Loading...
13-060 - 07-02 - accepting emergency water supply preliminary design and feasibility study, directing staff to proceed with financing plan and developing plans and specs Resolution 13-60 July 2, 2013 Member Schmidgall introduced the following resolution and moved its adoption: RESOLUTION ACCEPTING EMERGENCY WATER SUPPLY PRELIMINARY DESIGN AND FEASIBILITY STUDY; DIRECTING STAFF TO PROCEED WITH FINANCING PLAN AND DEVELOPING PLANS AND SPECIFICATIONS WHEREAS, the Joint Water Commission (JWC) is a joint powers entity authorized by Minnesota Statute 471.59 and consists of the cities of Crystal, Golden Valley and New Hope, initiated in 1963; and WHEREAS, based on the JWC joint powers agreement, the three cities built their water distribution systems to be interconnected without reference to city boundaries; and WHEREAS, the JWC has an ongoing long-term water purchase agreement with the City of Minneapolis water utility and intends to continue that relationship; and WHEREAS, the JWC continues to have concerns regarding the reliability of the Mississippi River as the sole water supply source for the City of Minneapolis and its customers; and WHEREAS, in 2009 the JWC and separately, each of the three member cities, adopted a Water Supply, Emergency and Conservation Plan to comply with Minnesota Statute 473.859, and said statute requires the JWC and the three member cities to identify and develop an emergency source of water supply; and WHEREAS, the JWC has identified groundwater from the Prairie du Chien/Jordan aquifer to be a viable alternative water supply on an emergency basis; and WHEREAS, legislation was passed during the 2004 legislative session authorizing the JWC to drill wells to meet the needs of the three member cities on a case-by-case basis; and WHEREAS, at the direction of the three city councils at the May 7, 2012, Tri-City Council meeting, the Emergency Water Supply Preliminary Design and Feasibility Study was prepared; and WHEREAS, the study sets forth recommendations for siting of wells, cost implications and alternatives for implementation of an emergency water supply. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Golden Valley, Minnesota: 1. That the Joint Water Commission develop financing plan alternatives to implement an emergency water supply system; Resolution 13-60 - Continued July 2, 2013 2 That the Joint Water Commission retain engineering and other professional services to develop plans and specifications for construction of an emergency water supply system; and 3 The Joint Water Commission will present the recommended financing plan and plans and specifications to a Tri-City Council meeting later in 2013 to authorize proceeding with bids for construction of an emergency water supply system. Shepa M. Harris, Ma ATTEST: `� � Susan M. Virnig, City Clerk The motion for the adoption of the foregoing resolution was seconded by Member Clausen and upon a vote being taken thereon, the following voted in favor thereof: Clausen, Harris, Pentel, Scanlon and Schmidgal�; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted, signed by the Mayor and his signature attested by the City Clerk.