02 - Vehicles and Equipment Replacement Sectiontry of
golden��
valley
Capital Improvement Program 2022-2031
Vehicles and Equipment Replacement Section
This section includes all capital equipment and vehicles that help employees have the tools to fulfill
their job requirements. The Vehicle Maintenance division maintains all equipment and vehicles except
for the golf course. The City's Information Technology Coordinator maintains the computers, printers
and phone system. Each year each piece of equipment is reviewed before replacement. This
schedule allows the City to finance upcoming purchases for the next ten years.
Financing for this fund comes from annual transfers from the General Fund.
City of Golden Valley, Minnesota
Capital Plan
2022 thm 2031
PROJECTS BY DEPARTMENT
Department # 2022 2023 2024 2025 2026 2027
Vehicles and Equipment
Marked Squad Cars (Police)
V&E-001
Computers and Printers (Finance)
V&E-002
Phone System (Finance)
V&E-004
Pickup Truck (Engineering)
V&E-008
Passenger Vehicle (Fire)
V&E-011
Asphalt Paver (Street)
V&E-012
Portable Computers (Police)
V&E-020
Sign Truck (Street)
V&E-022
Unmarked Police Vehicle (Police)
V&E-024
Dump Truck (Park)
V&E-029
Rotary Mower (Park)
V&E-030
Dump Truck (Street)
V&E-032
Streetscape Banners (Street)
V&E-038
Utility Tractor (Park)
V&E-039
Van (Park and Recreation)
V&E-042
Pickup Truck (Engineering)
V&E-044
Rescue Vehicle (Fire)
V&E-045
Pickup Truck (Park)
V&E-047
Rotary Mower (Park)
V&E-048
Asphalt Cold Planer (Street)
V&E-052
Dump Truck (Street)
V&E-053
Pickup Truck (Vehicle Maintenance)
V&E-054
Rescue Vehicle (Fire)
V&E-059
Extrication Tools (Fire)
V&E-061
Pickup Truck (Street)
V&E-063
Utility Tractor Mower (Park)
V&E-069
Single Axle Dump Truck (Street)
V&E-070
Pickup Truck (Engineering)
V&E-072
Aerial Bucket Truck(Park)
V&E-078
2028 2029 2030 2031 Total
120,000 120,000 120,000 80,000 120,000
120,000 120,000
95,000 95,000 95,000 95,000 95,000
95,000 95,000
100,000
35,000
40,000
40,000
250,000
50,000
135,000
75,000
35,000
200,000
65,000
50,000
25,000
285,000
100,000
125,000
30,000
30,000
100,000
80,000
120,000
150,000
1,150,000
95,000
95,000
95,000
950,000
100,000
35,000
80,000
250,000
50,000
100,000
135,000
40,000
40,000
85,000
85,000
125,000
125,000
230,000
230,000
30,000
75,000
30,000
35,000
200,000
65,000
50,000
25,000
285,000
100,000
125,000
100,000
45,000
45,000
100,000
100,000
250,000
250,000
40,000
40,000
300,000
300,000
Department #
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Self -Contained Breathing Apparatus (Fire)V&E-084
300,000
Sidewalk/Maintenance Tractor (Parks)
ME-089
55,000
55,000
55,000
55,000
55,000
55,000
55,000
Asphalt Hot Box (Street)
V&E-099
30,000
Pickup Truck (Park)
V&E-100
60,000
Pickup Truck (Fire)
V&E-102
40,000
Walk Behind Saw (Street)
V&E-103
30,000
Bobcat Utility Truckster (Park)
V&E-107
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
Dump Truck (Street)
V&E-110
250,000
Portable RadarTrailer
V&E-115
25,000
Bobcat Toolcat (Park)
v&E-116
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
Sidewalk Tractor (Street)
V&E-118
170,000
Tasers (Police)
V&E-121
800 MHZ Radios (Fire)
v&E-127
175,000
80,000
800 MHZ Radios (Police)
V&E-129
175,000
110,000
Asphalt Roller(streets)
V&E-131
45,000
Thermal Imaging Cameras (Fire)
V&E-132
75,000
800 MHz Radios (Public Works
V&E-133
100,000
Maintenance)
Body Cameras (Police)
V&E-135
24,070
124,070
24,070
24,070
24,070
24,070
24,070
24,070
Zodiac Boat (Fire)
V&E-136
5,500
Outboard Motor (Fire)
V&E-137
5,500
Passenger Vehicle (Fire)
V&E-138
40,000
Passenger Vehicle (Fire)
V&E-139
40,000
Pickup Truck (Park)
V&E-141
35,000
Dump Truck (Park)
V&E-142
Trash Compactor (Park)
V&E-143
Skid Steer Loader (Street)
V8E-145
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
Dump Truck (Street)
V&E-146
Police Commander Vehicle (Police)
V&E-147
50,000
Water Tanker Truck (Street)
V&E-149
300,000
Asset Management Software Upgrade
V&E-150
150,000
Passenger Vehicle (Fire)
V&E-152
40,000
40,000
Equipment Trailer (Street)
V&E-153
20,000
Traffic Trailer (Police)
V&E-154
30,000
Trailer (Street)
V&E-155
5,000
Passenger Car (Police)
V&E-158
40,000
Salt Brine Production Equipment (Streets) v&E-159
50,000
Physical Development Plotter
v&E-160
50,000
Pickup Truck (Engineering)
V&E-182
35,000
Pickup Truck (Engineering)
V&E-163
35,000
300,000
55,000
55,000
495,000
30,000
60,000
40,000
30,000
55,000
55,000
550,000
250,000
25,000
55,000
55,000
550,000
170,000
25,000
25,000
255,000
285,000
45,000
75,000
100,000
24,070
24,070
340,700
5,500
5,500
40,000
80,000
40,000
80,000
35,000
85,000
85,000
75,000
75,000
65,000
65,000
650,000
85,000
85,000
50,000
300,000
150,000
80,000
20,000
30,000
5,000
40,000
50,000
50,000
35,000
35,000
Department
#
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Trailer (Fire)
V&E-164
75,000
75,000
Fire Pumper (Fire)
V&E-165
750,000
750,000
Pickup Truck (Fire)
V&E-166
40,000
40,000
Utility Truck (Parks)
V&E-167
50,000
50,000
Rotary Mower (Parks)
V&E-168
12,500
12,500
Spreader -Sprayer
V&E-169
12,500
12,500
Pickup Truck (Parks)
V&E-170
35,000
35,000
Trailer(Parks)
V&E-171
5,000
5,000
Trailer (Parks)
V&E-17z
5,000
5,000
Utility Tractor (Parks)
V&E-173
35,000
35,000
Utility Truck (Parks)
V&E-174
50,000
50,000
Rotary Mower (Parks)
V&E-175
110,000
110,000
Utility Truck (Parks)
V&E-176
50,000
50,000
Utility Machine (Parks)
V&E-177
55,000
55,000
55,000
55,000
55,000
55,000
55,000
385,000
Rotary Mower (Parks)
V&E-178
110,000
110,000
Field Line Painter (Parks)
V&E-179
15,000
15,000
Hooklift Truck (Streets)
V&E-180
80,000
80,000
Trailer (Streets)
ME-181
10,000
10,000
Pickup Truck (Street)
V&E-182
35,000
35,000
Utility Machine (Streets)
V&E-183
150,000
150,000
Oil Distributor (Streets)
V&E-185
65,000
65,000
Trailer (Streets)
ME-186
10,000
10,000
Wheel Loader
V&E187
250,000
250,000
Dump Truck (Streets)
V&E-188
270,000
270,000
Hooklift Truck (Streets)
ME-189
230,000
230,000
Utility Machine (Streets)
V&E-190
150,000
150,000
Trailer (Police)
V&E-191
10,000
10,000
Unmarked Vehicle (Police)
V&E-192
40,000
40,000
80,000
Unmarked Vehicle (Police)
V&E-193
40,000
40,000
80,000
Unmarked Vehicle (Police)
V&E-194
40,000
40,000
Unmarked Vehicle (Police)
V&E-195
40,000
40,000
40,000
120,000
Marked Pickup Truck(Police)
V&E-196
40,000
40,000
Wheel Loader
V&E-f99
150,000
150,000
Dump Truck (Streets)
AE-201
230,000
230,000
Dump Truck (Streets)
V&E-202
280,000
280,000
Asphalt Wheel Saw
V&E-250
z 20,000
20,000
Vehicles and Equipment Total
1,415,070
1,449,070
1,764,070
1,659,070
1,254,070
1,474,070
1,889,070
999,070
1,094,070
1,749,070
14,746,700
GRAND TOTAL 1,415,070 1,449,070 1,764,070 1,659,070 1,254,070 1,474,070 1,889,070 999,070 1,094,070 1,749,070 14,746,700
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-001
Project ]name Marked Squad Cars (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Marked squad cars for the Police Department per replacement schedule for the City's ten squads.
Justification
Each year all ten squads are looked at based on the number of miles, accidents and overall safety. The number replaced may vary based on these factors.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
120,000
120,000
120,000
80,000
120,000
120,000
120,000
80,000
120,000
150,000
1,150,000
Total
120,000
120,000
120,000
80,000
120,000
120,000
120,000
80,000
120,000
150,000
1,150,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Equipment Replacement 120,000 120,000 120,000 80,000 120,000 120,000 120,000 80,000 120,000 150,000 1,150,000
Fund
Total 120,000 120,000 120,000 80,000 120,000 120,000 120,000 80,000 120,000 150,000 1,150,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-002
Project Name Computers and Printers (Finance)
Type Equipment
Useful Life
Category Equipment: Computers
Department Vehicles and Equipment
Contact
Description
3eplacement of computers siwitches and printers in the City. Most computers are scheduled to be replaced every four to five years and printers every eight. The City has a total of 150 computers
tndprinters. Also includes upgrades to the Ci 's computer network system which includes switches, hubs and fiber connection hardware.
Justification
technology changes make personal computers obsolete after five years for business purposes. The computers will be replaced on the basis of need.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
950,000
Total
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
950,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Equipment Replacement 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 950,000
Fund
Total 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 950,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-004
Project Name Phone System (Finance)
Type Equipment
Useful Life
Category Equipment: Electronics
Description
teplace the current CISCO system that was purchased in 2015.
Justification
Department Vehicles and Equipment
Contact
parts will be harder to find and current options will be outdated because the system will be 10 years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 100,000 100,000
Fund
Total 100,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-008
Project name Pickup Truck (Engineering)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
(Pickup Truck for the Engineering Division to replace Unit #233. 2009 Ford Ranger with topper.
l Justification
Increased repair and maintenance expenditures on Unit #233.
Expenditures 2022 2023 2024 2025 2026 2027 2028
EquipNehicles/Furnishings 35,000
Total 35,000
Funding Sources
2029 2030 2031 Total
35,000
35,000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000
Fund
35,000
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-011
Project Name Passenger Vehicle (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
3assenger vehicle for the Fire Department to replace Unit 360, 2017 Ford Explorer.
Justification
Jnit #360 is a Fire Department emergency response vehicle, which will be six years old. It is recommended to re -assign this emergency response vehicle to non -emergency response division.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 40,000 40,000 80,000
Total 40,000 40,000 80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-012
Project Name Asphalt Paver (Street)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Department Vehicles and Equipment
Contact
paver to replace a 2013 Maulden 1550D paver, Unit #700.
Justification
repair and maintenance expenditures on Unit #700, which is 9 years old and meets life cycle replacement criteria. The paver is used for in-house paving projects.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 250,000 250,000
Total 250,000 250,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 250,000 250,000
Fund
Total 250,000 250,000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # V&E-020
Project Name Portable Computers (Police)
Type Equipment
Useful Life
Category Equipment: Computers
Department Vehicles and Equipment
Contact
Replacement of portable computers in squad cars. There are currently ten Toughbook PCs with docking stations.
Justification
Fhe current machines were acquired in 2017. Increased repair and maintenance occurs as machines age. New Technology requires current hardware. These portable computers are replaced every
Four years.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
Funding Sources
50,000
50,000
50,000 100,000
50,000 100,000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000 100,000
Fund
Total 50,000 50,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-022
Project Name Sign Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
iign truck to replace a 2018 Ford F-550 truck with utility box, air compressor, and crane, Unit #717.
Justification
Increased repair and maintenance expenditures on Unit #717, which is 10 years old and meets life cycle replacement criteria. The sign truck is used to install, repair, and maintain traffic signs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 135,000 135,000
Total 135,000 135,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 135,000 135,000
Fund
Total 135,000 135,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-024
Project Name Unmarked Police Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
One new unmarked police vehicle to replace Unit #819 (2021 Dodge Charger).
Justification
Increased repair and maintenance expenditures on Unit #819.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000
Fund
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-029
Project Name Dump Truck (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
F-550 truck with swaploader hook system for the Park Department to replace Unit 480, a 2021 Ford F-550 diump truck with Swaploader hook system.
Justification
Increased repair and maintenance expenditures on Unit #480, which will be ten years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 85,000 85,000
Total 85,000 85,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 85,000 85,000
M ind
Total 85,000 85,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-030
Project Name Rotary Mower (Park)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Department Vehicles and Equipment
Contact
Description
W hydrostatic tractor mower for the Park Department to replace Unit #484 (2021 Toro Groundsmaster 5910D).
Justification
Increased repair and maintenance expenditures on Unit #484, which will be eight years old. Large mowers of this type are the most cost-effective approach to mowing large open areas such as
nark land.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 125,000 125,000
Total 125,000 125,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
125,000 125,000
1 VLRl 1GJ3VVV 1445wV
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
project # V&E-032
Project Name Dump Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Single Axle Dump Truck to replace a 2017 Mack dump truck, Unit #712.
Justification
Increased repair and maintenance expenditures on Unit #712, which is 12 years old and meets life cycle replacement criteria. The dump truck is used for snow and ice control and hauling material.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 230,000 230,000
Total 230,000 230,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 230,000 230,000
Fund
Total 230,000 230,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ject # V&E-038
ject Name Streetscape Banners (Street)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
of banners for streetscape along Winnetka Avenue and Golden Valley Road that were purchased in 2017.
Justification ]
Fabric deteriorates and colors fade after weathered conditions..
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 30,000 30,000
Fund
Total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-039
Project Name Utility Tractor (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
tractor with broom for the Park Department to replace Unit 473, a 2008 John Deere utility tractor. This unit is used to mow right-of-way, maintain skating rinks and general maintenance.
Justification
Increased repair and maintenance expenditures on Unit #473.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 75,000 75,000
Total 75,000 75,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 75,000 75,000
Fund
Total 75,000 75,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-042
Project Name Van (Park and Recreation)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Van to replace a 2012 Dodge Grand Caravan, Unit #157.
Justification
Increased repair and maintenance expenditures on Unit #157, which is 15 years old and meets life cycle replacement criteria. The van is used to haul supplies and staff to playgrounds for various
,ark and recreation programs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
30,000 30,000
Total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-044
Project Name pickup Truck (Engineering)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Vew pickup truck for the Engineering Department to replace Unit #235 (2012 Ford F-150 pickup).
Justification
Increased repair and maintenance expenditures on Unit #235..
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
35,000
35,000
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Protect # V&E-045
Project name Rescue Vehicle (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
3escue vehicle for the Fire Department to replace Unit #347 (2008 Ford F-550).
Justification
[ncreased repair and maintenance expenditures on Unit 347.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 200,000 200,000
Total 200,000 200,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 200,000 200,000
Fund
Total 200,000 200,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ect # V&E-047
ect name Pickup Truck (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
`Pickup truck for the Park Maintenance Division to replace Unit 487, a 2013 Ford F-350 pikcup truck with utility box.
E Justification
Increased repair and maintenance expenditures on Unit #487.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 65,000 65,000
Total 65,000 65,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 65,000 65,000
Fund
Total 65,000 65,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-048
Project Name Rotary Mower (Park)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Department Vehicles and Equipment
Contact
Description `
7-TR mower for mowing City Hall Complex, Fire Stations and Neighborhood Parks.
Justification I
ncreased repair and maintenance expenditures on Unit #485.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000
Fund
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-052
Project Name Asphalt Cold Planer (Street)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Description
Department Vehicles and Equipment
Contact
ksphalt cold planer to replace a 2009 Bobcat cold planer, Unit #784.
Justification
ncreased repair and maintenance expenditures on Unit 9784, which is 15 years old and meets life cycle replacement criteria. The cold planer is used for milling and smoothing asphalt pavement.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 25,000 25,000
Fund
Total 25,000 25,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-053
Project Name Dump Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Candem axle dump truck for the Street Department to replace Unit #793 (2011 International Tandum Axle dump truck with hook system).
Justification
ncreased repair and maintenance expenditures on Unit #7793, which will be 11 years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029
EquipNehicles/Furnishings 285,000
Total 285,000
2030 2031 Total
285,000
285,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 285,000 285,000
Fund
Total 285,000 285,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-054
Project Name Pickup Truck (Vehicle Maintenance)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
truck for the Vehicle Maintenance Division to replace Unit 902, a 2008 Ford F-150 pickup truck with utility box and crane.
This unit was on inally transferred in 2013 from the Utilit+ Department.
Justification
increased repair and maintenance expenditures on Unit #902.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Vehicle Maintenance Fund 100,000 100,000
Total 100,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
'roject # V&E-059
'roject Name Rescue Vehicle (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Zescue Vehicle to replace a 2010 Ford F-550 rescue vehicle, Unit #351.
Justification
ncreased repair and maintenance expenditures on Unit #351, which is 15 years old and meets life cycle replacement criteria. The rescue vehicle is used to transport staff, tools, and equipment
when responding to emergencies.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 125,000 125,000
Total 125,000 125,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 125,000 125,000
Fund
Total 125,000 125,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-061
Project Name Extrication Tools (Fire)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Description
teplace hydraulic extrication tools.
Department Vehicles and Equipment
Contact
Justification
Increased repair and maintenance expenditures on extrication tools, which are 15 years old and meet life cycle replacement criteria. Parts arc difficult to obtain when repairs are needed. The
-xtrication tools are used for cutting and prying when responding to emergencies.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 100.000 100,000
Total 100,000 100,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 100,000 100,000
Fund
Total 100,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-063
Project Name Pickup Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Aility truck to replace a 2020 Ford F-250 utility truck, Unit #730.
Justification
Increased repair and maintenance expenditures on Unit #730, which is 10 years old and meets life cycle replacement criteria. The utility truck is used to transport staff, tools, and supplies to
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 45,000 45,000
Total 45,000 45,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 45,000 45,000
Fund
Total 45,000 45,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-069
Project Name Utility Tractor Mower (Park)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Description
Department Vehicles and Equipment
Contact
Utility Tractor Mower for the Park Division to replace Unit #401 John Deere Tractor Mower).
Justification
Increased repair and maintenance expenditures on Unit #401.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 100,000 100,000
Fund
Total 100,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-070
Project Name Single Axle Dump Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Single Axle dump truck for the Street Division to replace unit #703, a Sterling dump truck.
Justification I
ncreased repair and maintenance expenditures.
Expenditures 2022 2023
Equip/Vehicles/Fumishings
2024 2025 2026 2027 2028 2029 2030 2031 Total
250,000 250,000
Total 250,000 250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-072
Project Name Pickup Truck (Engineering)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
'ickup Truck to replace a 2020 Ford F-150 pickup, Unit #230
Justification
ncreased repair and maintenance expenditures on Unit #230, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, and supplies to
carious projects.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equi pNeh icles/Furnishings
Total
40,000
40,000
40,000
40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000
Fund
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-078
Project Name Aerial Bucket Truck(Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
;iffy foot Aerial Bucket Truck for the Park Division to replace Unit 4457 (2016 Ford F-750 Aerial Bucket Truck).for tree trimming, streetscape banners and miscellaneous aerial maintenance
•e pairs.
Justification
ncreased repair and maintenance expenditures on Unit 457 (2016 Ford F-750) with bucket and utility box.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehiclestFurnishings 300,000 300,000
Total 300,000 300,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 300,000 300,000
Fund
Total 300,000 300,000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # V&E-084
Project Name Self -Contained Breathing Apparatus (Fire)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Description
Uplace self-contained breathing apparatuses.
Department Vehicles and Equipment
Contact
Justification
Current self-contained breathing apparatuses were purchased in 2014, which are 10 years old and meet life cycle replacement criteria and NFPA standards.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 300,000 300,000
Total 300,000 300,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 300,000 300,000
Fund
Total 300,000 300,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-089
Project Name Sidewalk/Maintenance Tractor (Parks)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
tractor for clearing walks on the city hall complex for the Street Division to replace unit 486, a 2013 John Deere.
Justification I
Increased repair and maintenance expenditures on Unit 486.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000
Fund
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-099
Project Name Asphalt Hot Box (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
box to replace a 2017 Stepp hot box with Swaploader hook frame, Unit #711.
Justification
(Increased repair and maintenance expenditures on Unit #711, which is 10 years old and meets life cycle replacement criteria. The hot box is used to keep asphalt hot during pothole patching
oi,erations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 30,000 30,000
Fund
Total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-100
Project Name Pickup Truck (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
'F-350 Pickup/Utility Truck for the Park Division to replace unit 483, a 2012 F-350 pickup/utility truck.
Justification
Increase repair and maintenance expenditures on unit 483,
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 60,000 60,000
Total 60,000 60,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 60,000 60,000
Fund
Total 60,000 60,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-102
Project Name Pickup Truck (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
:our door pickup truck with storage box for Fire Department to replace Unit 364 (2019 F-150).
Justification
Vehicle to transport firefighters to emergency calls and training. Currently they are taking a fire engine out of service to these types of calls and training.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
40,000
40,000
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-103
Project Name Walk Behind Saw (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
concrete/asphalt saw to replace a 2011 Husgvarna saw, Unit #792.
Justification
Increased repair and maintenance expenditures on Unit #792, which is 15 years old and meets life cycle replacement criteria. The saw is used for cutting out street and curb repairs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 30,000 30,000
Fund
Total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-107
Project Name Bobcat Utility Truckster (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
New utility truckster to replace unit #469 (2005 Bobcat).
Justification
Increased repair and maintenance expenditures on Unit 9469.
This program allows us to purchase a new truckster and trade-in the old unit for a net of $4 500. With a new unit, parts and labor are rarely needed.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicies/Fumishings
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
550,000
Total
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
550,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Equipment Replacement 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Fund
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-110
Project Name Dump Truck (Street)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Department Vehicles and Equipment
Contact
Description
Single Axle Dump Truck to replace a 2007 Sterling 1,7500, Unit #772.
Justification
ncreased repair and maintenance expenditures on Unit 4772, which is 16 years old and meets life cycle replacement criteria. The dump truck is used for snow and ice control and hauling material.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 250,000 250,000
Total 250,000 250,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 250,000 250,000
Fund
Total 250,000 250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-115
Protect name Portable Radar Trailer
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
'rogrammable message sign for traffic control, maintenance work and events. This unit #872 is a 1999 Raidar Trailer).
Justification I
In house programmable message sign for street maintenance activities and city events.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 25,000 25,000
Fund
Total 25,000 25,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-116
Project Name Bobcat Toolcat (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
3obcat Toolcat for the Street Division to replace unit #703, a 2018 Bobcat Toolcat.
Justification
program allows us to purchase a new truckster and trade-in the old unit for a net of $4,500. With a new unit, parts and labor are rarely needed. The original toolcat was purchased in 2018.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Fund
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 550,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-118
Project Name Sidewalk Tractor (Street)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
machine for the Street Division to replace Unit #796 (2013 MT Trackless).
Justification I
Increased repair, maintenance and parts availability on Unit #796.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 170,000 170,000
Total 170,000 170,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 170,000 170,000
Fund
Total 170,000 170,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
t
ject # V&E-121
ject Name Tasers (Police)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
W Tasers were originally purchased in 2005. Thes warrenty runs three years. 19 were purchased in 2013. The remaining will be purchased in 2017. In 2021, another 13 will be replaced.
Justification
vlaintenance on each taxer runs around $800 per time after the warranty expires. This will allow new units to be purchased and less maintenance costs due to the warranty period. The police
ispartment believes that the use of the Taser both through deployment and threatened deployment continues to reduce the incidence of injuries to both officers and suspects.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
Funding Sources
25,000 25,000
25,000 25,000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 25,000 25,000
Fund
Total 25,000 25,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-127
Project Name 800 MHZ Radios (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment: Miscellaneous
Description
800 MHz portable radios and accessories in 2025 and 800 MHz mobile radios in 2026.
Justification
`Current portable radios were purchased in 2015 and mobile radios in 2016. In-service life is 10 to 12 years. Unlikely manufacturer will support radios with parts due to age.
Expenditures 2022 2023 2024
2025
2026 2027 2028 2029 2030 2031
Total
EquipNehicles/Furnishings
175,000
80,000
255,000
Total
175,000
80,000
255,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 175,000 80,000 255,000
Fund
Total 175,000 80,000 255,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
project # V&E-129
Project Name 800 MHZ Radios (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Replace 800 MHz portable radios and accessories in 2025 and 800 MHz mobile radios in 2026.
Justification
Current portable radios were purchased in 2015 and mobile radios in 2016. In-service life is 10 to 12 years. Unlikely manufacturer will support radios with parts due to age.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
175,000 110,000
175,000 110,000
285,000
285,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 175,000 110,000 285,000
Fund
Total 175,000 110,000 285,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-131
Project Name Asphalt Roller(streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
roller to replace a 2009 Bomag asphalt roller, Unit #780.
Justification
ncreased repair and maintenance expenditures on Unit #780, which is 15 years old and meets life cycle replacement criteria. The roller is used for compacting asphalt and granular materials
luring road r . airs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 45,000 _ 45,000
Total 45,000 45,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
45,000
45,000
Total 45,000 45,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-132
Project name Thermal Imaging Cameras (Fire)
Type Equipment
Useful Life
Category Unassigned
Description
replace thermal imaging cameras for Fire Department.
Department Vehicles and Equipment
Contact
Justification
Current thermal imaging cameras (TIC) were purchased in 2016, which are 10 years old and meet life cycle replacement criteria. TICs allow firefighters to see through smoke in zero visibility
conditions. TICS provide thermal readings of the surrounding environment so firefighters can quickly and safely locate/rescue fire victims or suppress fires.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 75,000 75,000
Total 75,000 75,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
75,000
75,000
Total 75,000 75,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-133
Project Name 800 MHz Radios (Public Works Maintenance)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment: Miscellaneous
Description
37-800 Mhx portable radios and accessories for communication in the field.
Justification
current radios purchased in 2008. Manufacturer and Hennepin County will no longer support radios with parts due to age. In-service life is 10-12 years. New radios P25 Phase II
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 100,000 100,000
Total 100,000 100,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 100,000 100,000
Fund
Total 100,000 100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-135
Project Name Body Cameras (Police)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
kcquisition of body cameras, maintenance agreement and server storage for officers.
2021, body cameras will be reiAaced. In 2023. cameras for the suuad cars will be
Justification
The Police Department will need to add body cameras (maintenance and video storage) to the array of technology tools for officers to wear while on -duty. Once the state legislature set up
guidelines the Ciry purchased the units in late 2017/2018..
Expenditures
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
EquipNehicles/Furnishings
24,070
124,070
24,070
24,070
24,070
24,070
24,070
24,070
24,070
24,070
340,700
Total
24,070
124,070
24,070
24,070
24,070
24,070
24,070
24,070
24,070
24,070
340,700
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 24,070 124,070 24,070 24,070 24,070 24,070 24,070 24,070 24,070 24,070 340,700
Fund
Total 24,070 124,070 24,070 24,070 24,070 24,070 24,070 24,070 24,070 24,070 340,700
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-136
Project Name Zodiac Boat (Fire)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Boat fpor the Fire Department Unit 329, a 2008 Zodiac boat utilized for water rescue.
Justification
teplace Unit 320, a 2008 Zodiac inflatable boat.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 5,500 5,500
Total 5,500 5,500
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 5,500
Fund
5,500
Total 5,500 5,500
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-137
Project Name Outboard Motor (Fire)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Zodiac water rescue boat outboard motor utilized by the Fire Department for water rescues to replace Unit #352 a 2010 Yamaha outboard motor.
Justification
Increased repair and maintenance expenditures on Unit 9352.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 5,500 5,500
Total 5,500 5,500
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 5,500 5,500
Fund
Total 5,500 5,500
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-138
Project Name Passenger Vehicle (Fire)
Type Equipment
Useful Life
Category Vehicles
vehicle to replace a 2020 Ford Explorer, Unit #301.
Department Vehicles and Equipment
Contact
Justification
Increased repair and maintenance expenditures on Unit #301, which is 5 years old and meets life cycle replacement criteria. The passenger vehicle is used to transport staff, tools, equipment, and
supplies when responding to emergencies. This vehicle will be reassinrned to the Insnections Department.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 40,000 40,000 80,000
Total 40,000 40,000 80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
EProject# V&E-139
Project Name Passenger Vehicle (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
'assenger vehicle for the Fire Department to replace Unit #355, a Ford Explorer.
Justification
Increased repair and maintenance on Unit #355 which is an emergency response vehicle This vehicle will be re -assigned to the Inspections Department.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
40,000
40,000
80,000
Total
40,000
40,000
80,000
Funding Sources 2022 2023 2024
2025 2026 2027
2028 2029 2030 2031
Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-141
Project Name Pickup Truck (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
pickup truck for the Park Division to replace Unit #475, a 2009 Ford Ranger.
Justification
repair and maintenance expenditures on Unit #475.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000 35,000
Fund
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-142
Project name Dump Truck (Park)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
truck to replace a 2020 Ford F-550 truck with Swaploader hook system, Unit #424.
Justification
ncreased repair and maintenance expenditures on Unit #424, which is 10 years old and meets life cycle replacement criteria. The hooklift truck is used to transport staff, tools, supplies,
;yuirment, and material when aerforminc maintenance onerations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 85,000 85,000
Total 85,000 85,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 85,000 85,000
Fund
Total 85,000 85,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-143
Project name Trash Compactor (Park)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
(Trash compactor for the Park Division to replace Unit #479, a 2021 Wayne trash compactor with hook frame to be used with F-550 dump trucks with Swaploader hook system.
Justification
Increased reoair and maintenance expenditures on Unit #479.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 75,000 75,000
Total 75,000 75,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 75,000 75,000
Fund
Total 75,000 75,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-145
Project Name Skid Steer Loader (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Skid Steer Loader to replace a 2019 Bobcat T650 skid steer loader, Unit #716
Justification
k skid steer is purchased every year where the net difference between the purchase price and trade-in amount is a fixed price, around the estimated depreciation value. The City will save money
maintenance and repair costs by eliminating the need to buy or replace wear items. Additional savings will come from major repairs covered under warrant v and less downtime.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
650,000
Total
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
65,000
650,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Equipment Replacement 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 650,000
Fund
Total 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 650,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-146
Project Name Dump Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
3ooklift truck to replace a 2021 Ford F-550 truck with Swaploader hook system, Unit #791.
Justification
ncreased repair and maintenance expenditures on Unit #791, which is 10 years old and meets life cycle replacement criteria. The hooklift truck is used to transport staff, tools, supplies,
;yuirment, and material when performing maintenance o erations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 85,000 85,000
Total 85,000 85,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 85,000 85,000
Fund
Total 85,000 85,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
IProject# V&E-147
Project Name Police Commander Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
3assenger vehicle to replace a 2012 Ford sedan, Unit #821.
Justification
ncreased repair and maintenance expenditures on Unit #821, which is 9 years old and meets life cycle replacement criteria. The passenger vehicle is used to transport staff, tools, equipment, and
;u > plies.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
50,000
50,000
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-149
Project Name water Tanker Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Water truck for the Street Department to replace Unit #770 (2006 Sterling L7500 Tanker). This truck is utilized for street sweeping, skating rink flooding and watering landscaping.
Justification
Increased repair and maintenance expenditures on Unit #770, which will be sixteen years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 300,000 300,000
Total 300,000 300,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 300,000 300,000
Fund
Total 300,000 300,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-150
Project Name Asset Management Software Upgrade
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
Jpgrade asset management software that was purchased in 2016.
Justification
Current technology will be needed for speed and operating systems to improve efficiencies with the organization and service delivery to external customers. The software will be utilized to
manage routine tasks and business workflows, track inspections and maintenance, and assist in prwrammim future ex[ienditures.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 150,000 150,000
Total 150,000 150,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
150,000
150,000
Total 150,000 150,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
project # V&E-152
Project Name Passenger Vehicle (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
'assenger vehicle for the Fire Department to replace Unit #356 (2015 Ford Crown Victoria).
Justification
Increased repair and maintenace on Unit 356 on an emergency response vehicle. This passenger vehicle will be re -assigned to the Inspection Division.
Expenditures
2022 2023 2024 2025
2026 2027 2028
2029 2030 2031 Total
EquipNehicles/Furnishings
40,000
40,000
80,000
Total
40,000
40,000
80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # V&E-153
Project Name Equipment Trailer (Street)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Equipment Trailer for the Street Division to replace Unit 774, a 2007 Felling equipment trailer.
Justification
Increase repair and maintenance expenditures on Unit 774.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 20,000 20,000
Total 20,000
20,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 20,000 20,000
Fund
Total 20,000 20,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ect # V&E-154
ect Name Traffic Trailer (Police)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
Traffic control/radar trailer for the Police Department to replace Unit 817, a 2012 message/radar trailer.
Justification
Increased repair and maintenance expenditures on unit 817, which will be ten years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 30,000 30,000
Fund
Total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
oject itV&E-155
oject Name Trailer (Street)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
Trailer for the Street Maintenance Division to replace Unit 754, a 2000 utility trailer.
Justification
Increased repair and maintenance expenditures on Unit 754.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 5,000 5,000
Total 5,000 5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 5,000 5,000
Fund
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-158
Project Name Passenger Car (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
k passenger vehicle that can be used for emergencies for the Police Chief and/or commanders to respond. This wll replace unit #831, a 2008 Chevrolet Suburban that was a forfeited vehicle.
Justification `
ncreased repair and maintenance expenditures on Unit #831.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000
Fund
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-159
Project Name Salt Brine Production Equipment (Streets)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Brine Production Equipment to replace equipment purchased in 2012.
Justification
Increased repair and maintenance expenditures on 2012 equipment, which is 10 years old. Salt brine, along with blending of additives, reduce the environmental impacts of de-icing chemicals to
.ocal waterbodies.
Expenditures ` 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000
50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 Fund 50,000
Total 50,000
50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-160
Project Name physical Development Plotter
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment: Miscellaneous
of Physical Development Plotter that was purchased in 2015.
Justification
parts will be harder to find and current options will be outdated because the plotter will be 10 years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000
Fund
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-162
Project Name pickup Truck (Engineering)
Type Equipment
Useful Life
Category Vehicles
Description
?ickup truck to replace a 2016 Ford F-150 pickup, Unit #237.
Department Vehicles and Equipment
Contact
Justification
Increased repair and maintenance expenditures on Unit #237, which is 12 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, and supplies to
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000 35,000
Fund
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ject # V&E-163
ject Name Pickup Truck (Engineering)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
Pickup truck to replace a 2012 Ford F-150 pickup, Unit #238.
Justification
Increased repair and maintenance expenditures on Unit #238, which is 14 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, and supplies to
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000 35,000
Fund
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
EProject# V&E-164
Project Name Trailer (Fire)
Type Equipment
Useful Life
Category Equipment: Miscellaneous
Department Vehicles and Equipment
Contact
Description
inclosed trailer to replace a 2004 enclosed trailer, Unit #345.
Justification
ncreased repair and maintenance expenditures on Unit #345, which is 20 years old and meets life cycle replacement criteria. The trailer is used for responding to hazardous material incidents.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
75,000
75,000
75,000
75,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 75,000 75,000
Fund
Total 75,000 75,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
'roject # V&E-165
'roject dame Fire Pumper (Fire)
Type Equipment
Useful Life
Category Equipment: Heavy Equip.
Description
'ire pumper to replace a 2009 Spartan Pumper, Unit 4349.
Department Vehicles and Equipment
Contact
Justification
Increased repair and maintenance expenditures on Unit #349, which is 19 years old and meets life cycle replacement criteria. The fire pumper is used to transport staff, tools, equipment, and water
when respondin.,, to emergencies.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 750,000 _ 750,000
Total 750,000 750,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 750,000 750,000
Fund
Total 750,000 750,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-166
Project Name Pickup Truck (Fire)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Vehicles
Description
?ickup truck to replace a 2015 Ford F-150 pickup truck, Unit #357.
Justification
ncreased repair and maintenance expenditures on Unit 9357, which is 9 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, and equipment when
espondini; to emercencies.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
40,000
40,000
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-167
Project Name Utility Truck (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
'ickup truck to replace a 2017 Ford F-250 pickup truck with utility box, Unit #403.
Justification
ncreased repair and maintenance expenditures on Unit #403, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, supplies, and
x ui ment when performing maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000
Fund
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-168
Project Name Rotary Mower (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
totary mower to replace a 2018 Exmark walk behind mower, Unit #407.
Justification
ncreased repair and maintenance expenditures on Unit #407, which is 10 years old and meets life cycle replacement criteria. The mower is used for mowing City Hall Complex, Fire Stations, and
ieiAhborhood parks.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 12,500 12,500
Total 12,500 12,500
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 12,500 12,500
Fund
Total 12,500 12,500
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-169
Project Name Spreader -Sprayer
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
Stand -On Spreader -Sprayer to replace a 2018 Exmark spreader -sprayer, Unit #408.
Justification
Increased repair and maintenance expenditures on Unit #408, which is 10 years old and meets life cycle replacement criteria. The spreader -sprayer is used to spread granular fertilizer at the City
Hall Complex, Fire Stations, and neighborhood marks. Additionally, it is used to spray liquid de-icing chemicals at the City Hall Complex reducing environmental impacts.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 12,500
Total 12,500
12,500
12,500
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 12,500 12,500
Fund
Total 12,500 12,500
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-170
Project Name Pickup Truck (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
?ickup truck to replace a 2013 Ford F-150 pickup truck with topper, Unit #489.
Justification
Increased repair and maintenance expenditures on Unit #489, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, supplies, and
equipment when performinje maintenance oocrations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000
Fund
35.000
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-171
Project name Trailer(Parks)
Type Equipment
Useful Life
Category Park Equipment
Description
['railer to replace a 2014 single axle utility trailer, Unit #490.
Department Vehicles and Equipment
Contact
Justification
Increased repair and maintenance expenditures on Unit #490, which is 15 years old and meets life cycle replacement criteria. The trailer is used to transport equipment when performing
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 5,000 5,000
Total 5,000 5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 5,000 5,000
Fund
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-172
Project Name Trailer (Parks)
Type Unassigned Department Vehicles and Equipment
Useful Life Contact
Category Unassigned
trailer to replace a 2014 tandem axle utility trailer, Unit #491
Justification
ncreased repair and maintenance expenditures on Unit #491, which is 15 years old and meets life cycle replacement criteria. The trailer is used to transport equipment when performing
naintenance overations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Eq uipNehicles/Furnishings
Total
5,000
5,000
5,000
5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 5,000 5,000
Fund
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-173
Project Name Utility Tractor (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description _ I
Aility tractor to replace a 2014 John Deere tractor with mower and snow blower, Unit #493.
Justification
(Increased repair and maintenance expenditures on Unit #493, which is 10 years old and meets life cycle replacement criteria. The utility tractor with mower is used to mow the City Hall Complex,
Fire Stations, and nei hborhood barks. The tractor with a snow blower attachment is used for City Hall Complex sidewalks.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000 35,000
Fund
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-174
Project Name Utility Truck (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
3ickup truck to replace a 2014 Ford F-250 pickup truck with utility box, Unit #494.
Justification
ncreased repair and maintenance expenditures on Unit #494, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, supplies, and
,c ui ment when erformin� maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000
Fund
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-175
Project Name Rotary Mower (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Rotary mower to replace a 2015 Toro Groundsmaster 5910, Unit #496.
Justification
Increased repair and maintenance expenditures on Unit #496, which is 9 years old and meets life cycle replacement criteria. The mower is used for mowing large open areas, athletic fields, and
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 110,000 110,000
Total 110,000 110,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 110,000 110,000
Fund
Total 110,000 110,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-176
Project Name Utility Truck (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description I
'ickup truck to replace a 2015 Ford F-250 pickup truck with utility box, Unit #497.
Justification
Project Justification
Increased repair and maintenance expenditures on Unit 4497, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, supplies, and
euuinment when nerforminL maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 50,000 50,000
Fund
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-177
Project Name Utility Machine (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
machine to replace a 2015 Bobcat Toolcat 5600 with attachments, Unit 9498.
Justification
Increased repair and maintenance expenditures on Unit #498, which is 10 years old and meets life cycle replacement criteria. The utility machine with attachments is used for various maintenance
activities. The utilir,, machine will be part of an annual trade -out program after the initial replacement Purchase.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings
55,000
55,000
55,000
55,000
55,000
55,000
55,000
385,000
Total
55,000
55,000
55,000
55,000
55,000
55,000
55,000
385,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 55,000 55,000 55,000 55,000 55,000 55,000 55,000 385,000
Fund
Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 385,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-178
Project Name Rotary Mower (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
totary mower to replace a 2016 Toro Groundsmaster 5910, Unit #499.
Justification
ncreased repair and maintenance expenditures on Unit 9499, which is 11 years old and meets life cycle replacement criteria. The mower is used for mowing large open areas, athletic fields, and
iei,,hborhood parks.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 110,000 110,000
Total 110,000 110,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 110,000 110,000
Fund
Total 110,000 110,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-179
Project Name Field Line Painter (Parks)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Field Line Painter to replace a 2017 Airless 7000 line painter, Unit #404.
Justification E
Increased repair and maintenance expenditures on Unit #404, which is 10 years old and meets life cycle replacement criteria. The line painter is used to outline the athletic fields.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Fumishings 15,000 15,000
Total 15,000 15,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 15,000 15,000
Fund
Total 15,000 15,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-180
Project Name Hooklift Truck (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
3ooklift truck to replace a 2014 Ford F-550 truck with Swaploader hook system, Unit #701.
Justification
Increased repair and maintenance expenditures on Unit #701, which is 10 years old and meets life cycle replacement criteria. The hooklift truck is used to transport staff, tools, supplies,
- ui pment, and material when performing maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 80,000
Total 80,000
80,000
80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 80,000 80,000
Fund
Total 80,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-181
Project Name Trailer (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Trailer to replace a 2014 tandem axle utility trailer, Unit 9702.
Justification
Increased repair and maintenance expenditures on Unit #702, which is 15 years old and meets life cycle replacement criteria. The trailer is used to transport traffic control signs and devices.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 10,000 10,000
Fund
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-182
Project Name pickup Truck (Street)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
truck to replace a 2016 Ford F-150 Crew Cab pickup, Unit #704.
Justification
Increased repair and maintenance expenditures on Unit #704, which is 10 years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools, supplies, and
equipment when performin& maintenance oE.erations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 35,000 35,000
Fund
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-183
Project Name Utility Machine (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Ality machine to replace a 2016 Trackless MT6 with attachments, Unit #705.
Justification
Increased repair and maintenance expenditures on Unit #705, which is 10 years old and meets life cycle replacement criteria. The utility machine is used for sidewalk snow removal during the
winter and trail and mill and overlau sweuinr during the summer.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 150,000 150,000
Total 150,000 150,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 150,000 150,000
Fund
Total 150,000 150,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-185
Project Name Oil Distributor (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
ail distributor to replace a 2017 Stepp oil distributor, Unit #710.
Justification
ncreased repair and maintenance expenditures on Unit #710, which is 10 years old and meets life cycle replacement criteria. The oil distributor is used to apply tack oil on existing asphalt prior
aavin * to create a better bond and stronger road.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 65,000 65,000
Total 65,000 65,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement
Fund
Total
65,000 65,000
65,000
65,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-186
Project Name Trailer (Streets)
Type Equipment
Useful Life
Category Equipment
Description I
trailer to replace a 2009 Felling FT10 trailer, Unit #781.
Department Vehicles and Equipment
Contact
`Justification I
Increased repair and maintenance expenditures on Unit #781, which is 15 years old and meets life cycle replacement criteria. The trailer is used to transport the asphalt rollers.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 10,000 10,000
Fund
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E187
Project Name wheel Loader
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Wheel loader to replace a 2011 Caterpillar 938 loader, Unit #794.
Justification I
Increased repair and maintenance expenditures on Unit 4794, which is 15 years old and meets life cycle replacement criteria. The wheel loader is used for general earth work and loading dump
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 250,000 250,000
Total 250,000 250,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 250,000 250,000
Fund
Total 250,000 250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-188
Project Name Dump Truck (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Fandem axle dump truck to replace a 2012 International dump truck, Unit #795.
1 Justification I
'Increased repair and maintenance expenditures on Unit #795, which is 13 years old and meets life cycle replacement criteria. The dump truck is used for snow and ice control and hauling material.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 270,000 270,000
Total 270,000 270,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 270,000 270,000
Fund
Total 270,000 270,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-189
Project name Hooklift Truck (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Tingle axle hooklift truck to replace a 2014 International truck with Swaploader hook system, Unit #798.
Justification
(Increased repair and maintenance expenditures on Unit #798, which is 12 years old and meets life cycle replacement criteria. The hooklift truck is used for snow and ice control, transporting
eLmiliment, and haulinu material.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 230,000 230,000
Total 230,000 230,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 230,000 230,000
Fund
Total 230,000 230,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-190
Project Name Utility Machine (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Ality machine to replace a 2014 Trackless MT with attachments, Unit #799.
Justification
Increased repair and maintenance expenditures on Unit #799, which is 11 years old and meets life cycle replacement criteria. The utility machine is used for sidewalk snow removal during the
winter and trail and mill and overlay sweepin! during the summer.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 150,000 150,000
Total 150,000 150,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 150,000 150,000
Fund
Total 150,000 150,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-191
Project Name Trailer (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
trailer to replace a 2007 enclosed trailer, Unit #803.
Justification
repair and maintenance expenditures on Unit #803, which is 20 years old and meets life cycle replacement criteria. The trailer is used to transport supplies and equipment.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 10,000 10,000
Fund
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-192
Project Name Unmarked Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
nmarked police vehicle to replace a 2014 Ford Explorer, Unit #827.
Justification
Increased repair and maintenance expenditures on Unit #827, which is 8 years old and meets life cycle replacement criteria. The police vehicle is used for detective activities.
Expenditures
2022 2023 2024 2025
2026 2027 2028 2029 2030 2031
Total
EquipNehicles/Furnishings
40,000 _
40,000
80,000
Total
40,000
40,000
80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-193
Project Name Unmarked Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
police vehicle to replace a 2015 Ford Explorer, Unit #828.
Justification
repair and maintenance expenditures on Unit #828, which is 8 years old and meets life cycle replacement criteria. The police vehicle is used for detective activities.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 40,000 40,000 80,000
Total 40,000
40,000 80,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 80,000
Fund
Total 40,000 40,000 80,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-194
Project Name Unmarked Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
police vehicle to replace a 2016 Ford Explorer, Unit #832.
Justification
repair and maintenance expenditures on Unit #832, which is 9 years old and meets life cycle replacement criteria. The police vehicle is used for traffic enforcement.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000
Fund 40,000
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
'roject# V&E-195
'roject Name Unmarked Vehicle (Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Police Vehicles that need to be replaced due to miles.
Justification
ncreased repair and maintenance expenditures on Unit #833.,
Expenditures
2022 2023 2024
2025 2026 2027
2028 2029 2030 2031
Total
EquipNehicles/Furnishings
40,000 _ _
40,000
40,000
120,000
Total
40,000
40,000
40,000
120,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 40,000 40,000 40,000 120,000
Fund
Total 40,000 40,000 40,000 120,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-196
Project name Marked Pickup Truck(Police)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
vlarked police vehicle to replace a 2018 Ford F-150 Responder, Unit #845.
Justification
ncreased repair and maintenance expenditures on Unit #845, which is 9 years old and meets life cycle replacement criteria. The police vehicle is used for community service activities.
Expenditures 2022 2023 2024
2025 2026 2027 2028
2029 2030 2031 Total
EquipNehicles/Fumishings
_ 40,000
40,000
Total
40,000
40,000
Funding Sources 2022 2023 2024
2025 2026 2027 2028
2029 2030 2031 Total
Equipment Replacement
40,000
40,000
Fund
Total
40,000
40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-199
Project Name Wheel Loader
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
Jdheel Loader to replace a 2009 Caterpillar IT Wheel Loader, Unit #684.
Justification
ncreased repair and maintenance expenditures on Unit #684, which is 15 years old and meets life cycle replacement criteria. The loader is used for general earth work and loading dump trucks.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 150,000 150,000
Total 150,000 150,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 150,000 150,000
Fund
Total 150,000 150,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-201
Project name Dump Truck (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description I
Tingle Axle Dump Truck to replace a 2016 Mack dump truck, Unit #707.
Justification
ncreased repair and maintenance expenditures on Unit #707, which is 12 years old and meets life cycle replacement criteria. The dump truck is used for snow and ice control and hauling
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 230,000 230,000
Total 230,000 230,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 230,000 230,000
Fund
Total 230,000 230,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# V&E-202
Project Name Dump Truck (Streets)
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Equipment
Description
randem Axle Dump Truck to replace a 2018 Mack dump truck, Unit 9719.
Justification
ncreased repair and maintenance expenditures on Unit #719, which is 12 years old and meets life cycle replacement criteria. The dump truck is used for snow and ice control and hauling
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 280,000 280,000
Total 280,000 280,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 280,000 280,000
Fund
Total 280,000 280,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # V&E-250
Project ]name Asphalt Wheel Saw
Type Equipment Department Vehicles and Equipment
Useful Life Contact
Category Park Equipment
Description
ksphalt Wheel Saw to provide approriate tools for staff.
Justification
Tool needed to work with concrete in-house.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicies/Furnishings 20,000 20,000
Total 20,000 20,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equipment Replacement 20,000 20,000
Fund
Total 20,000 20,000