control,Valley-Rich Company, and Vessco, Inc. Staff gave a quick reviewed the need to replace the original valves from 1959 and 1960. Staff recommend replacement at this time as the tower is down and is an ideal time for replacement. Moved by McDonald seconded by Norris to approve the replacement of the original altitude valve and butterfly valve in the pit at the north water tower. Motion carried. TAC UPDATE Nothing at this time. Other Business Staff reported that we have been chosen to give a presentation on the DeCola Study Project at the Minnesota Association of Flood Plan Management. Staff provided the Commission with an update of the DeCola Ponds Project stating bid requests will be August or September of next year. Joint Water Commission October 3, 2018 Page 2 of 2 The Commission discussed the meeting schedule.Specifically changing to quarterly meetings or to remain with the present schedule of meeting according to agenda items. . The Commissioners agreed the meeting schedule is fine and will continue to hold meetings when there are agenda items for action. Staff provided the Commission with an update on the North Tower stating the structural work is done and presently working on the inside blasting and maintenance.The exterior painting will being next spring. Staff was requested to keep the Commission updated on the progress. Staff was requested to provide an update of Capital Improvement Funds at the next meeting. Next Meeting November 7, 2018. Adjournment Moved by Cruikshank seconded by McDonald to adjourn meeting. Motion carried. Chair Norris adjourned the meeting at 2:30 pm. ATTEST: Chair Anne Norris Sue Schwalbe, Recording Secretary Total Control Systems, Inc Iota I c o nt 1 o f 38841 Nyman Drive NE SYSTEMS ; INC PO Box40 Stanchfield, MN 55080-0040 Phone 320-396-4442/Fax 320-396- 4443 October 17, 2018 To: Randy K. (JWC) Re: JWC, Minnesota —2018 SCADA upgrades Total Control Systems, Inc. (TCS) proposes to furnish equipment and services in accordance to the project plans and specifications that were received. Update 2 computer systems. Update hardware and software for the communications master for the SCADA system. Including: Dell computers and 24" displays (2) Win911 Software Dialer update Windows 10 (2) Microsoft Office 2019 (2) Golden Valley/Crystal master RTU modifications Allen Bradley Micrologix 1400 equipment to match existing configuration Cmore display unit Color 10" Ethernet Relays Power supply 24 VDC Replace outdated SLC 5/03 equipment Update programming for communications SCADA network modifications All PLC programming and configuration Configure and Setup Computers O&M manuals Warranty Start-up Price for the JWC upgrade package: $ 26,121.00 total parts and labor. Does not include: Sales Tax (Exempt with certificate) Repairing any existing equipment not shown above Any electrical wiring external to updated panels - We acknowledge receipt of Addendum No . - Terms are Net 30 days from invoice date. No retainage allowed. A 1.5% charge per month added to any past due balance. Price may be dependent on past credit history. - This quote/proposal valid for 60 days. - Work to commence after receipt of an acceptable written purchase order acknowledging acceptance of our terms. - F.O.B. job-site. - Start-up service/training, documentation and equipment adjustment is included as specified. - No Bid or Performance Bonds included - Additional insurance not required by specifications is extra. - TCSI does not accept any liquidated damages. - ALL PANELS FURNISHED BY TCS WILL HAVE A UL 508 SERIALIZED OR UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT EXTENSIONS LABEL, AS REQUIRED. If you have any questions regarding our proposal, please contact our office. We look forward to working with you on this project. Sincerely, TOTAL CONTROL SYSTEMS, INC. Al Doberstein AD/lb Joint Water Commission TAC Meeting Thursday October 25th, 2018 2:00 PM l 1 . Project Updates a. Elevated Towers • Bypass work is complete- need to check remaining budget if any. • Primer will be applied this year, tank refilled for winter. • Final painting will take place in spring. b. Reservoir Work • TAC working with Bolton and Menk to replace high service pump #3 at Golden Valley pump house and replacing gate vale and ball valve associated with pump#3. • Will use Gate Valve Replacement funds to replace valves at Golden Valley pump house. • Will look into type of starter with design (VFD vs. soft start). • Looking to use old meter pit to install new meters -this will be a future project not associated with this contract. • Still working with Minneapolis to install 48-inch valve at Golden Valley reservoir later this year- have not heard anything from Minneapolis in months. c. Tower Security • Total Control looking into options for JWC. d. Crystal Valve Replacement • This project will be moved to 2019, when more money is available. • Project budget is being used at Golden Valley pump house (see above) e. SCADA Updates • TAC approved quote from Total Control. f. Maintenance Items • A/C unit repairs at GV pump house-will be done in spring. • Fence repair at GV pump house- has been completed. C:\Users\sschwalbe\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6WUOGAUG\JWC TAC Meeting Minutes 10.25.18.docx