#108 09-21-65 Approve Day Labor 65-SS-8Resolution No. 108
September 21, 1965
Member Flannagan introduced the following resolution and moved its
adoption:
RESOLUTION APPROVING PLANS AND SPECIFICATIONS
AND ORDERING WORK DONE BY DAY LABOR
(Proposed Storm Sewer - 65 -SS -8)
WHEREAS, the Village Engineer has prepared plans and specifications for
proposed storm sewer construction and has presented such plans and specifica-
tions to the Council for its approval; NOW, THEREFORE,
BE IT RESOLVED by the Village Council of the Village of Golden Valley,
1. That such plans and specifications are hereby approved.
2. The Village Engineer shall proceed under the direction of the Village
Council, as given from time to time, to carry on all work done in connection
with said improvement, in accordance with the plans and specifications herein
approved.
3. It is hereby found and determined that the Village of Golden Valley
has sufficient equipment to carry on the work necessary for said improvements.
It is hereby directed that the said equipment be used for said work and that
the appropriate funds shall be charged for the use of said equipment, and
the reasonable rental value thereof as the cost of said work, and the Village
Engineer shall keep an accurate record and account of the use and rental of
said equipment and of materials used and of work done and shall include it on
any and all reports on the cost of work done by day labor under the provisions
of the resolution.
Attest:
A
zti/
Village Clerk
The motion for the adoption of the foregoing resolution was duly
seconded by Member Schaphorst and, upon vote being taken thereon, the following
voted in favor thereof: Flannagan, Garis, Nadasdy, Schaphorst, and Teresi;
and the following voted against the same: None, whereupon said resolution
was declared duly passed and adopted, signed by the Mayor and his signature
attested by theVillage Clerk.
1
169