Loading...
#005 01-20-81 Prepare Improvement Bassett Creek Flood Control Project6 Resolution #5 January 20, 1981 Member Mitchell in troduced and read the following resolution and moved its adoption: RESOLUTION Order Preparation of Report on Improvement Bassett Creek Flood Control Project WHEREAS, it is proposed to construct a storm drainage facility along Bassett Creek and to assess the benefited properties pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Golden Valley, Minnesota that the proposed improvement be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed im- provement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the im- provement as recommended. ROS ARY THOfiā‚¬1d;._. MAYOR ATTFST- The motion for the adoption of the foregoing resolution was seconded by Member Stockman and upon vote being taken thereon, the following voted in favor thereof: Anderson, Johnson, Mitchell, Stockman and Thorsen, and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Mayor and her signature attested by the Clerk.