#074 07-20-65 Approve Day Labor 65-GG-7Resolution No. 74
July 20, 1965
Member Flannagan introduced the following resolution and moved its
adoption:
RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND ORDERING WORK DONE BY DAY LABOR
(Proposed Grading & Graveling
65 -GG -7)
WHEREAS, the Village Engineer has prepared plans and specifications
to the Council for their approval; NOW, THEREFORE,
Valley,
BE IT RESOLVED by the Village Council of the Village of Golden
1. That such plans and specifications are hereby approved.
2. The Village Engineer shall proceed under the direction of the
Village Council, as given from time to time, to carry on all work in
connection with said improvement, in accordance with the plans and.specifica-
tions herein approved.
3. It is hereby found and determined that the Village of Golden
Valley has sufficient equipment to carry on the work necessary for said. improve-
ments. It is hereby directed. that said equipment be used. for said work and.
that the appropriate funds shall be charged for the use of said. equipment,
the reasonable rental value thereof as the cost of said work and the Village
Engineer shall keep an accurate record and account of the use and. rental of
said equipment and of materials used and of work done and shall include it
on any and all reports on the cost of work done by day labor under the
provisions of the resolution.
4�
Mayor
Attest:
A/C
Village Clerk
The motion for the adoption of the foregoing resolution was duly
seconded. by Member Garis, and upon vote being taken thereon, the following
voted in favor thereof: Flannagan, Garis, Nadasdy, Schaphorst, and Teresi;
and. the following voted against the same: None, whereupon said resolution was
declared duly passed and adopted, signed by the Mayor and his signature
attested. by the Village Clerk.
u
109