Loading...
91-006 - 01-15 Establish Fees Provided in the City CodeResolution 91-6 January 15, 1991 0 Member Thompson introduced the following resolution and moved its adoption: RESOLUTION ESTABLISHING FEES AS PROVIDED FOR IN THE CITY CODE WHEREAS, the City Code provides for fees to be established for permits, licensee goods and services as provided for therein; and WHEREAS, fees were last set in Resolution 90-6, adopted February 6, 1990, and now need to be revised; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Golden Valley, that the fees as set forth in Exhibit A, "City of Golden Valley Fees" are hereby established effective January 15, 1991, and supercede fees established in Resolution 90-6. Ray B. Stockman, Mayor Pro Tem ATTEST: S irley J. Nelson, City Clerk The motion for the adoption of the foregoing resolution was seconded by Member Johnson, and upon a vote being taken thereon, the following voted in favor thereof: Bakken, Johnson, Stockman and Thompson; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Mayor Pro Tem and his signature attested by the City Clerk. • Resolution 91-6 - Continued EXHIBIT A City of Golden Valley Fees Effective January 15, 1991 Pages Building and Construction Permits 1-4 Business License Fees Utilities 5-7 me • Miscellaneous Fees, Planning and Zoning 10 • January 15, 1991 0 0 • Resolution 91-6 - Continued BUILDING AND CONSTRUCTION PERMITS Land Reclamation/Excavation (filling, dredging) permit (excluding Excavation under building permit or street excavation permit) Signs Permit: Base fee Area fee ( per sq. ft. of sign area) Well Permit: Street Excavation Permit: Base Fee Street replacement fee (based on time and materials) House/Building Moving Steam or Hot Water Heating System: January 15, 1991 $100.00 $20.00 $ .30 $10.00 $15.00 $100.00 A. Boiler and total piping system including piping, radiators, coils, coverters, etc., up to and including 100,000 BTU -hr. input: $45.00 Each addl. 50,000 BTU input or fraction thereof: $10.00 B. Boiler only in connection with an existing system, up to 100,000 BTU input: $30.00 Each addl. 50,000 BTU input or fraction thereof: $10.00 C. For the installation of a piping system or misc. piping to a system up to $500.00 cost: $15.00 Each addl. $500.00 or fraction thereof: $10.00 D. Boiler used for any other purpose such as power steam or pressing or process use, 200,000 BTU or 6 H.P.: $50.00 Each addl. 100,000 BTU input or 3 H.P. or fraction thereof: $10.00 E. For repairs or alterations to any boiler or power plan. Fee same as "C." above. Refrigeration Systems (Commerical refrigeration, coolers, freezers, etc.): A. Up to and including 36,000 BTU or 3 H.P.: $15.00 B. Each additional 18,000 BTU or 1/2 H.P. $ 5.00 C. Alterations, additions or repairs to an existing system up to $500.00: $10.00 Each addl. $500.00 or fraction thereof: $ 8.00 -1- Resolution 91-6 - Continued Oil Burners and Equipment: • For any oil burner or its equipment -- For inputs not over 3 gal. per hour For each additional 3 gal. per hour Alterations, additions or repairs to existing equipment, first $500 in value Each additional $500 in va 1 ue Tanks: A. For any tank not buried or enclosed 500 gallons or less: Over 500 gallons to 1,000 gallons: For each additional 1,000 gallons: B. For any tank buried or enclosed - same as "A." above C. Tank removal, per tank Warm Air Heating System, Furnace and Duct Work; Gravity and Mechanical Without Air Conditioning as Part of System: A. New furnace - includes gas burners, but not gas piping or gas openings: Up to and including 100,000 BTU: Each addl. 50,000 BTU or fraction thereof January 15, 1991 $15.00 $12.00 $10.00 $ 8.00 $10.00 $12.00 $10.00 $40.00 $25.00 $10.00 B. Replacement furnace only gravity or mechanical. No duct work, • alterations or air conditioning added: Up to and including 100,000 BTU: $20.00 Each addl. 50,000 BTU or fraction thereof: $ 8.00 C. Alterations, additions or repairs to duct work or extensions to an existing system up to $500 or fraction thereof: $15.00 Each addl. $500 or fraction thereof: $ 8.00 Air cleaner added to system: $ 8.00 Humidifier added to system: $ 8.00 No charge for vent dampers when included with new installation or replacement unit as part of original factory equipment. Warm Air and Cool Air All Year Furnaces and Duct Systems: A. New 100,000 BTU input heating and up to 21/2 ton AC with system: $30.00 Each addl. 50,000 BTU heating or 21/2 ton cooling or fraction thereof: $10.00 B. Replacement furnace only, up to and including 100,000 BTU and/or 21/2 ton cooling: $25.00 Each addl. 50,000 BTU heating and/or 21/2 ton cooling or fraction thereof: $10.00 Air Conditioning Added to Existing System - Includes A Coil and Condensor: Up to 21/2 tons: $20.00 Each addl. 21/2 tons or fraction thereof: $ 8.00 -2- Resolution 91-6 - Continued January 15, 1991 © Air Conditioning Added to Existing System - Includes A Coil and Condensor, cont.: Alterations, additions or repairs to existing system: First $500.00 in va 1 ue : $10.00 Each addl. $500 in value or fraction thereof: $ 6.00 Condensor or A Coil Replacements Only: Up to 10 ton capacity: $15.00 Each addl. ton capacity: $ 5.00 Duct System Ventilation: A. General ventilation includes fan and duct system up to 2,000 CFM: 2,000 CFM: $15.00 Each addl. 1,000 CFM or fraction thereof $ 8.00 B. Noxious vapors - spray booths, etc., requiring hazard protection equipment: Up to 2,000 CFM: $20.00 Each addl. 1,000 CFM: $10.00 C. Domestic type kitchen or bath fan units $ 5.00 each Direct Fired Gas Systems: . Direct fired gas systems shall have their fees determined as listed for gas burners and conversion burners in the gas fitting piping permit schedule. Electric Heating Systems: First 28 kilawa tts 96,000 BTU: $12.00 Each addl. 14 kilawatts 48,000 BTU $ 8.00 Solar heating systems: Each system - first $500 in value: $15.00 Each addl. $500 or fraction thereof: $ 8.00 Gas piping for each opening up to 2" in diameter: $ 5.00 Gas piping for each opening above 2" in diameter: $ 8.00 Gas burners used for heating: Gas conversion burners to an existing system. Unit heaters, or infra red heaters (no duct work): Not exceeding 199,000 BTU $15.00 200,000 but not exceeding 399,000 BTU 23.00 400,000 but not exceeding 599,000 BTU 33.00 600,000 but not exceeding 999,000 BTU 43.00 1,000,000 but not exceeding 2,499,000 BTU 70.00 2,500,000 but not exceeding 9,999,000 BTU 85.00 10,000,000 but not exceeding 49,999,000 BTU 140.00 50,000,000 but not exceeding 74,999,000 BTU 180.00 75,000,000 BTU and over 240.00 -3- Resolution 91-6 - Continued Gas burners used for appliance • gas range, gas hot water heater Not exceeding 99,999 BTU 0 January 15, 1991 or miscellaneous, such as gas stove, other than a residential heater: 100,000 but not exceeding 199,999 200,000 but not exceeding 399,999 400,000 but not exceeding 599,999 600,000 but not exceeding 999,999 (for gas burners exceeding 999,999 for any appliance, fee shall be per schedule for a heating gas burner unit as listed above.) Plumbing and Piping: $10.00 15.00 25.00 35.00 45.00 Each plumbing fixture including waste and vent piping: $10.00 Each plumbing fixture replaced or set on existing piping: $ 3.00 Each plumbing fixture (rough -in only): $ 4.00 Garage catch basin (flammable waste trap): $12.00 Electric or gas water heater: $10.00 Hydraulic sewer valve: $10.00 Rain water leader - up to 10 story: $10.00 - each addl. story: $ 3.00 Alterations of existing plumbing systems - First $500 in valuation: $15.00 Each addl. $500: $ 8.00 Minimum permit fee: $10.00 A plumbing fixture is defined and taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system either directly or indirectly, and required by code or ordinance to be trapped. Fire Suppression System Permit, Sprinkler permits: 1st 10 sprinkler heads or fraction thereof: Each addl. 10 sprinkler heads or fraction thereof: Standpipe and wall hydrants permits - for the installation of any standpipe (up to 5 floors): Additional fee for each floor over 5 floors: For the alteration, repair or extension of standpipe or sprinkler systems where the work is of such nature that the fee cannot be determined by the methods previously noted, the permit fee shall be for each $500 of valuation or fraction thereof: Special fire suppression systems - Halon, hoods, spray bottles, etc. • -4- $10.00 $ 5.00 $30.00 $10.00 $10.00 $25.00 (min.; Resolution 91-6 - Continued BUSINESS LICENSE FEES LICENSEE Heating, Ventilation, Air Conditioning and Refrigeration Entertainment Bowling Alley (each alley) Pool Table or Juke Box (each) Games of Skill Shows (Movies, Caravans, Circuses, Amusement Rides, etc.) Dancing/Entertainment Food Non -restaurant food For establishments using kitchen more than 13 times year • For establishments using kitchen less than 12 times year Food Establishment Each additional facility Grocery Each additional facility Food Warehouse Catering Vehicle: For 1st vehicle Each additional vehicle Perishable Food Vehicle: For a fleet of vehicles For one vehicle Non-perishable Food Vehicle: For a fleet of vehicles For 1st vehicle -5- January 15, 199 FEE $45.00 ann. $10.00 ann. $35.00 ann. $50.00 ann. $50.00 ann. $350.00 ann. $100.00 ann. $50.00 ann. $200.00 ann. $50.00 ann. $150.00 ann. $20.00 ann. $110.00 ann. $100.00 ann. $50.00 ann. $160.00 ann. $40.00 ann. $80.00 ann. $20.00 ann. RENEWAI Resolution 91-6 - Continued January 15, 1991 LICENSEE FEE RENEWAL Itinerant Food Establishment: 1st Day $50.00 Each additional day $15.00 Bulk Vending (all locations) $25.00 ann. April Special Food Handling $40.00 ann. April Readily Perishable Vending Machines (each machine, each location): $15.00 ann April Non-perishable Vending Machine (each machine, each location) $15.00 ann. April Liquor Investigative fee: New applicants** $1,500.00 Renewals/Misc. changes $ 100.00 ann. **($500.00 non-refundable, remainder based on actual expenses) Sunday Sale $200.00 ann. July 1 Off Sale $200.00 ann. July 1 On Sale $6,250.00 ann. July 1 Wine On Sale $2,000.00 ann. July 1 Club: up to 200 members $300.00 ann. July 1 201-500 members $500.00 ann. July 1 501-1000 members $650.00 ann. July 1 1001-2000 members $800.00 ann. July 1 Over 2000 members $1,000.00 ann. July 1 Non -intoxicating Malt Liquor - On Sale $450.00 ann. April Non -intoxicating Malt Liquor - Off Sale $75.00 ann. April Mi scel la neou s Garbage Haulers (per vehicle) $40.00 ann. June 1 Massage Parlors -- Operating (each location) $1,500.00 ann. Jan. 1 Investigation Fee: $1,500.00 ann. ( Due upon application, due to ordinance violation, due to inordinate number of complaints, due to addition of owners, due to ownership change (new license), or upon City Council action for any reason.) UZ • -7- Resolution 91-6 - Continued January 15, 19 LICENSEE FEE RENEWA Massage Certificate $100.00 ann. Jan. 1 Massage Certification - Investigative Fee $300.00 Peddler's and Solicitors -- 1st person $20.00 ann. July 1 Each additional person $5.00 (Up to $40.00 max.) Advertising Benches (per bench) -- 1st Year $40.00 Renewal $20.00 April Cigarettes (Each location, each machine) $12.00 ann. Jan. 1 Christmas Tree - Each Season $50.00 ann. (Must apply by November 30th) Gasoline Station -- 1st outlet (nozzle) $50.00 ann. April Each additional di spensening outlet $10.00 ann. April Hotel -Motel -- each room $5.00 ann. July 1 Taxicab: Vehicle $25.00 ann. June 1 Driver $20.00 ann. June 1 Dog Kennel - Each kennel $200.00 ann. April Motor Vehicle Dealers $275.00 ann. Sept. • -7- Resolution 91-6 - Continued January 15, 1991 overcharge of 5% or more in customer's billing.) am UTILITIES (Water, Sewer, Recycling and Street Lights) Permits ( subject to State surcharge where applicable) Water Meter $ 20.00 Water Tapping $ 20.00 Sewer (connection) $ 25.00 Sewer Repair $ 20.00 Sewer Cut-off $ 25.00 Water Cut-off $ 20.00 Sewer Tap $ 25.00 Equipment (subject to State sales tax) Water Meters 5/8" x 3/4" $ 42.50 3/4" x 3/4" $ 70.00 1" $ 80.00 1 1/2" $230.00 2" $270.00 3" (Special Order) At cost Copper Horn . for 5/8" meter $ 23.25 for 3/4" meter $ 30.00 for 1" meter $ 38.25 Spuds $ 3.25 11 0" Ring $ 4.25 Fees for Service Tapping time and materials) Turn on Water (Addl. charge for call-in and overtime) $ 15.00 If leak $ 5.00 Adjust Curb Box (time and materials) Replacement, repair or adjustment of meter or outside register due to neglect or carelessness of owner or occupant (time and materials) Meter Testing -- Size of Meter: 5/8" to 2" meter $ 5.00 3" $10.00 4" $20.00 6" $30.00 (To be returned to customer if error in meter has caused overcharge of 5% or more in customer's billing.) am Resolution 91-6 - Continued January 15, 1991 Ra to s Sewer (Quarterly) Residential (per unit) $ 20.00 All others: Pipe connection size: Minimum charge - includes up to 10,000 gal. Minimum fee, includes up to 10,000 gal. of flow -- Water meters up to and including 1" $ 60.00 Water meters up to and 9.80 including 1" $ 20.00 Water meters from 1" up to and including 2" $ 33.33 Water meters from 2" up to and including 4" $ 50.00 Water meters over 4" $ $ 83.33 Above 10,000 gal. of flow .98 per quarter -- 10,000 gal. Flow rate (per 1,000 gal.) $ .82 (NOTE: Water meter flow is used to establish sewer flow unless a separate sewer flow meter has been installed; all accounts with quarterly flow above 10,000 gal. are charged at the flow rate.) Water (Quarterly) Pipe connection size: Minimum charge - includes up to 10,000 gal. of flow 3" $ 40.00 Water meters up to and including 1" $ 60.00 $ 9.80 Water meters from 1" up to and including 2" $ 19.60 Water meters from 2" up to and including 4" $ 29.40 Water meters over 4" $ 39.20 Above 10,000 gal. of flow per quarter Flow rate (per 1,000 $ gal.) .98 (NOTE: all accounts with quarterly flaw above 10,000 gal. are charged at the flow rates.) Water -Fire Lines (Annual) Pipe connection size: 2" $ 30.00 3" $ 40.00 4" $ 60.00 6" $ 80.00 8" $100.00 10" $120.00 12" $140.00 Recycling (Quarterly) Residential (per unit) $ 3.75 Street Lights (Quarterly) Ornamental (per unit) $ 6.00 Overhead (per unit) $ 2.50 Penalty - 10% per quarter of delinquent balance Resolution 91-6 - Continued MISCELLANEOUS FEES January 15, 1991 Alarm System: All fees are based on false alarms which occur in a 12 month period beginning March 1 of each year. 1-3 false alarms No Charge 4-10 false alarms (upon notice given) $50.00 each 11-15 false alarms (upon notice given) $100.00 each 16 or more false alarms (upon notice given) $150.00 each Firearms (for three year period) $10.00 Fireworks (per occurrence, plus rental of standby fire crew $30.00 and pumps) Animal Control: Dog license $ 6.00 Duplicate dog license $ 2.00 Impound fee for dogs $30.00 Boarding fee for dogs and cats (per day) $10.00 Weed Eradication Rate (one hour minimum charge) $60.00 Street Excavation $25.00 Sidewalks and Driveways $25.00 Administrative Overhead - Forced Tree Removal 20% of contracted removal fee PLANNING AND ZONING Rezoning $300.00 Planned Unit Development: Preliminary Design Plan $200.00 General Plan of Development $250.00 Amendments $150.00 Subdivision $225.00 Minor Subdivision $ 75.00 Easement Vacation - Each request $100.00 Flood Control Management - Special Permit $ 35.00 Variance from Zoning Code: Single family residential $ 35.00 All others $150.00 Conditional Use Permit for Home Occupation $ 75.00 Conditional Use Permit $150.00 Amendment to Conditional Use Permit $ 75.00 Resubmission if previously denied $ 50.00 -10-