08 - Water and Sanitary Sewer Utility SectionCapital Improvement Program 2022-2031
Water and Sanitary Sewer Utility Section
A ten-year projection of the Water and Sanitary Sewer Fund reveals some potential financial
challenges the City may have to address. The contract pricing with the City of Minneapolis and
City of Golden Valley, Minnesota
Capital Plan
2022 thru 2031
PROJECTS BY DEPARTMENT
Department
#
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
iwater & Sewer Systems
Sanitary Sewer &Water Line
W&sS-001
1,300,000
1,300,000
1,300,000
Repair/Recon.
3,900,000
Infrastructure Renewal Plan (IRP)
w&Ss-002
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
18,200,000
Pickup Truck
w&Ss-011
Sewer Jet Truck
w&ss-012
40,000
40,000
Pickup Truck
w&ss-ova
100,000
250,000
250,000
Pickup Truck
w&Ss-015
75,000
100,000
Cargo Van
w&Ss-028
75,000
Pickup/Utility Truck
w&ss-037
75,000
25,000
25,000
Multiquip Portable Generator
W&SS-041
10,000
75,000
Mill and Overlay Water/Sewer Repairs
W&ss-051
150,000
150,000
150,000
150,000
150,000
150,000
150,000
150,000
150,000
150,000
10,000
1,500,000
Portable Generator
W&SS-052
5,000
Televising Equipment
W&SS-053
250,000
5,000
Trailer
w&ss-054
250,000
Structure and Pipe Inspection Pole
W&ss055
25,000
10,000
10,000
Camera
25,000
Valve Replacement/Watermain Lining
w&ss-088
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
1,000,000
1-394 Inflow/Infiltration Project
W&SS-074
250,000
250,000
250,000
250,000
250,000
1,250,000
Sewer Flow Meters
W&Ss-076
35,000
35,000
Sanitary Sewer Lining 1/1 Reduction
W&SS-078
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
70,000
2,200,000
Asset Management Equipment
W&Ss-080
800 MHz Radios
w&Ss-081
40,000
40,000
T.H. 55 Lift Station Relocation
w&ss-0e3
770,000
40,000
40,000
Almond Portable Gen/Light Plant Trailer
w&ss-084
35,000
770,000
Trenchless Request for Information
W&Ss-086
50,000
,000
3535,000
Complete Water Meter Replacement
W&Ss087
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
3" Dewatering Pump
w&Ss-088
4" Dewatering Pump
w&ss-089
5,000
5,000
6" Dewatering Pump
w&ss-oso
5,000
5,000
Air Compressor
W&Ss-091
50,000
50,000
30,000
30,000
Department
#
2022
2023
2024
2025
2026 2027 2028
2029 2030 2031 Total
Cement Mixer
W&SS-093
5,000
Pickup Truck
W&SS-094
45,000
5,000
Trailer
w&SS-095
45,000
Trailer
w&ss-oss
10,000 10,000
Trailer Mounted Air Compressor
w&ss-oss
30,000
15,000
15,000
Cargo Van
w&SS-oss
30,000
Combination JetNactor
w&ss-goo
525,000
30,000
30,000
Trailer Mounted Welder
w&Ss-101
525,000
Zenith Avenue Reconstruction
w&sS-103
10,000
10,000
New Public Works Facility
w&SS-104
1,000,000
1,000,000
Zane &Lindsey St Reconstruction
w&ss-cos
750,000
1,500,000 1,500,000
Pikup Truck
w&ss-cos
50,000
750,000
Trunk Sanitary Sewer Repair-TH
w&ss-1o7
50,000
500,000
50,000
100/Glenwood
550,000
Inflow and Infiltraion Rehabilation
W&SS-108
1,000,000
Glenwood Avenue Watermain
W&ss-109
1,500,000
1,000,000
Rehabilitation
1,500,000
TH 55 Underpass Water Improvements
w&ss-110
150,000
150,000
Water & Sewer
Systems Total
4,705,000
4,000,000
2,820,000
3,995,000
4,425,000 3,645,000 3,350,000
3,900,000 33440,000 5,100,000 39,380,000
GRAND TOTAL 4,705,000 4,000,000 2,820,000 3,995,000 4,425,000 3,645,000 3,350,000 3,900,000 3,440,000 5,100,000 39,380,000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # W&SS-001
Project Name Sanitary Sewer & Water Line Repair/Recon.
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
dajor repairs and reconstruction on the City's sanitary sewer and water systems as needed. Repairs will be done in conjunction with the City's Pavement Management Program (See S #1).
Justification
Fo maintain City's water mains and sanitary sewer mains.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 1,300,000 1,300,000 1,300,000 3,900,000
Total 1,300,000 1,300,000 1,300,000 3,900,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 1,300,000 1,300,000 1,300,000 3,900,000
Total 1,300,000 1,300,000 1,300,000 3,900,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-002
Project Name Infrastructure Renewal Plan (IRP)
Type Maintenance
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description
Major repairs and reconstruction on the City's sanitary sewer and water system are needed. Repairs will be done in conjunction with the City's Infrastructure Renewal Program.
Justification I
Fo maintain City's water mains and sanitary sewer mains.
Expenditures 2022 2023
2024 2025
2026
2027
2028
2029
2030
2031
Total
Construction/Maintenance
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
18,200,000
Total
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
18,200,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 2,600,000 2,600,000 2,600,000 2,600,000 2,600,000 2,600.000 2.600.000 18.200.000
total 2,600,000 2,600,000 2,600,000 2,600,000 2,600,000 2,600,000 2,600,000 18,200,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-011
Project Name pickup Truck
Type Unassigned
Useful Life
Category Water and Sewer
Description l
'ickup truck to replace Unit #688, a 2010 F 150 pickup truck.
Department Water & Sewer Systems
Contact
Justification
ncreased repair and maintenance expenditures on Unit 630, which will be ten(10) years old and meets life cycle replacement criteria. The pickup truck is used to transport staff, tools and supplies
o various projects..
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Fumishings 40,000 4n nnn
Total
40.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 40 onn nn r
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-012
Project Name Sewer Jet Truck
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
Sigh pressure sewer jet/rodder truck for the Utility Division is an essential piece of equipment for mainline sewer cleaning.
Justification I
ncreased repair and maintenance expenditures on Unit which will be 11 years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 250,000 250,000
Total 250,000 250,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 250,000 250,000
Total 250,000 250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-014
Project Name Pickup Truck
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
3ickup/Utility truck for the Utility Department to replace Unit 604 a 2013 Ford F-550 4X4 with crane.
Justification
ncreased repair and maintenance expenditures on Unit 604, which will be nine years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings
Total
Funding Sources
100,000 100,000
100,000 100.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 100,000 inn nnn
Total 100,000
100,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-015
Project Name Pickup Truck
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
?ickup/Utility truck for the Utility Department to replace Unit 600, a Ford 2012 F350
Justification
ncreased repair and maintenance expenditures on Unit 600, which will be ten years old.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 75,000 75,000
Total 75,000
75,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 75,000 75,000
Total 75,000
75,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W &SS-028
Project Name Cargo Van
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
argo Van to replace a 2016 Ford Transit Connect, Unit #612.
Justification
ncreased repair and maintenance expenditures on Unit #612, which is 10 years old and meets life cycle replacement criteria. The cargo van is used for Inflow and Infiltration inspections.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
25,000 25,000
25,000 25.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 25,000 25,000
Total 25,000 25.000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-037
Project Name pickup/Utility Truck
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
Ality Truck with crane to replace a 2014 Ford F-350 Utility Truck with crane, Unit #607.
Justification
ncreased repair and maintenance expenditures on Unit #607, which is 10 years old and meets life cycle replacement criteria. The utility truck is used for routine maintenance, plowing, and
ift station pumps.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Other 75,000 75,000
Total 75.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 75,000 75,000
Total 75,000 75_nnn
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-041
Project Name Multiquip Portable Generator
Type Unassigned
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description I
k Multiquip portable generator Unit 692, a 2010 portable generator.
Justification
ncreased repair and maintenance expenditures on Unit 692.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Fumishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 10,000 10,000
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ect # W&SS-051
ect Name Mill and Overlay Water/Sewer Repairs
Type Improvement
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description I
Water and Sanitary Sewer repairs willl be made in conjuction with the annual Asphalt Overlay program. Repairs include but not limited to valve and hydrant replacement, manhole adjustments,
nanhole sealing, and pipe replacement.
Justification
Co maintain Citys water mains and sanitary sewer mains.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 1,500,000
Total
Funding Sources
150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 1,500,000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 1,500,000
Total 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 1,500,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-052
Project Name Portable Generator
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
Portable Generator to replace a 2010 Honda Generator, Unit #689.
Justification
ncreased repair and maintenance expenditures on Unit #689, which is 15 years old and meets life cycle replacement criteria. The generator supplies power for hand tools.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 5,000
5,000
Total 5,000 5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 5,000 5,000
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-053
Project Name Televising Equipment
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
Sewer televising mainline computer and electronic equipment purchased with the televising truck .The televising equipment will be replaced along with new Electroscan equipment.
Justification
Jpdate computer and electronic equipment that will televise and incorporate electroscan into the upgraded televising equipment. Enhanced sanitary sewer inspection to identify, quantify and
)rioritize defects in the sanitary sewer system.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 250,000
250,000
Total 250,000 250,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 250,000 250,000
Total 250,000 250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-054
Project Name Trailer
Type Equipment
Useful Life
Category Water and Sewer
Description I
[railer to replace a 2015 Tandem axle utility trailer, Unit 611.
Justification
Department Water & Sewer Systems
Contact
ncreased repair and maintenance expenditures on Unit 611, which will be 15 years old and meets life cycle replacement criteria. The trailer used to transport tools, equipment and supplies to
epair manhole and catch basin structures.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 10,000 10.000
Total
10,000
10.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 10,000 10,000
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-055
Project Name Structure and Pipe Inspection Pole Camera
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
Structure and pipe inspection, portable pole camera televising equipment. Camera is mounted on a pole for quick and efficient televised inspeciton of manhole structures. Recorded inspection
information is then downloaded into the mainline televising software for electronic filing of data
Justification
Increased efficiencies on structure inspections and structure information documentation.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 25,000 25,000
Total 25,000 25,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 25,000 25,000
Total 25,000 25,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-066
Project Name Valve Replacement/Watermain Lining
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
Jatermain valve replacement and strategic watermain lining associated with future overlay project.
Justification
.ncludes the cost to replace leaking water valves and line minor portions of the public watermain in conjunction with the future overlay program.
Expenditures
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Construction/Maintenance
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
1,000,000
Total
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
1,000,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Water & Sewer Utility Fund
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
10,000
910,000
Total
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
10,000
910,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-074
Project Name I-394 Inflow/Infiltration Project
Type Improvement
Useful Life
Category Water and Sewer
Description
teduce inflow/infiltration in the I-394 sewer shed district.
Department Water & Sewer Systems
Contact
Justification I
The sanitary sewer in the I-394 sewer shed is currently near capacity following large storm events. The reduction of I/I in the sewer shed is necessary in order to continue to allow future
redevelopment of the corridor.
Expenditures 2022
2023 2024
2025 2026
2027 2028
2029 2030
2031
Total
Construction/Maintenance
250,000
250,000
250,000
250,000
250,000
1,250,000
Total
250,000
250,000
250,000
250,000
250,000
1,250,000
Funding Sources 2022
2023 2024
2025 2026
2027 2028
2029 2030
2031
Total
Water & Sewer Utility Fund
250,000
250,000
250,000
250,000
250,000
1,250,000
Total
250,000
250,000
250,000
250,000
250,000
1,250,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-076
Project Name Sewer Flow Meters
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
'ortable sewer flow meters for monitoring inflow and infiltration in sanitary sewer system.
Justification I
teplace older portable sewer flow meters to accurately monitor sewer flows.
Expenditures
2022 2023
2024 2025 2026 2027 2028 2029 2030 2031
Total
EquipNehicles/Furnishings
35,000
35,000
70,000
Total
35,000
35,000
70,000
Funding Sources
2022 2023
2024 2025
2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund
35,000
35,000
70,000
Total
35,000
35,000
70,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-078
Project Name Sanitary Sewer Lining I/1 Reduction
Type Improvement Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
ng of Sanitary Sewer Mains outside of the PMP project area.
Justification
The City's aging sanitary sewer infrastructure requires maintenance and repair. As part of the maintenance and repair is the lining of sanitary sewer mains. The goal is to maintain the sanitary sewer
to reduce I/I and to avoid an additional surcharge/demand charge from MCES, by investing in the sanitary sewer system to reduce 1/I. The proposed budget is for lining approximately 2,600 feet of
sanitary sewer main annually.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance
100.000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
Total
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Water & Sewer Utility Fund 100,000 100,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,200,000
Total 100,000 100,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,200,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-080
Project Name Asset Management Equipment
Type Equipment
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description
purchase of hardware, mobile devices and equipment necessary to support the implementation of the new mobile web -based Asset and Management Software system.
Justification
Che move to a mobile web -based work management system will improve efficiencies within the organization and service delivery to external customers. The software will be utilized to manage
outine tasks and business workflows, track inspections and maintenance and assist in programming future expenditures
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
Funding Sources
Water & Sewer Utility Fund
40.000
40,000
an nnr
40,000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
40.000
1n nnn
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-081
Project Name 800 MHz Radios
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
I-800 MHz portable radios and accessories to be purchased in 2019.
Justification I
teplace current raidos purchased in 2019. New radios P25 Phase II modulation compliant.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 40,000 40,000
Total 40,000 40,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-083
Project Name T.H. 55 Lift Station Relocation
Type Improvement
Useful Life
Category Water and Sewer
Description
2elocate T.H. 55 sanitary sewer lift station structure.
Department Water & Sewer Systems
Contact
Justification I
design and construction to relocate T.H. 55 lift station to remove the lift station from the 100 year flood plain. The current structure has times were flooding occurs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 770,000 770,000
Total 770,000
770,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 770,000 770,000
Total 770,000
770,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-084
Project name Almond Portable Gen/Light Plant Trailer
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description
kn Almond portable generator/light plant trailer Unit #687, a 2009 portable emergency generator/light plant.
Justification I
ncreased repair and maintenance on Unit #687.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 35,000 35,000
Total 35,000 35,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 35,000 35,000
Total 35,000 35,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&cSS-086
Project Name Trenchless Request for Information
Type Improvement
Useful Life
Category Water and Sewer
Description I
Conduct a Request for Information on trenchless technologies.
Department Water & Sewer Systems
Contact
Justification
k trenchless technologies Request for Information should be conducted so staff has the newest facts before decisions are made pertaining to the Infrastructure Renewal Plan. It is anticipated that
his project will partmer with other local agencies for shared costs and benefits
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 50,000 sn nnn
Total
50,000
50.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 50,000 50,000
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-087
Project Name Complete Water Meter Replacement
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
teplacement of the entire water meter (water meter body, meter, and transmitter) throughout the whole City beginning in 2030.
Justification I
Fhe average expected water meter life is twenty years. The existing meters will be thirty years old by 2030. Water meters begin to underestimate water usage as they age resulting inaccurate water
tnd sewer usage and inaccurate billine.
Expenditures
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
EquipNehicles/Furnishings
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
Total
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
Funding Sources
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Total
Water & Sewer Utility Fund
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200,000
Total
100,000
100,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
250,000
2,200 000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # W&SS-Ogg
Project Name 3" Dewatering Pump
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
1" Dewatering Pump to replace a 2011 Wacker Pump, Unit #694.
Justification I
ncreased repair and maintenance expenditures on Unit #694, which is 15 years old and meets life cycle replacement criteria. Dewatering pumps are used to alleviate localized flooding during
ieavy rain or rapid snowmelt events and water main repairs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings
Total
5,000
5,000
nnn
5.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 5,000 5,000
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-089
Project Name 4" Dewatering Pump
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
1" Dewatering Pump to replace a 2011 Wacker Pump, Unit #695.
Justification
ncreased repair and maintenance expenditures on Unit #695, which is 15 years old and meets life cycle replacement criteria. Dewatering pumps are used to alleviate localized flooding during
teavy rain or rapid snowmelt events and water main repairs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 5,000 5 nnn
Total 5,000 5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 5,000 5 nnn
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ect # W&SS-090
ect Name 6" Dewatering Pump
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
6" Dewatering Pump to replace a 2010 Godwin Pump, Unit #696.
Justification
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
Funding Sources
50,000
50,000
Vn nnn
50.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 50,000 50,000
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
F
ect # W&SS-091
ect Name Air Compressor
Type Unassigned
Useful Life
Category Unassigned
Department Water & Sewer Systems
Contact
Description I
trailer Mounted Air Compressor to replace 2012 Sullair Air Compressor, Unit #601.
Justification
ncreased repair and maintenance expenditures on Unit #601, which is 15 years old and meets life cycle replacement criteria. The air compressor is used to prepare fire hydrants for painting.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
30,000 30,000
30,000 30.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 30,000 30,000
Total 30,000
30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-093
Project Name Cement Mixer
Type Equipment
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description I
:ement Mixer to replace a 2010 Multiquip Cement Mixer, Unit #691.
Justification I
ncreased repair and maintenance expenditures on Unit #691, which is 15 years old and meets life cycle replacement criteria. The cement mixer is used during manhole and catch basin repairs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 5,000 5,000
Total 5,000 5,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 5,000 5,000
Total 5,000 5,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-094
Project Name Pickup Truck
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
Jtility Truck to replace a 2014 Ford F-250 Utility Truck, Unit #608
Justification I
ncreased repair and maintenance expenditures on Unit #608, which is 10 years old and meets life cycle replacement criteria. The utility truck is used for routine maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 45,000
45.000
Total
Funding Sources
45,000
45.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 45,000 45,000
Total 45,000 45.000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-095
Project Name Trailer
Type Unassigned
Useful Life
Category Unassigned
Description
Jtility Trailer to replace a 2014 Felling Trailer, Unit #6 99.
Department Water & Sewer Systems
Contact
Justification
ncreased repair and maintenance expenditures on Unit #609, which is 15 years old and meets life cycle replacement criteria. The trailer transports the cement mixer, risers, tools, and supplies to
e ap it manhole and catch basin structures.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 10,000 10,000
Total 10,000 10,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 10,000 10,000
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-097
Project Name Trailer
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
Jtility Trailer to replace a 2014 Felling Trailer, Unit #602.
Justification
ncreased repair and maintenance expenditures on Unit #602, which is XX years old and meets life cycle replacement criteria. The trailer transports the cement mixer, risers, tools, and supplies to
epair manhole and catch basin structures.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 15,000 15,000
Total 15,000
15,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 15,000 15.000
Total 15,000
15,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-098
Project Name Trailer Mounted Air Compressor
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
Trailer Mounted Air Compressor to replace 2009 Sullair Air Compressor, Unit #686.
Justification
Increased repair and maintenance expenditures on Unit 4686, which is 15 years old and meets life cycle replacement criteria.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings
Total
Funding Sources
30,000
30,000
sn nnn
30.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 30,000 m nnn
total 30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-099
Project Name Cargo Van
Type Equipment
Useful Life
Category Water and Sewer
Description I
.argo Van to replace a 2016 Ford Transit T-150, Unit #613.
Department Water & Sewer Systems
Contact
Justification I
ncreased repair and maintenance expenditures on Unit #613, which is 10 years old and meets life cycle replacement criteria. The cargo van is used for water meter maintenance activities.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
EquipNehicles/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources
Water & Sewer Utility
Total
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Fund 30,000
30,000
30,000 30,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-100
Project Name Combination Jet/Vactor
Type Equipment
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description
ombination JetNac Unit to replace a 2012 Vactor Combination Jet/Vac Unit, Unit #699.
Justification I
ncreased repair and maintenance expenditures on Unit #699, which is 12 years old and meets life cycle replacement criteria. The combination unit cleans and removes debris for the storm and
tanitary sewer systems_
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings 525,000
Total 525,000 525,000
525,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 525,000
Total 525,000 525,000
525,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-101
Project Name Trailer Mounted Welder
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
Crailer Mounted Welder to replace a 2011 Miller Welder, Unit #697.
Justification
ncreased repair and maintenance expenditures on Unit #697, which is 15 years old and meets life cycle replacement criteria. The welder is used for off -site welding repairs.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Equip/Vehicles/Furnishings
Total
Funding Sources
Water & Sewer Utility Fund
10,000 10,000
10,000 10.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
10,000
i n nnn
Total 10,000 10,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-103
Project Name Zenith Avenue Reconstruction
Type Improvement
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description I
Major repairs and reconstruction on the City's sanitary sewer and water system are needed. Repairs will be done in conjunction with the City's Pavement Management Program.
Justification
Fo maintain City's water mains and sanitary sewer mains.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Infrastructure
Improvements
Total
Funding Sources
Water & Sewer Utility Fund
1,000,000
1,000,000
1,000,000
1.000.000
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
1,000,000
1 nnn nnn
total 1,000,000 1,000,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-104
Project Name New Public Works Facility
Type Improvement
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description
Instruct a 100' by 100' expansion to the north side of the Utility Maintenance building.
Justification I
ncreased accidents to vehicles, equipment, and building from insufficient space and decreased mobility. Vehicles and equipment should be stored inside to extend life cycle given the large capital
nvestment. Staff can respond to emergency operations quicker because equipment remains warm and staged during adverse weather conditions
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Infrastructure Improvements 1,500,000 1,500,000
Total 1,500,000 1,500,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 1,000,000 1,000,000
Water & Sewer Utility - Operating 500,000 500,000
Total 1,500,000 1,500,000
Capital Plan 2022 rhru 2031
City of Golden Valley, Minnesota
Project # W&SS-105
Project Name Zane & Lindsey St Reconstruction
Type Improvement Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description
✓lajor repairs and reconstruction on the City's sanitary sewer and water system are needed. Repairs will be done in conjunction with the City's Pavement Management Program.
Justification
To maintain City's water mains and sanitary sewer mains.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Infrastructure 750,000
Improvements 750,000
Total 750,000
750,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 750,000 750,000
Total 750,000 750,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-106
Project Name Pikup Truck
Type Equipment Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
Jtility Truck to replace a 2015 Ford F-250 Utility Truck, Unit #610.
Justification I
ncreased repair and maintenance expenditures on Unit #610, which is 10 years old and meets life cycle replacement criteria. The utility truck is used for routine maintenance operations.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Other 50,000
50,000
Total 50,000 50,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 50,000 50,000
Total 50,000 50,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-107
Project name Trunk Sanitary Sewer Repair-TH 100/Glenwood
Type Improvement Department Water & Sewer Systems
Useful Life Contact
Category Water and Sewer
Description I
Zepair and rehabilitation of the trunk sanitary sewer line that runs under TH 100, north of Glenwood towards the MCES gravity interceptor.
Justification
Significant degradation was found in this pipe as part of a MCES repair project in 2019. In order to prevent further degradation, the pipe must be repaired or rehabilitated. Staff evaluated the pipe
further in 2020 and determined that some minor repairs are needed in 2022 however the repair work can wait until 2024
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 50,000 500,000 "A Ann
Total 50,000 500,000
550.000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 50,000 500,000 550,000
Total 50,000 500,000 550,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project# W&SS-108
Project Name Inflow and Infiltraion Rehabilation
Type Improvement
Useful Life
Category Water and Sewer
Department Water & Sewer Systems
Contact
Description I
Zehabilitation of the sanitary sewer system in high areas of inflow and infiltration.
Justification
Sanitary sewer rehabilitation projects are quick and effective ways to help reduce the inflow and infiltration in the City. Should COVID-19 Relief funding become available, the City has areas of
high Inflow and Infiltration where the funds could go towards to continue efforts towards our goal of eliminating I&I
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 1,000,000 1,000,000
Total 1,000,000
1,000,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 1,000,000 1,000,000
Total 1,000,000
1,000,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-109
Project Name Glenwood Avenue Watermain Rehabilitation
Type Unassigned Department Water & Sewer Systems
Useful Life Contact
Category Unassigned
Description I
Rehabilitation of the watermain system along Glenwood Avenue between Georgia Avenue and King Creek Road
Justification
The watermain system along Glenwood Avenue has seen an exponential increase in watermain breaks dating back to 2018. The system is in grave need of rehabilitation to prevent a major water
outage in this area.
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Construction/Maintenance 1,500,000 1,500.000
Total 1,500,000
1,500,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 1,500,000 1.500 non
total 1,500,000
1,500,000
Capital Plan 2022 thru 2031
City of Golden Valley, Minnesota
Project # W&SS-110
Project Name TH 55 Underpass Water Improvements
Type Improvement
Useful Life
Category Water and Sewer
Description
Justification
Department Water & Sewer Systems
Contact
Expenditures 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Infrastructure 150,000
Improvements 150,000
Total 150,000
150,000
Funding Sources 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Water & Sewer Utility Fund 150,000 150,000
Total 150,000
150,000