09-04 - 01-20 - amend Pavement Management Policy
Resolution 09-4
January 20, 2009
Member Pentel introduced the following resolution and moved its adoption:
RESOLUTION AMENDING THE CITY'S
PAVEMENT MANAGEMENT POLICY
WHEREAS, Resolution 95-5, adopting a Pavement Management Program
("Program") was approved by the Golden Valley City Council ("Council") on January 17,
1995; and amended by Resolution 96-96, on October 15, 1996; amended by Resolution
97-88 on December 9, 1997; and amended by Resolution 05-42 on June 7,2005;
WHEREAS, it is recommended the staff amend the Pavement Management
Program by amending the policy including the following elements:
1. Establish the 8-618 concrete curb and gutter constructed to industry standards as
the City standard.
2. Include the sanitary sewer service repair and rehabilitation program in street
reconstruction projects.
3. Consider alternative styles of concrete curb and gutter, such as drive-over curb
(D412), if 100 percent of the property owners on a street petition for the alternate
style of curb, and agree that the City will no longer repair damage done to lawns and
obstructions in the right-of-way that are caused by snow and ice control.
4. Include language to formalize the City's practice of rejecting participation in the
driveway reconstruction program in situations, which may create liability for the City.
5. Remove the option of reconstructing streets with concrete pavement, thus
establishing streets with asphalt pavement and concrete curb and gutter as the City
standard roadway.
6. Delete the typical schedule for Pavement Management Projects due to changes in
project development practices.
7. Delete the Appendix A, Petition Process, from the policy.
cXvntlitjj(;t~
Linda R. Loomis, Mayor
ATTEST:
~i:t!Y~~
The motion for the adoption of the foregoing resolution was seconded by Member Freiberg
and upon a vote being taken thereon, the following voted in favor thereof: Freiberg,
Loomis, Pentel, Scanlon and Shaffer; and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted, signed by the Mayor
and her signature attested by the City Clerk.
Resolution 09-04 - Continued
January 20,2009
Pavement Management Policy
for
The City of Golden Valley
January 17, 1995
Amended October 15, 1996
Amended December 9, 1997
Amended June 7,2005
Amended January 20, 2009
Purpose
There are approximately 119 miles of street to be maintained within the City of Golden
Valley. Of this total, 23 miles are designated as Municipal State Aid (MSA) roadways, and
the remaining 96 miles are local streets. Keeping the street system in good condition is
necessary to provide safe and reasonable transportation to the citizens of the City, to
maintain property values and to keep the City an attractive and desirable place to live and
do business.
The goal of the Pavement Management Policy is to establish a Pavement Management
Program (PMP) that systematically evaluates the street network to maximize the pavement
lifespan, at minimum long-term cost, by performing the proper rehabilitation measure at the
proper time.
Background
A properly constructed street can be expected to have an average effective lifespan of 50
to 60 years if proper maintenance measures (crack sealing, sealcoating, and bituminous
overlays) are performed at the proper times. Many of the streets in Golden Valley were
constructed more than 30 years ago, and did not receive the subgrade corrections that are
consistent with today's standards. Many were constructed without removing unsuitable
soils from the street subgrade, which causes the street to crack, distort and break up under
normal traffic loading. This breakup of the pavement allows moisture into the subgrade,
which further accelerates deterioration.
Many of Golden Valley's streets are newer, having been constructed to City standards
within the last 20 years. Although the pavement on these streets also exhibits some
distress, the Pavement Management Program will include maintenance and rehabilitation
of these streets in order to maximize their functional lifespan .
The Pavement Management Program (PMP)
The entire street system under the jurisdiction of the City of Golden Valley has been
broken into segments which are evaluated by staff and consultants to determine the type of
pavement distresses present. Staff then records the severity and extent of each pavement
distress as well as the quality of the ride, traffic volumes and structural capacity on each
street segment. Using a pavement management computer program, staff analyzes the
recorded information and assigns a Pavement Quality Index (POI) to each street segment.
For example, a POI of 10.0 represents a newly constructed street with little or no distress
Resolution 09-04 - Continued
January 20, 2009
evident; and a pal of 2.0 represents a street pavement that has completely failed. The pal
of each street segment is then inventoried, and streets are selected for rehabilitation
strategies based on staff opinion and the analysis of the computer software. The goal of
the City is to maintain a street system with an average pal of 6.0 to 7.0. Residential streets
shall be designated for an axle loading of 7 ton.
Because streets decay at different rates depending on subgrade and pavement conditions,
staff will periodically evaluate the pavement and assign pals. Approximately every fifth
year, a consulting engineering firm will conduct a complete inventory and evaluation of the
street system. This will ensure that the baseline data being used for decision making is
current and that each street in the system receives appropriate rehabilitation measures
when the need for maintenance first arises. Rehabilitation measures will include
sealcoating, edge and full-width milling and overlays, varying degrees of in-place
reclamation, total street reconstruction and other potential methods that may become
available as new technology develops.
Sea/coating
Sealcoating is a preventive maintenance measure used to extend the life of a bituminous
pavement. Liquid bituminous and aggregate are applied to help seal out moisture, reduce
abrasion of the existing surface, increase skid resistance and help prevent older
pavements from drying out and prematurely deteriorating. A properly installed sealcoat
should last approximately 6 to 10 years.
Sealcoating will be applied to those streets in the system that have been constructed to
City standards and do not exhibit distresses indicative of poor street subgrade. The
sealcoating process will include crack sealing, routine patching and limited repair of
concrete curb and gutter.
Bituminous Milling and Overlay
Bituminous milling and overlay consists of mechanically removing a portion of the existing
bituminous pavement surface, and placing new pavement. After placement of a bituminous
overlay, properly timed sealcoating can extend the life of a street for an estimated 20 to 25
years before another overlay is required.
Bituminous overlays will be performed on those streets that have been constructed to City
standards and do not have distresses indicative of a poor subgrade. The streets receiving
overlays also will be subject to crack sealing, curb repair, and patching before the
placement of the overlays.
Reconstruction
Reconstruction is defined as any major rehabilitation involving the removal or relaying of all
surface material for a particular segment of street. Reconstruction will be performed on
streets that have deteriorated to the point where reconstruction is the only cost-effective
method of rehabilitation. Sanitary sewer, water main, and storm sewer systems on streets
subject to reconstruction will also be investigated as part of the PMP. Those utilities that
exhibit inadequate capacity, maintenance problems, and do not meet specific state or
Resolution 09-04 - Continued
January 20,2009
federal requirements for the utility will be repaired or replaced as part of the street
reconstruction project.
Construction Standards
The City will strive to maintain the existing street width and parking arrangements
unless there is an over-riding safety reason to change. Variation from existing
conditions, including parking and street width, will be considered in the following
situations:
1. On Municipal State Aid streets where MSA standards apply.
2. On collector and local streets where traffic volumes exceed 500 vehicles
per day.
3. Where there are existing safety issues.
4. Where maintaining existing street widths and parking conditions create
undue hardship on adjacent properties or elsewhere on the project.
5. To avoid environmental impacts such as wetland filling and removal of
significant trees.
Drainage Improvements
The City will attempt to improve drainage conditions during reconstruction wherever
possible and feasible. Drainage improvements for areas outside of public right-of-
way will be implemented where feasible and in accordance with the Special
Assessment Policy.
Landscapinq Impacts
The City will endeavor to minimize landscaping disturbances whenever possible,
and shall consider reasonable replacements when disturbances are necessary. The
Environmental Coordinator shall comment on tree and landscaping impacts due to
proposed projects and will include this review in project feasibility reports.
Concrete Curb and Gutter
Concrete curb and gutter provides structural support for the edge of the paved
roadway, aids in snow removal and facilitates drainage of storm water for water
quality treatment and minimizing damage to adjacent properties. Therefore, design
of streets subject to reconstruction will include concrete curb and gutter. The City's
standard for concrete curb and gutter is the Minnesota Department of
Transportation's 8-618 design constructed according to industry standards.
Concrete curb and gutter designs other than the City's standard, such as D type,
may be considered based upon neighborhood input. In order for alternate styles to
be installed, 100 percent of the property owners abutting a street must sign a
petition prepared by the Public Works Department requesting the alternate curb
style. This petition will state that the City will no longer repair damages to turf,
landscaping, sprinkler systems, mailboxes or other items placed within the public
right-of-way by property owners resulting from the City's snow and ice control
measures.
Resolution 09-04 - Continued
January 20, 2009
Property Owner Involvement
During the preliminary design phase of any reconstruction project, the City will hold
open houses for affected property owners. Property owners will be consulted and
provided the opportunity to have input in the preliminary project design during the
open houses. The City will also endeavor to keep property owners informed during
construction through the use of construction newsletters, daily construction notices,
targeted correspondence and other means of communication deemed appropriate.
Driveway Reconstruction
Pavement Management street reconstruction projects will include an opportunity for
residents in the project area to reconstruct their driveways as part of the project. If
property owners wish to participate in the driveway reconstruction program the City
will prepare an estimate for the work, determine eligibility and liability for
participation, determine the indirect costs for the work, prepare a contract and
manage reconstruction of the driveway. Following reconstruction the property owner
may choose to pay for the driveway reconstruction in one of two methods as
outlined in the Special Assessment Policy.
The City of Golden Valley will pay for replacement of the portion of each driveway
that is removed due to the street reconstruction with the same material that was
removed (asphalt or concrete). If property owners wish to have the driveway
reconstructed in a material other that what was removed (install concrete when
asphalt was removed) they will be responsible for the cost differential between the
materials.
The City reserves the right to reject requests for private driveway reconstruction in
situations where the reconstruction requires that the City and/or its contractors must
assume a higher degree of liability during construct than a normal driveway, or
where the ability to achieve the required quality is not possible. Such situations
include excessive or minimal slopes, landscaping impacts, structural impacts or
similar conditions. The determination of eligibility to participate in the driveway
reconstruction program is at the discretion of the Public Works Department.
Sanitary Sewer Service Repair
Pavement management street reconstruction projects will include an opportunity for
property owners affected by the street reconstruction to reconstruct their private
sanitary sewer services. This voluntary program will allow property owners to
become compliant with Chapter 3 of Golden Valley City Code, and helps the
community reduce the inflow and infiltration of clear water into the sanitary sewer
system. If a property owner wishes to participate in the sewer service rehabilitation
program, the City will prepare estimates for the work, determine eligibility and liability
for participation, determine the indirect costs for the work, prepare a contract and
manage the rehabilitation work. Following completion of the sewer service
rehabilitation the property owner may choose to pay for the work as outlined in the
Special Assessment Policy.
Resolution 09-04 - Continued
January 20, 2009
Maintenance
The City will perform major maintenance procedures in a timely and cost-effective
manner to maintain condition over the life of the street, including overlays and
sealcoating. However, streets that need reconstruction also need maintenance
measures beyond what is required for streets built to City standards. These
maintenance measures must also be performed more frequently on poor quality
streets, resulting in an increasing burden on General Fund street maintenance and
the need for more taxes to finance them. Therefore, those streets recommended for
reconstruction consistent with the Pavement Management Policy but denied by the
City Council because of resident opposition will no longer be subject to maintenance
measures beyond those deemed necessary for public safety. Maintenance
measures required for public safety will include, but are not limited to, repair of large
potholes in the driving lanes and patching of utility openings.
Sidewalks
The construction of sidewalks will be evaluated for each street in keeping with the
goals of the Golden Valley Sidewalk Committee. Sidewalk construction will be
financed by the City.
Financing and Special Assessments
The City of Golden Valley Pavement Management Program is to be financed through the
General Fund and general obligation bonds. The bonds will be repaid through tax levies
and special assessments. Sealcoating will be financed completely through the General
Fund, with no assessments to adjacent properties. Bituminous overlays may be contracted
with the reconstruction portion of the program and will be financed through bonding as
funding allows. Special assessments will only be levied against those properties adjacent
to streets being reconstructed. The amount of the special assessments will be set in the
City's annual fee resolution based on the Special Assessment Policy.
Typical Project Schedule and Process
The following schedule and process is typical for a Pavement Management street
reconstruction project.
1. City staff makes recommendations to the City Council regarding proposed
reconstruction projects for each year. The City Council reviews the
recommendations and orders feasibility reports for projects.
2. Preliminary project data gathering, including surveying, soil borings and review of
maintenance records is performed.
3. Preliminary project design and public participation occurs.
4. Project design continues with preparation of the feasibility report, and public
hearings for project authorization and special assessments are held.
5. Following project authorization the final plans, specifications and contract
documents are prepared, the project is bid and a contract is awarded.
6. Project construction occurs begins in the spring and is completed in the fall.