AGENDA
JOINT WATER COMMISSION
September 7, 2022-1:30 pm
This meeting will be held via Webex in accordance with the local emergency declaration made by the City
under Minn. Stat.12.37. The public may monitor this meeting by calling 1-415-655-0002 and entering the
meeting code 2468 657 1021. Additional information about monitoring electronic meetings is available on
the City website at www.goldenvalleymn.gov. For technical assistance, please contact the City at 763-593-
8300 or webexsupprt(agoldenvalleymn.gov. If you incur costs to call into the meeting, you may submit the
costs to the City of reimbursement consideration.
1. Call to Order —Roll Call
2. Approval of Minutes —June 1, 2022
3. Discuss next steps for Election of Officers
4. Approve Crystal Pump House Camera Installation (Ray)
5. Approve GV Pump House Fiber Project with LOGIS (Hansen)
6. TAC Update (Kieffer)
7. Other Business
• Next Scheduled Meeting October 5, 2022 — Can we look at possible dates/times to
reschedule this meeting?
8. Adjournment
This document is available in alternate formats upon a 72-hour request. Please call
763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats
may include large print, electronic, Braille, audiocassette, etc.
Joint Water Commission
June 1, 2022
Page 1 of 2
JOINT WATER COMMISSION MINUTES
Golden Valley - Crystal - New Hope
Meeting of June 1, 2022
The Golden Valley - Crystal - New Hope Joint Water Commission (JWC) meeting was called
to order at 1:30 pm.
Roll Call
Present
Anne Norris, City Manager, Crystal
Kirk McDonald, City Manager, New Hope
Tim Cruikshank, City Manager, Golden Valley
Staff Present
Tim Hoyt, Police Chief, New Hope
Joe Hansen, Utilities Superintendent, Golden Valley
Dave Lemke, Operations Manager, New Hope
Matt Rowedder, Utilities Maintenance Supervisor, New Hope
Patrick Sele, Utilities Supervisor, Crystal
Tim Kieffer, Public Works Director, Golden Valley
Sue Virnig, Finance Director, Golden Valley
Bernie Weber, Public Works Director, New Hope
Derek Goddard, Water Distribution Specialist, Golden Valley
Mark Ray, Director of Public Works/City Engineer, Crystal
R.J. Kakach, Assistant City Engineer, Golden Valley
Carrie Nelson, Engineering Assistant, City of Golden Valley
Approval of Minutes — May 4, 2022
Moved by Cruikshank and seconded by McDonald to approve the minutes of the May 4,
2022 Joint WaterCommission (JWC) Meeting. Upon a roll call vote the following voted in
favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion
carried.
rove 2023-2032 CIP — Resolution 22-03
Moved by McDonald and seconded by Cruikshank to approve the 2023-2032 CIP —
Resolution 22-03. Upon a roll call vote the following voted in favor: Norris, McDonald, and
Cruikshank. The following voted against: None. Motion carried.
Joint Water Commission
June 1, 2022
Page 2 of 2
Approve 2023 Budget — Resolution 22-04
Moved by McDonald and seconded by Cruikshank to approve the 2023 Budget — Resolution 22-
04. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank.
The following voted against: None. Motion carried.
Appoint Tim Hoyt to the JWC Board
Moved by Cruikshank and seconded by McDonald to appoint Tim Hoyt as New Hope's
representative on the Golden Valley/Crystal/New Hope Joint Water Commission. Upon a roll
call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following
voted against: None. Motion carried.
Appoint Chairperson, Vice Chair, and Secretary/Treasurer for the remainder of 2022
Moved by McDonald and seconded by Cruikshank to appoint Anne Norris as Chair, Tim
Cruikshank as Vice Chair, and Tim Hoyt as Secretary/Treasurer for the remainder of 2022.
Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The
following voted against: None. Motion carried.
Other Business
The next Joint Water Commission meeting is scheduled for July 6, 2022
Adjournment
Moved by McDonald seconded by Cruikshank to adjourn meeting. Motion carried. Chair Norris
adjourned the meeting at 1:50 pm.
ATTEST:
Carrie Nelson, Recording Secretary Chair Anne Norris
Memorandum
DATE: August 19, 2022
TO: Joint Water Commission
FROM: Mark Ray, PE, Crystal Director of Public Works
Pat Sele, Crystal Utilities Superintendent
SUBJECT: Crystal Pump House camera installation
As part of security improvements at the pump houses Crystal staff obtained a quote to install cameras at the
Crystal Pump House. The quote was obtained from the vendor the City currently uses for other facilities so that
everything will be on the same system. In all, 6 cameras are proposed to be installed at the pump house covering
the doors, control room, and outside hatches.
Project cost
Computer Integration Technologies, Inc. quote for $16,843
Project funding
This project will be funded using the SCADA updates (70-18) project which has $190,102.41 balance remaining.
The reason for not using the Security Upgrades project is due to that funding being saved for the fiber installation
to the Golden Valley Pump House.
Recommended action
Motion approving the agreement with Computer Integration Technologies, Inc
\\Files\goldval$\Joint Water Commission\JWC Agendas\2022 JWC Agenda\9 - September\3 - JWC Camera Install at Pump House 8.19.22.docx
Joint Water Commission TAC Memo
-f September 7, 2022
l
1
Agenda Item #5
Authorize the contract with LOGIS to provide the North/South fiber run from Golden Valley Road to the
Skyline Pumphouse.
Prepared by
Joint Water Commission Technical Advisory Committee
Summary
The 2022 CIP includes funds to install new fiber to the Golden Valley Pump House.
To keep costs down, Golden Valley Utilities is working on a joint venture with Hennepin County
to run fiber from LOGIS to the intersection of Golden Valley Road and Hidden Lakes Parkway,
price to be determined later. This quote is for the solo JWC portion of the run from the above
intersection to the pumphouse.
Financial Considerations
The funds from the 2022 CIP #14-037 Security for All Towers and Pump Stations (Fiber), which
includes $150,000 in 2022, will be used for this project.
Recommended Actions
Motion to authorize the LOGIS contract for the first half of the fiber installation to the
Golden Valley Pump House in the amount of $ 79,794.00
Supporting Documents
• Quote from LOGIS
L El I
'LOCAL OLIVERNMENT
INFORMATION SYSTEMS
5750 Duluth Street, Golden Valley, MN 55422-4063
Main:763.543.2600 i Service: 763.543.2662
Project Number
270501
Project Name* (')
GV-Pump House 1500 Skyline Dr to LO - new build
Name*
Joe Hansen
Email*
JHansen@goldenvalleymn.gov
Member*
Golden Valley
Member Type
Members Other
Budget Revision
Are There Other Members/External Parties Involved In The Project
Yes
No
Reason For Cost Revision*
Route Change
Initial Cost
Labor
$ 174,262.50
Materials
$ 37,974.00
Cost Estimate Total
$ 212,236.50
Estimated Annual Locates
$ 1,765.50
Revised Cost
Revised Labor
$ 61,825.00
Revised Materials
$ 17,969.00
Revised Cost Estimate Total
$ 79,794.00
Revised Estimated Annual Locates
$ 561.00
Attachment
270501 Route MapREV1.pdf
195.51 KB
Joint Water Commission TAC Meeting
l
f Thursday, August 25, 2022 9:00 AM
1
1. Towers — New Hope
• MLR Tower— plan for 2023, NH has reached out to KLM, start design, get updated
cost estimates, 2024 construction. Antenna work going at tower.
2. Pumps
• Pump #4 at GV reservoir is original and needs to be replaced. Will include VFD
• Pump #3 at Crystal is original and needs to be replaced.
• Bolton and Menk designing project.
• GV replacing valves and actuators between pump and manifold tee.
1. Purchase parts with battery backup, approximately $60,000 of work — has been
approved and ordered
2. Parts will be installed by GV Utilities (and Crystal and NH?) crews (currently 24-
26 week lead time on parts).
• GV pump #5 is out of service, pump #4 needs replacement, GV working off of two
pumps — waiting on actuators from Vessco. Crystal will need to pump while GV
replaces valves.
1. Need to fix both GV pumps before valve work at Crystal reservoir and NH
Tower.
A. Valves Fall/Winter work
• GV pumps 2&3 only two in service until repairs and replacement of pump #4 is
complete.
• GV will inspect motors and electrical annually once pump #4 is replaced.
3. Valves
• Crystal — valve replacement around pump house was moved to spring of 2022 to
finalize scope of work and logistics. NEED TO MOVE START DATE BACK UNTIL GV
PUMP HOUSE HAS 4 OPERATIONAL PUMPS — SEE NOTE ABOVE (most likely Spring
2023 — parts are all on hand ready to install)
• Meter update at same time as valve replacement in Crystal (—$40,000)
• Golden Valley — St. Croix valve work — add a new valve in 2022. Work to start in
Mayor June. DONE
o Replacement adapters ordered in April — 3-4 month lead time.
• Olympia and Louisiana — bad gear box, need to evaluate scope of repair.
• Valve replacement will be based on the following criteria:
o General idea is start at pumphouses/reservoirs and work out from
there.
o Can slide in other failed valves as we become aware of them.
\\Files\goldval$\Joint Water Commission\JWC Agendas\2022 JWC Agenda\9 - September%- JWC TAC Meeting Minutes_8.25.22.docx
o Can also prioritize valves that are part of street improvement projects.
o Will update list next TAC meeting now that St. Croix Valve is complete.
4. SCADA
a. Recommend approving quote to add 6 cameras to Crystal pump house, will
use remaining SCADA funds.
5. Miscellaneous
A. Medicine Lake Tower Parts Storage — Parts received, Smartsheet created, need to
organize.
• Create column in Smartsheet for Replacement Parts Ordered and fill
with date ordered.
• Temp part storage during tower rehab in 2023? North Tower?
B. Fiber - TAC agreed running fiber to all facilities is a long-term goal.
o Existing Fiber - both emergency wells in Crystal, GV Tower, North Tower, and
Crystal reservoir.
o Proposed Fiber — GV Pumphouse (2023) —Joint project with Hennepin County in
2023 or 2024 to get to GV Pump house, recommend approving $80K project
with LOGIS to get fiber from pump house to GV Rd. Will then approve another
portion with Hennepin County along GV Rd in late 2022/early 2023. Project
will be well under $200K budget.
C. Golden Valley Tower Verizon Agreement Amendment
• DONE
D. TH 55/Douglas WM Relocation
• Project to start in 2023.
E. Effluent Meter Pit
• Exploration work on top of existing pit will be postponed until time
allows.
F. Mpls Agreement Renewal 2024
G. CIP — working on 2023 — 2032 CIP
H. Altitude Valve Repalcement at MLR Tower
• To be included with recoating in 2024 (similar to what was done with
GV tower last year)