#157 05-01-56 Relate Gas Service Connections South Trunk SewerResolution No. 157 May 1, 1956
Member Rahn introduced the following resolution and moved its adoption:
RESOLUTION RELATING TO GAS SERVICE CONNECTIONS
SOUTH TRUNK SEWER
WHEREAS, work on Village Trunk Sewer :Improvement No. 2 can be expedited by
the temporary removal of certain gas installations, and
WHEREAS, such temporary removal can best be accomplished by the employees
of the Minneapolis Gas Company, and
WHEREAS, the said Minneapolis Gas Company has indicated a willingness to do
such work when requested to do so by the Village on a basis which appears
to be satisfactory to this Council,
NOW, THEREFORE, BE IT RESOLVED as follows:
1. That the Sanitary Sewer Resident Engineer is hereby authorized and directed
to order the temporaty removal of such gas3installations in Village streets
as will expedite the construction of said improvement.by the signing of
written work orders for such items of labor and materials as are hereinafter,
specified.
2. That the cost of such items of labor and.materials hereinafter specified
shall be paid for by the Village and charged to the proper Sanitary Sewer
Improvement Construction Fund upon presentation of monthly verified claims
therefor.by the said Minneapolis Gas Company after audit and allowance by
the Village Council.
3. That the items of labor and materials for which reimbursement shall be
made shall be as follows:
(a) Direct payroll according to schedules established by contract for
rank and classification of workmen used in actual performance of
said work, including laborers, mechanics, welders, machine oper-
ators and street "foremen" (working union crew leader) and costs
directly relating to payroll such as workments compensation
insurance, pensions, social security, state unemployment, hosp-
italization insurance and group insurance.
('dime devoted by officers, superintendents, engineer, supervisors
and inspectors in planning and co-ordinating the work, locating
and marking gas structures for the contractors, taking precautionary
measures on gas company initiative or observing precautions being
taken by the contractors will not be included in costs of temporary
removal and replacement ordered by the Village.)
(b) Materials installed in the permanent structure as restored and
replaced which are made necessary by the temporary removal, such
as pipe, pipe protective coatings, compression couplings, pressure
control fittings,.rapai sleeves and clamps, welding flanges,
service saddles, street tees and ells, drip pots, etcl, at store
room cost.
632
Resolution No. 157 (continued)
May 1, 1956
(c) The operating cost of trucks used in bringing tools and
supplies and moving men and equipment to be charged on an
hourly basis as determined from operating cost records.
(d)
In the event that sections of gas mains lying along the
length of streets to be opened for sewer installation would
be undermined and must be removed and subsequently relaid
and reconnected involving the use of a main lying crew
and #9avy construction equipment, then charges may include
the time of a main crew supervising foreman and gasoline
and lubricants used on the job by the power equipment.
The motion for the adoption of the foregoing resolution was duly seconded
by Member Teresi and upon vote being taken thereon, the following members
voted in favor thereof: Bies, Nadasdy, Rahn and Teresi; and the following.
voted against the same: None whereupon said resolution was declared
duly passed and adopted, signed by the Mayor and his signature was attested
by the Clerk.