Loading...
#079 10-03-61 Award Contract 61-LF-19, 61-WM-30Resolution No. 79 October 3, 1961 Member Teresi introduced the following resolution and MOVED its adoption: RESOLUTION ORDERING CONSTRUCTION AND PROVIDING THAT WORK BE DONE PURSUANT TO ORDERS CHANGING EXISTING CONTRACTS (61 -LF -19; 61-WM-30) BE IT RESOLVED by the Village Council of the Village of Golden Valley, Minnesota, as follows: 1. That at a public hearing held on this day at 7:30 o'clock p.m. at the address of 7800 Golden Valley Road,,in the Village of Golden Valley, Minnesota, after notices of said hearing duly published as required by law, this Council has consulted the views of all persons interested and, being fully advised of the pertinent facts, does hereby determine to proceed with the construction of certain proposed public improvements contained in said notices. 2. It is hereby found and determined that said public improvements can best be constructed as proposed and not in connection with some other public improvement. 3. The cost of said improvements shall be paid out of special assess- ments to be levied as set forth in said notices of public hearing. 4. The Village Engineer is hereby designated as the engineer for the construction of said proposed public improvements and plans and specifi- cations heretofore prepared by him are hereby approved. 5. With reference to Improvement No. 61 -LN -19, the estimated cost of this improvement is $10,515.00. It is found and determined that said improvement can be best and most -economically constructed by the issuance of a change order to Phelps -Drake Company, Inc., with which company the Village on July 5, 1961, entered into a contract for the construction of all other lateral sanitary sewers to be installed in 1961, the base amount of said contract being $196,297.97, that said contractor under the terms of said contract will perform all work in extremely close proximity to Project 61 -LF -17; and that the Village Engineer is hereby authorized and instructed to proceed with said project No. 61 -LF -19 by issuing a Change Order to said Phelps -Drake Company, Inc. directing the said contractor to add Project No. 61 -LF -19 to the other work to be done under said contracts and in accordance with its provisions. 6. With reference to Improvement No. 61 WM-30, the estimated cost of this improvement is $6,994.42. It is found and determined that said improvement can be best and most -economically constructed by the issuance of a Change Order to Lametti & Sons, Inc., with which company the Village on September 5, 1961, entered into a contract for the construction of all other lateral water mains to be installed in 1961, the base amount of said contract being $231,291.51, that said contractor under the terms of said contract will perform all work in extremely close proximity to Project 61WM-30; and that the Village Engineer is hereby authorized and instructed to proceed with said Project No. 61-WM-30 by issuing a Change Order to said Lametti & Sons, Inc. directing the said contractor to add Project Resolution No. 79 (Continued) No. 61-WM-30 to the other work to be done under said contracts and in accordance with its provisions. Attest; Village Clerk r� Mayor The motion for the adoption of the foregoing resolution was duly seconded by Member Scherer and, upon vote being taken thereon, the following members voted in favor thereof: Bies, Nadasdy, Scherer, and Teresi; and the following voted against the same; None, whereupon said resolution was declared duly passed and adopted, signed by the Mayor and his signature attested by the Village Clerk. 1 1