Loading...
JWC Agenda 9-7-2022DocuSign Envelope ID: 24810FOD-B1BC-48C1-96A3-25ACB9041A14 Golden Valley • Crystal • New Hope AGENDA JOINT WATER COMMISSION September 7, 2022-1:30 pm This meeting will be held via Webex in accordance with the local emergency declaration made by the City under Minn. Stat.12.37. The public may monitor this meeting by calling 1-415-655-0002 and entering the meeting code 2468 657 1021. Additional information about monitoring electronic meetings is available on the City website at www.goldenvalleymn.gov. For technical assistance, please contact the City at 763-593- 8300 or webexsupprt(agoldenvalleymn.gov. If you incur costs to call into the meeting, you may submit the costs to the City of reimbursement consideration. 1. Call to Order —Roll Call 2. Approval of Minutes —June 1, 2022 3. Discuss next steps for Election of Officers 4. Approve Crystal Pump House Camera Installation (Ray) 5. Approve GV Pump House Fiber Project with LOGIS (Hansen) 6. TAC Update (Kieffer) 7. Other Business • Next Scheduled Meeting October 5, 2022 — Can we look at possible dates/times to reschedule this meeting? 8. Adjournment This document is available in alternate formats upon a 72-hour request. Please call 763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats may include large print, electronic, Braille, audiocassette, etc. Joint Water Commission June 1, 2022 Page 1 of 2 JOINT WATER COMMISSION MINUTES Golden Valley - Crystal - New Hope Meeting of June 1, 2022 The Golden Valley - Crystal - New Hope Joint Water Commission (JWC) meeting was called to order at 1:30 pm. Roll Call Present Anne Norris, City Manager, Crystal Kirk McDonald, City Manager, New Hope Tim Cruikshank, City Manager, Golden Valley Staff Present Tim Hoyt, Police Chief, New Hope Joe Hansen, Utilities Superintendent, Golden Valley Dave Lemke, Operations Manager, New Hope Matt Rowedder, Utilities Maintenance Supervisor, New Hope Patrick Sele, Utilities Supervisor, Crystal Tim Kieffer, Public Works Director, Golden Valley Sue Virnig, Finance Director, Golden Valley Bernie Weber, Public Works Director, New Hope Derek Goddard, Water Distribution Specialist, Golden Valley Mark Ray, Director of Public Works/City Engineer, Crystal R.J. Kakach, Assistant City Engineer, Golden Valley Carrie Nelson, Engineering Assistant, City of Golden Valley Approval of Minutes — May 4, 2022 Moved by Cruikshank and seconded by McDonald to approve the minutes of the May 4, 2022 Joint WaterCommission (JWC) Meeting. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion carried. rove 2023-2032 CIP — Resolution 22-03 Moved by McDonald and seconded by Cruikshank to approve the 2023-2032 CIP — Resolution 22-03. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion carried. Joint Water Commission June 1, 2022 Page 2 of 2 Approve 2023 Budget — Resolution 22-04 Moved by McDonald and seconded by Cruikshank to approve the 2023 Budget — Resolution 22- 04. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion carried. Appoint Tim Hoyt to the JWC Board Moved by Cruikshank and seconded by McDonald to appoint Tim Hoyt as New Hope's representative on the Golden Valley/Crystal/New Hope Joint Water Commission. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion carried. Appoint Chairperson, Vice Chair, and Secretary/Treasurer for the remainder of 2022 Moved by McDonald and seconded by Cruikshank to appoint Anne Norris as Chair, Tim Cruikshank as Vice Chair, and Tim Hoyt as Secretary/Treasurer for the remainder of 2022. Upon a roll call vote the following voted in favor: Norris, McDonald, and Cruikshank. The following voted against: None. Motion carried. Other Business The next Joint Water Commission meeting is scheduled for July 6, 2022 Adjournment Moved by McDonald seconded by Cruikshank to adjourn meeting. Motion carried. Chair Norris adjourned the meeting at 1:50 pm. ATTEST: Carrie Nelson, Recording Secretary Chair Anne Norris Memorandum DATE: August 19, 2022 TO: Joint Water Commission FROM: Mark Ray, PE, Crystal Director of Public Works Pat Sele, Crystal Utilities Superintendent SUBJECT: Crystal Pump House camera installation As part of security improvements at the pump houses Crystal staff obtained a quote to install cameras at the Crystal Pump House. The quote was obtained from the vendor the City currently uses for other facilities so that everything will be on the same system. In all, 6 cameras are proposed to be installed at the pump house covering the doors, control room, and outside hatches. Project cost Computer Integration Technologies, Inc. quote for $16,843 Project funding This project will be funded using the SCADA updates (70-18) project which has $190,102.41 balance remaining. The reason for not using the Security Upgrades project is due to that funding being saved for the fiber installation to the Golden Valley Pump House. Recommended action Motion approving the agreement with Computer Integration Technologies, Inc \\Files\goldval$\Joint Water Commission\JWC Agendas\2022 JWC Agenda\9 - September\3 - JWC Camera Install at Pump House 8.19.22.docx Joint Water Commission TAC Memo -f September 7, 2022 l 1 Agenda Item #5 Authorize the contract with LOGIS to provide the North/South fiber run from Golden Valley Road to the Skyline Pumphouse. Prepared by Joint Water Commission Technical Advisory Committee Summary The 2022 CIP includes funds to install new fiber to the Golden Valley Pump House. To keep costs down, Golden Valley Utilities is working on a joint venture with Hennepin County to run fiber from LOGIS to the intersection of Golden Valley Road and Hidden Lakes Parkway, price to be determined later. This quote is for the solo JWC portion of the run from the above intersection to the pumphouse. Financial Considerations The funds from the 2022 CIP #14-037 Security for All Towers and Pump Stations (Fiber), which includes $150,000 in 2022, will be used for this project. Recommended Actions Motion to authorize the LOGIS contract for the first half of the fiber installation to the Golden Valley Pump House in the amount of $ 79,794.00 Supporting Documents • Quote from LOGIS L El I 'LOCAL OLIVERNMENT INFORMATION SYSTEMS 5750 Duluth Street, Golden Valley, MN 55422-4063 Main:763.543.2600 i Service: 763.543.2662 Project Number 270501 Project Name* (') GV-Pump House 1500 Skyline Dr to LO - new build Name* Joe Hansen Email* JHansen@goldenvalleymn.gov Member* Golden Valley Member Type Members Other Budget Revision Are There Other Members/External Parties Involved In The Project Yes No Reason For Cost Revision* Route Change Initial Cost Labor $ 174,262.50 Materials $ 37,974.00 Cost Estimate Total $ 212,236.50 Estimated Annual Locates $ 1,765.50 Revised Cost Revised Labor $ 61,825.00 Revised Materials $ 17,969.00 Revised Cost Estimate Total $ 79,794.00 Revised Estimated Annual Locates $ 561.00 Attachment 270501 Route MapREV1.pdf 195.51 KB Joint Water Commission TAC Meeting l f Thursday, August 25, 2022 9:00 AM 1 1. Towers — New Hope • MLR Tower— plan for 2023, NH has reached out to KLM, start design, get updated cost estimates, 2024 construction. Antenna work going at tower. 2. Pumps • Pump #4 at GV reservoir is original and needs to be replaced. Will include VFD • Pump #3 at Crystal is original and needs to be replaced. • Bolton and Menk designing project. • GV replacing valves and actuators between pump and manifold tee. 1. Purchase parts with battery backup, approximately $60,000 of work — has been approved and ordered 2. Parts will be installed by GV Utilities (and Crystal and NH?) crews (currently 24- 26 week lead time on parts). • GV pump #5 is out of service, pump #4 needs replacement, GV working off of two pumps — waiting on actuators from Vessco. Crystal will need to pump while GV replaces valves. 1. Need to fix both GV pumps before valve work at Crystal reservoir and NH Tower. A. Valves Fall/Winter work • GV pumps 2&3 only two in service until repairs and replacement of pump #4 is complete. • GV will inspect motors and electrical annually once pump #4 is replaced. 3. Valves • Crystal — valve replacement around pump house was moved to spring of 2022 to finalize scope of work and logistics. NEED TO MOVE START DATE BACK UNTIL GV PUMP HOUSE HAS 4 OPERATIONAL PUMPS — SEE NOTE ABOVE (most likely Spring 2023 — parts are all on hand ready to install) • Meter update at same time as valve replacement in Crystal (—$40,000) • Golden Valley — St. Croix valve work — add a new valve in 2022. Work to start in Mayor June. DONE o Replacement adapters ordered in April — 3-4 month lead time. • Olympia and Louisiana — bad gear box, need to evaluate scope of repair. • Valve replacement will be based on the following criteria: o General idea is start at pumphouses/reservoirs and work out from there. o Can slide in other failed valves as we become aware of them. \\Files\goldval$\Joint Water Commission\JWC Agendas\2022 JWC Agenda\9 - September%- JWC TAC Meeting Minutes_8.25.22.docx o Can also prioritize valves that are part of street improvement projects. o Will update list next TAC meeting now that St. Croix Valve is complete. 4. SCADA a. Recommend approving quote to add 6 cameras to Crystal pump house, will use remaining SCADA funds. 5. Miscellaneous A. Medicine Lake Tower Parts Storage — Parts received, Smartsheet created, need to organize. • Create column in Smartsheet for Replacement Parts Ordered and fill with date ordered. • Temp part storage during tower rehab in 2023? North Tower? B. Fiber - TAC agreed running fiber to all facilities is a long-term goal. o Existing Fiber - both emergency wells in Crystal, GV Tower, North Tower, and Crystal reservoir. o Proposed Fiber — GV Pumphouse (2023) —Joint project with Hennepin County in 2023 or 2024 to get to GV Pump house, recommend approving $80K project with LOGIS to get fiber from pump house to GV Rd. Will then approve another portion with Hennepin County along GV Rd in late 2022/early 2023. Project will be well under $200K budget. C. Golden Valley Tower Verizon Agreement Amendment • DONE D. TH 55/Douglas WM Relocation • Project to start in 2023. E. Effluent Meter Pit • Exploration work on top of existing pit will be postponed until time allows. F. Mpls Agreement Renewal 2024 G. CIP — working on 2023 — 2032 CIP H. Altitude Valve Repalcement at MLR Tower • To be included with recoating in 2024 (similar to what was done with GV tower last year) \\Files\goldval$\Joint Water Commission\JWC Agendas\2022 JWC Agenda\9 - September%- JWC TAC Meeting Minutes_8.25.22.docx