Loading...
07 - Storm Water Sectioncity of golden, valley Capital Improvement Program 2022-2031 Storm Water Section This section includes the storm water infrastructure improvements and the flood damage reduction program for the next five years. Most of these improvements, which include both rate control and water quality projects, coincide with the Pavement Management Program (see section on Streets) and the Infrastructure Renewal Plan starting in 2025. Improvements will be funded by user fees based on different types of property as to the volume of storm water runoff from an acre of each type of land. The goal is to have enough reserves to account for 50% of the current revenues. City of Golden Valley, Minnesota Capital Plan 2022 thru 2031 PROJECTS BY DEPARTMENT Department # 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Residential Stone Sewer Improvements ss-01 1,250,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 8,000,000 Street Sweeper SS-05 225,000 225,000 Street Sweeper SS•16 350,000 350,000 Pickup Truck (Stone Water Utility) SS-22 35,000 35,000 Storm Water Pond Dredging SS-23 300,000 300,000 300,000 300,000 300,000 1,500,000 V-Box Spreader and Anti -Ice (tandem) SS-26 67,000 67,000 Flood Mitigation (Floodproofing, SS-34 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000 Voluntary) Utility Machine SS-41 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000 Zane Avenue & Lindsay St ReconstructiorrSS-46 335,000 335,000 Medley Park Stormwater Treatment SS-49 440,000 330,000 880,000 1,650,000 Facility 800 MHz Radios SS-51 20,000 20,000 Storm Sewer Repairs-MS4 and Other SS-53 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 2,250,000 Decola Pond F Storage & Diversion SS-54 1,770,000 1,000,000 2,780,000 300,000 5,850,000 Project Bassett Creek Regional Trail -Stone SS-60 50,000 50,000 Sewer Repairs V-Box Sander SS-63 50,000 50,000 Salt Brine Production Equipment SS-64 50,000 50,000 Toledo Avenue Flood Mitigation Project ss65 50,000 1,650,000 1,650,000 3,350,000 Bassett Creek Restorationn Project- SS-67 110,000 660,000 770,000 Regent to GV Rd Turf Sweeper SS-69 40,000 40,000 Decola Ponds SEA School Flood Ss-69 1,980,000 1,030,000 3,010,000 Reduction Project Study Flood Risk in Localized Flood- SS-70 125,000 125,000 300,000 550,000 prone Areas Inspect and Maintain Large Diameter SS-71 300,000 300,000 600,000 Stone Sewers Zenith Avenue Reconstruction SS-72 500,000 500,000 Compact Excavator SS-73 80,000 80,000 Department # 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Bassett Creek Restoration in Brookview ss-74 150,000 150,000 Golf Course Water Quality Pond Restoration SS-75 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 500,000 Laurel Greenbelt Culvert Replacement SS-76 750,000 750,000 Storm Water Total 5,147,000 3,525,000 4,665,000 3,465,000 4,925,000 4,105,000 3,430,000 1,425,000 1,635,000 1,405,000 33,727,000 GRAND TOTAL 5,147,000 3,525,000 4,665,000 3,465,000 4,925,000 4,105,000 3,430,000 1,425,000 1,635,000 1,405,000 33.727.000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-01 Project name Residential Storm Sewer Improvements Type Improvement Useful Life Category Storm Water Department Storm Water Contact and repair of storm sewer drainage system in conjunction with the Pavement Management Program and forthcoming Infrasturcture Renewal Program. Justification 3rovide an improve storm water drainage system in conjunction with the Pavement Management Program (PMP) and forthcoming Infrastructure Renewal Program (IRP) to facilitate surface water unoff, minimize local draina_ a and flooding issues, protect pavement and facilitate sump drainage from the Crivate property. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 1,250,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 8,000,000 Improvements Total 1,250,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 8,000,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 1,250,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 8,000,000 (7300) Total 1,250,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 8,000,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-05 Project Name Street Sweeper Type Equipment Department Storm Water Useful Life Contact Category Storm Water Description street sweeper to replace a 2017 Elgin Street Sweeper, Unit #515, Justification repair and maintenance expenditures on Unit 515, which is 11 years old. Street Sweepers are used to remove leaves and debris from roadways reducing the amount of sediment and from enterinR_> the Citv's Storm Sewer and improvise water oualitv__ Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Furnishings 225,000 225,000 Total 225,000 225,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 225,000 225,000 (7300) Total 225,000 225,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-16 Project Name Street Sweeper Type Equipment Useful Life Category Storm Water Department Storm Water Contact Description Replace existing mechanical sweeper with a high -efficiency street sweeper to improve program effectiveness and reduce pollutant loading to waterbodies within the City. The BCWMC capital improvement ro ram has funding to cover 100% of the estimated cost to upgrade from mechanical to high -efficiency enhanced swee Ter. Justification Street sweeping is one of the most cost-effective best management practices for improving water quality and reducing pollutant loading to impaired waters. Utilizing an enhanced street sweeper will improve the City's street sweeping program and provide direct benefits to Bassett Creek and all surface waters within the Citv. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 350,000 Improvements 350,000 Total 350,000 350,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund (7300) 350,000 350,000 Total 350,000 350,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-22 Project Name Pickup Truck (Storm Water Utility) Type Equipment Department Storm Water Useful Life Contact Category Storm Water Description F150 to replace Unit #507 (2012 Ford F150). Justification Increased repair and maintenance expenditures on Unit #517, which will be ten years old. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Furnishings 35,000 35,000 Total 35,000 35,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 35,000 35,000 (7300) Total 35,000 35,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project# SS-23 Project Name Storm Water Pond Dredging Type Maintenance Department Storm Water Useful Life Contact Category Storm Water Description Dredging program to remove accumulated sediment and hazardous materials such as Polycyclic Aromatic Hydrocarbons (PAH), including the proper disposal of dredged materials. Project ons will be prioritized and targeted utilizing the City's storm water Pond modeling software, field survevs and other factors. Justification it sedimentation reduces the water quality volume in ponds and contributes to degradation of downstream waters. Periodic dredging removes accumulated sediment and hazardous and restores nutrient and sediment removal efficiencies. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Other 300,000 300,000 300,000 300,000 300,000 1,500,000 Total 300,000 300,000 300,000 300,000 300,000 1,500,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 300,000 300,000 300,000 300,000 300,000 1,500,000 (7300) Total 300,000 300,000 300,000 300,000 300,000 1,500,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project# SS-26 Project Name V-Box Spreader and Anti -Ice (tandem) Type Equipment Useful Life Category Storm Water Department Storm Water Contact -Boz sander with liquid application for pre -wet and anti -icing for tamdem axle dump truck. This unit is 511. Justification I V-Box sanders are the most efficient and cost effective way to apply the de-icing chemicals for winter operations. V-Box sanders will reduce the impacts of de-icing chemicals on local lakes and ,treams. This spreader will be 11 v ears old. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Equip/Vehicles/Furnishings 67,000 67,000 Total 67,000 67,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 67,000 67,000 Total 67,000 67,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-34 Project name Flood Mitigation (Floodproofing, Voluntary) Type Improvement Department Storm Water Useful Life Contact Category Storm Water Description of funds to reduce or eliminate damage from flooding on Bassett Creek and its tributaries, including City storm water ponds such as Decola Pponds. Justification flood damage causes public health and safety concerns and significant economic loss. Flood mitigation will reduce or eliminate flood damage to structures and property. This may firkin,,, with homeowners, the Bassett Creek Watershed Management Commission and Minnesota Department of Natural Resources to imizlement nroeram. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Construction/Maintenance 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000 Total 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000 (7300) Total 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-41 Project Name Utility Machine Type Equipment Department Storm Water Useful Life Contact Category Storm Water Description Toolcat will be purchased with snow blower and sweeper attachments. This is a multipurpose loader that can also be used as a stump grinder, post hole auger, trencher etc. This unit was ,ed in 2013 and is unit 510. be a purchase of a new bobcat with a trade-in for the existing equioment to net Justification repair and maintenance on Unit 510. saves the cite monies in maintenance of the Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Furnishings 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000 Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 55,000 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 91,000 (7300) Tradie-in Vendor 50,500 50,500 50,500 50,500 50,500 50,500 50,500 50,500 404,000 Total 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 495,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-46 Project Name Zane Avenue & Lindsay St Reconstruction Type Improvement Useful Life Category Storm Water Department Storm Water Contact and/or repair of storm sewer drainage system in conjunction with Pavement Management Program. Justification I 'rovide and improve storm water drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff, minimize local drainage and flooding issues, protect iavement and facilitate sump drainages from private property. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total I nfrastructure 335,000 335,000 Improvements Total 335,000 335,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 335,000 335,000 (7300) Total 335,000 335,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-49 Project name Medley Park Stormwater Treatment Facility Type Improvement Department Storm Water Useful Life Contact Category Storm Water Description of a water quality treatment pond or similar facility to help remove sediment and nutrient loads within the Medicine Lake sub -watershed of the Bassett Creek watershed. Justification Bassett Creek Watershed Management Commission Capital Improvement Program includes the construction of this project and provides funding to maximize the rate control and water in this area of the watershed. Medicine Lake is impaired for the nutrients (phosphorus) and this project will help to meet water quality goals for the lake. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 440,000 330,000 880,000 1,650,000 Improvements Total 440,000 330,000 880,000 1,650,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 40,000 30,000 80,000 150,000 (7300) Bassett Creek Watershed 400,000 300,000 800,000 1,500,000 Mgmt Comm Total 440,000 330,000 880,000 1,650,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-51 Project Name 800 MHz Radios Type Unassigned Department Storm Water Useful Life Contact Category Storm Water Description MHz portable radios and accessories to be was purchased in 2019 and need to be replaced. Justification current radios purchased in 2019. New radios P25 Phase II modulation compliant. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Furnishings 20,000 20,000 Total 20,000 20,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 20,000 20,000 (7300) Total 20,000 20,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-53 Project Name Storm Sewer Repairs-MS4 and Other Type Maintenance Useful Life Category Storm Water Department Storm Water Contact Description Storm sewer repair and replacement as part of the City's MS4 inspection program and in conjunction with the City's annual asphalt overlay program. Repairs include but are not limited to pipe •ehabilitation and replacement, manhole adiustments and manhole sealine_ Justification To maintain the City's storm water and drainage system in conjunction with its MS4 program and asphalt overlay program. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 2,250,000 Improvements Total 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 2,250,000 Funding Sources Storm Water Utility Fund (7300) Total 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 2,250,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 150,000 300,000 2,250,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-54 Project Name Decola Pond F Storage & Diversion Project Type Improvement Useful Life Category Storm Water Department Storm Water Contact Description I Construction of flood storage ponds and storm sewer pipes to divert stormwater and lower the depth of flooding in the DeCola Ponds area. Justification ['he Medicine Lake Road and Winnetka Avenue Area Flood Mitigation Plan includes several projects that are needed to reduce the effect of repeat flooding on roadways and adjacent properties. ?rojects will reduce the depth of flooding on roadways and will lower flood elevations to help protect structures from flood damage. The Bassett Creek Watershed Management Commission Tital Improvement Pro., ram includes construction of this pro iect. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 1,770,000 1,000,000 2,780,000 300,000 5,850,000 Improvements Total 1,770,000 1,000,000 2,780,000 300,000 5,850,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 400,000 400,000 300,000 300,000 1,400,000 (7300) Bassett Creek Watershed 600,000 700,000 1,300,000 Mgmt Comm Hennepin County 370,000 370,000 MN DNR 1,000,000 1,780,000 2,780,000 Total 1,770,000 1,000,000 2,780,000 300,000 5,850,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-60 Project Name Bassett Creek Regional Trail -Storm Sewer Repairs Type Unassigned Department Storm Water Useful Life Contact Category Storm Water Description and repair of storm sewer drainage system in conjunction with Bassett Creek Regional Trail. Justification provide and improve storm water drainage system in conjunction with construction of the Bassett Creek Regional Trail. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Construction/Maintenance 50,000 50.000 Total 50,000 50,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 50,000 50,000 (7300) Total 50,000 50,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-63 Project Name V-Box Sander Type Equipment Useful Life Category Storm Water Department Storm Water Contact -Box Spreader to replace a 2012 Single Axle V-Box Spreader, Unit 512. Justification repair and maintenance expenditures on Unit #512, which is 13 years old. V-Box spreaders with liquid capabilities for pre -wetting and anti -icing apply de-icing chemicals effiently and ivelv durine winter operations. V-Box spreaders reduce the environmental impacts of de-icing chemicals to local waterbodies. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Fumishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 50,000 50,000 (7300) Total 50,000 50,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-64 Project Name Salt Brine Production Equipment Type Unassigned Department Storm Water Useful Life Contact Category Storm Water Description Salt Brine Production Equipment to replace equipment purchased in 2012. Justification Anti -icing brine production for reducing anti-icing/de-icing chemical application on city streets to reduce the impacts of de-icing chemicals in our creeks, lakes and wetlands. repair and maintenance expenditures on 2012 equipment, which is 10 years old. Salt brine, along with blending of additives, reduce the environmental impacts of de-icing chemicals to Expenditures 12022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Fumishings 50,000 50,000 Total 50,000 50,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 50,000 50,000 (7300) Total 50,000 50,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project# SS-65 Project Name Toledo Avenue Flood Mitigation Project Type Improvement Useful Life Category Storm Water Department Stone Water Contact telocate portions of Toledo Avenue North, Scott Avenue North, and Minnaqua Drive to a higher elevation to reduce frequent flooding of streets, driveways and regional trail near Minnaqua Por 3roject may involve property acquisition. This flood reduction project is identified in the Hennepin County hazard mitigation plan and would require funding from Mn Dept of Public Safety 3omeland Security and Emergency Management Division (75% grant funding) and Three Rivers Park District (for regional trail). This project is also identified in the BCWMC CIP and includes water ualit y improvements to protect and im rove Bassett Creek. Planning study scheduled for 2025. Justification >treets and driveways near Minnaqua Pond are impassable for residents and emergency response vehicles due to frequent flooding. Bassett Creek is identified by MPCA as an impaired water bot Expenditures Infrastructure Improvements Total 2022 2023 2024 2025 50,000 50,000 2026 2027 2028 2029 2030 2031 Total 1,650,000 1,650,000 3,350,000 1,650,000 1,650,000 3,350,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 50,000 375,000 375,000 800,000 (7300) Hennepin County 1,125,000 1,125,000 2,250,000 Three Rivers Park District 150,000 150,000 300,000 Total 50,000 1,650,000 1,650,000 3,350,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-67 Project Name Bassett Creek Restorationn Project -Regent to GV Rd Type Improvement Useful Life Category Storm Water Department Storm Water Contact Description Fhis project will include stream bank stabilization measures and erosion repair methods using a variety of best management practices. Justification Fhe City's annual creek inventory identified significant erosion in this reach of the creek. Continued erosion along the stream will result in increased sediment and pollutant loading downstream ind poses a risk to public infrastructure. Restoration and repair of the streat in this area will reduce phosphorus and is consistent with BCWMC goals regarding water quality. This project is iro rammed in the BCWMC CIP. Three Rivers Park District has been identified as a potential garment due to its interest in Sohacki Park. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 110,000 660,000 770,000 Improvements Total 110,000 660,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 770,000 Total Storm Water Utility Fund 10,000 60,000 70,000 (7300) Bassett Creek Watershed 100,000 600,000 700,000 Mgmt Comm Total 110,000 660,000 770,000 2031 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-68 Project Name Turf Sweeper Type Equipment Useful Life Category Storm Water Department Storm Water Contact Description Curf Sweeper to replace a 2011 Smithco Turf Sweeper, Unit #506. Justification ncreased repair and maintenance expenditures on Unit #506, which is 15 years old. Turf Sweepers are used to collect leaves and debris from maintained turf. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Fumishings Total 40,000 40,000 40,000 40,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 40,000 40,000 (7300) Total 40,000 40,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-69 Project Name Decola Ponds SEA School Flood Reduction Project Type Improvement Useful Life Category Storm Water Department Storm Water Contact Description Construction of flood storage ponds and storm sewer pipes to divert stormwater and lower the depth of flooding in the Decola Ponds area. This project involves portions of Wildwood Park and SEA School. Funds in 2020 will be utilized to study potential properties, solutions, and options lowerin,- flood levels on Decola Ponds E and F. Justification The Medicine Lake Road and Winnetka Avenue Area Flood Mitigation Plan includes several projects that are needed to reduce the effect of repeat flooding on roadways and adjacent properties. Projects will reduce the depth of flooding on roadways and will lower flood evelations to help protect structures from flood damage. The Bassett Creek Watershed Management Commission Capital Improvement Program includes construction of this nroiect. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 1,980,000 1,030,000 3,010,000 Improvements Total 1,980,000 1,030,000 3,010,000 Funding Sources Storm Water Utility Fund (7300) Bassett Creek Watershed Mgmt Comm Hennepin County 300,000 300,000 MN DNR 1,300,000 1,300,000 1,680,000 1,330,000 3,010,000 Total 2022 2023 2024 80,000 30,000 300,000 1,000,000 2025 2026 2027 2028 2029 2030 2031 Total 110,000 1,300,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-70 Project Name Study Flood Risk in Localized Flood -prone Areas Type Unassigned Department Storm Water Useful Life Contact Category Unassigned a study including field survey and analysis of flood prone areas in the City to determine flood risk and identify potential solutions. Construct low-cost, high -benefit solutions in 2024. Justification ve flood damage causes significant economic loss. Understanding flood risk is critical to reducing or eliminating flood damage to homes, property, and infrastructure. As outlined in the )m lrehensive Plan, the City will complete studies to evaluate and determine flood risk in areas that may be Urone to floodine. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Other 125,000 125,000 300,000 550.000 Total 125,000 125,000 300,000 550,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 125,000 125,000 300,000 (7300) 550,000 Total 125,000 125,000 300,000 550,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-71 Project Name Inspect and Maintain Large Diameter Storm Sewers Type Improvement Useful Life Category Storm Water Department Storm Water Contact Description Storm sewer inspection, cleaning, maintenance, and repair of its large diameter storm sewer pipes. Justification Co maintain the City's storm water system to facilitate proper drainage and reduce flooding throughout the City. Large pipes are typically filled with storm water and require additional resources tnd equipment to inspect, clean, and maintain. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 300,000 300,000 600,000 Improvements Total 300,000 300,000 600,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 300,000 300,000 600,000 (7300) Total 300,000 300,000 600,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-72 Project Name Zenith Avenue Reconstruction Type Improvement Department Storm Water Useful Life Contact Category Storm Water Description repair and maintenance expenditures on Unit #509, which is 9 years old. V-Box spreaders with liquid capabilities for pre -wetting and anti -icing apply de-icing chemicals efficiently and ively during winter operations. V-Box spreaders reduce the environmental impacts of de-icing chemicals to local waterbodies. Justification and improve storm water drainage system in conjunction with the Pavement Management Program to facilitate surface water runoff, minimize local drainage and flooding issues, protect Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 500,000 500,000 (7300) Total 500,000 500,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project# SS-73 Project Name Compact Excavator Type Unassigned Department Storm Water Useful Life Contact Category Unassigned Description Compact Excavator to replace a 2015 Bobcat Compact Excavator Justification Increased repair and maintenance expenditures on Unit 9513, which is 15 years old and meets life cycle replacement criteria. The compact excavator is used for excavation in close surroundings and creek maintenance. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total EquipNehicles/Fumishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 80,000 80,000 (7300) Total 80,000 80,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-74 Project Name Bassett Creek Restoration in Brookview Golf Course Type Improvement Useful Life Category Storm Water Department Storm Water Contact Description Stabilize and restore a 500-feet section of Bassett Creek that is actively eroding, impacting infrastructure in Brookview Golf Course and water quality within the Main Stem of Bassett Creek. Justification k section of Bassett Creek within the golf course is eroding and previously installed streambank protection has deteriorated beyond its useful life. Sediment and nutrient loads are being deposited nto Bassett Creek. Bassett Creek is impaired for biota (fish and insects). Restoring and maintaining the streambanks within Brookview Golf Course will help protect and improve Bassett Creek and improve wildlife habitat. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 150,000 150,000 Improvements Total 150,000 150,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 150,000 150,000 (7300) Total 150,000 150,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-75 Project Name water Quality Pond Restoration Type Unassigned Department Storm Water Useful Life Contact Category Unassigned Description ining, dredging, and restoring the water quality treatment volume in ponds within Brookview Golf Course to help stabilize eroding slopes and remove sediment and nutrient loads and e water quality within the Main Stem of Bassett Creek. Justification slopes within the golf course are eroding and aging infrastructure in and around the ponds are beyond their useful life. Sediment and nutrient loads are depositing into the ponds and stream into Bassett Creek. Bassett Creek is impaired for biota (fish and insects). Restoring and maintaining the ponds within Brookview Golf Course will help protect and improve Bassett Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Infrastructure 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 500,000 Improvements Total 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 500,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 500,000 (7300) Total 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 500,000 Capital Plan 2022 thru 2031 City of Golden Valley, Minnesota Project # SS-76 Project Name Laurel Greenbelt Culvert Replacement Type Unassigned Useful Life Category Unassigned Department Storm Water Contact of the culvert between the West Ring and East Ring Ponds north of Laurel Avenue at Louisiana Avenue. Justification aging large diameter corrugated metal culvert is showing signs of degradation at the water level line and must be replaced to avoid future ongoing maintenance and flooding issues. Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total I nfrastructure 750,000 750,000 Improvements Total 750,000 750,000 Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Storm Water Utility Fund 750,000 750,000 (7300) Total 750,000 750,000